Attachment 09 Mech 100_ 19-292.pdf

PDF 21 MB Posted

Attached to
Y1DA--635-414 Parking Garage 2 Construction Minor - OKC (VA-23-00002215)
Solicitation number
36C77623B0046
Issued by

About this file

This document provides details for a federal contract opportunity to construct a parking garage at the Oklahoma City VA Medical Center. The solicitation number is 36C77623B0046 and seeks bids for the construction of Parking Garage 2 under opportunity Y1DA--635-414. The Department of Veterans Affairs Technology Acquisition Center in Austin is the contracting agency. The scope of work involves all aspects of new construction for the parking garage, with responses due by the date specified in the full solicitation. Pricing will be fixed-price bids with construction to be completed within the timeframe outlined. This opportunity is set aside for verified service-disabled veteran-owned small businesses.

View the file

Other files

File Type Posted
2nd Visit Signed Sign in Sheet OKC Parking Garage 2.pdf PDF
36C77623B0046 0007.docx DOCX document
36C77623B0046 0006.docx DOCX document
36C77623B0046 0005.docx DOCX document
36C77623B0046 0004.docx DOCX document
Tech Questions Responses OKC Parking Garage Tracking Q _ A.pdf PDF
36C77623B0046 0003.docx DOCX document
36C77623B0046 0002.docx DOCX document
OKC DBA Wages Determination OKC County.pdf PDF
amendment Site visit Sheet 36C77623B0046 0001.pdf PDF
Site Visit signed Sign in Sheet OKC Parking Garage 2.pdf PDF
Signed Site visit Sheet 36C77623B0046 0001.pdf PDF
Attachment 13 - Contractor Safety - Environmental Form.docx DOCX document
Attachment 04 Struct 100_ 19-292.pdf PDF
Attachment 08 Plumb 100_ 19-292.pdf PDF
Attachment 11 Specs.pdf PDF
Attachment 07 FS 100_ 19-292.pdf PDF
Attachment 02 Civil 100_ 19-292.pdf PDF
Attachment 01 Gen 100_ 19-292.pdf PDF
Attachment 03 Land 100_ 19-292.pdf PDF
Attachment 06 Arch 100_ 19-292.pdf PDF
Attachment 15- Site Visit Instructions.docx DOCX document
36C77623B0046_1.docx DOCX document
Attachment 14 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 10 Elec 100_ 19-292.pdf PDF
Attachment 16- DBA Wages Determination.pdf PDF
Attachment 12 - Geotech Report.pdf PDF
Attachment 05 AP AW 100_ 19-292.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A/E ARCHITECT / ENGINEER

AAHX AIR TO AIR HEAT EXCHANGER

AB AIR BLENDER

AAV AUTOMATIC AIR VENT

ACC AIR-COOLED CONDENSER

ACCH AIR-COOLED CHILLER

ACCU AIR-COOLED CONDENSING UNIT

ACU AIR CONDITIONING UNIT

ACD AUTOMATIC CONTROL DAMPER,

MODULATING

ACD-TP AUTOMATIC CONTROL DAMPER,TWO

POSITION

AD ACCESS DOOR

AF AFTER FILTER

AFCV AIR FLOW CONTROL VALVE

AFF ABOVE FINISHED FLOOR

AFMD AIR FLOW MEASURING DEVICE

AFW AIR FOIL WHEEL (FAN)

AHU AIR-HANDLING UNIT

AMP AMPERAGE

AP ACCESS PANEL

APD AIR PRESSURE DROP

ARI AIR CONDITIONING AND

REFRIGERATION INSTITUTE

AS AIR SEPARATOR

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

AW AIR WASHER

AXF AXIAL FLOW

B BOILER

BD BUTTERFLY DAMPER

BDD BACKDRAFT DAMPER

BDR BASE BOARD RADIATOR

BFP BACKFLOW PREVENTER

BFT BOILER PLANT FIRE TUBE

BHP BRAKE HORSEPOWER

BHW HOT WATER HEATING BOILER

BHX BOILER BLOWDOWN HEAT

EXCHANGER

BIW BACKWARD INCLINED WHEEL (FAN)

BSC BIOLOGICAL SAFETY CABINETS

BT BUFFER TANK

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CENTIGRADE (CELSIUS)

CC COOLING COIL

CCD COOLING COIL CONDENSATE DRAIN

CENT CENTRIFUGAL

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFT CUBIC FEET

CFP CHEMICAL FEED PUMP

CH CHILLER

CHWP CHILLED WATER PUMP

CHW CHILLER WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CM CARBON MONOXIDE

CM CUBIC METER

CM/S CUBIC METER PER SECOND

CO CLEAN OUT

CO2 CARBON DIOXIDE

COMP COMPRESSOR UNIT

COP COEFFICIENT OF PERFORMANCE

CP CONDENSATE PUMP

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

CV CONSTANT VOLUME

CW COLD WATER (POTABLE)

CHWCC CHILLED WATER COOLING COIL

D DAMPER - AUTOMATIC

D-1 OUTDOOR AIR DAMPER

D-2 RETURN AIR DAMPER

D-3 RELIEF AIR DAMPER

D-4 ECONOMIZER OUTDOOR AIR

DAMPER

dB DECIBELS Db DRY-BULB TEMPERATURE

DDC DIRECT DIGITAL CONTROLS

DEG DEGREE

DF DIFFUSER

DIA DIAMETER

DIW DEIONIZED WATER

DP DEW POINT TEMPERATURE

DP DIFFUSER PLATE

DPA DIFFERENTIAL PRESSURE

ASSEMBLY

DPS DIFFERENTIAL PRESSURE SENSOR

DX DIRECT EXPANSION

DXCC DIRECT EXPANSION COOLING COIL

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECC ENGINEERING CONTROL CENTER

EER ENERGY EFFICIENCY RATIO

EF EXHAUST FAN

EG EXHAUST GRILLE

EGS EMERGENCY GAS SHUTOFF

EH EXHAUST HOOD

EJ EXPANSION JOINT

EMD END OF MAIN DRIP (STEAM)

ENT ENTERING

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

EX EXISTING

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

F/SDPR COMBINATION FIRE SMOKE DAMPER

FA FREE AREA

FC FLEXIBLE CONNECTION

FCU FAN COIL UNIT (4 PIPE)

FCW FORWARD CURVED WHEEL (FAN)

FD FLOOR DRAIN

FD FIRE DAMPER

FF FINAL FILTER

FM FLOW METER

FPM FEET PER MINUTE

FPS FEET PER SECOND

FRP FIBER REINFORCED POLYESTER

FS FLOW SWITCH

FSTAT FREEZESTAT

FT FEET

FT-LB FOOT-POUND

FTR FIN TUBE RADIATION

FV FACE VELOCITY

GA GAUGE

GAL GALLONS

GH GRAVITY HOOD

GPD GALLONS PER DAY

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GS GALVANIZED STEEL

H HUMIDIFIER

H&CW HOT & COLD WATER

HAC HOUSEKEEPING AID CLOSET

HB HOSE BIBB

HC HEATING COIL

HD HEAD

HD HOOD

HHW HEATING HOT WATER

HHWC HEATING HOT WATER COIL

HHWP HEATING HOT WATER PUMP

HHWR HEATING HOT WATER RETURN

HHWS HEATING HOT WATER SUPPLY

HOA HAND/OFF/AUTOMATIC

HP HEAT PUMP

HP HORSEPOWER

HPDT HIGH PRESSURE DRIP TRAP

HPR HIGH PRESSURE RETURN (STEAM

CONDENSATE)

HPS HIGH PRESSURE SUPPLY (STEAM)

HRC HEAT RECOVERY COIL

HRD HEAT RECOVERY DEVICE

HRP HYDRONIC RADIANT (CEILING) PANEL

HRW HEAT RECOVERY WHEEL

HSTAT HUMIDISTAT

HUM HUMIDIFIER UNIT MOUNTED

HVU HEATING AND VENTILATING UNIT

HW HOT WATER

HWC HOT WATER COIL

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

Hz HERTZ

I/O INPUT/OUTPUT

IAQ INDOOR AIR QUALITY

IBT INVERTED BUCKET TRAP

ICF IN-LINE CENTRIFUGAL FAN

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER

IFB INTEGRAL FACE AND BYPASS

IN INCHES

IN HG INCHES OF MERCURY

IN WC INCH WATER COLUMN

IN WG INCH WATER GAUGE

IN-LB INCH-POUND

IPLV INTEGRATED PART LOAD VALUE

IRH INFRARED HEATER

IS INSECT SCREEN

IV INLET VANES

kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR

L LITER

L/s LITERS PER SECOND

LAT LEAVING AIR TEMPERATURE

LBS/HR POUNDS PER HOUR

LF LINEAR FOOT (FEET)

LH LATENT HEAT

LPR LOW PRESSURE RETURN (STEAM

CONDENSATE)

LPS LOW PRESSURE SUPPLY (STEAM)

LSD LINEAR SLOT DIFFUSER

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LVG LEAVING

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

M METER, SI UNIT

M/s METERS PER SECOND (OR

METERS/SECOND)

MA MIXED AIR

MAT MIXED AIR TEMPERATURE

MAV MANUAL AIR VENT

MAX MAXIMUM

MB MIXING BOX

MBH 1000 BTUH

MCA MINIMUM BRANCH CIRCUIT AMPACITY

MER MECHANICAL EQUIPMENT ROOM

MERV MINIMUM EFFICIENCY REPORTING

VALUE

MHP MOTOR HORSEPOWER

MIN MINIMUM

MM MILLIMETER

MOD MOTOR OPERATED CONTROL DAMPER

MOV MOTOR OPERATED VALVE

MPR MEDIUM PRESSURE RETURN (STEAM

CONDENSATE)

MPS MEDIUM PRESSURE SUPPLY (STEAM)

MTD MEAN TEMPERATURE DIFFERENCE

MVD MANUAL VOLUME DAMPER

NA NOT APPLICABLE

NC NOISE CRITERIA

NC NORMALLY CLOSED

NO NORMALLY OPEN

NOAA NATIONAL OCEANIC & ATMOSPHERIC

ADMINISTRATION

NOM NOMINAL

NPLV NON-STANDARD PART LOAD VALUE

NPSH NET POSITIVE SUCTION HEAD

NTS NOT TO SCALE

OA OUTSIDE AIR

OAI OUTSIDE AIR INTAKE

OD OUTSIDE DIAMETER

OR OPERATING ROOM

OSA OUTSIDE SUPPLY AIR

(CONDITIONED)

P PUMP

PC PUMPED CONDENSATE

PCF POUNDS PER CUBIC FOOT (FEET)

PD PRESSURE DROP

PF PRE-FILTER

PG PRESSURE GAGE

PHC PREHEAT COIL

PHCP PREHEAT COIL PUMP

PPM PARTS PER MILLION

PRV PRESSURE REGULATING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH –

ABSOLUTE

PSIG POUNDS PER SQUARE INCH – GAGE

PSS PRIMARY SECONDARY SYSTEM

PSV PRESSURE SAFETY VALVE

R/E RETURN OR EXHAUST

RA RETURN AIR

RAT RETURN AIR TEMPERATURE

RDS ROOM DATA SHEETS

REA RELIEF AIR

RF RETURN FAN

RG RETURN GRILLE

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RL REFRIGERANT LIQUID LINE

RLA RUN LOAD AMPERE

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

RV RELIEF VALVE

SA SUPPLY AIR

SAD SOUND ATTENUATING DEVICE

SAT SUPPLY AIR TEMPERATURE

SC SHADING COEFFICIENT

SCFM STANDARD CUBIC FEET PER MINUTE

SCR SILICON CONTROLLED RECTIFIER

SD SMOKE DETECTOR

SD SUPPLY AIR DIFFUSER

SDPR SMOKE DAMPER

SDR SMOKE DAMPER (RETURN)

SDS SMOKE DAMPER (SUPPLY)

SEN SENSIBLE HEAT

SF SUPPLY FAN

SH STEAM HUMIDIFIER

SHC STEAM HEATING COIL

SI SQUARE INCHES

SP STATIC PRESSURE

SP GR SPECIFIC GRAVITY

SPD SUPPLY PROCESS AND

DISTRIBUTION

SPRV STEAM PRESSURE REDUCING VALVE

SPS STATIC PRESSURE SENSOR

SQ FT SQUARE FOOT (FEET)

SR SUPPLY AIR REGISTER

SS STAINLESS STEEL

SSR SOLID SEPARATOR

ST STEAM TRAP

SV STEAM SAFETY VALVE

SVS STEAM VENT SILENCER

T & PCV TEMPERATURE AND PRESSURE

CONTROL VALVE

TAB TESTING, ADJUSTING, BALANCE

TD TEMPERATURE DIFFERENCE

TDH TOTAL DYNAMIC HEAD

TDS TOTAL DISSOLVED SOLIDS

TP TRAP

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TU TERMINAL UNIT

UC UNDER CUT

UH UNIT HEATER

UL UNDERWRITERS LABORATORY

V VALVE

VAF VANE-AXIAL FAN

VAV VARIABLE AIR VOLUME

VD VOLUME DAMPER (MANUAL

OPPOSED BLADE)

VFD VARIABLE FREQUENCY DRIVE

VHA VETERANS HEALTH ADMINISTRATION

VI VIBRATION ISOLATOR

VP VACUUM PUMP

VPS VARIABLE PRIMARY SYSTEM

VR VACUUM (STEAM CONDENSATE)

RETURN

VSD VARIABLE SPEED DRIVE

VUH VERTICAL UNIT HEATER

W WATTS

Wb WET-BULB (TEMPERATURE)

WFCV WATER FLOW CONTROL VALVE

WFM WATER FLOWMETER

WFMD WATER FLOW MEASURING DEVICE

WG WATER GAGE

WPD WATER SIDE PRESSURE DROP

XT EXPANSION TANK

YR YEAR

CO2 CARBON DIOXIDE SENSOR

HUMIDISTAT OR HUMIDITY SENSOR

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

ROUND FLEX DUCT

EQUIPMENT TAG

LINEAR SLOT DIFFUSER

BALANCING DAMPER

FIRE DAMPER

SMOKE DAMPER

D

R INCLINED RISE, IN

DIRECTION OF AIRFLOW

INCLINED DROP, IN DIRECTION

OF AIRFLOW

CONNECT NEW DUCT

TO EXISTING

LIMIT OF DEMOLITION

VANED ELBOW (PROVIDE ALL

SQUARE OR RECTANGULAR

ELBOWS WITH VANES EVEN IF

SYMBOL IS MISSING)

STANDARD RADIUS ELBOW

(LONG RADIUS)

10x8 NEW DUCT (INSIDE

DIMENSIONS: WIDTH X DEPTH)

EXISTING DUCT TO REMAIN

EXISTING DUCT TO BE

DEMOLISHED

DUCT TRANSITION

END MOUNTED OR SIDEWALL GRILLE

SUPPLY

RETURN45°

45°

DN

DN

UP

UP

DNUP

STANDARD BRANCH SUPPLY OR

RETURN, NO SPLITTER (45° TAP)

SUPPLY DUCT (UP & DOWN)

EXHAUST DUCT (UP & DOWN)

RETURN DUCT (UP & DOWN)

S-60

S-15

CR-15

CHWS

CHWR

HIGH PRESSURE STEAM

PIPING (60 PSI)

LOW PRESSURE STEAM PIPING

(15 PSI AND BELOW)

LOW PRESSURE STEAM

CONDENSATE RETURN

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

PIPE UP

PIPE DOWN

BOTTOM CONNECTION

TOP CONNECTION

CAPPED OR PLUGGED PIPE

GLOBE VALVE

GATE VALVE

BALL VALVE

STEAM SAFETY VALVE

PRESSURE REGULATING VALVE

WYE STRAINER VALVE

BALANCING VALVE

MODULATING TWO-WAY CONTROL

VALVE

STEAM TRAP

COND CONDENSATE DRAIN LINE

CR-60 HIGH PRESSURE STEAM

CONDENSATE RETURN

HWS

HWR

HEATING HOT WATER SUPPLY

PIPING

HEATING HOT WATER RETURN PIPING

RLS REFRIGERANT LINE SET (LIQUID

AND SUCTION)

CONNECT TO EXISTING PIPE

LIMIT OF DEMOLITION

INLINE CENTRIFUGAL PUMP

STEAM PRESSURE REDUCING

VALVE

DRAIN VALVE

TEST PLUG

SUPPLY

TERMINAL UNIT SUPPLY

DUCT BRANCH (CONICAL

TAP)

CHECK VALVE

FIRE / SMOKE DAMPER

VANED ELBOW (SHORT RADIUS) S-30

CR-30

MEDIUM PRESSURE STEAM

PIPING (16 PSI AND 59 PSI)

MEDIUM PRESSURE STEAM

CONDENSATE RETURN

THERMOSTAT OR TEMPERATURE SENSOR

TWO POSITION CONTROL VALVE

DIFFUSER TAG | DIFFUSER CFM

32-CU-4

EG-8 2000

MODULATING THREE-WAY

CONTROL VALVE

T

H

F

SD

FS

1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.

2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.

3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.

4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.

5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.

6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.

7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).

8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.

9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.

10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.

11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.

12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.

13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.

14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND

PIPING IN THE FIELD.

15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.

16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.

17. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.

18. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.

19. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.

20. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.

21. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.

22. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH COR.

23. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.

24. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE

NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.

25. INSTALL PIPING FREE OF SAGS AND BENDS.

26. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.

27. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.

28. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.

A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.

B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.

C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN.

D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.

29. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING

COORDINATION AT NO ADDITIONAL COST

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/5

/2

:5

:2

P M

C U s e rs

\t b u d a i\ D o c u m e n ts \M

P

-2

-O

K C

P a rk in g G a ra g e tb u d a i.

rv t

M-001

MECHANICAL GENERAL INFORMATION

1 5SMR

PARKING GARAGE 2

921 NE 13TH STREET

OKLAHOMA CITY, OK 73104

JULY 8, 2022

100% CONSTRUCTION DOCUMENTS

635-41419-292

N/A

PLH

MECHANICAL ABBREVIATIONS

MECHANICAL LEGEND

MECHANICAL GENERAL NOTES

DocuSign Envelope ID: DE6B1966-C688-4097-B859-109EA506307E

7/6/2022

PROPOSED

PARKING

GARAGE

EXISTING VAMC BUILDING

EXISTING PARKING GARAGE

NEW PARKING GARAGE

2"

2"

A S

T

,0

G

A L L O

N

A S

T

,0

G

A L L O

N

K

W G

E N

E R

A T

O R

K

W G

E N

E R

A T

O R

S W

IT

C

H G

E A

R

FUEL

PUMP

NEW DIESEL GENERATOR DTRP-1

FTP-1

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/5

/2

:5

:2

P M

C U s e rs

\t b u d a i\ D o c u m e n ts \M

P

-2

-O

K C

P a rk in g G a ra g e tb u d a i.

rv t

MS101

MECHANICAL SITE PLAN

2 5SMR

PARKING GARAGE 2

921 NE 13TH STREET

OKLAHOMA CITY, OK 73104

JULY 8, 2022

100% CONSTRUCTION DOCUMENTS

635-41419-292

N/A

PLH

Scale: No Scale

MECHANICAL SITE PLAN SCHEMATIC

1 EXISTING ABOVE GROUND DIESEL TANK YARD.

REFER TO SHEET M-501 FOR DETAILS.

2 PROVIDE 2'' FUEL OIL UNDERGROUND SUPPLY

AND RETURN PIPING FROM EXISTING DIESEL

TANKS TO NEW DIESEL GENERATOR.

3 CONNECT FUEL OIL SUPPLY AND RETURN

PIPING TO NEW GENERATOR IN ACCORDANCE

WITH GENERATOR MANUFACTURER'S

INSTRUCTIONS

4 CONNECT TO EXISTING FUEL OIL SUPPLY AND

RETURN PIPING IN THE DIESEL TANK YARD,

VERIFY SIZE OF EXISTING PIPING AND

CONNECTION LOCATIONS IN THE FIELD

5 PROVIDE PACKAGED FUEL OIL TRANSFER PUMP

ON CONCRETE PAD. INSTALL PER

MANUFACTURER'S INSTRUCTIONS.

N O

R T

H

ELEV EQUIP

MECH

TT

E1

ELEV

E2

ELEV

E3

FUTURE

ELEV

S1

STAIR

IU-100-1

IU-100-2

EUH-101

EUH-E3

EUH-E2

EUH-E1

EUH-S1-1

EUH-S1-2

T

EF-101

12"x12" EXHAUST LOUVER

12"x12" INTAKE

LOUVER OVER DOOR

DDC

CONTROL

PANEL

MOD

1" D

A

B

RS RL

RL RS

T

3.91.6

CO

IT

ELEC

SEC

T

T

T

OU-103

OU-102

OU-104

IU-104

T

T

T

1" D

1" D

1" D

RS RL

RS

RL

IU-102

D

E

RL

RS

4ø

RL

RS

RS

RL

M-601

5.5

CO

CO

CO

ELEV

LOBBY

E3

FUTURE

ELEV

E2

ELEV

E1

ELEV

S1

STAIR

IU-E4

OU-E4

T

1" D

RL

RS

A

B

C

OU-100-1

OU-100-2 7

RL

RS

RL

RS

1.6

B.6

CO

S2

STAIR

EUH-S2-1

EUH-S2-2

F

G

8.8

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/5

/2

:5

:2

P M

C U s e rs

\t b u d a i\ D o c u m e n ts \M

P

-2

-O

K C

P a rk in g G a ra g e tb u d a i.

rv t

MH401

ENLARGED MECHANICAL PLANS

3 5SMR

PARKING GARAGE 2

921 NE 13TH STREET

OKLAHOMA CITY, OK 73104

JULY 8, 2022

100% CONSTRUCTION DOCUMENTS

635-41419-292

N/A

PLH

1 PROVIDE INDOOR UNIT. INSTALL UNIT ABOVE

DOOR. COORDINATE EXACT LOCATION WITH

EQUIPMENT IN ROOM. ROUTE CONDENSATE

DRAIN TO STANDPIPE WITH AIR GAP FITTING.

2 PROVIDE OUTDOOR UNIT. MOUNT OUTDOOR

UNIT ON WALL PER DETAIL 1/M-601.

3 PROVIDE UNIT HEATER. SET AT 40 DEG. F FOR

FREEZE PROTECTION.

4 3/4'' CONDENSATE DRAIN TO ABOVE ROOF

SURFACE.

5 PROVIDE UNIT HEATER. SET AT 50 DEG. F.

6 PROVIDE INDOOR UNIT.

7 PROVIDE OUTDOOR UNIT. MOUNT UNIT ON

ROOF. REFER TO DETAIL 4/M-601.

8 BAS ZONE SENSOR TO MONITOR ROOM

TEMPERATURE AND TRIGGER AN ALARM FOR

EITHER HIGH OR LOW ROOM TEMPERATURE. IF

THE ROOM TEMPERATURE FALLS BELOW 38

DEG F (ADJ) AN ALARM IS ACTIVATED. IF THE

ROOM TEMPERARATURE RISES ABOVE 95 DEG

F (ADJ) AN ALARM IS ACTIVATED. THE BAS

SYSTEM SHALL MAINTAIN TRENDS FOR THE

ROOM TEMPERATURE IN MAXIMUM 10 MINUTE

INCREMENTS FOR AT LEAST THE PAST 30 DAYS.

9 PROVIDE INDOOR UNIT. MOUNT UNIT ON WALL.

COORDINATE EXACT LOCATION WITH

EQUIPMENT IN ROOM. ROUTE CONDENSATE

DRAIN TO STANDPIPE WITH AIR GAP FITTING.

10 PROVIDE 6" DIAMETER WALL CAP SIMILAR TO

GREENHECK MODE WC-6 (OR EQUAL),

ALUMINUM CONSTRUCTION AND FINISH, WITH

BACKDRAFT DAMPER AND BIRDSCREEN.

PROVIDE MANUAL DAMPER IN DUCT, BALANCE

TO 30 CFM.

11 1" CONDENSATE DRAIN TO AIR GAP FITTING.

REFER TO DETAIL 6/P-501.

12 1'' CONDENSATE DRAIN TO STORM DRAIN AIR

GAP FITTING.

13 REFRIGERANT PIPING THRU ROOF DOWN TO

FLOOR BELOW.

14 REFRIGERANT PIPING UP TO OUTDOOR UNITS.

15 PROVIDE INDOOR UNIT. ROUTE CONDENSATE

DRAIN TO OUTSIDE.

N

SCOPE OF WORK

KEY PLAN

SCALE: NO SCALE

AREA OF WORK

Scale: 1/4" = 1'-0"

ENLARGED LEVEL 1 MECHANICAL PLAN

N O

R T

H0 2 4 8

Scale: 1/4" = 1'-0"

ENLARGED LEVEL 1

MECHANICAL PLAN - IT 102,

ELEC 103, SECURITY 104

N O

R T

H0 2 4 8

Scale: 1/4" = 1'-0"

ENLARGED LEVEL 2 MECHANICAL PLAN

N O

R T

H0 2 4 8

Scale: 1/4" = 1'-0"

ENLARGED FIRST FLOOR

STAIR S2 MECHANICAL

PLAN

N O

R T

H0 2 4 8

A. COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR.

B. COORDINATE ALL THERMOSTAT LOCATIONS

WITH ALL OTHER WALL MOUNTED OBJECTS

BEFORE INSTALLATION.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/5

/2

:5

:2

P M

C U s e rs

\t b u d a i\ D o c u m e n ts \M

P

-2

-O

K C

P a rk in g G a ra g e tb u d a i.

rv t

M-501

MECHANICAL DETAILS

4 5SMR

PARKING GARAGE 2

921 NE 13TH STREET

OKLAHOMA CITY, OK 73104

JULY 8, 2022

100% CONSTRUCTION DOCUMENTS

635-41419-292

N/A

PLH

Scale: No Scale

EXISTING DIESEL TANK YARD

ALLOW MINIMUM 80'' FROM THE

FLOOR SURFACE TO THE BOTTOM

OF SUPPORT BRACKET. VERIFY

SELECTED OUTDOOR

UNITS/BRACKETS SATISFY 80''

REQUIREMENT.

CLEARANCES ON ALL

SIDES OF UNIT SHALL BE

IN ACCORDANCE WITH

MANUFACTURER'S

INSTRUCTIONS.

EXTERIOR W

ALL

BOLT UNIT TO WALL BRACKET,

SUPPORT PER

MANUFACTURER'S

RECOMMENDATIONS.

MANUFACTURER'S WALL

BRACKET, SECURE TO WALL

PER MANUFACTURER'S

RECOMMENDATIONS

REFRIGERANT LIQUID AND

SECTION LINES INTO

BUILDING

NOTE:

CLEARANCES INDICATED ARE THE MINIMUM REQUIRED. USE THESE

MINIMUM DIMENSIONS, MANUFACTURERS RECOMMENDATIONS, OR

LARGER IF INDICATED ON THE PLANS.

80''

WATERPROOF, UV

RESISTANT SEALANT

WATERPROOF, UV

RESISTANT SEALANT

PIPE INSULATION TO BE

CONTINUOUS THROUGH

PENETRATION

SLEEVE THROUGH

WALL, TRIM FLUSH WITH

FINISHED SURFACE

EXTERIOR PIPE

INSULATION SHALL

HAVE 28 GAUGE

ALUMINUM JACKET

INTERIOREXTERIOR

EXTERIOR WALL

EXTERIOR WALL

EXTERIOR WALL

CORE DRILL WALL

3/4" CONDENSATE

DRAIN PIPING ABOVE CEILING.

UNLESS OTHERWISE NOTED ON

PLAN.

SEAL PIPE PENETRATION

INSIDE AND OUT.

FINISHED FLOORROOF

CEILING

ELECTRICAL DISCONNECT ON WALL

OR STAND, MAINTAIN 30" WIDE BY 3

FEET DEEP CLEARANCE

42" HIGH GUARD RAIL

FOR ANY SURFACE

HEIGHT DIFFERENCE

GREATER THAN 30"

WITHIN 10 FEET OF UNIT.

CLEARANCES ON ALL

SIDES OF UNIT SHALL

BE IN ACCORDANCE

WITH

MANUFACTURER'S

INSTRUCTIONS.

BOLT UNIT TO CURB TOP

PER MANUFACTURER'S

RECOMMENDATIONS

18" TALL ROOF CURB -

INSTALL PER

MANUFACTURER'S

RECOMMENDATIONS

REFRIGERANT LIQUID AND SECTION

LINES INTO BUILDING, ONLY ONE

PENETRATION THROUGH THE EXTERIOR

WALL SHALL BE PROVIDED FOR EACH

GROUPING OF CONDENSING UNITS

FLEXIBLE CONDUIT

EXTERIOR W

ALL OR PARAPET

NOTE:

1. CLEARANCES INDICATED ARE THE MINIMUM REQUIRED. USE THESE MINIMUM DIMENSIONS,

MANUFACTURERS RECOMMENDATIONS, OR LARGER IF INDICATED ON THE PLANS.

ROOF

FLASHING PER ROOFING

MANUFACTURER'S

RECOMMENDATIONS

NOTES:

1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.

2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE

REGARDLESS OF W DIMENSION.

3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE BETWEEN

VANES AND A 3/4" TRAILING EDGE.

4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE TYPE.

W1

W

NOTES:

1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS THIGHTLY.

2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.

3. SEE SMACNA 2005, FIGURE 9-16

INSULATION

DUCT

GASKET

INSULATION

SECTION "A-A"

ACCESS PANEL

CASING

GASKET HANDLE INSIDE

FLEXIBLE WASHER

FACTORY

FABRICATED LATCH

SECTION "B-B"

ACCESS DOOR

INSULATION

"B" "B"

"A"

"A"

SPLIT SYSTEM:

RUN CONDITIONS - CONTINUOUS:

THE UNIT SHALL RUN CONTINUOUSLY AND SHALL MAINTAIN:

A 77° F (ADJ.) COOLING SETPOINT

ALARMS SHALL BE PROVIDED AS FOLLOWS:

HIGH ZONE TEMP: IF THE ZONE TEMPERATURE IS GREATER THAN THE

COOLING SETPOINT BY A USER DEFINABLE AMOUNT (ADJ.).

ZONE SETPOINT ADJUST:

THE OCCUPANT SHALL BE ABLE TO ADJUST THE ZONE TEMPERATURE

COOLING SETPOINT AT THE ZONE SENSOR.

FAN:

THE FAN SHALL RUN ANYTIME THE UNIT IS COMMANDED TO RUN,

UNLESS SHUTDOWN ON SAFETIES.

RA SA T

AI - ZONE TEMP

HARDWARE POINTS SOFTWARE POINTS

POINT NAME

HIGH ZONE TEMP

AI AO BI BO AV BV LOOP SCHED TREND ALARM SHOW ON GRAPHIC

TOTALS

TOTAL HARDWARE (1) TOTAL SOFTWARE (1)

X

11 0 0 0 0 0 0 0 0 2

REFER TO SPECIFICATION SECTION 23 09 23 FOR INTEGRATION REQUIREMENTS

ZONE TEMP X

X

X

LEVEL 1 SW STAIR

0"

LOWER LEVEL

-4' - 0"

LEVEL 01 NE STAIR

-1' - 2"

LEVEL 1

0"

/4

/4

OU-104 OU-103 OU-102

INSTALL TIGHT TO

BOTTOM OF

CONCRETE TEE (TYP.)

NOTE: ALLOW MINIMUM 80'' FROM THE FLOOR SURFACE TO THE BOTTOM OF SUPPORT

BRACKET. VERIFY SELECTED OUTDOOR UNITS/BRACKETS SATISFY 80'' REQUIREMENT.

IT

102ELEC

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/5

/2

:5

:3

P M

C U s e rs

\t b u d a i\ D o c u m e n ts \M

P

-2

-O

K C

P a rk in g G a ra g e tb u d a i.

rv t

M-601

MECHANICAL SCHEDULES AND

DETAILS

5 5SMR

PARKING GARAGE 2

921 NE 13TH STREET

OKLAHOMA CITY, OK 73104

JULY 8, 2022

100% CONSTRUCTION DOCUMENTS

635-41419-292

N/A

PLH

MARK LOCATION

CONDENSING UNIT

COMPRESSOR TYPE

CAPACITY

(BTU)

ELECTRICAL

REMARKSMCA MOCP VOLTAGE PHASE

OU-100-1 ROOF DC INVERTER-DRIVEN TWIN ROTARY 24,000 17.1 20 208 1 1, 3, 4

OU-100-2 ROOF DC INVERTER-DRIVEN TWIN ROTARY 24,000 17.1 20 208 1 1, 3, 4

OU-102 OUTSIDE IT 102 DC INVERTER-DRIVEN TWIN ROTARY 18,000 14 24 208 1 1, 2, 3, 5, 8

OU-103 OUTSIDE IT 102 DC INVERTER-DRIVEN TWIN ROTARY 18,000 14 24 208 1 1, 2, 3, 5, 8

OU-104 OUTSIDE IT 102 DC INVERTER-DRIVEN TWIN ROTARY 18,000 10 15 208 1 1, 3, 7, 8

OU-E4 ROOF DC INVERTER-DRIVEN TWIN ROTARY 12,000 14 24 208 1 1, 2, 3, 6

MARK LOCATION

INDOOR UNIT

TYPE AIRFLOW

CAPACITY

(BTU) EAT DB

ELECTRICAL

VOLTAGE PHASE

IU-100-1 ELEV EQUIP 100 WALL MOUNTED UNIT 738-628-544-469-388 24,000 75 °F 208 1

IU-100-2 ELEV EQUIP 100 WALL MOUNTED UNIT 738-628-544-469-388 24,000 75 °F 208 1

IU-102 IT 102 CEILING CASSETTE 475-420-300 18,000 75 °F 208 1

IU-104 SECURITY 104 WALL MOUNTED UNIT 625-530-431-328 18,000 75 °F 208 1

IU-113 ELEC 103 CEILING CASSETTE 475-420-300 18,000 75 °F 208 1

IU-E4 ELEV LOBBY 200 CEILING CASSETTE 335-265-230 12,000 75 °F 208 1

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PROVIDE WITH STANDARD WALL THERMOSTAT AND FILTER ALONG WITH CONDENSATE PUMP.

3. INDOOR UNIT POWERED THROUGH CONDENSING UNIT.

4. BASIS OF DESIGN: MITSUBISHI MSY-GL24NA & MUY-GL24NA WALL-MOUNTED AIR-CONDITIONING SYSTEM.

5. BASIS OF DESIGN: MITSUBISHI SLZ-KF18NA & SUZ-KA18NA2 CEILING-CASSETTE HEAT PUMP SYSTEMS.

6. BASIS OF DESIGN: MITSUBISHI SLZ-KF12NA & SUZ-KA12NAHZ CEILING-CASSETTE HEAT PUMP SYSTEMS.

7. BASIS OF DESIGN: MITSUBISHI MSZ-HM18NA & MUZ-HM18NA WALL-MOUNTED HEAT PUMP SYSTEM.

8. PROVIDE WITH MANUFACTURER'S WALL MOUNTING BRACKET.

DUCTLESS SPLIT SCHEDULE

MARK LOCATION TYPE

CAPACITY

(BTU) KW VOLTAGE PHASE REMARKS

EUH-101 MECH 101 ELECTRIC 2,560 0.75 120 1 1,2,3

EUH-E1 ELEV E1 ELECTRIC 2,560 0.75 120 1 1,2,3

EUH-E2 ELEV E2 ELECTRIC 2,560 0.75 120 1 1,2,3

EUH-E3 ELEV E3 ELECTRIC 2,560 0.75 120 1 1,2,3

EUH-S1-1 STAIR S1 ELECTRIC 10,236 3 208 1 1,2,3

EUH-S1-2 STAIR S1 ELECTRIC 10,236 3 208 1 1,2,3

EUH-S2-1 STAIR S2 ELECTRIC 10,236 3 208 1 1,2,3

EUH-S2-2 STAIR S2 ELECTRIC 10,236 3 208 1 1,2,3

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. INTEGRAL THERMOSTAT.

3. CONVECTION SPECIALTY HEATER.

ELECTRIC UNIT HEATER SCHEDULE

FAN SCHEDULE

MARK LOCATION BUILDING/AREA SERVED AIRFLOW TSP

FAN MOTOR ELECTRICAL

REMARKSTYPE DRIVE

NOMINAL POWER

PHASE VOLT R.P.M.BHP HP

EF-101 MECH 101 MECH 101 200 CFM 0.20 in-wg INLINE CENTRIFUGAL DIRECT 0.02 0.05 115 690 11

Scale: No Scale

WALL MOUNTED CONDENSING UNIT

Scale: No Scale

EXTERIOR WALL PIPE PENETRATION

Scale: No Scale

EXTERIOR CONDENSATE DRAIN PIPING DETAIL

Scale: No Scale

CONDENSING UNIT INSTALLATION DETAIL - ON ROOF CURB

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

Scale: No Scale

DUCTWORK SQUARE VANE ELBOWS

Scale: No Scale

ACCESS PANEL AND DOOR DETAIL

Scale: No Scale

SPLIT SYSTEM CONTROL SCHEMATIC

Scale: No Scale

WALL MOUNTED OUTDOOR UNITS DETAIL

3. SIZED AND PROVIDED BY FUEL EQUIPMENT VENDOR.

2. PACKAGED SYSTEM. EXACT REQUIRMENTS TO BE COORDINATED WITH EQUIPMENT USED.

1. FLOW RATE LISTED IS MINIMUM REQUIRED FLOW.

NOTES:

FTP-1 GENERATOR GENERATOR - MAIN TANKS TRANSFER PUMP DUPLEX PACKAGED 1.5 1 DIESEL 10 50 93 2 3 208 NOTES 1, 2

DTRP-1 GENERATOR GENERATOR FUEL OIL RETURN PUMP TRANSFER PUMP PACKAGED 1 1 DIESEL NOTE 3 NOTE 3 NOTE 3 NOTE 3 NOTE 3 NOTE 3 NOTES 2 AND 3

FLUID FLOW HEAD TEMPERATURE NOMINAL MOTOR PHASE VOLT REMARKS

MARK LOCATION AREA AND/OR BLDG SERVED

SYSTEM AND/OR

SERVICE

TYPE INLET SIZE DISCHARGE SIZE

CIRCULATING FLUID ELECTRICAL DATA

FUEL OIL PUMP SCHEDULE

FUEL OIL PUMP SCHEDULE

Sheets
M-001 - MECHANICAL GENERAL INFORMATION
MS101 - MECHANICAL SITE PLAN
MH401 - ENLARGED MECHANICAL PLANS
M-501 - MECHANICAL DETAILS
M-601 - MECHANICAL SCHEDULES AND DETAILS
2022-07-13T10:02:32-0700
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .