Attachment 05 Support for Unloaded Labor Rates and Costs.xlsx

XLSX spreadsheet 38 KB Posted

Attached to
FDRMC ENGINEERING SUPPORT SERVICES
Solicitation number
N6817126RN005
Issued by

About this file

This is a labor rate support document that provides unloaded labor rates and hours for multiple labor categories supporting an engineering services task order. The file presents staffing requirements across a base period and four option periods, with an extension option, for positions located in Bahrain and Rota. The labor categories include Engineering Technicians (Mechanical Auxiliary and Hydraulics), Production Controllers (D-level planner and IMA Planner), Dive Planners, METCAL Program Technicians, Marine Gas Turbine Inspectors, and Combat System Technicians (CANES/Afloat Network and SPY). The base period requires 14,784 total hours, while option periods 1 through 4 maintain consistent hours of 14,784 (option period 1) and 19,008 hours each (option periods 2-4). The extension option covering six months requires 9,504 hours. The document includes columns for unloaded labor rates, costs, and notes on the basis of salary determination, which may reference current employees, salary surveys, or subcontractor rates, though the specific rate values are not populated in the provided file content.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Period

BaseBase
PeriodPeriod
UnloadedUnloaded
SOWLaborLabor
PWSLocationLabor Category Description per PWSHoursRateCostsNotes on Basis of Salary such as current employee, salary survey, subcontractor, labor category rates etc.
3.1.5.1BahrainEngineering Technician - Mechanical Auxiliary2112
3.1.5.2BahrainEngineering Technician - Mechanical Hydraulics2112
3.1.5.3BahrainProduction Controller - D level planner
3.1.5.4BahrainProduction Controller - IMA Planner
3.1.5.5RotaProduction Controller - Dive Planner2112
3.1.6RotaTechnician - METCAL Program2112
3.2.1RotaEngineering Technician - Marine Gas Turbine Inspector2112
3.2.2RotaCombat System Technician - CANES/Afloat Network2112
3.2.3RotaCombat System Technician - SPY Technician2112
Hours14784

Option Period 1

BaseBase
PeriodPeriod
UnloadedUnloaded
SOWLaborLabor
PWSLocationLabor Category Description per PWSHoursRateCostsNotes on Basis of Salary such as current employee, salary survey, subcontractor, labor category rates etc.
3.1.5.1BahrainEngineering Technician - Mechanical Auxiliary2112
3.1.5.2BahrainEngineering Technician - Mechanical Hydraulics2112
3.1.5.3BahrainProduction Controller - D level planner
3.1.5.4BahrainProduction Controller - IMA Planner
3.1.5.5RotaProduction Controller - Dive Planner2112
3.1.6RotaTechnician - METCAL Program2112
3.2.1RotaEngineering Technician - Marine Gas Turbine Inspector2112
3.2.2RotaCombat System Technician - CANES/Afloat Network2112
3.2.3RotaCombat System Technician - SPY Technician2112
Hours14784

Option Period 2

BaseBase
PeriodPeriod
UnloadedUnloaded
SOWLaborLabor
PWSLocationLabor Category Description per PWSHoursRateCostsNotes on Basis of Salary such as current employee, salary survey, subcontractor, labor category rates etc.
3.1.5.1BahrainEngineering Technician - Mechanical Auxiliary2112
3.1.5.2BahrainEngineering Technician - Mechanical Hydraulics2112
3.1.5.3BahrainProduction Controller - D level planner2112
3.1.5.4BahrainProduction Controller - IMA Planner2112
3.1.5.5RotaProduction Controller - Dive Planner2112
3.1.6RotaTechnician - METCAL Program2112
3.2.1RotaEngineering Technician - Marine Gas Turbine Inspector2112
3.2.2RotaCombat System Technician - CANES/Afloat Network2112
3.2.3RotaCombat System Technician - SPY Technician2112
Hours19008

Option Period 3

BaseBase
PeriodPeriod
UnloadedUnloaded
SOWLaborLabor
PWSLocationLabor Category Description per PWSHoursRateCostsNotes on Basis of Salary such as current employee, salary survey, subcontractor, labor category rates etc.
3.1.5.1BahrainEngineering Technician - Mechanical Auxiliary2112
3.1.5.2BahrainEngineering Technician - Mechanical Hydraulics2112
3.1.5.3BahrainProduction Controller - D level planner2112
3.1.5.4BahrainProduction Controller - IMA Planner2112
3.1.5.5RotaProduction Controller - Dive Planner2112
3.1.6RotaTechnician - METCAL Program2112
3.2.1RotaEngineering Technician - Marine Gas Turbine Inspector2112
3.2.2RotaCombat System Technician - CANES/Afloat Network2112
3.2.3RotaCombat System Technician - SPY Technician2112
Hours19008

Option Period 4

BaseBase
PeriodPeriod
UnloadedUnloaded
SOWLaborLabor
PWSLocationLabor Category Description per PWSHoursRateCostsNotes on Basis of Salary such as current employee, salary survey, subcontractor, labor category rates etc.
3.1.5.1BahrainEngineering Technician - Mechanical Auxiliary2112
3.1.5.2BahrainEngineering Technician - Mechanical Hydraulics2112
3.1.5.3BahrainProduction Controller - D level planner2112
3.1.5.4BahrainProduction Controller - IMA Planner2112
3.1.5.5RotaProduction Controller - Dive Planner2112
3.1.6RotaTechnician - METCAL Program2112
3.2.1RotaEngineering Technician - Marine Gas Turbine Inspector2112
3.2.2RotaCombat System Technician - CANES/Afloat Network2112
3.2.3RotaCombat System Technician - SPY Technician2112
Hours19008

-8 Extension

OptionSixSix
YearMonthMonth
FourEXTEXT
SOWUnloadedEscalationUnloadedLabor
PWSLocationLabor Category Description per PWSHoursRatePercentRateCosts
3.1.5.1BahrainEngineering Technician - Mechanical Auxiliary1056
3.1.5.2BahrainEngineering Technician - Mechanical Hydraulics1056
3.1.5.3BahrainProduction Controller - D level planner1056
3.1.5.4BahrainProduction Controller - IMA Planner1056
3.1.5.5RotaProduction Controller - Dive Planner1056
3.1.6RotaTechnician - METCAL Program1056
3.2.1RotaEngineering Technician - Marine Gas Turbine Inspector1056
3.2.2RotaCombat System Technician - CANES/Afloat Network1056
3.2.3RotaCombat System Technician - SPY Technician1056
Hours9504