This is a Quality Assurance Surveillance Plan (QASP) document that establishes the procedures and guidelines the Government will use to monitor contractor performance under a Cost Plus Fixed Fee task order for FDRMC Engineering Support Services awarded under the SeaPort NxG contract vehicle. The QASP defines the roles and responsibilities of Government personnel including the Contracting Officer, Contracting Officer's Representative (COR), Contract Specialist, and Technical Advisors in conducting surveillance activities. The document outlines nine inspection methods available for monitoring contractor performance: direct observation, management information systems analysis, periodic inspection, user surveys, validated customer complaints, 100% inspection, periodic sampling, random sampling, and progress/status meetings.
The QASP establishes specific performance standards and acceptable quality levels (AQLs) across four key performance elements tracked in a Surveillance Matrix: Quality and Schedule of Deliverables (requiring greater than 95% timely submission without rework through monthly 100% inspection of CDRLs), Overall Performance/Management (requiring a Satisfactory or higher CPAR rating through weekly status meetings and direct observation), Invoicing/Cost Control (requiring 100% accuracy in timely invoices reviewed in WAWF), and Regulatory Compliance with FAR clause 52.222-50 on Combating Trafficking in Persons (requiring 100% compliance through 100% inspection). Formal quarterly inspections will be conducted during each active performance period, with monthly surveillance results reported to the Contracting Officer. Non-compliance will result in Contract Discrepancy Reports (CDRs) requiring written contractor responses within five days, with potential consequences including task order termination, loss of future Government contracts, and non-exercise of available options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 08 CDRL_A0002_ROSTER.pdf | ||
| Attachment 07 CDRL_A0001_CO MGMT REPORT.pdf | ||
| Attachment 01 Past Performance Information.doc | DOC document | |
| Attachment 09 CDRL_A0003_ODC REPORT.pdf | ||
| Attachment 04 Calculation of Indirect Costs.xlsx | XLSX spreadsheet | |
| Attachment 03 DD Form 254_ENG.pdf | ||
| Solicitation - N6817126RN005.pdf | ||
| Attachment 02 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 10 CDRL_A0004_TRIP REPORT.pdf | ||
| Attachment 05 Support for Unloaded Labor Rates and Costs.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. INTRODUCTION
This Quality Assurance Surveillance Plan (QASP) sets forth the procedures and guidelines FDRMC will use in ensuring the expected outcomes or performance objectives are achieved by the contractor.
2. PURPOSE
This QASP ensures that FDRMC has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion. It provides the detailed process for a continuous oversight process:
· What will be monitored
· How monitoring will take place
· Who will conduct the monitoring
· How monitoring efforts and results will be documented
Per NAVSEAINST 4200.19 (series), this QASP will identify the method(s) that will be used to monitor all expenditures.
3. AUTHORITY
Authority for the issuance of this QASP is provided under contract Section E, Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation called for in service contracts, to be executed by the Contracting Officer (KO) or a duly authorized representative.
4. ROLES AND RESPONSIBILITIES
The following Government personnel shall oversee and coordinate surveillance activities.
| 4.1 | Contracting Officer (KO) - The KO ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interest of the United States in the contractual relationship. It is the KO that assures the contractor receives impartial, fair, and equitable treatment under the task order. |
| 4.2 | Contracting Officer’s Representative (COR) - The COR is responsible for providing continuous oversight of the contractor’s performance and it will be performed by utilizing this QASP. The COR may seek assistance from assigned Technical Advisors (TAs) to conduct surveillance, however the COR determines the overall rating based on received input. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action. |
4.3 Contract Specialist (CS) - The CS is an individual assigned by a KO to assist in the daily administration of the contract. The CS may assist in providing input to the KO and COR on the quality of performance for areas addressed in this QASP. The CS is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf.
4.4 Technical Advisor (TA) - An individual designated by the COR to assist in surveilling and administering specific tasks under the contract. A TA cannot, in any manner, alter the scope of the task order, make commitments, or authorize any changes on the Government’s behalf.
5. CONTRACTOR REPRESENTATIVES
Contractor employees that have been designated by the contractor as being responsible for managing performance on the contract, such as the Program Manager and/or Task Manager, should be included during the execution of the QASP. This will increase their understanding of this process and provide awareness of the Acceptable Quality Levels (AQLs) that must be met and should minimize disagreements between the contractor and Government on bestowed performance ratings.
6. REQUIREMENTS
The effort performed in accordance with this QASP does not replace any other requirement for evaluating contractor performance, such as a CPARS report. The following sub-sections provide details of the effort involved to satisfactorily comply with this QASP.
6.1 Surveillance – The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The primary methods of surveillance used to monitor performance will include, but not be limited to, random or periodic sampling, periodic or 100% inspection, and validated customer complaints. The COR conducts surveillance in accordance with the inspection methods contained in the Surveillance Matrix (hereinafter referred to as the Matrix), Attachment 1, to determine if the contractor is in compliance with contract requirements and has met the cited performance standards and AQLs.
6.2 Surveillance Matrix (Matrix) – The Matrix contains the performance objectives and standards that must be met by the contractor in order to be deemed compliant. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements.
Performance objectives define the desired outcomes and performance standards define the level of service required under the contract to successfully meet the performance objective. The inspection methods define how, when, and what will be assessed in measuring performance. The AQL identifies the lowest level of contractor performance deemed to be acceptable. If the lowest AQL is 100%, which means no deviation is allowed, then an AQL will not be cited in the Matrix.
6.3 Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the task order.
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the task order for the required content, quality, timeliness, and accuracy.
c. Cost – The COR will review monthly cost vouchers to monitor the contractor’s expenditures throughout the performance period(s). Also, the COR will analyze the impact on cost of any inaccurate management assertions, acceleration of the due dates for the financial reports, or the lack of personnel.
d. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.11, the Government will assess the contractor’s record of conforming to requirements and to standards of good workmanship, the contractor’s record of forecasting and controlling costs (for cost-reimbursement), the contractor’s adherence to schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior, and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
6.4 Inspection – A formal inspection to determine if the required results are being achieved will be performed quarterly. The inspection dates and inspection periods will align with the contract’s active Period of Performance (POP). Each inspection will encompass all work performed by the contractor at any time during the respective inspection period but will not include cumulative information from prior inspections. The COR may invite the contractor to submit a self-assessment, if submitted the COR will consider the contractor’s input when conducting the inspection.
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
| 6.5 | Incentives/Disincentives - The COR makes an annual report on contractor performance (CPARS and/or other annual reports). The contractor’s failure to achieve satisfactory performance, reflected in the COR’s annual report, may result in termination of the task order and may also result in the loss of future Government contracts/task orders. The contractor’s failure to achieve satisfactory performance may result in the non-exercise of any available options. |
| 7. | DOCUMENTATION |
7.1 Surveillance – The results of the on-going surveillance conducted in accordance paragraph 6.1 hereinabove will be emailed to the KO monthly.
7.2 Inspection – The results of each inspection, in accordance with paragraph 6.4 hereinabove, will be reported by completing the Matrix. This matrix when completed will document the government’s assessment of the contractor’s performance for each specific inspection and the aggregate of these matrices will aid in the creation of a CPARS report. A copy of each completed Surveillance Matrix will be provided to the contracting officer.
7.3 Contract Discrepancy Report (CDR) – For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
For cost-reimbursement contracts, in accordance with inspection of services provisions, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional fee, to replace or correct work that fails to meet requirements. To maximize the profit earned on costs incurred, the contractor is incentivized to ensure that quality products are provided in a timely manner.
8. CHANGES
Decisions regarding changes to this QASP will be clearly documented and shall be approved by the contracting officer before being implemented via modification.
9. TYPES OF INSPECTION METHODS
9.1 DIRECT OBSERVATION - Can be performed periodically or through 100% surveillance.
9.2 MANAGEMENT INFORMATION SYSTEMS (MIS) - Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.
9.3 PERIODIC INSPECTION - Uses a comprehensive evaluation of selected outputs. Inspections may be scheduled daily, weekly, monthly, quarterly, or annually or unscheduled, as required.
9.4 USER SURVEY - Combines elements of validated user complaints and random sampling. User survey is conducted to solicit user satisfaction. Appropriate for high quantity activities that have historically been satisfactory. May also generate periodic and 100% inspections.
9.5 VALIDATED USER/CUSTOMER COMPLAINTS - Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.
9.6 100% INSPECTION - Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security. This surveillance method should be used for deliverables.
9.7 PERIODIC SAMPLING - Variation of random sampling. However, sample is only taken when a deficiency is suspected. Good follow-up to MIS analysis. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.
9.8 RANDOM SAMPLING - Designed to evaluate the outputs of the award requirement by randomly selecting and inspecting a statistically significant sample. Highly recommended for large quantity repetitive activities with objective and measurable quality attributes.
9.9 PROGRESS OR STATUS MEETINGS – Obtain performance results/data via meetings.
| 10. | CPAR RATING DEFINITIONS |
| Performance |
Rating Definition
| Exceptional |
| Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective. |
| Very Good |
| Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective. |
| Satisfactory |
| Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory. |
| Marginal |
| Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented. |
| Unsatisfactory |
| Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective. |
Surveillance Matrix
| Contract No. | Rating Period: | Frequency: Quarterly | |
| Performance Element | |||
| Performance Requirement | |||
| Surveillance Method | |||
| Frequency | |||
| Acceptable Quality Level | |||
| Rating |
| Quality and Schedule of Deliverables |
| Deliverables/ |
CDRLs furnished as prescribed in the PWS, attachments, etc. as applicable.
| 100% Inspection of CDRLs by the COR; Validated complaints |
| Monthly |
| >95% of deliverables submitted timely and without rework required. |
Overall Performance/ Management
| Overall performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual CPAR on contractor performance |
| Status Meetings; Direct Observation |
| Weekly; Annual or at completion of performance |
| All performance elements rated Satisfactory (or higher) |
| Invoicing/Cost Control |
| Invoices are timely and accurate. |
| Review and acceptance of the invoice in WAWF |
| As specified in the order |
| 100% accuracy |
| Regulatory Compliance of FAR clause 52.222-50, Combating Trafficking in Persons |
| 100% compliance with the clause |
| 100% inspection |
| As specified in FAR clause 52.222-50 |
| 100% compliance |
Overall Rating:
COR Signature and Date: ______________________________________ Notes: