This is a pricing workbook submitted as Attachment 1 for an Invitation for Bid (IFB) solicited by the California Department of General Services – Procurement Division for Asphalt Concrete Plant Mix, Delivered under Event ID 0000037785. The solicitation covers nine geographic areas within District 1, spanning multiple counties including Humboldt, Trinity, Del Norte, Mendocino, Lake, and Siskiyou. The commodity being procured is 1/2" aggregate with PG 64-16 binder to be delivered via transfer, end dump, or bottom dump trucks. Quantities vary by location, ranging from 250 to 1,225 tons per delivery site, with a total of 43 contract line items across the nine areas. The pricing workbook contains blank cells for bidders to complete the asphalt contract price and fuel contract price, which when combined equal the contract unit price. The resulting contract will have an initial three-year term with two optional one-year renewal periods available.

The pricing structure requires bidders to submit separate pricing for asphalt costs and fuel costs on a per-ton basis, with automatic extension calculations based on contract unit price multiplied by quantity. The workbook includes non-award factors for alternate pricing options such as alternate aggregate sizes, PG binder grades, MC/SC binder alternatives, and different delivery methods (super dump, semi-end dump, end dump 4-10 yard). Additional delivery requirements include provisions for after-hours deliveries with portal-to-portal charges, plant opening fees, state agency pickup with plant opening charges, and unplanned delay charges at a standing rate of $3.25 per minute. Bidders must complete only the yellow cells as indicated in the instructions, with all calculations automated through formulas. No set-asides, funding sources, or incumbent information is identified in this pricing workbook.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Area 1

District 1 Area 1 Location (s) 1 through 5
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePlant's Physical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract Unit PriceExtension
1010101111Humboldt960.00/23.112251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010102112Humboldt9623.1/R45.6412251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010103113Humboldt16913.20/33.8410001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010104114Humboldt29928.5/43.048001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010105115Trinity2990.00/25.7712001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

Page &P

Area 2

District 1 Area 2 Location (s) 1 through 5
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePlant's Physical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract Unit PriceExtension
1010201121Del Norte
Del Norte101
1690.00/25.00
0.00/3.521,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order30121601TON1$ - 0$ - 0
1010202122Del Norte
Del Norte197
1990.00/7.08
.506/22.001,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order30121601TON1$ - 0$ - 0
1010203123Humboldt101125.7/137.145001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order30121601TON1$ - 0$ - 0
1010204124Del Norte10125.00/46.492501/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order30121601TON1$ - 0$ - 0
1010205125Del Norte19922.0/36.415251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries to be specified at the time of order30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

Area 3

District 1 Area 3 Location (s) 1 through 7
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePlant's Physical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract Unit PriceExtension
1010301131Humboldt

Humboldt Humboldt Humboldt 101 254 283 36.00/50.00 20.8/39.14

39.14/46.53 0.0/0.361,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010302132Humboldt
Humboldt101
21150.00/74.00
72.82/79.165001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010303133Humboldt

Humboldt Humboldt 101 255 74.0/100.00 0.00/2.68

0.00/8.801,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010304134Humboldt360.00/26.001,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010305135Humboldt3626.00/45.691,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010306136Humboldt101100.00/125.71,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010307137Humboldt2990.00/28.501,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

Page &P

Area 4

District 1 Area 4 Location (s) 1 through 2
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePlant's Physical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract Unit PriceExtension
1010401141Mendocino

Mendocino Mendocino 1 271 90.00/105.58 82.50/100.30

0.00/7.51,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010402142Mendocino10159.3/82.51,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

Area 5

District 1 Area 5 Location (s) 1 through 6
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePlant's Physical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract Unit PriceExtension
1010501151Mendocino
Mendocino1
2050.0/75.00
0.00/17.301,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010502152Mendocino10.00/25.001,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010503153Mendocino125.00/50.01,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010504154Mendocino175.00/90.01,1751/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010505155Mendocino1280.0/25.07501/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010506156Mendocino12825.0/50.97501/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

Area 6

District 1 Area 6 Location (s) 1 through 5
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePlant's Physical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract Unit PriceExtension
1010601161Mendocino

Mendocino Mendocino Mendocino 101 20 0.00/45.0 0.00/9.85 0.00/2.15

33.2/44.11,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010602162Mendocino2017.30/33.21,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010603163Mendocino10145.0/59.31,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010604164Mendocino1620.0/34.051,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010605165Mendocino2530.0/17.21,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

Area 7

District 1 Area 7 Location (s) 1 through 3
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePhysical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract Unit PriceExtension
1010701171Lake

Lake Lake 20 175 0.00/25.00 27.92/52.5

0.00/8.21,2001/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010702172Lake
Lake20
5325.00/46.4
0.0/7.4581,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
1010703173Lake

Lake Lake 29 281 5.81/27.92 8.2/28.0

14.00/17.001,1751/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

Area 8

District 1 Area 8 Location (s) 1
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePlant's Physical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract Unit PriceExtension
1010801181Siskiyou960.00/23.271,1751/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)Atta+'Area 8'!F11:W18/2026
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

Area 9

District 1 Area 9 Location (s) 1
Department of General Services - Procurement Division
Event ID: 0000037785, Asphalt Concrete Plant Mix, Delivered
Attachment 1 - Pricing Worksheet, 11/04/2026
Bidder:
Instructions: Refer to IFB Pricing language for completion instructions. Bidder must complete the Yellow Cells only.
Contract Line Item # (CLIN)District NumberArea NumberLocation NumberCountyRoutePost MilesQuantityCommodity DescriptionUNSPSC CodeManufacturer Part Number (OEM #)Manufacturer (OEM)SKU # / Item #Plant NamePlant's Physical Address(City, State and Zip Code)Plant's Telephone NumberMiles from Delivery Site (Within +/- 5 Miles)Unit of MeasureQuantity in
Unit of MeasureAsphalt Contract PriceFuel Contract PriceContract PriceExtension
1010901191Humboldt

Humboldt Humboldt Humboldt Mendocino Mendocino 101 254 271 271 101 0.00/20.0 20.0/36.0 0.00/20.8 0.0-0.31

15.6/22.8 100.30/106.801,2251/2" Aggregate, PG 64-16 Binder, Transfer End Dump or Bottom Dump Deliveries at the time of order.30121601TON1$ - 0$ - 0
TOTAL:$ - 0
ALTERNATE COST: (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionTypeStock Keeping Unit Number (SKU #)Contract Price (Per Ton)
A1Alternate Aggregate Cost (any size)N/A
A2Alternate PG Binder (any grade, specify-->
A3Alternate MC/SC Binder (any grade)N/A
A4Alternate Delivery Super DumpN/A
A5Alternate Delivery Semi-End DumpN/A
A6Alternate Delivery End Dump ( 4-10 yard)N/A
A7Open GradeN/A
ADDITIONAL DELIVERY REQUIREMENTS (NON-AWARD FACTOR)
Alternate Cost Contract Line Item (CLIN)Commodity DescriptionStock Keeping Unit Number (SKU #)Delivery Price (Per Ton)Plant OpeningUnplanned Delays Charge (per minute)
A8Requested deliveries to job sites may be outside regular working hours. Additional charge for delivery "portal to portal".N/AN/A
A9Requested deliveries to job sites may be outside regular working hours and or days may require plant opening.N/AN/A
A10Additional charge for state agency pick up and plant opening.N/AN/A
A11UNPLANNED DELAYS WILL BE PAID AT THE STANDING TIME CHARGE OF $3.25 PER MINUTE.N/AN/AN/A
A12Plant Mix pick up by state agency (Orders less than the minimum)N/AN/AN/A
Note: Asphalt Contract Price + Fuel Contract Price = Contract Unit Price
Note: Extension is automatically calculate by (Contract Unit Price x Quantity)
End of Sheet

File details come from the government source that posted it. Updated .