Attachment 1 - C_E QAPS.pdf

PDF 13 MB Posted

Attached to
Rocky Mountain/West Coast/Offshore (RMW) Program Federal contract opportunity
Solicitation number
SPE602-21-R-0703
Issued by
Defense Logistics Agency Energy

About this file

This solicitation is seeking offers for the annual bulk fuel procurement for the Rocky Mountain/West Coast/Offshore region for Fiscal Year 2022. The Defense Logistics Agency Energy is requesting pricing for approximately 546 million gallons of Turbine Fuel, Aviation (JAA); 85 million gallons of Turbine Fuel, Aviation (JA1); 127 million gallons of Turbine Fuel, Aviation (JP5); and 112 million gallons of Fuel, Naval Distillate (F76) to be delivered between October 1, 2021 through September 30, 2022 to various bases in the specified region via tanker, barge, truck and pipeline on both FOB origin and destination terms. An estimated 15.77% of the total fuel quantity is reserved for small businesses. Offers are due via the mandatory Bulk Offer Entry Tool by the closing date of the solicitation. The period of performance will be one year if a contract is awarded.

View the file

Other files for this federal contract opportunity

Other files attached to Rocky Mountain/West Coast/Offshore (RMW) Program, newest first.
File Type Posted
21R0703 Bid Award Sheet.pdf PDF
21R0703 All Offeror MCBEW.pdf PDF
21R0703 Min Laid-Down Cost Solution.pdf PDF
21R0703 Summary of Awards.pdf PDF
RMW SPE60221R0703 Conformed RFP Amd 0011.pdf PDF
RMW SPE60221R0703 AMD 0011.pdf PDF
AMD10_Attachment 5 - Fillable Clauses.pdf PDF
RMW Amendment 0010 Final.pdf PDF
RMW SPE60221R0703 Conformed RFP Amd 0009.pdf PDF
SPE60221R0703 AMD 009 FINAL.pdf PDF
RMW SPE60221R0703 Conformed RFP Amd 0008.pdf PDF
SPE60221R0703 Amendment 0008.pdf PDF
RMW SPE60221R0703 Conformed RFP Amd 0007.pdf PDF
SPE60221R0703 Amendment 0007_Final.pdf PDF
Update_Attachment 5 - Fillable Clauses.pdf PDF
SPE60221R0703 Amendment 0006 FINAL_v2.pdf PDF
Attachment 6 -Excel Format Schedule B RequirementsAMD5.xlsx XLSX spreadsheet
RMW SPE60221R0703 Conformed Amd 0005 Final.pdf PDF
SPE60221R0703 Amendment 0005 Final.pdf PDF
SPE60221R0703 Amendment 0004_Final.pdf PDF
RMW SPE60221R0703 Conformed RFP Amd 0003.pdf PDF
SPE60221R0703 Amendment 0003_Final.pdf PDF
SPE602-21-R-0703_Conformed RFP Amd 0002.pdf PDF
SPE60221R0703 Amendment 0002.pdf PDF
RMW SPE60221R0703 Conformed RFP Amd 0001.pdf PDF
RMW SPE602-21-R-0703 AMD 0001.pdf PDF
Attachment 2 - F76 Traceability Signature Page.pdf PDF
Attachment 6 -Excel Format Schedule B Requirements.xlsx XLSX spreadsheet
Attachment 3 - Equal Value Exchanges of Fuel.pdf PDF
Attachment 5 - Fillable Clauses.pdf PDF
RMW SPE60221R0703 1.pdf PDF
Attachment 4 - DLA Form 2019 July 2018.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

PDF (DLA)DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET 1 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

Print Form Email Form Clear Export Data Import Data About Check for Newer Version Contact Us

REV DESCRIPTION DATE APPROVED

0 DLA ENERGY QAP E12 JUL 2015 30 JUL 2015

REVISIONS

ENERGY QAP E12 POINT OF ACCEPTANCE. For use all fixed-price solicitations/contracts for supplies.

As I12: MFR dated 18 Sep 81. As E12: MFRs dated 8 Sep 89, 20 Mar 90, 7 Mar 91, 2 Apr 91, 15 Apr 92, 23 Nov 93, 23 Feb 98, 07 Aug 09. As DLAD 52.246-9029: MFR dated 3 May 10. As Energy QAP E12: DLA FORM 1889 dated 30 Jul 15.

ENERGY QAP E12 (JUL 2015) POINT OF ACCEPTANCE

(a) For f.o.b. origin contract items, acceptance of the supplies furnished hereunder shall take place at origin.

(b) For f.o.b. destination contract items, acceptance of the supplies furnished hereunder shall take place at destination.

(c) Acceptance shall take place as stated above, unless specifically stated otherwise in the contract.

DISTRIBUTION

STATEMENT - A

APPROVED FOR

PUBLIC RELEASE

DISTRIBUTION IS

"UNLIMITED"

DATE

7/30/2015

APPROVED BY

07/30/2015

REVIEWED BY

07/30/2015

PREPARED BY

DRAWING NUMBERSCALE

CODE ID NO.

52838

SIZE

NSN

MULTIPLE

ITEM

DLA ENERGY QAP E12

DLA Land & Maritime DLA Troop Support DLA Aviation clear

DEFENSE LOGISTICS AGENCY ENERGY

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR, VIRGINIA 22060-6222

DLA Energy

SHEET 2 OF 2PREVIOUS EDITION IS USABLE Add Continuation Page

0 DLA ENERGY QAP E12 JUL 2015 30 JUL 2015

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION

(SQAP)

DRAWING NUMBERSCALE CODE ID NO.

PDF (DLA)

DLA FORM 1889, OCT 2011

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 0 description: DLA ENERGY QAP E12 revdate: JUL 2015 revapproved: 30 JUL 2015 revcomments:

apprdate: 7/30/2015 apprBy:

reviewdate: 2015-07-30 revBy:

prepdateA: 2015-07-30 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E12 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

1 DLA ENERGY QAP E21.01 JUN 2015 26 JUN 2015

ENERGY QAP E21.01 POINT OF INSPECTION. For use in Bulk fuel, Bulk FSII, Bulk lube oil, and PC&S solicitations/contracts. Use of this Energy QAP requires inclusion of either Energy QAP E22 or Energy QAP E22.01. As I21.01: MFRs dated 21 Oct 80, 13 Jan 81, 19 Oct 81, 20 Dec 82. As E21.01: MFRs dated 22 Apr 91, 15 Apr 92, 6 Oct 97, 3 Feb 98, 27 Jul 99, 24 Jul 02, 28 Apr 10; DLA FORM 1889 dated 26 Jun 15.

ENERGY QAP E21.01 (JUN 2015) POINT OF INSPECTION

(a) This Energy QAP applies to the Bulk Fuel, Bulk FSII, Bulk Lube Oil and Posts, Camps, and Stations Programs.

(b) When government inspection is deemed necessary, it shall be performed, prior to acceptance, by the office specified in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or the QUALITY REPRESENTATIVE Energy QAP of this contract, whichever is applicable.

(1) For f.o.b. origin contract items, inspection will normally be performed at origin, however, the Government reserves the right to perform an inspection at any point prior to acceptance.

(2) For f.o.b. destination contract items, inspection will normally be performed at destination, however, the Government reserves the right to perform an inspection at any point prior to acceptance.

(3) For f.o.b. destination contract items for aviation fuels delivered via waterborne transport, pipeline, rail car, tank truck, tank wagon and Bulk Fuel Container (BFC) and non-aviation fuels delivered by waterborne transport, a preliminary inspection for product quality will normally be performed at origin, with final inspection normally being at destination. However, the Government reserves the right to perform an inspection at any point prior to acceptance.

(4) On contract items for delivery of drummed or packaged products, f.o.b. origin or f.o.b. destination, a preliminary inspection for product quality will normally be performed at the point of manufacturing or blending, with final inspection normally being at the f.o.b. point. However, the Government reserves the right to perform an inspection at any point prior to acceptance.

(c) When the Contractor is informed by the responsible Inspection Office that government inspection is deemed necessary, the Contractor shall ensure that the Inspection Office is provided with sufficient information and advance notification to facilitate such inspection. When government inspection is necessary at a contractor or subcontractor (commercial or government) facility, the Contractor shall notify the Inspection Office of the necessary requirements to access those facilities and shall help facilitate such access. After initial notification, the Contractor shall keep the Inspection Office informed of any changes that may affect that inspection.

26 June 2015

06/26/2015

06/26/2015

DLA ENERGY QAP E21.01

1 DLA ENERGY QAP E21.01 JUN 2015 26 JUN 2015

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 1 description: DLA ENERGY QAP E21.01 revdate: JUN 2015 revapproved: 26 JUN 2015 revcomments:

apprdate: 26 June 2015 apprBy:

reviewdate: 2015-06-26 revBy:

prepdateA: 2015-06-26 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E21.01 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

SHEET 1 OF 4PREVIOUS EDITION IS USABLE Add Continuation Page

2 DLA ENERGY QAP E22 AUG 2020 7 AUG 2020

ENERGY QAP E22 LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS (DLA ENERGY) (AUG

2020)

The following lists shall be used to identify the Government inspection office assigned inspection and/or acceptance responsibility for DLA Energy contracts in a particular geographic area. These contracts include, but are not limited to, those for bulk petroleum products and additives, into-plane refueling, petroleum storage and laboratory services, coal, aerospace energy (including compressed gases), and posts, camps, and stations. The area of inspection responsibility and corresponding office code are assigned in paragraphs (a) and (b). The address and phone number of each inspection office, by office code, is provided in paragraph (c). Unless a particular inspection office is identified in another part of the contract, the assignments in this QAP shall apply.

(a) AREAS OF RESPONSIBILITY AND OFFICE CODES WITHIN THE CONTINENTAL UNITED STATES

(CONUS):

Alabama 110 Maine 110 Oklahoma 110 Arizona 120 Maryland 110 Oregon 120 Arkansas 110 Massachusetts 110 Pennsylvania 110 California 120 Michigan 110 Rhode Island 110 Colorado 120 Minnesota 110 South Carolina 110 Connecticut 110 Mississippi 110 South Dakota 110 Delaware 110 Missouri 110 Tennessee 110 District of Columbia 110 Montana 120 Texas 110 1 Florida 110 Nebraska 110 Utah 120 Georgia 110 Nevada 120 Vermont 110 Idaho 120 New Hampshire 110 Virginia 110 Illinois 110 New Jersey 110 Washington 120 Indiana 110 New Mexico 120 West Virginia 110 Iowa 110 New York 110 Wisconsin 110 Kansas 110 North Carolina 110 Wyoming 120 2 Kentucky 110 North Dakota 110 Louisiana 110 Ohio 110

EXCEPTIONS:

1 The El Paso, Texas, area is assigned to Code 120 (DLA Energy Americas West).

2 The Newcastle, Wyoming, area is assigned to Code 110 (DLA Energy Americas East).

08/07/2020

8/7/2020

08/04/2020

DLA ENERGY QAP E22

SHEET 2 OF 4PREVIOUS EDITION IS USABLE Add Continuation Page

(b) AREAS OF RESPONSIBILITY AND OFFICE CODES OUTSIDE THE CONTINENTAL UNITED STATES

(OCONUS) (INCLUDING ALASKA AND HAWAII):

Afghanistan 400 Cyprus 200 Malaysia 300 Singapore 300 Africa 200 3 Egypt 400 3 Maldives 300 South America 110 Alaska 130 Europe (Continental) 200 Malta 200 South Korea 300 Antarctica 300 Georgia 200 Mauritius 200 Sri Lanka 300 Armenia 200 Greenland 200 Mexico 110 Syria 400 Ascension Island 110 Hawaiian Islands 300 Midway Island 300 Taiwan 300 Australia 300 Hong Kong 300 Mongolia 300 Tajikistan 400 Azerbaijan 200 Iceland 200 Myanmar 300 Thailand 300 Azores 200 India 300 Nepal 300 Turkey 200 Bahrain 400 Indonesia 300 New Zealand 300 Turkmenistan 400 Bangladesh 300 Ireland 200 North Korea 300 United Arab Bermuda 110 Iran 400 Oman 400 Emirates 400 Bhutan 300 Iraq 400 Pacific Islands United Kingdom 200 Brunei 300 Israel 200 (Central & South) 300 Uzbekistan 400 Cambodia 300 Japan 300 Pakistan 400 Vietnam 300 Canada 110/120 4 Jordan 400 Papua New Guinea 300 Wake Island 300 Canary Island 200 Kazakhstan 400 Philippines 300 Yemen 400 Caribbean Islands 110 Kuwait 400 Qatar 400 Central America 110 Kyrgyzstan 400 Russia 200 Chagos Archipelago 300 Laos 300 Ryukus Islands, Japan 300 China 300 Lebanon 400 Saudi Arabia 400 Comoros 200 Madagascar 200 Seychelles Is. 200

EXCEPTIONS:

3 Except for Egypt, which is assigned to DLA Energy Middle East (Code 400), all other countries in Africa fall under DLA Energy Europe (Code 200).

4 The provinces of Manitoba, Ontario, Quebec, Newfoundland and Labrador, New Brunswick, Nova Scotia, and Prince Edward Island are assigned to DLA Energy Americas East (Code 110). The rest of Canada falls under DLA Energy Americas West (Code 120).

(c) INSPECTION OFFICES AND CODES.

110. DLA Energy Americas East

ATTN: Quality Manager 5 Federal Building, Suite 1005 2320 LaBranch Street Houston, TX 77004-1091 Phone: (713) 332-4113

FAX: (713) 718-3891

SHEET 3 OF 4PREVIOUS EDITION IS USABLE Add Continuation Page

120. DLA Energy Americas West

3171 N Gaffey Street San Pedro, CA 90731-1099 Phone: (424) 347-3101/3102

FAX: (424) 347-3120

130. DLA Energy Americas North

1480 Sijan Street, Suite 300 Joint Base Elmendorf-Richardson, AK 99505 Phone: (907) 384-7180

FAX: (907) 384-1086

200. DLA Energy Europe and Africa

Military Mailing Address:

DLA Energy Petroleum Lab ATTN: Quality Manager 5

CMR 422

APO AE 09067-0422

Phone: 49-631-3406-2285/2286 6

FAX: 49-631-3406-2289 6

Commercial Shipping Address:

DLA Energy Petroleum Lab ATTN: Quality Manager Bldg. 320, Rhine Ordinance Barracks Am Opelkreisel 67663 Kaiserslautern, Germany

300. DLA Energy Indo-Pacific

Bldg. 17000, Room 21

APO AP 96543

Phone: (671) 366-7762

FAX: (671) 366-7767

[Location: Guam]

SHEET 4 OF 4PREVIOUS EDITION IS USABLE Add Continuation Page

400. DLA Energy Middle East

PSC 851, Box 180

FPO AP 09834-2800

Phone: 973-1785-6493 6

FAX: 973-1785-4650 6

[Location: Bahrain]

5 Designated location of the DLA Energy Regional Quality Manager/Pre-Award Survey Monitor.

6 Dial 011 before these numbers when calling from the U.S. When calling these numbers from outside the U.S., use the appropriate international long distance prefix for the country where the call originates.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev: 2 description: DLA ENERGY QAP E22 revdate: AUG 2020 revapproved: 7 AUG 2020 revcomments:

apprdate: 2020-08-07 apprBy:

reviewdate: 8/7/2020 revBy:

prepdateA: 2020-08-04 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: DLA ENERGY QAP E22 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN ROAD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 3.00000000

ENERGY QAP E35 December 2011

E35 NONCONFORMING SUPPLIES AND SERVICES

(a) DEFINITION: As used in this contract provision:

Deviation is defined as a written authorization granted after contract award and prior to manufacture of an item, to depart from a particular performance or design requirement of a contract, specification, or referenced document, for a specific number of units or specific period of time, normally the duration of the contract.

Extraordinary situation means the matter cannot await resolution until the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded).

Waiver is defined as a written authorization granted after contract award to accept a configuration item or other designated item which, during production or after having been submitted for inspection, is found to depart from specified requirements, but nevertheless is considered suitable for use “as is” or after repair by an approved method. Approval is on a case-by-case basis and is normally for a set period of time.

(b) The Government may, at its discretion, accept nonconforming supplies or services. In such cases, the Contractor must obtain a deviation or waiver from the Contracting Officer prior to acceptance.

(c) The following procedures shall be used to request a deviation or waiver.

(1) Requests for deviations and waivers shall be submitted by the Contractor to the Contracting Officer with a copy to the appropriate Inspection Office referenced in the LIST OF INSPECTION OFFICES FOR DLA ENERGY CONTRACTS or QUALITY REPRESENTATIVE contract provision of this contract. Each request shall provide the following information: Contractor name; name and contact information of the contractor's authorized negotiator; contract number; contract line item number and product nomenclature, clause or contract provision number, paragraph and subparagraph, as appropriate; the nature of the request; the reason for the request; the corrective action being taken by the Contractor to correct and prevent recurrence of the condition(s) causing the nonconformance; and an agreement to pay an equitable price reduction, estimated and proposed by DLA Energy, over and above the administrative fee, contingent on the impact of the specific circumstances on DLA Energy relative to approval of the deviation or waiver.

(2) In extraordinary situations, the Contractor may initially submit a verbal request for a waiver, but not a deviation, to the Contracting Officer.

Written requests shall be submitted to the Contracting Officer by the next DLA Energy business day (0800 to 1630 hours EST, Monday through Friday, Federal Holidays excluded). If the Contracting Officer cannot be reached, the Duty Officer shall be contacted to provide the necessary information to the proper individuals as soon as possible. The Duty Officer's telephone number is (800) 286-7633 or (703) 767-8420.

(3) If a deviation or waiver is granted, the contract will be modified to accept the nonconforming supplies or services and to require the Contractor to provide an equitable price reduction or other adequate consideration commensurate with the deviation or waiver being granted. If the situation warrants, a deviation or waiver may be granted without prior agreement on price reduction or other consideration, subject to agreement by the Contractor, or its representative, to subsequent negotiation. Such an agreement, in addition to a brief description of the terms of the deviation or waiver, shall be documented on the shipping document or other appropriate correspondence. After negotiations, failure to agree on adequate consideration shall be a dispute concerning a question of fact within the meaning of the Disputes paragraph of the CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS contract provision of this contract.

(4) If a deviation or waiver is granted and the nonconforming supplies are accepted, then in no event will consideration be less than $500, which covers administrative costs, plus any additional cost of Government reinspection or retest, if necessary.

5) If a deviation or waiver is granted modifying this contract, but the supplies accepted are subsequently determined to be in conformity with contract specifications, the Contractor shall still be obligated to pay the consideration originally agreed upon in support of the deviation or waiver.

If, however, this consideration exceeds $1000, a second contract modification shall be issued reducing the Contractor's obligation to $1000 (the administrative cost of issuing the two required modifications), plus, if appropriate, any cost of Government reinspection or retest performed as a result of the deviation or waiver being granted.

04/18/2014

DATEREVIEWED BY

04/14/2014

ENERGY QAP E35

8725 JOHN J. KINGMAN RD

ENERGY QAP E35 December 2011

(d) When notification of nonconforming supplies is received after the supplies have been accepted, and the Government determines not to exercise its right to reject or to require correction under the INSPECTION OF SUPPLIES - FIXED-PRICE, INSPECTION OF SERVICES - FIXED PRICE, or CONTRACT TERMS AND CONDITIONS - COMMERCIAL ITEMS contract provision, then in no event will consideration be less than $500 to cover administrative costs. This $500 fee is in addition to --

(1) Consideration commensurate with the extent of nonconforming supplies; and

(2) Cost of Government reinspection or retest, if necessary.

The administrative fee will apply to each claim letter issued for off-specification product delivered to an activity.

(e) Contractors shall be held responsible for payment of any fines or penalties imposed on a receiving activity by an environmental enforcement agency, resulting from the delivery of nonconforming supplies under a DLA Energy contract.

(f) Repeated tender of nonconforming supplies or services, including those with only minor defects, will be discouraged by appropriate actions, including, but not limited to, rejecting the supplies or services whenever feasible and documenting the Contractor's performance records.

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

SHEET OF

PREVIOUS EDITION IS USABLE

REV

DESCRIPTION

DATE

APPROVED

REVISIONS

DESCRIPTION

DATE

APPROVED

REVISIONS

DISTRIBUTION STATEMENT - A

APPROVED FOR PUBLIC RELEASE

DISTRIBUTION IS "UNLIMITED"

SUPPLEMENTAL QUALITY ASSURANCE PROVISION (SQAP)

Supplemental Quality Assurance Provision (SQAP)

DSCC Form 2291, Feb 2004 online none standard

Quality Assurance

DLA

1 +

No

Tech Qual Deskbook n/a

No

Supplemental Quality Assurance Provision (SQAP) interactive

October 2011 (added Energy; updated supply center names)

CurrentPage:

PageCount:

btnPrint:

btnEmail:

btnClear:

btnExport:

btnImport:

btnAbout:

btnChkVersion:

btnContactUs:

Button1:

rev:

description: ENERGY QAP E35 revdate: December 2011 revapproved:

revcomments:

apprdate: 04/18/2014 apprBy:

reviewdate:

revBy:

prepdateA: 2014-04-14 prepbyA:

drawingNum:

scale:

codeIDNo: 52838 size:

nsn: MULTIPLE itemdesc: ENERGY QAP E35 btnDSCC:

btnDSCP:

btnDSCR:

line1: DEFENSE LOGISTICS AGENCY ENERGY line2: 8725 JOHN J. KINGMAN RD line3: FORT BELVOIR, VIRGINIA 22060-6222 revcomments2:

totInstances: 1.00000000

JUN 2014 08 JUL 2014

8 Jul 2014.

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 1

DISTRIBUTION STATEMENT – A: APPROVED FOR PUBLIC RELEASE. DISTRIBUTION IS UNLIMITED

Signature

Prepared by:

Quality/Technical Support

Office Approval:

Contracting Approval:

C1.02 ASSIST DATABASE OF SPECIFICATIONS (DEC 2016)

Unless otherwise specified, current versions of defense or federal specifications and standards, military handbooks, commercial item descriptions, qualified product lists, and other related technical documents cited in this solicitation/contract can be accessed from the Department of Defense (DoD) Acquisition Streamlining and Standardization Information System

(ASSIST) database at https://assist.dla.mil under ASSIST-Quick Search or http://quicksearch.dla.mil. ASSIST is the official source for all Defense Standardization Program documents and contains the most current information on documents prepared by DoD, as well as information on how to acquire referenced non-Government standards that have been adopted for

DoD use. Note that commercial or foreign specifications are not located on ASSIST and must be obtained from the relevant sponsoring organization (e.g. ASTM, SAE, API, ISO, etc.). Registered ASSIST account holders may establish profiles to receive automatic E-mail alerts when changes are planned or made to documents of interest by selecting criteria on the [Alert

Portal Profile Maintenance] screens accessed from the [User Profile] menu. Users may also view or download a bi-monthly summary of changes to the ASSIST database under the [ASSIST Update] menu.

Basic instructions on how to use ASSIST:

1. Go to http://quicksearch.dla.mil/.

2. Type in the numeric portion of the specification or Qualified Product List (QPL) and click on the Search button.

3. Look through the search results to find the desired document and click on the Document ID.

a. For specifications: click on the .pdf link under Media.

b. For QPL information: click on the View Qualified Product Database (QPD) data link to open the QPD

i. Click on the link in the “Govt Designation” Column to view qualified products

1. To view qualified source plants, click on the Source Plants link under the Related Links column http://quicksearch.dla.mil/

2017-08-07T09:00:32-0400

TAYLOR.LORI.L.1391585080

2017-08-07T09:22:23-0400

SHEPHERD.SANDRA.S.1012568459

2017-11-20T09:19:52-0500

BANISZEWSKI.DANIEL.J.1287388698

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 2

C16.01 TURBINE FUEL, AVIATION (JP5) (DLA ENERGY APRIL 2018)

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT

9130-00-273-2379 Turbine Fuel, Aviation, JP-5 JP5

9130-01-499-9521 Turbine Fuel, Aviation, JP-5 (Bunker fuel overseas locations only) JP5

Product shall meet MIL-DTL-5624W, Turbine Fuel, Aviation, Grade JP-5, dated March 28, 2016.

(a) SPECIFICATION MODIFICATION: The requirements of Table I in the specification are modified as follows:

a. FILTRATION TIME TESTING. Round upwards when reporting the filtration time, in minutes. For example, a filtration time of 4 minutes, 22 seconds, would be reported as 5 minutes.

b. FLASH POINT TESTING. The referee procedure for performing flash point testing of JP-5 shall be the manual method of ASTM D93 as opposed to the automated version of ASTM D93.

c. FLASH POINT.

i. All batches of JP-5 that are presented for Government acceptance at origin and for subsequent shipment through a multiproduct pipeline, shall meet a minimum flash point requirement of 62.5°C.

ii. In the U.S. all JP-5 deliveries in California, Oregon, and Washington shall have a minimum Flash Point of 62.5 oC at the custody transfer point.

iii. In Australia all JP-5 deliveries shall have a minimum Flash Point of 61.5°C at the custody transfer point.

d. ACID NUMBER. For JP-5 delivered to Kodiak Island, Alaska, the maximum total acid number shall be 0.020 mg KOH/g.

e. MICRO-SEPAROMETER (MSEP) REQUIREMENTS.

i. Prior to initial production under this contract, the Contractor shall elect, on a one-time basis, which MSEP limit to meet for the balance of the contract. If the Contractor introduces Fuel System Icing Inhibitor (FSII) and/or Corrosion Inhibitor/Lubricity Improver (CI/LI) after verification of product conformance with the MSEP requirement, the product is not required to meet a fixed limit on subsequent MSEP tests.

ii. If the Contractor elects to verify conformance with the MSEP requirement on a sample of product that does not contain FSII and CI/LI, an additional MSEP test shall be performed on a hand blend containing jet fuel, FSII, CI/LI, and Antioxidant (only if required). The FSII shall be added to this hand blend at a concentration range between 0.08 volume percent minimum and 0.11 volume percent maximum. The amount of the CI/LI added to this hand blend shall be within the concentration range specified in QPL-25017.

f. ADDITIONAL REQUIREMENT APPLICABLE TO DEEP FREEZE PROGRAM ONLY. The Deep Freeze Program is for Antarctic operations of the Department of Defense and other federal agencies; whereby JP-5 sulfur content shall not exceed 0.0015 mass-percent (15 ppm).

(b) ADDITIVES.

a. Additives are required for deliveries of JP-5, per MIL-DTL-5624W, unless addition is excluded by specific solicitation line item, applicable contract clause, or other contractual requirement. FSII included in jet fuel shall conform to MIL-DTL- 85470B, Inhibitor, Icing, Fuel System, High Flash, Notice 1 dated June 15, 1999 and revalidated March 24, 2004.

b. The CI/LI additive(s) used shall conform to MIL-PRF-25017H Inhibitor, Corrosion/Lubricity Improver, Fuel Soluble, w/Amendment 1, dated August 4, 2011

c. Line injection of additives (FSII and CI/LI) from shipping tank to delivery conveyance or other free on board (FOB) point is permitted under the following conditions:

i.Additives must be proportionately injected throughout the entire loading process to ensure the additive is homogeneously blended into the jet fuel. The Contractor shall maintain records evidencing the homogeneous blending of all line injected additives. Such methods may include meter or tank gauge readings or test results taken at intervals to provide confidence in the injection process.

ii. When FSII is required, additive concentration must be verified based on a representative sample from each shipping conveyance.

(c) Conformance to specification requirements at the custody transfer point is required, however, prior to shipment, a laboratory hand blend of JP-5 fuel with all additives required by this contract shall be tested to verify compliance with the required specification (except for MSEP). MSEP analysis shall be performed per the Contractor’s election in MIL-DTL-5624W.

(d) BATCH SAMPLING: The Contractor shall provide one 20 mL sample per each individual tank in a procurement batch.

NOTE: This sample is in addition to those required in accordance with Quality Assurance Provision (QAP) E1

QUANTITY OF SAMPLE WHEN SAMPLED SUBMISSION PERIOD

20 mL Upon completion of each individual procurement batch Shipped within 30 days of procurement batch delivery

“Batch” Definition in accordance with MIL-STD-3004, 3.1.9: A specific quantity of product that is processed or utilized as a single unit and tested to meet test criteria and specifications.

DEFENSE LOGISTICS AGENCY ENERGY Page 2 of 2

The sample from each tank/batch shall be either an all-level sample or a composite of upper, middle, and lower samples. A copy of the batch’s full-specification test report shall accompany each sample. The sample container shall be any 20 mL amber borosilicate vial with a polytetrafluoroethylene (PTFE) lined screw cap. A tracking number for the samples shall be provided to: Thomas Loegel at thomas.loegel@nrl.navy.mil or (202) 767-1716. Samples shall be shipped to:

US Naval Research Laboratory ATTN: Thomas Loegel, Code 6181

JP-5 Component Analysis Library Project 4555 Overlook Ave., S.W.

Washington D.C. 20375-5320

The paperwork provided with these samples shall include the following information:

• Contract Number

• Contractor’s Name

• Product

• Refinery Location

• Quantity of Tank/Batch

• For samples containing synthetic components, include the following additional information:

• Manufacturer of synthetic component

• Batch Number

• Date of Test Report

• Quantity of Tank/Batch

• Percent Composition

• Production Process of Synthetic Component

• Feedstock

Prepared by

Quality Technical Support Office Approval

Contracting Approval mailto:Robert.morris@nrl.navy.mil

C16.01 TURBINE FUEL, AVIATION (JP5) (DLA ENERGY APRIL 2018)

c. FLASH POINT.

e. MICRO-SEPAROMETER (MSEP) REQUIREMENTS.

(b) ADDITIVES.

c. Line injection of additives (FSII and CI/LI) from shipping tank to delivery conveyance or other free on board (FOB) point is permitted under the following conditions:

2018-04-25T09:13:12-0400

YEN.CHENG.H.1539446041

2018-04-25T09:18:48-0400

BANISZEWSKI.DANIEL.J.1287388698

2018-04-26T16:45:01-0400

SHEPHERD.SANDRA.S.1012568459

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 2

C16.08-1 TURBINE FUEL, AVIATION (JET A) (DLA ENERGY APRIL 2020)

Jet A shall conform to the requirements of ASTM D 1655, Standard Specification for Aviation Turbine Fuels, except as modified below, at the custody transfer point

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE

DLA ENERGY PRODUCT

CODE

9130-00-359-2026 Turbine Fuel, Aviation, Jet A JAA

Supplies delivered under this contract shall conform to all Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation in a manner consistent with any existing or after-imposed Title V (Clean Air Act) Permits.

(a) SPECIFICATION MODIFICATIONS

(1) Microseparometer (MSEP).

(i) The following MSEP ratings apply in the presence of the additives listed below. Values apply at point of manufacture:

Jet-A Additive MSEP Rating, min.

Fuel System Icing Inhibitor (FSII) 85

Corrosion Inhibitor/Lubricity Improver (CI/LI) 80 Fuel System Icing Inhibitor (FSII) and Corrosion

Inhibitor/Lubricity Improver (CI/LI)

(2) Fatty Acid Methyl Ester (FAME)

(i) For offerors that will be offering Jet A FOB Destination and/or Origin TT, which involves staging jet fuel at a terminal via a multi-product pipeline, a Certificate of Quality of the issue tank must include testing for FAME for Acceptance of the fuel. The Test method to be used is either IP 585, IP 583, IP 590, IP 599, or ASTM D 7797. The Referee Method is IP

585. Current ASTM D1655 Jet A specification allows no more than 50 parts per million of FAME in jet fuel.

(b) ADDITIVES.

(1) Additives shall not be premixed with other additives before injection into the fuel.

(2) FUEL SYSTEM ICING INHIBITOR (FSII). When required by contract line item-

(i) FSII shall be added to the fuel and shall be Diethylene Glycol Monomethyl Ether (DIEGME) conforming to ASTM D4171, Standard Specification for FSIIs, Type III or MIL-DTL-85470B, dated June 15, 1999 Inhibitor, Icing, Fuel System, High Flash, NATO Code Number S-1745.

(ii) FSII shall be added to the fuel so that the resulting concentration in the final blend is between 0.07% and 0.10% by volume.

(iii) When using the 20-ounce aerosol can to introduce FSII during over the wing refueling, determine the fuel quantity and calculate the amount of required additive. This additive shall be added gradually during filling to permit proper blending in the fuel. One can of aerosol additive will inhibit 180 gallons of fuel to 0.087 percent by volume. The use of aerosol FSII is not permitted for U.S. Navy aircraft refueling.

(3) CORROSION INHIBITOR/LUBRICITY IMPROVER (CI/LI). When required by contract line item-

(i) The additive must conform to MIL-PRF-25017H with Amendment 1, dated August 4, 2011 Inhibitor, Corrosion/Lubricity

Improver, Fuel Soluble (NATO S-1747), found in ASSIST and shall be listed in the electronic Qualified Products List (QPL)-25017, located in the Qualified Products Database (QPD) found at https://assist.dla.mil (or http://quicksearch.dla.mil)

(ii) The concentration of CI/LI added to the fuel must be between the minimum effective concentration and the maximum allowable concentration as listed for the CI/LI in QPL-25017.

(4) STATIC DISSIPATER ADDITIVE (SDA). When required by contract line item-https://assistdocs.com/ https://assistdocs.com/ http://quicksearch.dla.mil/

DEFENSE LOGISTICS AGENCY ENERGY Page 2 of 2

(i) SDA shall be added to the fuel and the conductivity limits of 50 to 600 picosiemens per meter (pS/m) at ambient temperature or 29.4oC (85oF), whichever is lower, unless otherwise directed by the procuring activity.

(5) METAL DEACTIVATOR (MDA). MDA shall not be used unless the supplier has obtained PRIOR written consent from the procuring activity.

(6) Product shall be homogeneously mixed. Until all aviation turbine fuel tanks are coated, it is acceptable to perform stratification tests in lieu of circulating tanks to achieve homogeneity.

(c) REPORTS. Refer to the MATERIAL INSPECTION AND RECEIVING REPORT (QAP E40.01) contract provision for reporting requirements.

Quality / Technical Support Office Approval:

2020-04-02T15:38:06-0400

YEN.CHENG.H.1539446041

2020-04-02T15:47:16-0400

BANISZEWSKI.DANIEL.J.1287388698

2020-04-03T12:05:03-0400

CATLIN.JOSHUA.D.1276289540

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 1

Office Approval

C16.09 TURBINE FUEL, AVIATION (JET A1) (DLA ENERGY OCT 2017)

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE

DLA ENERGY PRODUCT

CODE

9130-00-753-5026 Turbine Fuel, Aviation, Jet A-1 JA1

Supplies delivered under this contract shall conform to all Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. This includes delivery of fuel and documentation in a manner consistent with any existing or after-imposed Title V (Clean Air Act) Permits. The list of such requirements contained in this contract is not intended to be a complete list, and the Contractor shall be responsible for determining the existence of all such requirements. Selected regional environmental requirements are highlighted in the SPECIFICATIONS (CONT’D) clause. In the event that a Federal, State, or local environmental requirement is more stringent than a fuel specification contained in this contract, the Contractor shall deliver product that complies with the more stringent fuel specification. Product that fails to meet the more stringent fuel specification will be considered to be a nonconforming supply. Product(s) to be supplied shall fully meet the requirements of the applicable specification(s) as cited above. In the event that compliance with the more stringent fuel specification causes the contractor to incur additional costs, the contractor may request an equitable adjustment.

Product shall conform to the latest version of ASTM D1655: Standard Specification for Aviation Turbine Fuels with the following modifications. For European, Middle Eastern, and Asian Locations Only: product shall conform to the latest revision of Defence Standard 91-091.

(a) SPECIFICATION MODIFICATIONS

(1) Microseparometer (MSEP).

(i) The following MSEP ratings apply in the presence of the additives listed below. Values apply at point of manufacture:

Jet A-1 Additive MSEP Rating, min.

Fuel System Icing Inhibitor (FSII) 85

Corrosion Inhibitor/Lubricity Improver (CI/LI) 80 Fuel System Icing Inhibitor (FSII) and Corrosion Inhibitor/Lubricity Improver (CI/LI) 70

(b) ADDITIVES: Additives shall not be premixed with other additives before injection into the fuel.

(1) FUEL SYSTEM ICING INHIBITOR (FSII). When FSII is required by contract line item—

(i) The fuel shall contain 0.07 to 0.10 percent by volume FSII.

(ii) FSII shall be added to the fuel and shall be Diethylene Glycol Monomethyl Ether (DIEGME) conforming to ASTM D4171, Standard Specification for FSIIs, Type III or MIL-DTL-85470B, dated June 15, 1999 Inhibitor, Icing, Fuel System, High Flash, NATO Code Number S-1745.

(iii) When using the 20-ounce aerosol can to introduce FSII during over the wing refueling, determine the fuel quantity and calculate the amount of required additive. This additive shall be added gradually during filling to permit proper blending in the fuel. One can of aerosol additive will inhibit 180 gallons of fuel to 0.087 percent by volume. The use of aerosol FSII is not permitted for U.S. Navy aircraft refueling.

(2) CORROSION INHIBITOR/LUBRICITY IMPROVER (CI/LI). When CI/LI is required by contract line item the additive shall conform to the latest revision of MIL-PRF-25017H with amendment 1 dated August 4, 2011, and be listed in Qualified Products List (QPL)-25017. In order to obtain dosage data for QPL-25017 additives, log into ASSIST Online, access the Qualified Products Database (QPD), do a search for QPL number 25017, and click the MIL-PRF-25017 Category 1 link. The dosage information is located in the "source notes" for each qualified additive as minimum effective and maximum allowable concentrations in grams per cubic meter (g/m3).

(3) STATIC DISSIPATER ADDITIVE (SDA). When required by contract line item-

(i) SDA shall be added to the fuel and the conductivity limits of 50 to 600 picosiemens per meter (pS/m) at ambient temperature or

29.4oC (85oF), whichever is lower, unless otherwise directed by the procuring activity.

(4) METAL DEACTIVATOR ADDITIVE (MDA). MDA shall not be used unless the supplier has obtained written consent from the procuring activity and user.

(i) Product shall be homogeneously mixed. Until all aviation turbine fuel tanks are coated, it is acceptable to perform stratification tests in lieu of circulating tanks to achieve homogeneity.

2017-10-24T08:07:38-0400

WEDDELL.MARGARET.E.1502957461

2017-10-24T08:14:48-0400

BANISZEWSKI.DANIEL.J.1287388698

2017-10-24T09:00:27-0400

SHEPHERD.SANDRA.S.1012568459

DEFENSE LOGISTICS AGENCY ENERGY Page 1 of 5

C16.23 FUEL, NAVAL DISTILLATE (F-76) (DLA ENERGY APRIL 2020)

NATIONAL STOCK NUMBER PRODUCT NOMENCLATURE DLA ENERGY PRODUCT CODE

9140-00-273-2377 Fuel, Naval Distillate F76

For supplies delivered under this contract, the Contractor shall conform to all International, Federal, State, and local environmental requirements applicable to the geographic location of the receiving activity on the date of delivery. The Contractor shall also comply with all applicable International Agreements, Treaties, Conventions, and the like to which the United States is a signatory or with whose terms the receiving activity has otherwise agreed to comply, including but not limited to, the requirements of MARPOL 73/78 Annex VI Regulations 14 and 18. The Contractor shall be responsible for determining the existence of all such requirements prior to the time deliveries are made. This includes delivery of fuel and documentation in a manner consistent with any existing or after-imposed Title V (Clean Air Act) Permits. The list of such requirements contained in this contract is not intended to be a complete list, and the Contractor shall be responsible for determining the existence of all such requirements. In the event that an International, Federal, State, and/or local environmental requirement, as identified above, is more stringent than a requirement contained in this contract, the Contractor shall deliver product(s) that complies with the more stringent requirement. Product(s) that fails to meet the more stringent requirement will be considered nonconforming supply. Product(s) to be supplied shall fully meet the requirements of the applicable specification(s). In the event that compliance with the more stringent requirement causes the contractor to incur additional costs, the contractor may request an equitable adjustment.

Unless otherwise indicated by the Contractor in writing, prior to award, the product offered shall be required to fully meet all applicable specifications. The supplier shall provide to the receiving vessel a “Statutory Sample” of at least 400 mL in volume, taken from the receiving vessel’s inlet bunker manifold, together with a Bunker Delivery Note (BDN). This sample will be sealed and carry a sample tag that provides the documentation required per MARPOL 73/78, Annex VI Regulation 18.

a) Naval Distillate Fuel (F-76) shall conform to the requirements of Military specification MIL-DTL-16884P dated 26 Sept 2017.

Nomenclature for Naval Distillate Fuel (F-76) is shown above.

b) SPECIFICATION MODIFICATIONS:

1) Flash Point: All batches of F-76 that are presented for Government acceptance at origin shall meet a minimum flash point requirement of 62.5 degrees Celsius (°C).

2) F-76 offered from a location other than where refined (excludes synthesized material as defined in section 3.2.2 and 3.2.3 of MIL- DTL-16884P) requires testing for FAME content by test method ASTM D7963, BS EN 14078, or IP 579. ASTM D7963 is considered to be the referee test method.

3) In Australia, all deliveries of F-76 shall have a minimum Flash Point of 62.5°C at the custody transfer point.

c) MATERIALS: The F-76 supplied under this contract shall not contain un-hydrotreated light cycle oils or contain any stabilizer additives, or any other additive or material not explicitly allowed per section 3.2 of MIL-DTL-16884P.

For F-76 containing a synthetic component, the synthetic component shall be certified to Tables A-I and A-II of MIL-DTL-16884P. It is not necessary to analyze each batch of the synthetic component for compliance with Table A-II once it is demonstrated that the process scheme is adequately controlled and if no significant changes to existing production operations have been made, such as a turnaround event on a refinery unit used to produce the synthetic component or a change in feedstock material. The signed F-76 synthetic component certification page shall be supplied for each shipment which includes synthetic paraffinic materials attesting that no changes to the production process have been made and certifying that the last certificate of analysis, dated and including Table A- II results, is still valid.

d) ADDITIVES:

1) Lubricity Improver Additive (LIA) – Lubricity additives are allowed in F-76. The LIA additive(s) used shall conform to MIL-PRF-

32490A, Performance Specification, Additive, Lubricity Improver, Diesel, dated 24 May 2019 and found in ASSIST and shall be listed in the electronic Qualified Products List (QPL)-32490, located in the Qualified Products Database (QPD) found at https://assist.dla.mil/ (or http://quicksearch.dla.mil) . Instructions on how to use ASSIST are located in QAP C1.02. Either Grade A.

Grade B, or Grade C material is suitable for treatment of de-sulfurized F-76. Additive concentration shall not exceed the maximum allowable concentration applicable to the specific additive selected for inclusion in finished F-76.

2) Information pertaining to qualification of additives not currently listed on QPL-32490 may be obtained from Commander, Naval Sea Systems Command, ATTN: SEA 05S, 1333 Isaac Hull Avenue, SE, Stop 5160, Washington Navy Yard, DC 20376-5160, USA, or by e-mailing CommandStandards@navy.mil.

3) Dyes and Markers - Red dye required in off-highway diesel fuel in accordance with 40 CFR Part 80 as modified by the

DEFENSE LOGISTICS AGENCY ENERGY Page 2 of 5

Environmental Protection Agency's interim final rule published in the Federal Register dated July 14, 1994 shall not be added to F-

76. The finished product shall show no visual evidence of red dye. This F-76 product is for military, off-highway use only and must be segregated at all times from any diesel fuel used on-highway. NOTE: Red dye does not apply to Atlantic/Europe/Mediterranean or Western Pacific Overseas Bulk purchase programs unless offering refinery is located in the United States or one of its possessions.

e) BATCH SAMPLING: The Contractor shall provide one 20 mL sample per each individual tank in a procurement batch.

NOTE: This sample is in addition to those required in accordance with Quality Assurance Provision (QAP) E1

QUANTITY OF SAMPLE WHEN SAMPLED SUBMISSION PERIOD

20 mL Upon completion of each individual

Shipped within 30 days of delivery of

“Batch” Definition in accordance with MIL STD 3004, 3.1.9: A specific quantity of product that is processed or utilized as a single unit and tested to meet test criteria and specifications.

The sample from each tank/batch shall be either an all-level sample or a composite of upper, middle, and lower samples. A copy of the full-specification test report shall accompany each sample. The sample container will be any 20 mL amber borosilicate vial with a polytetrafluoroethylene (PTFE) lined screw cap. A tracking number for the samples shall be provided to: Thomas Loegel at Thomas.loegel@nrl.navy.mil or (202) 404-1157. Samples shall be shipped to:

US Naval Research Laboratory ATTN: Thomas Loegel, Code 6181 F76 Component Analysis Forensic Project 4555 Overlook Ave., S.W.

Washington D.C. 20375-5320

The paperwork provided with these samples shall include the following information:

Contract Number Contractor’s Name Product Refinery Location Quantity of Tank/Batch

For samples containing synthetic components, include the following additional information:

Manufacturer of synthetic component Batch Number Date of Test Report Quantity of Tank/Batch Percent Composition Production Process of Synthetic Component Feedstock

f) TRACEABILITY:

1) F-76 fuel supplied under this contract shall maintain traceability with respect to additives and materials, which is defined as the ability to trace the individual batch of fuel back to the original point of manufacture through documentation.

2) All traceability documentation shall be sufficient to guarantee that at no point have any unauthorized materials or additives been blended into the final product or any of its associated blend components per section 3.2 Material of MIL-DTL-16884P.

3) For all F-76 supplied, the traceability documentation shall consist of statement(s) attesting to the materials composition, which includes materials derived from non-petroleum sources, additives and their concentration levels. Additives and concentrations to be reported include LIAs outlined in section d.1 above and any trace additives resulting from existing tank heels, product trail-back in a multiproduct system, all product blending operations, etc.

DEFENSE LOGISTICS AGENCY ENERGY Page 3 of 5

4) If F-76 is produced by means of blending, the traceability requirement and documentation for additives and materials shall apply to each blending component used from the point of manufacture through the blend operation. Materials composition, additives and their concentration levels shall be included. The requirement and intent of traceability for blend components is not to obtain full certificates of analysis of each individual blend component, but for certification that no unapproved additives or materials are present in blend components used.

5) The form titled: “F-76 Traceability Signature Page” (attached below) shall be used to document conformance with the provisions of this traceability paragraph. The offeror/supplier shall comply with this requirement utilizing one of the three options below and notification shall be provided to both the contracting office and QT@dla.mil during the pre-award phase which option was chosen for compliance. Documents provided in conjunction with individual shipments shall be uploaded into Wide Area Work Flow as attachments under the quality tab.

i) OPTION 1 – As part of the offeror submission package the offeror shall provide the traceability signature page from each entity in the supply chain providing and/or handling F-76 product and/or blending components all the way back to the point of manufacture. For each individual shipment, the supplier will submit a traceability page signed only by the awardee.

ii) OPTION 2 – As part of the offer submission package the offeror shall provide the traceability signature page, signed only by the offeror. Upon award and prior to the first shipment the awardee shall provide the signed traceability signature page from each entity in the supply chain providing and/or handling F-76 product and/or blending components all the way back to the point of manufacture. For each individual shipment, the supplier will submit a traceability page signed only by the awardee.

iii) OPTION 3 – As part of the offeror submission package, the offeror shall provide the traceability signature page, signed only by the offeror. For each individual shipment, the awardee shall provide the signed traceability signature page from each entity in the supply chain providing and/or handling F-76 product and/or blending components all the way back to the point of manufacture.

Regardless of the option chosen, the traceability sheet signed by offeror shall be submitted to both the contracting office and to QT@dla.mil during pre-award phase.

For OPTION 1 or OPTION 2, the purpose of the awardee submitting a signed traceability page with each shipment is to confirm that the initial traceability certification is still valid at the time of F-76 product shipment.

6) If at any point during the contract period the traceability information provided under OPTION 1 or OPTION 2 becomes invalid (i.e.

the supply chain is altered or the source of F-76 product or a blending component changes), the supplier shall notify both the contracting office and QT@dla.mil and updated documentation shall be provided.

Quality / Technical Support Office Approval:

DEFENSE LOGISTICS AGENCY ENERGY Page 4 of 5

F-76 Traceability Signature Page

Contract or Solicitation Number:

CLIN:

Order Number:

Shipment Number:

Traceability OPTION selected per paragraph e.5 (circle or otherwise indicate which one of the three options is chosen):

OPTION 1 OPTION 2 OPTION 3

F-76 fuel supplied under the above contract, CLIN, order number and shipment number maintains traceability with respect the materials composition, additives and their concentration levels.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .