0001 Attachment 2a Combined Drawings Construct Addition and Renovated Bldg 60.pdf
PDF 21 MB Posted
- Attached to
- Y1DA--589-703 Construct Addition and Renovate Community Living Center, Building 60 (VA-24-00028736)
- Solicitation number
- 36C77624B0019
About this file
This document appears to be Attachment 2a, which contains combined drawings for the construction of an addition and renovation of Building 60 under Solicitation Number 36C77624B0019. The related federal contract opportunity is for the "Construct Addition and Renovate Community Living Center, Building 60 (VA-24-00028736)" and is being issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The Statement of Work for this project is provided in Attachment 1. No further details about required products or services, response dates, award dates, pricing terms, set asides, or incumbents are included in this particular document.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing #
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. A-930 EXP. 12/31/2023
ENGR REG. NO. E-2586 EXP. 12/31/2023
STRUCTURAL/CIVIL
ENGINEER
H2B
1225 N. LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH
ENGINEER
SPUR DESIGN
11020 KING STREET, STE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
LANDSCAPE ARCHITECT
CLS & ASSOCIATES
825 N. BROADWAY AVE, STE 315
OKLAHOMA, OK 73102
(405) 525-2220
HEALTHCARE/MED
EQUIPMENT PLANNER
INNOVA GROUP
3196 N. SWAN ROAD
TUCSON, AZ 85712
(520) 886-8650
PHYSICAL SECURITY
FORCE PROTECT SECURITY
CONSULTANTS,
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
FOOD & BEVERAGE
PLANNER
STURM CONSULTING
5838 S. HUDSON PLACE
TULSA, OK 74135
(918) 260-0667
ENVIRONMENTAL
ENGINEER
RIVERFRONT ENVIRONMENTAL
1139 OLIVE STREET, STE 300
ST. LOUIS, MO 63101
(314) 436-9492
SPUR #: 2015
/5
/2
:3
:4
A
M
COVER SHEET
NR 001 OF 229DLK
BID DOCUMENTS
ADDITION AND RENOVATION OF CLC
VA PROJECT NUMBER: 589-703
ADDITION AND RENOVATION
OF CLC
09/06/2023
589-703
ROBERT J. DOLE VA MEDICAL CENTER
5500 EAST KELLOGG, BLDG. 60
WICHITA, KS 67218
ROBERT J. DOLE VA MEDICAL CENTER
5500 EAST KELLOGG, BLDG. 60
WICHITA, KS 67218
BID DOCUMENTS
G-000
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
001 G-000 COVER SHEET
002 GI001 GENERAL INFORMATION
003 GI011 PHASING PLANS
004 GI012 PHASING PLANS
005 GI013 OCCUPANCY PLAN - AREA A
006 GI014 OCCUPANCY PLAN - AREA B
007 GI015 INTERIM LIFE SAFETY PLAN
008 GI016 LIFE SAFETY PLAN - AREA A
009 GI017 LIFE SAFETY PLAN - AREA B
010 GI018 RECESS SLAB FLOOR PLAN
[02] LANDSCAPE
011 LS-01 HARDSCAPE PLAN
012 LS-02 HARDSCAPE DETAILS
013 LS-03 HARDSCAPE DETAILS
014 LP-01 LANDSCAPE PLAN
015 LP-02 LANDSCAPE DETAILS
016 LI-01 IRRIGATION PLAN
017 LI-02 IRRIGATION DETAILS
[03] CIVIL
018 CS000 TOPOGRAPHIC SURVEY
019 CS100 OVERALL LAYOUT
020 CS101 SITE LAYOUT
021 CS102 DEMOLITION LAYOUT
022 CS103 ENLARGED SITE LAYOUT (1 OF 2)
023 CS104 ENLARGED SITE LAYOUT (2 OF 2)
024 CS105 ENLARGED GRADING LAYOUT (1 OF 2)
025 CS106 ENLARGED GRADING LAYOUT (2 OF 2)
026 CS107 DRAINAGE AREA MAP LAYOUT
027 CS108 DRAINAGE AREA MAP CALCULATIONS
028 CS109 UTILITY LAYOUT
029 CS110 STORM WATER POLLUTION PREVENTION PLAN
030 CS111 PLAN AND PROFILE (1 OF 2)
031 CS112 PLAN AND PROFILE (2 OF 2)
032 CS200 PAVEMENT AND DRAINAGE DETAILS
033 CS201 SANITARY SEWER DETAILS
034 CS202 WATER LINE DETIALS
035 CS203 SWPPP DETAILS
036 CS204 MISCELLANEOUS DETAILS
[04] STRUCTURAL
037 SA001 STRUCTURAL GENERAL NOTES
038 SA002 STRUCTURAL GENERAL NOTES
039 SA010 STRUCTURAL SPECIAL INSPECTIONS
040 SA011 STRUCTURAL SPECIAL INSPECTIONS
041 SA030 TYPICAL DETAILS - CONCRETE
042 SA031 TYPICAL DETAILS - CONCRETE
043 SA050 TYPICAL DETAILS - STEEL
044 SA051 TYPICAL DETAILS - STEEL
045 SD101 STRUCTURAL DEMOLITION SITE PLAN
046 SD102 STRUCTURAL DEMOLITION FRAMING PLAN
047 SB100 OVERALL PLAN
048 SB101 FOUNDATION PLAN
049 SB102 PARTIAL EXISTING FOUNDATION PLAN
050 SB401 ENLARGED PLANS
051 SB501 FOUNDATION DETAILS
052 SB502 FOUNDATION DETAILS
053 SF101 ROOF FRAMING PLAN
054 SF102 PARTIAL EXISTING ROOF FRAMING PLAN
055 SF103 PENTHOUSE - ROOF FRAMING PLAN
056 SF501 FLOOR FRAMING DETAILS
057 SF504 ROOF FRAMING DETAILS
058 SF505 STRUCTURAL FRAMING DETAILS
059 SF506 STRUCTURAL FRAMING DETAILS
[05] ENVIRONMENTAL
060 HA001 ENVIRONMENTAL GENERAL NOTES
061 HA100 ENVIRONMENTAL HAZARDS - GROUND FLOOR
062 HA200 ENVIRONMENTAL HAZARDS - ROOF
[06] ARCHITECTURAL
063 AS001 ARCHITECTURAL DEMOLITION SITE PLAN
064 AS010 ARCHITECTURAL NEW SITE PLAN
065 AD010 DEMOLITION PLAN
066 AD011 DEMOLITION PLAN
067 AD102 DEMOLITION REFLECTED CEILING PLAN
068 AE021 PARTITION TYPES AND DETAILS
069 AE101 OVERALL FLOOR PLAN
070 AE111 REFERENCE PLAN - AREA A
071 AE112 REFERENCE PLAN - AREA B
072 AE113 DIMENSION PLAN - AREA A
073 AE114 DIMENSION PLAN - AREA B
074 AE120 ROOF PLAN
075 AE121 PENTHOUSE PLANS
076 AC131 REFLECTED CEILING PLAN - AREA A
DEDUCT ALTERNATES
N
AREA
PLAN
LOCATION
PLAN
N
PROJECT LOCATION
BUILDING 60
1. REMOVE CASEWORK IN RESIDENT ROOMS (#119, #121, #122, #134, #135, #136, #137, #138, #139, #140, #141, #142, #143, #145, #146, #151, #152, #153, #155, #156, #157, #158, #159, #160, #161, #162, #163, #164, #173 & #175).
2. REMOVE CASEWORK AND FINAL FINISHES IN THE FOLLOWING SPACES: #130 - CONFRENCE ROOM, # 128 - ART ROOM, #144 DEN, #132 MULTIPURPOSE ROOM, AND #132A - MULTIPURPOSE ROOM STORAGE.
REMOVE CASEWORK AT THE NURSING STATION (#123 & #167) AND PANTRY KITCHENS (#133 & #166).
3. REMOVE SECURITY GATE AT THE BACK OF THE BUILDING. THIS IS LOCATED NORTH OF THE NEW
BUILDING EXPANSION. THIS ALSO INCLUDES THE SENSOR, NEW CONCRETE, AND CURBS.
4. REMOVE MEDICAL GAS AND VACUUM FROM DESIGN.
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
077 AC132 REFLECTED CEILING PLAN - AREA B
078 AC133 ENLARGED REFLECTED CEILING PLANS - AREA A
079 AC134 ENLARGED REFLECTED CEILING PLANS - AREA B
080 AE201 BUILDING ELEVATIONS
081 AE202 BUILDING ELEVATIONS
082 AE203 BUILDING ELEVATIONS
083 AE301 BUILDING SECTIONS
084 AE302 BUILDING SECTIONS
085 AE303 BUILDING SECTIONS
086 AE311 WALL SECTIONS
087 AE312 WALL SECTIONS
088 AE313 WALL SECTIONS
089 AE401 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
090 AE402 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
091 AE403 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
092 AE404 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
093 AE405 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
094 AE406 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA A
095 AE407 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
096 AE408 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
097 AE409 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
098 AE410 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
099 AE411 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
100 AE412 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
101 AE413 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
102 AE414 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
103 AE415 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
104 AE416 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
105 AE417 INTERIOR ELEVATIONS & ENLARGED PLANS - AREA B
106 AE421 SECTION DETAILS
107 AE451 PLAN DETAILS
108 AE452 PLAN DETAILS
109 AE453 PLAN DETAILS
110 AE454 PLAN DETAILS
111 AE501 CEILING DETAILS
112 AE601 DOOR AND WINDOW SCHEDULES
113 AE610 DOOR AND WINDOW DETAILS
114 AE611 DOOR AND WINDOW DETAILS
115 AF701 FINISH FLOOR PLANS - AREA A
116 AF702 FINISH FLOOR PLANS - AREA B
117 AF711 FINISH SCHEDULE AND FINISH LEGEND
118 AF712 INTERIOR DETAILS
119 AF901 MILLWORK DETAILS
120 AF902 MILLWORK DETAILS
121 AI722 3D INTERIOR VIEWS
122 AQ801 EQUIPMENT PLAN - AREA A
123 AQ802 EQUIPMENT PLAN - AREA B
124 AW950 SIGNAGE PLAN - AREA A
125 AW951 SIGNAGE PLAN - AREA B
[07] FIRE PROTECTION
126 FA001 FIRE ALARM GENERAL NOTES, LEGEND, AND DIAGRAMS
127 FA101 FIRE ALARM AUDIBILITY GROUND FLOOR PLAN
128 FA102 FIRE ALARM PLAN - AREA A
129 FA103 FIRE ALARM PLAN - AREA B
130 FX101 FIRE SUPPRESSION HAZARD CLASSIFICATION GROUND FLOOR
[08] PLUMBING
131 P-000 PLUMBING LEGEND
132 PD101 PLUMBING WASTE DEMOLITION PLAN
133 PD102 PLUMBING SUPPLY DEMOLITION PLAN
134 PD103 PLUMBING MEDICAL GAS DEMOLITION PLAN
135 PD104 PENTHOUSE PLUMBING DEMOLITION PLAN
136 PP101 PLUMBING SUPPLY PLAN - AREA A
137 PP102 PLUMBING SUPPLY PLAN - AREA B
138 PP401 PLUMBING SUPPLY ENLARGED PLANS
139 PL101 PLUMBING WASTE UNDERGROUND PLAN - AREA A
140 PL102 PLUMBING WASTE UNDERGROUND PLAN - AREA B
141 PL103 PLUMBING WASTE PLAN - AREA A
142 PL104 PLUMBING WASTE PLAN - AREA B
143 PL105 PLUMBING ROOF PLAN - AREA A
144 PL106 PLUMBING ROOF PLAN - AREA B
145 PG101 PLUMBING MEDICAL GAS PLAN - AREA A
146 PG102 PLUMBING MEDICAL GAS PLAN - AREA B
147 PS201 NATURAL GAS CONNECTION PLAN
148 PS202 NATURAL GAS ENLARGED PLANS
149 P-301 PLUMBING RISER SUPPLY DIAGRAM
150 P-302 DRAIN WASTE VENT RISER - AREA A
151 P-303 DRAIN WASTE VENT RISER - AREA B
152 P-304 MEDICAL GAS RISER
153 P-401 PLUMBING PENTHOUSE PLAN
154 P-501 PLUMBING DETAILS
155 P-502 PLUMBING DETAILS
156 P-601 PLUMBING SCHEDULES
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[09] MECHANICAL
157 M-000 LEGEND AND ABBREVIATIONS
158 MT101 MECHANICAL TEMPORARY PLAN
159 MD101 MECHANICAL HVAC DEMOLITION PLAN
160 MD102 MECHANICAL PIPING DEMOLITION PLAN
161 MD103 MECHANICAL ROOF DEMOLITION PLAN
162 MD104 MECHANCIAL PENTHOUSE DEMOLITION PLAN
163 MH101 MECHANICAL HVAC DUCT PLAN - AREA A
164 MH102 MECHANICAL HVAC DUCT PLAN - AREA B
165 MH103 MECHANICAL ROOF PLAN
166 MH131 MECHANICAL HVAC AIRFLOW PLAN - AREA A
167 MH132 MECHANICAL HVAC AIRFLOW PLAN - AREA B
168 MP101 MECHANICAL HVAC PIPING PLAN - AREA A
169 MP102 MECHANICAL HVAC PIPING PLAN - AREA B
170 M-201 MECHANICAL FLOW DIAGRAMS
171 M-301 MECHANICAL SECTIONS
172 M-401 MECHANICAL PENTHOUSE ENLARGED PLANS
173 M-402 MECHANICAL UTILITY YARD PLAN
174 M-501 MECHANICAL DETAILS
175 M-502 MECHANICAL DETAILS
176 M-503 MECHANICAL DETAILS
177 M-504 MECHANICAL DETAILS
178 M-601 MECHANICAL SCHEDULES
179 M-602 MECHANICAL SCHEDULES
180 M-701 MECHANICAL CONTROLS
181 M-702 MECHANICAL CONTROLS
182 M-703 MECHANICAL CONTROLS
183 M-704 MECHANICAL CONTROLS
184 M-705 MECHANICAL CONTROLS
[10] ELECTRICAL
185 E-001 ELECTRICAL SYMBOLS & ABBREVIATIONS
186 ES101 ELECTRICAL OVERALL SITE PLAN
187 ES102 ELECTRICAL PARTIAL SITE PLANS
188 ED101 ELECTRICAL POWER DEMOLITION PLAN
189 ED102 ELECTRICAL LIGHTING DEMOLITION PLAN
190 ED103 ELECTRICAL ROOF DEMOLITION PLAN
191 EP101 ELECTRICAL POWER PLAN - AREA A
192 EP102 ELECTRICAL POWER PLAN - AREA B
193 EL201 ELECTRICAL LIGHTING PLAN - AREA A
194 EL202 ELECTRICAL LIGHTING PLAN - AREA B
195 EQ101 MECHANICAL COORDINATION POWER PLAN - AREA A
196 EQ102 MECHANICAL COORDINATION POWER PLAN - AREA B
197 EQ103 MECHANICAL COORDINATION POWER PLAN - ROOF
198 EQ104 ELECTRICAL LIGHTING PROTECTION PLAN
199 EP401 ELECTRICA UTILITY YARD AND ELECTRICAL ROOM PLANS
200 E-501 ELECTRICAL AND LIGHTING PROTECTION SYSTEM DETAILS
201 E-502 ELECTRICAL DETAILS
202 E-503 LIGHTING DETAILS
203 E-601 ELECTRICAL ONE-LINE DIAGRAM - DEMOLITION
204 E-602 ELECTRICALONE-LINE DIAGRAM - NEW WORK
205 E-603 ELECTRICAL PANEL SCHEDULES - EXISTING
206 E-604 ELECTRICAL PANEL SCHEDULES - NEW WORK
207 E-605 ELECTRICAL PANEL SCHEDULES - NEW WORK
208 E-606 LIGHTING SCHEDULES
[11] TECHNOLOGY
209 T-000 TECHNOLOGY SYMBOLS & ABBREVIATIONS
210 TS101 TECHNOLOGY SITE PLAN
211 TS102 TECHNOLOGY SITE FIBER ROUTING PLAN
212 TD101 TECHNOLOGY DEMOLITION PLAN
213 TN201 TECHNOLOGY TELECOMMUNICATIONS PLAN - AREA A
214 TN202 TECHNOLOGY TELECOMMUNICATIONS PLAN - AREA B
215 TY301 TECHNOLOGY SECURITY PLAN - AREA A
216 TY302 TECHNOLOGY SECURITY PLAN - AREA B
217 T-401 TECHNOLOGY DETAILS
218 T-402 TECHNOLOGY DETAILS
219 T-501 TECHNOLOGY RISER DIAGRAMS
[12] FOOD SERVICE
220 FS1.1 FOOD SERVICE EQUIPMENT ARRANGEMENT PLAN
221 FS1.2 FOOD SERVICE EQUIPMENT ELEVATIONS
222 FS2.1 FOOD SERVICE EQUIPMENT SPECIAL CONDITIONS PLAN
223 FS3.1 FOOD SERVICE EQUIPMENT PLUMBING CONNECTIONS PLAN
224 FS4.1 FOOD SERVICE EQUIPMENT ELECTRICAL CONNECTIONS PLAN
225 FS5.1 FOOD SERVICE EQUIPMENT VENTILATOR PLAN
226 FS5.2 FOOD SERVICE EQUIPMENT VENTILATOR PLAN
227 FS5.3 FOOD SERVICE EQUIPMENT VENTILATOR PLAN
228 FS5.4 FOOD SERVICE EQUIPMENT VENTILATOR PLAN
229 FS6.1 FOOD SERVICE EQUIPMENT SNEEZE GUARD PLAN
TOTAL SHEETS: 229
No. REVISION DESCRIPTION DATE
CODES STANDARDS AND EXECUTIVE ORDERS
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: WICHITA, KS
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (TABLE 5.5-4):
ROOFS: REQUIRED: DESIGNED:
INSULATION ABOVE DECK R-30 c.i. R-30 METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls N/A
ATTIC AND OTHER: R-49 N/A
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. N/A METAL BUILDING: R-0 + R-15.8 c.i. N/A STEEL-FRAMED: R-13 + R-7.5 c.i. R24.52 WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 N/A
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. N/A
FLOORS
MASS: R-14.6 c.i. N/A
STEEL-FRAMED: R-30 N/A
WOOD-FRAMED AND OTHER: R-30 N/A
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 FOR 24 in. R-15 HEATED SLABS: R-20 for 24 in. N/A
OPAQUE DOORS
SWINGING: U-0.370 U-X.XX
NON-SWINGING: U-0.310 U-X.XX
FENESTRATION (TABLE 5.5-4)
VERTICAL FENESTRATION, U-FACTOR
NON-METAL FRAMING (ALL): U-0.31 U-X.XX
METAL FRAMING, FIXED: U-0.36 U-X.XX
METAL FRAMING, OPERABLE: U-0.45 U-X.XX
METAL FRAMING, ENTRANCE DOOR: U-0.63 U-X.XX
SKYLIGHT, 0% TO 3% OF ROOF, U-FACTOR
ALL TYPES: U-0.50 U-X.XX
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL
CONFIRM ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE
ENTIRE DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY
WORK, TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY
DISCREPANCIES TO THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY
ALL DIMENSIONS AND EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND
REPAIR ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED
OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE
OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE
AND OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS,
BUT DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL
DRAWINGS. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE
OTHER SHEETS AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION
DOCUMENTS THAT REFLECT WORK REQUIRED TO ACHIEVE A COMPLETE AND
OPERATIONAL GOAL. LACK OF COORDINATION AND REVIEW OF DRAWINGS AND
SPECIFICATIONS AS AN ENTIRE DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL
SYSTEMS, BEING OBVIOUS AND TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE
DRAWINGS AND SPECIFICATIONS, SHALL NOT BE IN ANY WAY AN ADDITIONAL COST TO
THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH
SERVICES TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN
ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE,
EXACT TIME OF, AND APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR
INTERRUPTIONS OF ANY SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60
CALENDAR DAYS PRIOR TO THE DESIRED TIME AND SHALL BE PERFORMED AS
DIRECTED BY THE COR. MAJOR INTERRUPTIONS SHALL BE COORDINATED WITH OTHER
MAJOR INTERRUPTIONS AND MAY NOT BE SCHEDULED FOR ONE DISCIPLINE MORE
THAN TWICE THROUGHOUT THE OVERALL CONSTRUCTION SCHEDULE UNLESS
REQUESTED IN WRITING AND APPROVED BY THE COR. CONTRACTOR WILL BE ADVISED,
IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH OTHER DATE AND/OR TIME
SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE TO OPERATIONS OF
THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE MEDICAL CENTER MAY
OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING HOURS. SCHEDULE
INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT BE AN
ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT MAY
AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR
DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING
BUILDING MATERIALS (ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE
DESIGNED/SPECIFIED AS BUILDING MATERIAL IN ANY OF THE CONSTRUCTION
DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION
GENERAL NOTES
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
ABBREVIATIONS
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALK BOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CP/CI CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CAROET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPXOY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HMD HOLLOW METAL DOOR PAINT
HMDF HOLLOW METAL DOOR FRAME
PAINT
HMWF HOLLOW METAL WINDOW FRAME
PAINT
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
HW HARDWARE
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
OTS OPEN TO STRUCTURE
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
R
RAF RESILIENT ATHLETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL FACED ACOUSTICAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
4' -0
M
A X
4' -0
M
A X
2' -1
0" M
A X
2' -3
M
IN
1'-6" MIN
1. GENERAL CONTRACTOR TO PROVIDE METAL SUPPORT
BLOCKING FOR ALL WALL MOUNTED ACCESSORIES,
FIXTURES, AND EQUIPMENT.
2. PROVIDE ADA SUPPORT BRACKETS PLACED AT ALL OPEN
COUNTERTOPS @ 36"-48" MAX ON CENTER.
3. SPECIFIED MAXIMUMS ARE MEASURED FROM AFTER
FINISHED FLOOR TO THE OPERABLE PART OF THE FIXTURE.
4. FIXTURES SHOWN ARE REPRESENTATIONAL ONLY. NOT ALL
FIXTURES MAY BE USED. REFER TO SPECIFICATIONS FOR
FIXTURE TYPES USED IN THIS PROJECT.
5. FIXTURES MAY OVERLAP WAINSCOT. WHERE APPLICABLE,
BACKING TO BE PROVIDED AS SHIM FOR FLUSH
APPLICATION. SHIM TO MATCH SCHEDULED WALL FINISH.
6" MAX
9" M
IN
SHOWER
TOILET ROOM
TURNING RADIUS
DRINKING
FOUNTAIN
PAPER TOWEL
DISPENSER
SANITARY
NAPKIN
DISPENSER
4' -0
"M A
X
WASTE
RECEPTACLE
LAVATORY
WITH MIRROR
ON CENTER
WALL
4' -0
M
A X
SOAP
DISPENSER
2' -1
0" M
A X
T O
B .O
. R E
F
LE
C T
IV
E
S U
R F
A C
E
3' -4
"M A
X
17 MIN
2' -3
M
IN
3' -0
M
A X
1'-6" MIN
WALL
2' -9
3' -0
M A
X
4' -0
2'-0" MIN
8" MIN
WALL
LAVATORY
WITH APRON
1' -5
M
A X
1'-6" MIN
URINAL
WALL
1'-5" - 1'-7" (AMBULATORY)
1'-4" - 1'-6" (WHEELCHAIR)
CLEAR FLOOR
5'-6"
CLEAR FLOOR
6'-0"
3'-0" MIN
2' -9
3' -0
1'-0" MIN
3'-6" MIN 1'-0"MAX
4'-6" MIN
1' -5
'-7
1' -6
M
IN
A N
S I I
C C
A
7.
1)
1' -3
M
IN
A D
A /A
B A
2' -9
'-0
WALL
WALL
4' -0
M
A X
WALL HOOK
7' -0
CLOCK
WALL
FINISHED FLOOR
FIRE EXTINGUISHER
CABINET
WEIGHT > 40LBS
FIRE EXTINGUISHER
CABINET
WEIGHT < 40LBS
4' -0
"M A
X
4' -0
M
A X
TOILET SEAT
COVER
DISPENSER
BABY
CHANGING
STATION
CLEAR FLOOR SPACE
@ WATER CLOSET
5'-6"
2'-6"
4' -0
2'-6"
4' -0
HANDRAILS AND
BUMPERGUARDS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES
18" MIN
M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
M
IN
FRONT APPROACH,
PUSH SIDE
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN
*4 8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
M
IN
42" MIN
DOOR AND FIXTURE CLEARANCES
N
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
ROOM NAME
150 SF
000A
ROOM NAME
000A
/1 A101
X0000
6"
3' -0
M
A X
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
6'- 0"
5'- 6"
BARIATRIC TOILET ROOM
TURNING RADIUS
CLEAR FLOOR SPACE
@ ADA LAVATORY
CLEAR FLOOR SPACE @ ADA
DRINKING FOUNTAIN
4"
6"
3"
6"
1' -6
6" MAX
7" - 9" 11" MIN
17" - 25"
M
IN
6' -0
(ANSI ICC A117.1)
39"- 41"
(A N
S I I
C C
A
7.
1)
M
IN
(A N
S I I
C C
A
7.
1)
1"
3' -6
M
A X
5' -0
M
A X
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS
SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• NATIONAL FIRE CODES (NFC) PUBLISHED BY THE NATIONAL FIRE PROTECTION ASSIATION (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS
• 2020 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2021 VA PHYSICAL SECURITY & RESILIENCY DESIGN MANUAL
• 2020 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2016 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2015 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2017 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• 2019 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2019 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2019 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
STANDARD ROLL-IN TYPE
SHOWER COMPARTMENT
SIZE AND CLEARANCE
NOTE: INSIDE FINISHED
DIMENSIONS MEASURED
AT THE CENTER POINTS
OF OPPOSING SIDES
BACK
WALLSIDE
WALL
SIDE
WALL
60 MIN
M
IN
M
IN
PROJECT SUMMARY
THE SCOPE OF THE PROEJECT ENTAILS BUILDING AN EXPANSION ADDITION TO THE EXISTING BUILDING 60 AS WELL AS RENOVATING PORTIONS OF THE CURRENT BUILDING. TWO NEW ENTRY VESTIBULES WILL BE CONSTRUCTED INTO THE EXISTING BUIILDING. EXTERIOR MODIFICATIONS INCLUDE LANDSCAPING, HARDSCAPE AREAS, AND NEW INFASTRUCTURE FOR THE ADDITION.
MATERIALS LEGEND
7' -0 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. A-930 EXP. 12/31/2023
ENGR REG. NO. E-2586 EXP. 12/31/2023
STRUCTURAL/CIVIL
ENGINEER
H2B
1225 N. LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH
ENGINEER
SPUR DESIGN
11020 KING STREET, STE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
LANDSCAPE ARCHITECT
CLS & ASSOCIATES
825 N. BROADWAY AVE, STE 315
OKLAHOMA, OK 73102
(405) 525-2220
HEALTHCARE/MED
EQUIPMENT PLANNER
INNOVA GROUP
3196 N. SWAN ROAD
TUCSON, AZ 85712
(520) 886-8650
PHYSICAL SECURITY
FORCE PROTECT SECURITY
CONSULTANTS,
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
FOOD & BEVERAGE
PLANNER
STURM CONSULTING
5838 S. HUDSON PLACE
TULSA, OK 74135
(918) 260-0667
ENVIRONMENTAL
ENGINEER
RIVERFRONT ENVIRONMENTAL
1139 OLIVE STREET, STE 300
ST. LOUIS, MO 63101
(314) 436-9492
SPUR #: 2015
/5
/2
:3
:4
A
M
GENERAL INFORMATION
NR 002 OF 221DLK
BID DOCUMENTS
ADDITION AND RENOVATION
OF CLC
09/06/2023
589-703
ROBERT J. DOLE VA MEDICAL CENTER
5500 EAST KELLOGG, BLDG. 60
WICHITA, KS 67218
GI001
FD
FD
FD
FD
FD
FD
FD
E12E11E10E9AE8A
ED
EE
EF
EG
E13E7
EF1
EH
P
EJ
EK
E6 E8 E9
EA
EB
E1 E2 E3
EC
E4 E5
PHASE 1
M
1B153
1B152
1B147A 1B147
1B145
1B144
1B151
1B149
1B120A
1B120
101B
1B100B
1B100A
1B100
1B101 1B103
1B103A
1B105 1B107 1B109 1B111 1B113 1B115
1B113A
1B109A1B105A
1B103B
1B106 1B108 1B110 1B112 1B114 1B116
1B114A1B110A1B108A
1B104 1B117
1B118
1B119
1B121
1B122
1B121A
1B143 1B123
1B150
1B150
108C
114A 108B
103A
109A
113A
108A
110E
110F
110D 110C
110B 110A
1B133
1B133A
1B134
1B135A
1B1351B1361B1371B138
1B137A 1B136A
1B130
1B131
1B131A
1B132
1B125
1B127
1B141
1B124
1B142
1B140
1B140A
E12E11E10E9AE8A
ED
EE
EF
EG
E13
EF1
EH
P
EJ
EK
E6 E8 E9
EA
EB
E1 E2 E3
EC
E4 E5
F
D
A
876543
K
I
H
J
5.521
C
96.5
B
E
2.5 3.5
N
G
C.3PHASE 2VESTIBULE
006A
IT ROOM
116ELECTRICAL
FIRE RISER RM
115A
BATHING RM
117 TOILET
117A
HOUSE OFC
KITCHEN
DINING
133B
LIVING ROOM
133ART OFC
MED
HOUSE STOR.
HOUSE LNDRY
ART ROOM
MP STOR
132A
MULTIPURPOSE/
ACTIVITY ROOM
132TLT
CONF. / PRIVATE
DINING
EXTERIOR
COURTYARD
EXTERIOR
COURTYARD
RESIDENT
RESIDENT
STAFF LOUNGE
TLT
BATH
151A
BATH
152A
CORRIDOR
CORRIDOR
VESTIBULE
008A
RESIDENT
146BATH
146A
RESIDENT
DEN
BATH
145A
EQ. STOR
RESIDENT
RESIDENT
BATH
138A
BATH
141A
BATH
137A
RESIDENT
RESIDENT
BATH
143A
RESIDENT
BATH
142A
BATH
140A
RESIDENT
RESIDENT
BATH
139A
BATH
136A
RESIDENT
RESIDENT
BATH
135A
BATH
134A
RESIDENT
RESIDENT
RESIDENT
RESIDENT,
BARIATRIC
BATH
121A
BATH
122A
HAC
SOILED UTL
CLEAN SUPPLY
120 PANTRY
133C
108C
114A 108B
103A
109A
113A
108A
110E
110F
110D 110C
110B 110A
0-LOBBY-A
1B153
1B152
1B147A 1B147
1B145
1B133
1B133A
1B134
1B135A
1B1351B1361B1371B138
1B137A 1B136A
1B130
1B131
1B131A
1B132
1B125
1B127
1B141
1B124
1B142
1B140
1B144
0-ENTRY
1B151
1B149
1B120A
1B120
0-WAITING
RECEPT.
101B
1B100B
1B105 1B107 1B109 1B111 1B113 1B115
1B113A
TLT
1B109ATLT
1B105A
1B103B
1B106 1B108 1B110 1B112 1B114 1B116
1B114A1B110A1B108A
1B104 1B117
1B118
1B119
1B121
1B122
1B121A
1B143 1B123
1B150
1B150
1B140A
101A
PHASING PLAN LEGEND
PHASE 1
PHASE 2
NOT IN SCOPE
PHASE 3
PHASE 4
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. A-930 EXP. 12/31/2023
ENGR REG. NO. E-2586 EXP. 12/31/2023
STRUCTURAL/CIVIL
ENGINEER
H2B
1225 N. LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH
ENGINEER
SPUR DESIGN
11020 KING STREET, STE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
LANDSCAPE ARCHITECT
CLS & ASSOCIATES
825 N. BROADWAY AVE, STE 315
OKLAHOMA, OK 73102
(405) 525-2220
HEALTHCARE/MED
EQUIPMENT PLANNER
INNOVA GROUP
3196 N. SWAN ROAD
TUCSON, AZ 85712
(520) 886-8650
PHYSICAL SECURITY
FORCE PROTECT SECURITY
CONSULTANTS,
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
FOOD & BEVERAGE
PLANNER
STURM CONSULTING
5838 S. HUDSON PLACE
TULSA, OK 74135
(918) 260-0667
ENVIRONMENTAL
ENGINEER
RIVERFRONT ENVIRONMENTAL
1139 OLIVE STREET, STE 300
ST. LOUIS, MO 63101
(314) 436-9492
SPUR #: 2015
/5
/2
:3
:0
A
M
PHASING PLANS
NR 003 OF 221DLK
BID DOCUMENTS
ADDITION AND RENOVATION
OF CLC
09/06/2023
589-703
ROBERT J. DOLE VA MEDICAL CENTER
5500 EAST KELLOGG, BLDG. 60
WICHITA, KS 67218
GI011
N
1/16" = 1'-0"
PHASE 1 - DEMO1
N
1/16" = 1'-0"
PHASE 2 - NEW CONSTRUCTION - AREA A2
PHASE DESCRIPTIONS & OVERVIEW PHASE 1 - DEMOLITION OF SITE WORK IN PREPARATION FOR THE NEW ADDITION
1. A CONSTRUCTION STAGING AREA WILL BE SET UP ADJACENT TO THE SITE ACROSS THE ROAD, PLAN EAST OF THE EXISTING BUILDING #60 FOOTPRINT. THERE IS AN EXISTING GRAVEL PARKING AREA THAT CAN BE USED FOR CONSTRUCTION STAGING.
2. THIS WILL INCLUDE THE DEMOLITION OF THE EXISING NORTH GARDEN AREA FOR THE CONSTRUCTION OF THE NEW ADDITION. ALL TREES, UTILITIES, STRUCTUES (WHICH INLCUDES THE EXISTING GAZEBO), AND SIDEWALKS ARE TO BE REMOVED.
3. THE EXISTING SMOKING PORCH ADJACENT TO THE EXISTING CAFETERIA ARE IN THE PT/OT AREA WILL BE DEMOLISHED. THE EXISTING BRICK, COLUMNS, WINDOWS, ROOF, AND STRUCTURE WILL BE REMOVED. THE CONTRACTOR WILL NEED TO PAY CLOSE ATTENTION IN KEEPING THE EXISTING INTERIOR WALLS AROUND THE SMOKING PORCH INTACT DURING THIS DEMOLITION, SINCE THESE WALLS AND ASSOCIATED ELEMENTS WILL BE SAVED. CONTRACTOR TO PREP ANY EXTERIOR SURFACES THAT ARE EXPOSED IN THEIS AREA AFTER
DEMOLITION TO BE WEATHER RESISTANT.
4. SOME ADDITIONAL DEMOLITION WILL NEED TO TAKE PLACE IN SOME OF THE EXISTING EAST WING SO AS TO REMOVE EXISTING UTILITIES AND BRING IN NEW UTILITIES. THE AREAS AFFECTED WILL NEED ICRA BARRIERS AND EXTERIOR BARRIERS TO PROTECT THE ADJACENT AREAS THAT NEED TO REMAIN FUNCTIONAL DURING CONSTRUCTION AND TO PROTECT STAFF AND THE PATIENTS.
PHASE 2 - NEW CONSTRUCTION OF CLC ADDITION.
1. ONCE THE DEMOLITION OF THE EXTERIOR AREA TO THE NORTH OF THE EXISTING EAST
WING AND SMOKING PORCH HAS BEEN COMPLETED THEN NEW CONSTRUCTION CAN
COMMENCE. NEW UTILITIES WILL BE INSTALLED AND NEW STRUCTURAL FOOTING,
GRADE BEAMS AND SLABS WILL BE PLACED. NEW STEEL COLUMNS AND BEAMS WILL
BE INSTALLED PRIOR TO ROOFING AND EXTERIOR ENVELOPE INSTALLATION.
2. ONCE THE BUILDING IS ENCLOSED THE INTERIOR STUD WALLS CAN PUT UP AND DOORS
AND FRAMES CAN BE INSTALLED. MEP CAN START TO RUN DUCTWORK, PIPING,
CABLING, AND ANY OTHER ITEMS THROUGHTOUT THE NEW ADDITION.
3. ALL FINISHES TO BE INSTALLED ONCE ALL THE INTERIOR WALLS ARE UP AND IN PLACE.
CASEWORK INSTALLATION CAN OCCUR ALONG WITH FINISHES.
4. ONCE CASEWORK AND FINISHES HAVE BEEN INSTALLED, THEN ALL MEDICAL
EQUIPEMENT AND FURNISHINGS CAN BE INSTALLED.
PHASE 3 - DEMOLITION OF EXISTING CLC ROOMS AND SPACES TO BE RENOVATED.
1. ONCE THE NEW ADDITION HAS BEEN FINISHED AND ACCPETED BY THE VA FOR USE, THEN THE EAST
WING AND PORTION OF THE SOUTH WING OF THE EXISTING BUILDING #60 CAN START TO BE
DEMOLISHED. THIS INCLUDES BUT IS NOT LIMITED TO: FLOOR SLABS AS SPECIFIED FOR NEW UTILITIES, INTERIOR STUD WALLS, DOORS AND FRAMES, CEILINGS, AND MEP ITEMS. THE CONTRACTOR WILL BE
RESPONSIBLE TO PROTECT ALL ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING
DEMOLITION SO AS TO PROTECT THE STAFF AND PATIENTS. THE CONTRACTOR WILL COORDINATE ALL
ICRA BARRIERS AS NEEDED.
2. IN ADDITION TO THE EAST AND SOUTH WING DEMOLITION, THE EXISTING ENTRY LOBBY AREA WILL NEED TO BE UPDATED. DEMOLITION OF THIS AREA INCLUDES THE FOLLOWING ITEMS, BUT IS NOT LIMITED TO:
STUD WALLS, DOORS AND FRAMES, CEILINGS, AND MEP ITEMS AS NEEDED TO BE REMOVED. DURING THIS TIME, A NEW EXTERIOR VESTIBULE WILL BE CONSTRUCTED WHICH WILL ENTAIL THE REMOVAL OF
SOME OF THE EXTERIOR FINISHES. THE CONTRACTOR WILL BE REPSONSIBLE TO PROTECT ALL
ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING DEMOLITION TO PROECT THE STAFF
AND PATIENTS. THE CONTRACTOR WILL COORDINATE ALL ICRA BARRIERS AS NEEDED.
PHASE 4 - RENOVATION OF THE EXISTING CLC
1. ONCE THE DEMOLITION OF THE EXTERIOR AREA TO THE NORTH OF THE EXISTING EAST WING AND SMOKING PORCH HAS BEEN COMPLETED THEN NEW CONSTRUCTION CAN COMMENCE. NEW CONSTRUCTION WIL INCLUDING THE FOLLOWING, BUT NOT LIMITED TO: NEW STUD WALLS, DOORS AND FRAMES, CEILINGS, AND MEP RELATED PIPING, DUCTWORK, AND CABLING. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROTECTION OF ALL ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING NEW CONSTRUCTION TO PROJECT THE STAFF AND PATIENTS. THE CONTRACTOR WILL COORDINATE ALL ICRA BARRIERS AS NEEDED.
2. ONCE THE WALLS AND ASSOCIATED MEP ITEMS HAVE BEEN INSTALLED THEN WALL, FLOOR AND CIELING FINISHES CAN BE INSTALLED. MILLWORK INSTALLATION CAN
OCCUR ALONG WITH FINISHES.
3. ONCE THE MILLWORK AND FINISHES HAVE BEEN INSTALLED, ALL MEDICAL EQUIPMENT AND FURNISHINGS CAN BE INSTALLED.
4. IN ADDITION TO THE EAST AND SOUTH WING NEW CONSTRUCTION, THE EXISTING ENTRY LOBBY AREA WILL NEED TO BE UPDATED WITH A NEW LAYOUT. NEW CONSTRUCTION OF THIS AREA WILL NEED TO BE DONE WHICH INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING ITEMS: STUD WALLS, DOORS AND FRAMES, CEILINGS, AND MEP ITEMS AS NEEDED TO BE INSTALLED. FURTHERMORE, DURING THIS TIME, A NEW EXTERIOR VESTIBULE WILL ENTAIL THE ADDITION OF NEW STRUCTURAL STEEL AND NEW EXTERIOR WALLS AND FINISHES. THE CONTRATOR WILL BE RESPONSIBLE FOR PROTECTION OF ALL ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING NEW CONSTRUCTION SO AS TO PROTECT THE STAFF AND THE PATIENTS. THE CONTRACTOR WILL COORDINATED ALL ICRA BARRIERS AS NEEDED.
PHASE 1 SCOPE
• DEMOLITION OF SITE WORK IN
PREPARATION FOR THE NEW ADDITION.
PHASE 2 SCOPE
• NEW CONSTRUCTION OF CLC ADDITION.
PHASE 3 SCOPE
• DEMOLITION OF THE EXISTING CLC ROOMS
AND SPACES TO BE RENOVATED.
• PREPARE SITE FOR EXTERIOR
IMPROVEMENTS
PHASE 4 SCOPE
• RENOVATION OF THE EXISTING CLC.
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
E12E11E10E9AE8A
ED
EE
EF
EG
E13E7
EF1
EH
P
EJ
EK
E6 E8 E9
EA
EB
E1 E2 E3
EC
E4 E5
F
D
A
876543
K
I
H
J
5.521
C
96.5
B
E
2.5 3.5
G
C.3
PHASE 3
M
TEMPORARY FENCE
WITH GATE FOR
TEMPORARY
BOILER AND AHU,
REFER TO
MECHANICAL.
108C
114A 108B
103A
109A
113A
108A
110E
110F
110D 110C
110B 110A
1B133
1B133A
1B134
1B135A
1B1351B1361B1371B138
1B137A 1B136A
1B130
1B131
1B131A
1B132
1B125
1B127
1B141
1B124
1B142
1B140
OFFICE
CPU
CHARGING
1B153
STOR
1B152
TLT
1B147A
TLC RM
1B147
TLC ROOM
1B145
TLC ROOM
1B144
LAUNDRY
1B151
MEDICATION
1B149
TLT
1B120A
RESTROOM
1B120
OPEN
OFFICE
OFFICE
101B
REC
1B100B
OXYGEN
TLC RM.
1B105
TLC RM.
1B107
TLC RM.
1B109
TLC RM.
1B111
TLC RM.
1B113
TLC RM.
1B115
TLT
1B113A
COPY
1B103B
TLC RM.
1B106
TLC RM.
1B108
TLC RM.
1B110
TLC RM.
1B112
TLC RM.
1B114
TLC RM.
1B116
TLC RM.
1B114A
TLC RM.
1B110A
TLC RM.
1B108A
SLD.
UTILITY
1B104
CLEAN
LINEN
1B117
BARBER
1B118
OFFICE
1B119
TLC RM.
1B121
BREAK RM.
1B122
TLT
1B121A
SOC. WKR.
1B143
PSY.
1B123
TLT
1B150
TLC KIT.
1B150
OFFICE
1B103A
CONF. /
PRIVATE
DINING
TLT
ART ROOM
MP
STOR
132A
MULTIPURPOSE/
ACTIVITY
ROOM
132A
RT OFC
MED
HOUSE
STOR.
HOUSE
LNDRY
TOILET
117A
BATHING
ROOM
IT
ROOM
ELEC
FIRE RISER
ROOM
VESTIBULE
006A
RESIDENT
BARIATRIC
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
LIVING
ROOM
133A
KITCHEN
DINING
133B
SOILED
UTILITY
HOUSE OFC
PANTRY
133C
CLEAN
SUPPLY
BATH
135A
BATH
134A
BATH
122A
BATH
121ABATH
119A
BATH
136A
BATH
139A
BATH
140A
BATH
142A
BATH
143A
RESIDENT
RESIDENT
RESIDENT
BATH
138A
BATH
141A
BATH
137A
HAC
BATH
145A RESIDENT
RESIDENT
146BATH
146A
STOR
DEN
STAFF
LOUNGE
RESIDENT
RESIDENT
CORRIDOR
BATH
151A
TLT
VESTIBULE
008A
CORRIDOR
BATH
152A
1B140A
E12E11E10E9AE8A
ED
EE
EF
EG
E13E7
EF1
EH
P
EJ
EK
E6 E8 E9
EA
EB
E1 E2 E3
EC
E4 E5
F
D
A
876543
K
I
H
J
5.521
C
96.5
B
E
2.5 3.5
N
G
C.3
PHASE 4
1.8
108C
114A 108B
103A
109A
113A
108A
110E
110F
110D 110C
110B 110A
1B133
1B133A
1B134
1B135A
1B1351B1361B1371B138
1B137A 1B136A
1B130
1B131
1B131A
1B132
1B125
1B127
1B141
1B124
1B142
1B140
WAITING
CLEAN LINEN
SOILED UTL
GENERAL STOR
TEAM WORKRM
TEAM WORKRM
DEN
CORRIDOR
VESTIBULE
014A
RESIDENT - B2
BATH
175A
RESIDENT - B2
BATH
173A
MEDS
BATH
163A
BATH
161A
BATH
159A
BATH
158A
BATH
157A
BATH
156A
BATH
155A
RESIDENT - B1
RESIDENT - B1
153BATH
153A
CORRIDOR
BATH
160A
BATH
162A
BATH
164A
DINING
166B
LIVING ROOM
166A
RESIDENT DINING
N&FS KITCHEN/
SERVERY
131A
CORRIDOR
CORRIDOR
DIR OFC
MED DIR OFC
H. LAUNDRY
BATHING RM
TLT
184A
TLT
176A
EQUIP STOR
CLEAN SUPPLY
169NRS LDR OFC
SW OFC
178 HOUSE OFC
VESTIBULE
001A
PT/OT RECEP
100B
H. STOR
SSTV
131C
MOP
131B
HAC
154RESIDENT - B1
RESIDENT - B1
160RESIDENT - B1
RESIDENT - B2
RESIDENT - B2
161 RESIDENT - B2
RESIDENT - B2
158 RESIDENT - B2
RESIDENT - B2
CORRIDOR
OFFICE
1B103A
CONF. /
PRIVATE
DINING
TLT
ART ROOM
MP
STOR
132A
MULTIPURPOSE/
ACTIVITY
ROOM
132A
RT OFC
MED
HOUSE
STOR.
HOUSE
LNDRY
TOILET
117A
BATHING
ROOM
IT
ROOM
ELEC
FIRE RISER
ROOM
VESTIBULE
006A
RESIDENT
BARIATRIC
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
RESIDENT
LIVING
ROOM
133A
KITCHEN
DINING
133B
SOILED
UTILITY
HOUSE OFC
PANTRY
133C
CLEAN
SUPPLY
BATH
135A
BATH
134A
BATH
122A
BATH
121ABATH
119A
BATH
136A
BATH
139A
BATH
140A
BATH
142A
BATH
143A
RESIDENT
RESIDENT
RESIDENT
BATH
138A
BATH
141A
BATH
137A
HAC
BATH
145A RESIDENT
RESIDENT
146BATH
146A
STOR
DEN
STAFF
LOUNGE
RESIDENT
RESIDENT
CORRIDOR
BATH
151A
TLT
VESTIBULE
008A
CORRIDOR
BATH
152A
1B140A
1B1261B1281B129
PHASING PLAN LEGEND
PHASE 1
PHASE 2
NOT IN SCOPE
PHASE 3
PHASE 4
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing #
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
ARCH REG. NO. A-930 EXP. 12/31/2023
ENGR REG. NO. E-2586 EXP. 12/31/2023
STRUCTURAL/CIVIL
ENGINEER
H2B
1225 N. LOOP W #800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH
ENGINEER
SPUR DESIGN
11020 KING STREET, STE 350
OVERLAND PARK, KS 66210
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
LANDSCAPE ARCHITECT
CLS & ASSOCIATES
825 N. BROADWAY AVE, STE 315
OKLAHOMA, OK 73102
(405) 525-2220
HEALTHCARE/MED
EQUIPMENT PLANNER
INNOVA GROUP
3196 N. SWAN ROAD
TUCSON, AZ 85712
(520) 886-8650
PHYSICAL SECURITY
FORCE PROTECT SECURITY
CONSULTANTS,
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
FOOD & BEVERAGE
PLANNER
STURM CONSULTING
5838 S. HUDSON PLACE
TULSA, OK 74135
(918) 260-0667
ENVIRONMENTAL
ENGINEER
RIVERFRONT ENVIRONMENTAL
1139 OLIVE STREET, STE 300
ST. LOUIS, MO 63101
(314) 436-9492
SPUR #: 2015
/5
/2
:3
:1
A
M
PHASING PLANS
NR 004 OF 221DLK
BID DOCUMENTS
ADDITION AND RENOVATION
OF CLC
09/06/2023
589-703
ROBERT J. DOLE VA MEDICAL CENTER
5500 EAST KELLOGG, BLDG. 60
WICHITA, KS 67218
GI012
N
1/16" = 1'-0"
PHASE 3 - DEMO - AREA B1
N
1/16" = 1'-0"
PHASE 4 - RENOVATION - AREA B2
PHASE DESCRIPTIONS & OVERVIEW PHASE 1 - DEMOLITION OF SITE WORK IN PREPARATION FOR THE NEW ADDITION
1. A CONSTRUCTION STAGING AREA WILL BE SET UP ADJACENT TO THE SITE ACROSS THE ROAD, PLAN EAST OF THE EXISTING BUILDING #60 FOOTPRINT. THERE IS AN EXISTING GRAVEL PARKING AREA THAT CAN BE USED FOR CONSTRUCTION STAGING.
2. THIS WILL INCLUDE THE DEMOLITION OF THE EXISING NORTH GARDEN AREA FOR THE CONSTRUCTION OF THE NEW ADDITION. ALL TREES, UTILITIES, STRUCTUES (WHICH INLCUDES THE EXISTING GAZEBO), AND SIDEWALKS ARE TO BE REMOVED.
3. THE EXISTING SMOKING PORCH ADJACENT TO THE EXISTING CAFETERIA ARE IN THE PT/OT AREA WILL BE DEMOLISHED. THE EXISTING BRICK, COLUMNS, WINDOWS, ROOF, AND STRUCTURE WILL BE REMOVED. THE CONTRACTOR WILL NEED TO PAY CLOSE ATTENTION IN KEEPING THE EXISTING INTERIOR WALLS AROUND THE SMOKING PORCH INTACT DURING THIS DEMOLITION, SINCE THESE WALLS AND ASSOCIATED ELEMENTS WILL BE SAVED. CONTRACTOR TO PREP ANY EXTERIOR SURFACES THAT ARE EXPOSED IN THEIS AREA AFTER
DEMOLITION TO BE WEATHER RESISTANT.
4. SOME ADDITIONAL DEMOLITION WILL NEED TO TAKE PLACE IN SOME OF THE EXISTING EAST WING SO AS TO REMOVE EXISTING UTILITIES AND BRING IN NEW UTILITIES. THE AREAS AFFECTED WILL NEED ICRA BARRIERS AND EXTERIOR BARRIERS TO PROTECT THE ADJACENT AREAS THAT NEED TO REMAIN FUNCTIONAL DURING CONSTRUCTION AND TO PROTECT STAFF AND THE PATIENTS.
PHASE 2 - NEW CONSTRUCTION OF CLC ADDITION.
1. ONCE THE DEMOLITION OF THE EXTERIOR AREA TO THE NORTH OF THE EXISTING EAST
WING AND SMOKING PORCH HAS BEEN COMPLETED THEN NEW CONSTRUCTION CAN
COMMENCE. NEW UTILITIES WILL BE INSTALLED AND NEW STRUCTURAL FOOTING,
GRADE BEAMS AND SLABS WILL BE PLACED. NEW STEEL COLUMNS AND BEAMS WILL
BE INSTALLED PRIOR TO ROOFING AND EXTERIOR ENVELOPE INSTALLATION.
2. ONCE THE BUILDING IS ENCLOSED THE INTERIOR STUD WALLS CAN PUT UP AND DOORS
AND FRAMES CAN BE INSTALLED. MEP CAN START TO RUN DUCTWORK, PIPING,
CABLING, AND ANY OTHER ITEMS THROUGHTOUT THE NEW ADDITION.
3. ALL FINISHES TO BE INSTALLED ONCE ALL THE INTERIOR WALLS ARE UP AND IN PLACE.
CASEWORK INSTALLATION CAN OCCUR ALONG WITH FINISHES.
4. ONCE CASEWORK AND FINISHES HAVE BEEN INSTALLED, THEN ALL MEDICAL
EQUIPEMENT AND FURNISHINGS CAN BE INSTALLED.
PHASE 3 - DEMOLITION OF EXISTING CLC ROOMS AND SPACES TO BE RENOVATED.
1. ONCE THE NEW ADDITION HAS BEEN FINISHED AND ACCPETED BY THE VA FOR USE, THEN THE EAST
WING AND PORTION OF THE SOUTH WING OF THE EXISTING BUILDING #60 CAN START TO BE
DEMOLISHED. THIS INCLUDES BUT IS NOT LIMITED TO: FLOOR SLABS AS SPECIFIED FOR NEW UTILITIES, INTERIOR STUD WALLS, DOORS AND FRAMES, CEILINGS, AND MEP ITEMS. THE CONTRACTOR WILL BE
RESPONSIBLE TO PROTECT ALL ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING
DEMOLITION SO AS TO PROTECT THE STAFF AND PATIENTS. THE CONTRACTOR WILL COORDINATE ALL
ICRA BARRIERS AS NEEDED.
2. IN ADDITION TO THE EAST AND SOUTH WING DEMOLITION, THE EXISTING ENTRY LOBBY AREA WILL NEED TO BE UPDATED. DEMOLITION OF THIS AREA INCLUDES THE FOLLOWING ITEMS, BUT IS NOT LIMITED TO:
STUD WALLS, DOORS AND FRAMES, CEILINGS, AND MEP ITEMS AS NEEDED TO BE REMOVED. DURING THIS TIME, A NEW EXTERIOR VESTIBULE WILL BE CONSTRUCTED WHICH WILL ENTAIL THE REMOVAL OF
SOME OF THE EXTERIOR FINISHES. THE CONTRACTOR WILL BE REPSONSIBLE TO PROTECT ALL
ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING DEMOLITION TO PROECT THE STAFF
AND PATIENTS. THE CONTRACTOR WILL COORDINATE ALL ICRA BARRIERS AS NEEDED.
PHASE 4 - RENOVATION OF THE EXISTING CLC
1. ONCE THE DEMOLITION OF THE EXTERIOR AREA TO THE NORTH OF THE EXISTING EAST WING AND SMOKING PORCH HAS BEEN COMPLETED THEN NEW CONSTRUCTION CAN COMMENCE. NEW CONSTRUCTION WIL INCLUDING THE FOLLOWING, BUT NOT LIMITED TO: NEW STUD WALLS, DOORS AND FRAMES, CEILINGS, AND MEP RELATED PIPING, DUCTWORK, AND CABLING. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROTECTION OF ALL ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING NEW CONSTRUCTION TO PROJECT THE STAFF AND PATIENTS. THE CONTRACTOR WILL COORDINATE ALL ICRA BARRIERS AS NEEDED.
2. ONCE THE WALLS AND ASSOCIATED MEP ITEMS HAVE BEEN INSTALLED THEN WALL, FLOOR AND CIELING FINISHES CAN BE INSTALLED. MILLWORK INSTALLATION CAN
OCCUR ALONG WITH FINISHES.
3. ONCE THE MILLWORK AND FINISHES HAVE BEEN INSTALLED, ALL MEDICAL EQUIPMENT AND FURNISHINGS CAN BE INSTALLED.
4. IN ADDITION TO THE EAST AND SOUTH WING NEW CONSTRUCTION, THE EXISTING ENTRY LOBBY AREA WILL NEED TO BE UPDATED WITH A NEW LAYOUT. NEW CONSTRUCTION OF THIS AREA WILL NEED TO BE DONE WHICH INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING ITEMS: STUD WALLS, DOORS AND FRAMES, CEILINGS, AND MEP ITEMS AS NEEDED TO BE INSTALLED. FURTHERMORE, DURING THIS TIME, A NEW EXTERIOR VESTIBULE WILL ENTAIL THE ADDITION OF NEW STRUCTURAL STEEL AND NEW EXTERIOR WALLS AND FINISHES. THE CONTRATOR WILL BE RESPONSIBLE FOR PROTECTION OF ALL ADJACENT AREAS THAT ARE TO REMAIN IN OPERATION DURING NEW CONSTRUCTION SO AS TO PROTECT THE STAFF AND THE PATIENTS. THE CONTRACTOR WILL COORDINATED ALL ICRA BARRIERS AS NEEDED.
PHASE 1 SCOPE
• DEMOLITION OF SITE WORK IN
PREPARATION FOR THE NEW ADDITION.
PHASE 2 SCOPE
• NEW CONSTRUCTION OF CLC ADDITION.
PHASE 3 SCOPE
• DEMOLITION OF THE EXISTING CLC ROOMS
AND SPACES TO BE RENOVATED.
PHASE 4 SCOPE
• RENOVATION OF THE EXISTING CLC.
FD
FD
FD
FD
FD
FD
OCCUPANCY AREA LEGEND
ASSEMBLY - FIXED SEATING
ASSEMBLY - LESS CONCENTRATED USE, WITHOUT FIXED SEATING
ASSEMBLY, KITCHENS
BUSINESS
HEALTHCARE - SLEEPING DEPARTMENTS
STORAGE USE, OTHER
BATH
152A
RESIDENT
BATH
151A
RESIDENT
CORRI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .