Attachment 04 Calculation of Indirect Costs.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- FDRMC ENGINEERING SUPPORT SERVICES
- Solicitation number
- N6817126RN005
About this file
This is a pricing template in the form of an Excel spreadsheet for calculating indirect costs associated with a proposal response. The file is designed to assist contractors in determining and documenting their indirect cost rates and allocations for the FDRMC Engineering Support Services task order being solicited under the SeaPort NxG contract vehicle. The template provides a structured format for contractors to input their indirect cost calculations, including overhead, general and administrative expenses, and other indirect costs that would be factored into their Cost Plus Fixed Fee proposal pricing. By using this calculation sheet, contractors can ensure consistent and transparent indirect cost methodology that aligns with federal contracting requirements and the specific pricing terms of the SeaPort NxG task order. The spreadsheet serves as a supporting document to substantiate the pricing proposals submitted by active SeaPort contract holders to the Department of the Navy Naval Supply Systems Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 09 CDRL_A0003_ODC REPORT.pdf | ||
| Attachment 03 DD Form 254_ENG.pdf | ||
| Solicitation - N6817126RN005.pdf | ||
| Attachment 08 CDRL_A0002_ROSTER.pdf | ||
| Attachment 07 CDRL_A0001_CO MGMT REPORT.pdf | ||
| Attachment 01 Past Performance Information.doc | DOC document | |
| Attachment 10 CDRL_A0004_TRIP REPORT.pdf | ||
| Attachment 05 Support for Unloaded Labor Rates and Costs.xlsx | XLSX spreadsheet | |
| Attachment 06 QUALITY ASSURANCE SURVEILLANCE PLAN.docx | DOCX document | |
| Attachment 02 Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Total | Total | |||||||||||||||||||||
| SOW | Labor | Labor | Base | Base | Base | Option 1 | Option 1 | Option 1 | Option 2 | Option 2 | Option 2 | Option 3 | Option 3 | Option 3 | Option 4 | Option 4 | Option 4 | EXT | EXT | EXT | ||
| PWS | Location | Labor Category Description per PWS | Hours | Costs | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount | Rate | Hours | Amount |
| 3.1.5.1 | Bahrain | Engineering Technician - Mechanical Auxiliary | 2112 | 2112 | 2112 | 2112 | 2112 | 1056 | ||||||||||||||
| 3.1.5.2 | Bahrain | Engineering Technician - Mechanical Hydraulics | 2112 | 2112 | 2112 | 2112 | 2112 | 1056 | ||||||||||||||
| 3.1.5.3 | Bahrain | Production Controller - D level planner | 2112 | 2112 | 2112 | 1056 | ||||||||||||||||
| 3.1.5.4 | Bahrain | Production Controller - IMA Planner | 2112 | 2112 | 2112 | 1056 | ||||||||||||||||
| 3.1.5.5 | Rota | Production Controller - Dive Planner | 2112 | 2112 | 2112 | 2112 | 2112 | 1056 | ||||||||||||||
| 3.1.6 | Rota | Technician - METCAL Program | 2112 | 2112 | 2112 | 2112 | 2112 | 1056 | ||||||||||||||
| 3.2.1 | Rota | Engineering Technician - Marine Gas Turbine Inspector | 2112 | 2112 | 2112 | 2112 | 2112 | 1056 | ||||||||||||||
| 3.2.2 | Rota | Combat System Technician - CANES/Afloat Network | 2112 | 2112 | 2112 | 2112 | 2112 | 1056 | ||||||||||||||
| 3.2.3 | Rota | Combat System Technician - SPY Technician | 2112 | 2112 | 2112 | 2112 | 2112 | 1056 | ||||||||||||||
| Total Hours | 14784 | 14784 | 19008 | 19008 | 19008 | 9504 | ||||||||||||||||
| Full Time Equivalent (FTE) | 7 | 7 | 9 | 9 | 9 | 9 |
Rate Base Costs Rate Base Costs Rate Base Costs Rate Base Costs Rate Base Costs Rate Base Costs
Applicable Indirect Rates
| Notes: | Show calculation and allocation of prime and subcontor indirect |
| rates. Separate schedule for prime and subcontractor. |
File details come from the government source that posted it. Updated .