Attachment 04 - Exhibit Line Item Number Sheet.xlsx
XLSX spreadsheet 108 KB Posted
- Attached to
- Base Operations Support Services, Ft. Wainwright, AK Federal contract opportunity
- Solicitation number
- W912CN22R0013
About this file
This document provides details for a federal solicitation seeking base operations support services. The U.S. Army Contracting Command through the 413th Regional Contracting Office in Hawaii is soliciting proposals for non-personal services to provide maintenance, repair, waste management and other facilities support services at Fort Wainwright in Alaska and its training areas. The single-award IDIQ contract has a one-year base period and four one-year options. The requirement is 100% set aside for small businesses with a NAICS code of 561210 and size standard of $41.5 million. Services include fire system, solid waste, grounds, and paved/unpaved area maintenance as well as HVAC, plumbing and more to support military, government and contractor personnel at Fort Wainwright and its locations. Offerors should review the solicitation documents for requirement details and monitor sam.gov for amendments, with proposals due by the specified closing date.
View the file
Other files for this federal contract opportunity
Show all 50
Base Operations Support Services, Ft. Wainwright, AK has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Period
| CLIN Number | ELIN Number | Description | # of Pri 1 Jobs | Unit Price | Total Price | # of Pri 2 Jobs | Unit Price | Total Price | # of Pri 3 Jobs | Unit Price | Total Price | TOTAL VALUE | ||||
| Priority 1 | Priority 2 | Priority 3 | ||||||||||||||
| CLIN 0001 | Annex A (Overarching PWS) – Administrative – Job - 131 | |||||||||||||||
| RPR of DPW Owned/Operated Wheeled Equipment | Job | 5 | 1 | 0 | 1 | 0 | 3 | 0 | 0 | |||||||
| CLIN 0002 | Annex A (Overarching PWS) – Administrative - Job – 132 | |||||||||||||||
| ELIN 0002AA | CBA Adjustment | Job | 1 | 0 | 0 | |||||||||||
| ELIN 0002AB | Service Contract Report | Job | 1 | 0 | 0 | |||||||||||
| CLIN 0003 | Annex E - Solid Waste - Monthly - 131 | |||||||||||||||
| ELIN 0003AA | Refuse Collection and Relocation | Mth | 10 | 0 | 0 | |||||||||||
| ELIN 0003AB | Dumpster Maintenance | Mth | 10 | 0 | 0 | |||||||||||
| CLIN 0004 | Annex F - Maintenance Grounds - Monthly - 131 | |||||||||||||||
| Ground Maintenance Services | Mth | 10 | 0 | 0 | ||||||||||||
| CLIN 0005 | Annex F - Maintenance Grounds - Job - 131 | |||||||||||||||
| ELIN 0005AA | Ground Maintenance Services | Job | 41 | 1 | 0 | 5 | 0 | 35 | 0 | 0 | ||||||
| ELIN 0005AB | Hauling, Structural Lift/Transport | Job | 45 | 1 | 0 | 5 | 0 | 39 | 0 | 0 | ||||||
| CLIN 0006 | Annex G - Snow, Ice, and Sand Removal - Monthly - 131 | |||||||||||||||
| ELIN 0006AA | Snow, Ice, Sand Removal Services – Airfield | Mth | 10 | 0 | 0 | |||||||||||
| ELIN 0006AB | Snow, Ice, Sand Removal Services - FWA Roads | Mth | 10 | 0 | 0 | |||||||||||
| ELIN 0006AC | Snow, Ice, Sand Removal Services - YTA Roads | Mth | 10 | 0 | 0 | |||||||||||
| ELIN 0006AD | Snow, Ice, Sand Removal Services - DTA/Black Rapids Roads | Mth | 10 | 0 | 0 | |||||||||||
| ELIN 0006AE | Snow, Ice, Sand Removal Services - Non Org Park | Mth | 10 | 0 | 0 | |||||||||||
| ELIN 0006AF | Snow, Ice, Sand Removal Services - Org Park | Mth | 10 | 0 | 0 | |||||||||||
| CLIN 0007 | Annex G - Snow, Ice, and Sand Removal – Job - 131 | |||||||||||||||
| ELIN 0007AA | Snow, Ice, Sand, and Debris Removal Services | Job | 39 | 2 | 0 | 4 | 0 | 33 | 0 | 0 | ||||||
| ELIN 0007AB | Parking Lot Pass-Through Lane | Job | 13 | 1 | 0 | 1 | 0 | 11 | 0 | 0 | ||||||
| ELIN 0007AC | Small Scale Snow Removal Up to 500 SF | Job | 8 | 1 | 0 | 6 | 0 | 1 | 0 | 0 | ||||||
| CLIN 0008 | Annex G - Snow, Ice, Sand Removal Services - Airfield Grey Eagle De-Icing - Monthly - 131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - Airfield Grey Eagle De-Icing | Mth | 10 | ||||||||||||||
| CLIN 0009 | Snow, Ice, Sand Removal Services - BLM - Job - 131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - BLM | Job | 1 | 0 | |||||||||||||
| CLIN 0010 | LOGCAP Snow, Ice and Sand Removal Services -Job -131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - LOGCAP | Job | 18 | 1 | 0 | 2 | 0 | 15 | 0 | 0 | |||||||
| CLIN 0011 | LOGCAP Snow, Ice and Sand Removal Services - Monthly - 131 | |||||||||||||||
| Snow, Ice, and Sand Removal Services - LOGCAP | Mth | 10 | ||||||||||||||
| CLIN 0012 | Annex H - Facility Preventative Maintenance – Job - 132 | |||||||||||||||
| ELIN 0012AA | PM of Air Compressors | Job | 825 | 0 | A | |||||||||||
| ELIN 0012AB | PM of Air Systems and Fans | Job | 1458 | 0 | C | |||||||||||
| ELIN 0012AC | PM of Automatic Doors | Job | 3 | 0 | ERROR:#REF! | A | ||||||||||
| ELIN 0012AD | PM of Backflow Prevention Systems | Job | 59 | 0 | D | C | ||||||||||
| ELIN 0012AE | PM of Boilers, Fireplaces and Furnaces | Job | 457 | 0 | E | C | ||||||||||
| ELIN 0012AF | PM of Clothes Dryer Venting | Job | 25 | 0 | F | C | ||||||||||
| ELIN 0012AG | PM of Domestic Hot Water Systems | Job | 33 | 0 | G | D | ||||||||||
| ELIN 0012AH | PM of Emergency/Exit Light Systems | Job | 361 | 0 | H | E | ||||||||||
| ELIN 0012AI | PM of Fire Alarm and Control Systems | Job | 433 | 0 | I | F | ||||||||||
| ELIN 0012AJ | PM of Gate Controllers | Job | 6 | 0 | J | G | ||||||||||
| ELIN 0012AK | PM of Fire Suppression Engines | Job | 12 | 0 | K | H | ||||||||||
| ELIN 0012AL | PM of Fire Suppression Systems | Job | 81 | 0 | L | I | ||||||||||
| ELIN 0012AM | PM of Fuel Dispensing Systems | Job | 8 | 0 | M | J | ||||||||||
| ELIN 0012AN | PM of Gas Monitoring and CO Sensors | Job | 428 | 0 | N | K | ||||||||||
| ELIN 0012AO | PM of Generators | Job | 240 | 0 | O | K | ||||||||||
| ELIN 0012AP | PM of Grounding Points | Job | 27 | 0 | P | L | ||||||||||
| ELIN 0012AQ | PM of High Pressure Washers | Job | 76 | 0 | Q | M | ||||||||||
| ELIN 0012AR | PM of Kitchen Equipment – Commercial | Job | 160 | 0 | R | N | ||||||||||
| ELIN 0012AS | PM of Lightning Protection | Job | 44 | 0 | S | O | ||||||||||
| ELIN 0012AT | PM of Overhead Doors | Job | 102 | 0 | T | P | ||||||||||
| ELIN 0012AU | PM of Playground Equipment and Areas | Job | 17 | 0 | U | Q | ||||||||||
| ELIN 0012AV | PM of Recycle Wash Water Systems | Job | 132 | 0 | V | R | ||||||||||
| ELIN 0012AW | PM of Refrigeration Equipment Systems | Job | 197 | 0 | W | S | ||||||||||
| ELIN 0012AX | PM of Ski Hill Lifts | Job | 5 | 0 | X | T | ||||||||||
| ELIN 0012AY | PM of Traffic Signals | Job | 8 | 0 | Y | U | ||||||||||
| ELIN 0012AZ | PM of UPS Systems | Job | 38 | 0 | Z | V | ||||||||||
| ELIN 0012BA | PM of Water Distribution | Job | 8 | 0 | A | W | ||||||||||
| ELIN 0012BB | PM of Between Occupancy Maintenance | Job | 1271 | 0 | B | X | ||||||||||
| ELIN 0012BC | PM of Air Conditioning Systems | Job | 632 | 0 | ||||||||||||
| ELIN 0012BC | PM of Heating Systems | Job | 1063 | 0 | ||||||||||||
| ELIN 0012BD | PM of Lift Stations and Grease Traps | Job | 270 | 0 | ||||||||||||
| CLIN 0013 | Annex H - Facility Maintenance – Monthly - 132 | C | Y | |||||||||||||
| PM of Signs | Mth | 10 | 0 | D | Z | |||||||||||
| CLIN 0014 | Annex H - Facility Maintenance (DMO) - Job - 132 | E | Z | |||||||||||||
| ELIN 0014AA | Abatement Services – Asbestos | Job | 3 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | F | AA | ||||
| ELIN 0014AB | Abatement Services – Mold | Job | 3 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | G | AB | ||||
| ELIN 0014AC | RPR of Air Compressors and Systems | Job | 58 | 2 | 0 | 6 | 0 | 50 | 0 | 0 | H | AC | ||||
| ELIN 0014AD | RPR of Bailers and Compactors | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | I | AD | ||||
| ELIN 0014AE | RPR of Boilers, Fireplaces, and Furnaces | Job | 60 | 3 | 0 | 6 | 0 | 51 | 0 | 0 | J | AE | ||||
| ELIN 0014AF | RPR of Cabinets and Counter Tops | Job | 35 | 1 | 0 | 4 | 0 | 30 | 0 | 0 | K | AF | ||||
| ELIN 0014AG | RPR of Ceilings | Job | 75 | 3 | 0 | 8 | 0 | 64 | 0 | 0 | L | AG | ||||
| ELIN 0014AH | RPR of Clothes Dryer Vents | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | M | AH | ||||
| ELIN 0014AI | RPR of Coatings | Job | 20 | 1 | 0 | 2 | 0 | 17 | 0 | 0 | N | AH | ||||
| ELIN 0014AJ | RPR of Cranes – Overhead | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | O | AI | ||||
| ELIN 0014AK | RPR of Dock Levelers | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | AJ | |||||
| ELIN 0014AL | RPR of Domestic Water Systems | Job | 220 | 11 | 0 | 22 | 0 | 187 | 0 | 0 | AK | |||||
| ELIN 0014AM | RPR of Doors | Job | 503 | 18 | 0 | 38 | 0 | 347 | 0 | 0 | AL | |||||
| ELIN 0014AN | RPR of Electrical Systems | Job | 1665 | 72 | 0 | 146 | 0 | 1347 | 0 | 0 | AM | |||||
| ELIN 0014AO | RPR of Exhaust and Supply Air Systems | Job | 98 | 4 | 0 | 10 | 0 | 84 | 0 | 0 | AN | |||||
| ELIN 0014AP | RPR of Eyewash Stations/Safety Showers | Job | 57 | 2 | 0 | 5 | 0 | 50 | 0 | 0 | AO | |||||
| ELIN 0014AQ | RPR of Fences and Gates | Job | 55 | 2 | 0 | 6 | 0 | 47 | 0 | 0 | AP | |||||
| ELIN 0014AR | RPR of Fire Alarm Systems | Job | 439 | 21 | 0 | 44 | 0 | 374 | 0 | 0 | AQ | |||||
| ELIN 0014AS | RPR of Fire Suppression Engines | Job | 11 | 1 | 0 | 1 | 0 | 9 | 0 | 0 | AR | |||||
| ELIN 0014AT | RPR of Fire Suppression Systems | Job | 22 | 1 | 0 | 2 | 0 | 19 | 0 | 0 | AS | |||||
| ELIN 0014AU | RPR of Floors, Decks, Ramps and Stairs | Job | 105 | 4 | 0 | 11 | 0 | 90 | 0 | 0 | AT | |||||
| ELIN 0014AV | RPR of Fuel Dispensing Systems | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | AU | |||||
| ELIN 0014AW | RPR of Generators | Job | 88 | 4 | 0 | 9 | 0 | 75 | 0 | 0 | AV | |||||
| ELIN 0014AX | RPR of Heating Systems | Job | 741 | 36 | 0 | 75 | 0 | 630 | 0 | 0 | AW | |||||
| ELIN 0014AY | RPR of High Pressure Washers | Job | 23 | 1 | 0 | 2 | 0 | 20 | 0 | 0 | AX | |||||
| ELIN 0014AZ | RPR of Kitchen Equipment | Job | 127 | 6 | 0 | 13 | 0 | 108 | 0 | 0 | AY | |||||
| ELIN 0014BA | RPR of Masonry | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | AZ | |||||
| ELIN 0014BB | RPR of Miscellaneous Items | Job | 153 | 7 | 0 | 15 | 0 | 131 | 0 | 0 | BA | |||||
| ELIN 0014BC | RPR of Overhead Doors | Job | 182 | 8 | 0 | 19 | 0 | 155 | 0 | 0 | BB | |||||
| ELIN 0014BD | RPR of Playground Equip/Areas | Job | 4 | 1 | 0 | 1 | 0 | 2 | 0 | 0 | BC | |||||
| ELIN 0014BE | RPR of Plumbing Fixtures | Job | 631 | 30 | 0 | 64 | 0 | 537 | 0 | 0 | BD | |||||
| ELIN 0014BF | RPR of Pumps | Job | 181 | 8 | 0 | 19 | 0 | 154 | 0 | 0 | BE | |||||
| ELIN 0014BG | RPR of Recycle Wash Water Systems | Job | 8 | 1 | 0 | 1 | 0 | 6 | 0 | 0 | BF | |||||
| ELIN 0014BH | RPR of Refrigeration Systems | Job | 150 | 7 | 0 | 15 | 0 | 128 | 0 | 0 | BG | |||||
| ELIN 0014BI | RPR of Roofs | Job | 65 | 2 | 0 | 7 | 0 | 56 | 0 | 0 | BH | |||||
| ELIN 0014BJ | RPR of Signs | Job | 93 | 3 | 0 | 10 | 0 | 80 | 0 | 0 | BI | |||||
| ELIN 0014BK | RPR of Ski Hill Lifts | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | BJ | |||||
| ELIN 0014BL | RPR of Snow Making Equipment | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | BK | |||||
| ELIN 0014BM | RPR of Vehicle Lifts | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | BO | |||||
| ELIN 0014BN | RPR of Walls | Job | 150 | 7 | 0 | 15 | 0 | 128 | 0 | 0 | BP | |||||
| ELIN 0014BO | RPR of Water Utility Systems - Seward | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | BQ | |||||
| ELIN 0014BP | RPR of Window Attachments | Job | 49 | 2 | 0 | 5 | 0 | 42 | 0 | 0 | BR | |||||
| ELIN 0014BQ | RPR of Windows | Job | 126 | 5 | 0 | 13 | 0 | 108 | 0 | 0 | BS | |||||
| ELIN 0014BR | RPR of Air Conditioning Systems | Job | 77 | 3 | 0 | 8 | 0 | 66 | 0 | 0 | ||||||
| ELIN 0014BS | RPR of Air Handling Units and Ventilation | Job | 170 | 8 | 0 | 17 | 0 | 145 | 0 | 0 | ||||||
| ELIN 0014BT | RPR of Lift Stations | Job | 17 | 1 | 0 | 1 | 0 | 15 | 0 | 0 | ||||||
| ELIN 0014BU | RPR of Drain, Waste and Vent Systems | Job | 452 | 21 | 0 | 46 | 0 | 385 | 0 | 0 | ||||||
| CLIN 0015 | Annex H - Facility Maintenance - Self Help Program - Monthly - 132 | BT | ||||||||||||||
| Self Help Program | Mth | 10 | 0 | BU | ||||||||||||
| CLIN 0016 | Annex H - Facility Maintenance – Monthly - 131 | BW | ||||||||||||||
| Utility Locate Services | Mth | 10 | 0 | BX | ||||||||||||
| CLIN 0017 | Annex H - Facility Maintenance (PM LOGCAP) (Non-Garrison Funded) – Job - 131 | BY | ||||||||||||||
| ELIN 0017AA | PM of Concrete Anchors - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 0017AB | PM of Membrane - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 0017AC | PM of Doors - LOGCAP | Job | 40 | 0 | ||||||||||||
| ELIN 0017AD | PM of Rolling Service Doors - LOGCAP | Job | 16 | 0 | ||||||||||||
| ELIN 0017AE | PM of HVAC - LOGCAP | Job | 18 | 0 | ||||||||||||
| ELIN 0017AF | PM of Methane or Propane Systems - LOGCAP | Job | 0 | 0 | ||||||||||||
| ELIN 0017AG | PM of CO or NO2 Systems - LOGCAP | Job | 8 | 0 | ||||||||||||
| ELIN 0017AH | PM of Series MUH Series Modular Unit Heaters - LOGCAP | Job | 8 | 0 | ||||||||||||
| ELIN 0017AI | PM of Exit Signs - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 0017AJ | PM of Interior Lighting - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 0017AK | PM of Fire Detection and Alarms - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 0017AL | PM of Articial Turf - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 0017AM | PM of Aboveground Storage Tanks - LOGCAP | Job | 12 | 0 | ||||||||||||
| CLIN 0018 | Annex H - Facility Maintenance (DMO LOGCAP) (Non-Garrison Funded) - Job - 131 | |||||||||||||||
| ELIN 0018AA | RPR of Concrete Anchors - LOGCAP | Job | 12 | 4 | 0 | 4 | 0 | 4 | 0 | 0 | ||||||
| ELIN 0018AB | RPR of Membrane - LOGCAP | Job | 12 | 4 | 0 | 4 | 0 | 4 | 0 | 0 | ||||||
| ELIN 0018AC | RPR of Doors - LOGCAP | Job | 40 | 4 | 0 | 8 | 0 | 28 | 0 | 0 | ||||||
| ELIN 0018AD | RPR of Rolling Service Doors - LOGCAP | Job | 40 | 2 | 0 | 4 | 0 | 34 | 0 | 0 | ||||||
| ELIN 0018AE | RPR of HVAC - LOGCAP | Job | 40 | 2 | 0 | 8 | 0 | 30 | 0 | 0 | ||||||
| ELIN 0018AF | RPR of Methane or Propane Systems - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 0018AG | RPR of CO or NO2 Systems - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 0018AH | RPR of Series Modular Unit Heaters - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 0018AI | RPR of Exit Signs - LOGCAP | Job | 40 | 2 | 0 | 2 | 0 | 18 | 0 | 0 | ||||||
| ELIN 0018AJ | RPR of Interior Lighting - LOGCAP | Job | 80 | 2 | 0 | 2 | 0 | 76 | 0 | 0 | ||||||
| ELIN 0018AK | RPR of Fire Detection and Alarms - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 0018AL | RPR of Articial Turf - LOGCAP | Job | 6 | 2 | 0 | 2 | 0 | 2 | 0 | 0 | ||||||
| ELIN 0018AM | RPR of Aboveground Storage Tanks - LOGCAP | Job | 40 | 4 | 0 | 4 | 0 | 32 | 0 | 0 | ||||||
| CLIN 0019 | Annex J - Maintenance Scheduled Sweeping Support – Paved Surfaces - Monthly - 131 | |||||||||||||||
| Scheduled Sweeping Support – Paved Surfaces | Mth | 10 | 0 | |||||||||||||
| CLIN 0020 | Sweeping Services – Paved Surfaces - Job - 131 | |||||||||||||||
| Sweeping Services – Paved Surfaces | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | |||||||
| CLIN 0021 | Annex J - Maintenance (DMO) - Surfaced and Unsurfaced Areas - Job - 132 | |||||||||||||||
| ELIN 0021AA | RPR of Surfaces – Paved | Job | 16 | 1 | 0 | 1 | 0 | 14 | 0 | 0 | ||||||
| ELIN 0021AB | RPR of Surfaces – Unpaved | Job | 29 | 1 | 0 | 3 | 0 | 25 | 0 | 0 | ||||||
| ELIN 0021AC | RPR of Drainage and Culverts – Storm Water | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | ||||||
| CLIN 0022 | Annex J - Preventative Maintenance - Surfaced and Unsurfaced Areas - Monthly - 132 | |||||||||||||||
| ELIN 0022AA | PM of Surfaces – Paved | Mth | 10 | 0 | ||||||||||||
| ELIN 0022AB | PM of Surfaces – Unpaved | Mth | 10 | 0 | ||||||||||||
| ELIN 0022AC | PM of Drainage and Culverts – Storm Water | Mth | 10 | 0 | ||||||||||||
| CLIN 0025 | Annex L - Wastewater Services - Job - 131 | |||||||||||||||
| Sanitation Services | Job | 5 | 1 | 0 | 1 | 0 | 3 | 0 | 0 | |||||||
| CLIN 0028 | Annex M - Scheduled Pest Control Services - Job - 131 | |||||||||||||||
| Scheduled Pest Control Services | Job | 125 | 0 | |||||||||||||
| CLIN 0029 | Pest Control Services – Job - 131 | |||||||||||||||
| Pest Control Services | Job | 81 | 3 | 0 | 9 | 0 | 69 | 0 | 0 | |||||||
| CLIN 0030 | Contingency Response Services - 131 | |||||||||||||||
| NTE $40,800 | Contingency Response Services - 131 | 0 | NTE $40,800 | |||||||||||||
| CLIN 0031 | Contingency Response Services - 132 | |||||||||||||||
| NTE $20,400 | Contingency Response Services - 132 | 0 | NTE $20,400 | |||||||||||||
| CLIN 0032 | Materials and Supplies - (Garrison Funded) - 131 | |||||||||||||||
| NTE $400,800 | Materials and Supplies (Cost Reimbursable) - 131 | 0 | NTE $400,800 | |||||||||||||
| CLIN 0033 | Materials and Supplies - (Non-Garrison Funded) - 131 | |||||||||||||||
| NTE $1,800,000 | LOGCAP Materials and Supplies (Cost Reimbursable) - 131 | 0 | NTE $1,800,000 | |||||||||||||
| CLIN 0034 | Materials and Supplies (Cost Reimbursable) - (Garrison Funded) - 132 | |||||||||||||||
| NTE $140,000 | Materials and Supplies (Cost Reimbursable) - 132 | 0 | NTE $140,000 | |||||||||||||
| CLIN 0035 | Materials and Supplies (Cost Reimbursable) - (Non-Garrison Funded) - 132 | |||||||||||||||
| NTE $120,000 | Grey Eagle De-icing Materials and Supplies (Cost Reimbursable) - 132 | 0 | NTE $120,000 | |||||||||||||
| CLIN 0036 | Project Work Orders - 132 | |||||||||||||||
| NTE $500,000 | Project Work Orders - 1 $500-$25,000 | 7 | 250000 | NTE $500,000 | ||||||||||||
| CLIN 0037 | Project Work Orders - 2 $25,001-$50,000 | |||||||||||||||
| NTE $250,000 | Project Work Orders - 2 $25,001-$50,000 | 7 | 50000 | 0 | NTE $250,000 | |||||||||||
| CLIN 0038 | Project Work Orders - 3 $50,001-$100,000 | |||||||||||||||
| NTE $100,000 | Project Work Orders - 3 $50,001-$100,000 | 1 | 100000 | 0 | NTE $100,000 | |||||||||||
| CLIN 0039 | Project Work Orders - 4 $100,001-$150,000 | |||||||||||||||
| NTE $150,000 | Project Work Orders - 4 $100,001-$150,000 | 1 | 150000 | 0 | NTE $150,000 | |||||||||||
| CLIN 0040 | Annex A (Overarching PWS) – Administrative – Job - 131 | |||||||||||||||
| Phase In | Job | 1 | 1 | 0 |
Note: *131 designates a primary funding source and is used for administrative and tracking purposes internal to the Government. **132 is the same. The Contractor need not concern themselves with the differentiation of 131/132 on the individual line items.
1st Option Period
| CLIN Number | ELIN Number | Description | # of Pri 1 Jobs | Unit Price | Total Price | # of Pri 2 Jobs | Unit Price | Total Price | # of Pri 3 Jobs | Unit Price | Total Price | TOTAL VALUE | ||||
| Priority 1 | Priority 2 | Priority 3 | ||||||||||||||
| CLIN 1001 | Annex A (Overarching PWS) – Administrative – Job - 131 | |||||||||||||||
| ELIN 1001AB | RPR of DPW Owned/Operated Wheeled Equipment | Job | 5 | 1 | 0 | 1 | 0 | 3 | 0 | 0 | ||||||
| CLIN 1102 | Annex A (Overarching PWS) – Administrative - Job – 132 | |||||||||||||||
| ELIN 1002AA | CBA Adjustment | Job | 1 | 0 | 0 | |||||||||||
| ELIN 1002AB | Service Contract Report | Job | 1 | 0 | 0 | |||||||||||
| CLIN 1003 | Annex E - Solid Waste - Monthly - 131 | |||||||||||||||
| ELIN 1003AA | Refuse Collection and Relocation | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 1003AB | Dumpster Maintenance | Mth | 12 | 0 | 0 | |||||||||||
| CLIN 1004 | Annex F - Maintenance Grounds - Monthly - 131 | |||||||||||||||
| Ground Maintenance Services | Mth | 12 | 0 | 0 | ||||||||||||
| CLIN 1005 | Annex F - Maintenance Grounds - Job - 131 | |||||||||||||||
| ELIN 1005AA | Ground Maintenance Services | Job | 41 | 1 | 0 | 5 | 0 | 35 | 0 | 0 | ||||||
| ELIN 1005AB | Hauling, Structural Lift/Transport | Job | 45 | 1 | 0 | 5 | 0 | 39 | 0 | 0 | ||||||
| CLIN 1006 | Annex G - Snow, Ice, and Sand Removal - Monthly - 131 | |||||||||||||||
| ELIN 1006AA | Snow, Ice, Sand Removal Services – Airfield | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 1006AB | Snow, Ice, Sand Removal Services - FWA Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 1006AC | Snow, Ice, Sand Removal Services - YTA Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 1006AD | Snow, Ice, Sand Removal Services - DTA/Black Rapids Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 1006AE | Snow, Ice, Sand Removal Services - Non Org Park | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 1006AF | Snow, Ice, Sand Removal Services - Org Park | Mth | 12 | 0 | 0 | |||||||||||
| CLIN 1007 | Annex G - Snow, Ice, and Sand Removal – Job - 131 | |||||||||||||||
| ELIN 1007AA | Snow, Ice, Sand, and Debris Removal Services | Job | 39 | 2 | 0 | 4 | 0 | 33 | 0 | 0 | ||||||
| ELIN 1007AB | Parking Lot Pass-Through Lane | Job | 13 | 1 | 0 | 1 | 0 | 11 | 0 | 0 | ||||||
| ELIN 1007AC | Small Scale Snow Removal Up to 500 SF | Job | 8 | 1 | 0 | 6 | 0 | 1 | 0 | 0 | ||||||
| CLIN 1008 | Annex G - Snow, Ice, Sand Removal Services - Airfield Grey Eagle De-Icing - Monthly - 131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - Airfield Grey Eagle De-Icing | Mth | 12 | ||||||||||||||
| CLIN 1009 | Snow, Ice, Sand Removal Services - BLM - Job - 131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - BLM | Job | 1 | 0 | |||||||||||||
| CLIN 1010 | LOGCAP Snow, Ice and Sand Removal Services -Job -131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - LOGCAP | Job | 18 | 1 | 0 | 2 | 0 | 15 | 0 | 0 | |||||||
| CLIN 1011 | LOGCAP Snow, Ice and Sand Removal Services - Monthly - 131 | |||||||||||||||
| Snow, Ice, and Sand Removal Services - LOGCAP | Mth | 12 | ||||||||||||||
| CLIN 1012 | Annex H - Facility Preventative Maintenance – Job - 132 | |||||||||||||||
| ELIN 1012AA | PM of Air Compressors | Job | 825 | 0 | A | |||||||||||
| ELIN 1012AB | PM of Air Systems and Fans | Job | 1458 | 0 | C | |||||||||||
| ELIN 1012AC | PM of Automatic Doors | Job | 3 | 0 | ERROR:#REF! | A | ||||||||||
| ELIN 1012AD | PM of Backflow Prevention Systems | Job | 59 | 0 | D | C | ||||||||||
| ELIN 1012AE | PM of Boilers, Fireplaces and Furnaces | Job | 457 | 0 | E | C | ||||||||||
| ELIN 1012AF | PM of Clothes Dryer Venting | Job | 25 | 0 | F | C | ||||||||||
| ELIN 1012AG | PM of Domestic Hot Water Systems | Job | 33 | 0 | G | D | ||||||||||
| ELIN 1012AH | PM of Emergency/Exit Light Systems | Job | 361 | 0 | H | E | ||||||||||
| ELIN 1012AI | PM of Fire Alarm and Control Systems | Job | 433 | 0 | I | F | ||||||||||
| ELIN 1012AJ | PM of Gate Controllers | Job | 6 | 0 | J | G | ||||||||||
| ELIN 1012AK | PM of Fire Suppression Engines | Job | 12 | 0 | K | H | ||||||||||
| ELIN 1012AL | PM of Fire Suppression Systems | Job | 81 | 0 | L | I | ||||||||||
| ELIN 1012AM | PM of Fuel Dispensing Systems | Job | 8 | 0 | M | J | ||||||||||
| ELIN 1012AN | PM of Gas Monitoring and CO Sensors | Job | 428 | 0 | N | K | ||||||||||
| ELIN 1012AO | PM of Generators | Job | 240 | 0 | O | K | ||||||||||
| ELIN 1012AP | PM of Grounding Points | Job | 27 | 0 | P | L | ||||||||||
| ELIN 1012AQ | PM of High Pressure Washers | Job | 76 | 0 | Q | M | ||||||||||
| ELIN 1012AR | PM of Kitchen Equipment – Commercial | Job | 160 | 0 | R | N | ||||||||||
| ELIN 1012AS | PM of Lightning Protection | Job | 44 | 0 | S | O | ||||||||||
| ELIN 1012AT | PM of Overhead Doors | Job | 102 | 0 | T | P | ||||||||||
| ELIN 1012AU | PM of Playground Equipment and Areas | Job | 17 | 0 | U | Q | ||||||||||
| ELIN 1012AV | PM of Recycle Wash Water Systems | Job | 132 | 0 | V | R | ||||||||||
| ELIN 1012AW | PM of Refrigeration Equipment Systems | Job | 197 | 0 | W | S | ||||||||||
| ELIN 1012AX | PM of Ski Hill Lifts | Job | 5 | 0 | X | T | ||||||||||
| ELIN 1012AY | PM of Traffic Signals | Job | 8 | 0 | Y | U | ||||||||||
| ELIN 1012AZ | PM of UPS Systems | Job | 38 | 0 | Z | V | ||||||||||
| ELIN 1012BA | PM of Water Distribution | Job | 8 | 0 | A | W | ||||||||||
| ELIN 1012BB | PM of Between Occupancy Maintenance | Job | 1271 | 0 | B | X | ||||||||||
| ELIN 1012BC | PM of Air Conditioning Systems | Job | 632 | 0 | ||||||||||||
| ELIN 1012BC | PM of Heating Systems | Job | 1063 | 0 | ||||||||||||
| ELIN 1012BD | PM of Lift Stations and Grease Traps | Job | 270 | 0 | ||||||||||||
| CLIN 1013 | Annex H - Facility Maintenance – Monthly - 132 | C | Y | |||||||||||||
| PM of Signs | Mth | 12 | 0 | D | Z | |||||||||||
| CLIN 1014 | Annex H - Facility Maintenance (DMO) - Job - 132 | E | Z | |||||||||||||
| ELIN 1014AA | Abatement Services – Asbestos | Job | 3 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | F | AA | ||||
| ELIN 1014AB | Abatement Services – Mold | Job | 3 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | G | AB | ||||
| ELIN 1014AC | RPR of Air Compressors and Systems | Job | 58 | 2 | 0 | 6 | 0 | 50 | 0 | 0 | H | AC | ||||
| ELIN 1014AD | RPR of Bailers and Compactors | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | I | AD | ||||
| ELIN 1014AE | RPR of Boilers, Fireplaces, and Furnaces | Job | 60 | 3 | 0 | 6 | 0 | 51 | 0 | 0 | J | AE | ||||
| ELIN 1014AF | RPR of Cabinets and Counter Tops | Job | 35 | 1 | 0 | 4 | 0 | 30 | 0 | 0 | K | AF | ||||
| ELIN 1014AG | RPR of Ceilings | Job | 75 | 3 | 0 | 8 | 0 | 64 | 0 | 0 | L | AG | ||||
| ELIN 1014AH | RPR of Clothes Dryer Vents | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | M | AH | ||||
| ELIN 1014AI | RPR of Coatings | Job | 20 | 1 | 0 | 2 | 0 | 17 | 0 | 0 | N | AH | ||||
| ELIN 1014AJ | RPR of Cranes – Overhead | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | O | AI | ||||
| ELIN 1014AK | RPR of Dock Levelers | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | AJ | |||||
| ELIN 1014AL | RPR of Domestic Water Systems | Job | 220 | 11 | 0 | 22 | 0 | 187 | 0 | 0 | AK | |||||
| ELIN 1014AM | RPR of Doors | Job | 503 | 18 | 0 | 38 | 0 | 347 | 0 | 0 | AL | |||||
| ELIN 1014AN | RPR of Electrical Systems | Job | 1665 | 72 | 0 | 146 | 0 | 1347 | 0 | 0 | AM | |||||
| ELIN 1014AO | RPR of Exhaust and Supply Air Systems | Job | 98 | 4 | 0 | 10 | 0 | 84 | 0 | 0 | AN | |||||
| ELIN 1014AP | RPR of Eyewash Stations/Safety Showers | Job | 57 | 2 | 0 | 5 | 0 | 50 | 0 | 0 | AO | |||||
| ELIN 1014AQ | RPR of Fences and Gates | Job | 55 | 2 | 0 | 6 | 0 | 47 | 0 | 0 | AP | |||||
| ELIN 1014AR | RPR of Fire Alarm Systems | Job | 439 | 21 | 0 | 44 | 0 | 374 | 0 | 0 | AQ | |||||
| ELIN 1014AS | RPR of Fire Suppression Engines | Job | 11 | 1 | 0 | 1 | 0 | 9 | 0 | 0 | AR | |||||
| ELIN 1014AT | RPR of Fire Suppression Systems | Job | 22 | 1 | 0 | 2 | 0 | 19 | 0 | 0 | AS | |||||
| ELIN 1014AU | RPR of Floors, Decks, Ramps and Stairs | Job | 105 | 4 | 0 | 11 | 0 | 90 | 0 | 0 | AT | |||||
| ELIN 1014AV | RPR of Fuel Dispensing Systems | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | AU | |||||
| ELIN 1014AW | RPR of Generators | Job | 88 | 4 | 0 | 9 | 0 | 75 | 0 | 0 | AV | |||||
| ELIN 1014AX | RPR of Heating Systems | Job | 741 | 36 | 0 | 75 | 0 | 630 | 0 | 0 | AW | |||||
| ELIN 1014AY | RPR of High Pressure Washers | Job | 23 | 1 | 0 | 2 | 0 | 20 | 0 | 0 | AX | |||||
| ELIN 1014AZ | RPR of Kitchen Equipment | Job | 127 | 6 | 0 | 13 | 0 | 108 | 0 | 0 | AY | |||||
| ELIN 1014BA | RPR of Masonry | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | AZ | |||||
| ELIN 1014BB | RPR of Miscellaneous Items | Job | 153 | 7 | 0 | 15 | 0 | 131 | 0 | 0 | BA | |||||
| ELIN 1014BC | RPR of Overhead Doors | Job | 182 | 8 | 0 | 19 | 0 | 155 | 0 | 0 | BB | |||||
| ELIN 1014BD | RPR of Playground Equip/Areas | Job | 4 | 1 | 0 | 1 | 0 | 2 | 0 | 0 | BC | |||||
| ELIN 1014BE | RPR of Plumbing Fixtures | Job | 631 | 30 | 0 | 64 | 0 | 537 | 0 | 0 | BD | |||||
| ELIN 1014BF | RPR of Pumps | Job | 181 | 8 | 0 | 19 | 0 | 154 | 0 | 0 | BE | |||||
| ELIN 1014BG | RPR of Recycle Wash Water Systems | Job | 8 | 1 | 0 | 1 | 0 | 6 | 0 | 0 | BF | |||||
| ELIN 1014BH | RPR of Refrigeration Systems | Job | 150 | 7 | 0 | 15 | 0 | 128 | 0 | 0 | BG | |||||
| ELIN 1014BI | RPR of Roofs | Job | 65 | 2 | 0 | 7 | 0 | 56 | 0 | 0 | BH | |||||
| ELIN 1014BJ | RPR of Signs | Job | 93 | 3 | 0 | 10 | 0 | 80 | 0 | 0 | BI | |||||
| ELIN 1014BK | RPR of Ski Hill Lifts | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | BJ | |||||
| ELIN 1014BL | RPR of Snow Making Equipment | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | BK | |||||
| ELIN 1014BM | RPR of Vehicle Lifts | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | BO | |||||
| ELIN 1014BN | RPR of Walls | Job | 150 | 7 | 0 | 15 | 0 | 128 | 0 | 0 | BP | |||||
| ELIN 1014BO | RPR of Water Utility Systems - Seward | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | BQ | |||||
| ELIN 1014BP | RPR of Window Attachments | Job | 49 | 2 | 0 | 5 | 0 | 42 | 0 | 0 | BR | |||||
| ELIN 1014BQ | RPR of Windows | Job | 126 | 5 | 0 | 13 | 0 | 108 | 0 | 0 | BS | |||||
| ELIN 1014BR | RPR of Air Conditioning Systems | Job | 77 | 3 | 0 | 8 | 0 | 66 | 0 | 0 | ||||||
| ELIN 1014BS | RPR of Air Handling Units and Ventilation | Job | 170 | 8 | 0 | 17 | 0 | 145 | 0 | 0 | ||||||
| ELIN 1014BT | RPR of Lift Stations | Job | 17 | 1 | 0 | 1 | 0 | 15 | 0 | 0 | ||||||
| ELIN 1014BU | RPR of Drain, Waste and Vent Systems | Job | 452 | 21 | 0 | 46 | 0 | 385 | 0 | 0 | ||||||
| CLIN 1015 | Annex H - Facility Maintenance - Self Help Program - Monthly - 132 | BT | ||||||||||||||
| Self Help Program | Mth | 12 | 0 | BU | ||||||||||||
| CLIN 1016 | Annex H - Facility Maintenance – Monthly - 131 | BW | ||||||||||||||
| Utility Locate Services | Mth | 12 | 0 | BX | ||||||||||||
| CLIN 1017 | Annex H - Facility Maintenance (PM LOGCAP) (Non-Garrison Funded) – Job - 131 | BY | ||||||||||||||
| ELIN 1017AA | PM of Concrete Anchors - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 1017AB | PM of Membrane - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 1017AC | PM of Doors - LOGCAP | Job | 40 | 0 | ||||||||||||
| ELIN 1017AD | PM of Rolling Service Doors - LOGCAP | Job | 16 | 0 | ||||||||||||
| ELIN 1017AE | PM of HVAC - LOGCAP | Job | 18 | 0 | ||||||||||||
| ELIN 1017AF | PM of Methane or Propane Systems - LOGCAP | Job | 0 | 0 | ||||||||||||
| ELIN 1017AG | PM of CO or NO2 Systems - LOGCAP | Job | 8 | 0 | ||||||||||||
| ELIN 1017AH | PM of Series MUH Series Modular Unit Heaters - LOGCAP | Job | 8 | 0 | ||||||||||||
| ELIN 1017AI | PM of Exit Signs - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 1017AJ | PM of Interior Lighting - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 1017AK | PM of Fire Detection and Alarms - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 1017AL | PM of Articial Turf - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 1017AM | PM of Aboveground Storage Tanks - LOGCAP | Job | 12 | 0 | ||||||||||||
| CLIN 1018 | Annex H - Facility Maintenance (DMO LOGCAP) (Non-Garrison Funded) - Job - 131 | |||||||||||||||
| ELIN 1018AA | RPR of Concrete Anchors - LOGCAP | Job | 12 | 4 | 0 | 4 | 0 | 4 | 0 | 0 | ||||||
| ELIN 1018AB | RPR of Membrane - LOGCAP | Job | 12 | 4 | 0 | 4 | 0 | 4 | 0 | 0 | ||||||
| ELIN 1018AC | RPR of Doors - LOGCAP | Job | 40 | 4 | 0 | 8 | 0 | 28 | 0 | 0 | ||||||
| ELIN 1018AD | RPR of Rolling Service Doors - LOGCAP | Job | 40 | 2 | 0 | 4 | 0 | 34 | 0 | 0 | ||||||
| ELIN 1018AE | RPR of HVAC - LOGCAP | Job | 40 | 2 | 0 | 8 | 0 | 30 | 0 | 0 | ||||||
| ELIN 1018AF | RPR of Methane or Propane Systems - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 1018AG | RPR of CO or NO2 Systems - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 1018AH | RPR of Series Modular Unit Heaters - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 1018AI | RPR of Exit Signs - LOGCAP | Job | 40 | 2 | 0 | 2 | 0 | 18 | 0 | 0 | ||||||
| ELIN 1018AJ | RPR of Interior Lighting - LOGCAP | Job | 80 | 2 | 0 | 2 | 0 | 76 | 0 | 0 | ||||||
| ELIN 1018AK | RPR of Fire Detection and Alarms - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 1018AL | RPR of Articial Turf - LOGCAP | Job | 6 | 2 | 0 | 2 | 0 | 2 | 0 | 0 | ||||||
| ELIN 1018AM | RPR of Aboveground Storage Tanks - LOGCAP | Job | 40 | 4 | 0 | 4 | 0 | 32 | 0 | 0 | ||||||
| CLIN 1019 | Annex J - Maintenance Scheduled Sweeping Support – Paved Surfaces - Monthly - 131 | |||||||||||||||
| Scheduled Sweeping Support – Paved Surfaces | Mth | 12 | 0 | |||||||||||||
| CLIN 1020 | Sweeping Services – Paved Surfaces - Job - 131 | |||||||||||||||
| Sweeping Services – Paved Surfaces | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | |||||||
| CLIN 1021 | Annex J - Maintenance (DMO) - Surfaced and Unsurfaced Areas - Job - 132 | |||||||||||||||
| ELIN 1021AA | RPR of Surfaces – Paved | Job | 16 | 1 | 0 | 1 | 0 | 14 | 0 | 0 | ||||||
| ELIN 1021AB | RPR of Surfaces – Unpaved | Job | 29 | 1 | 0 | 3 | 0 | 25 | 0 | 0 | ||||||
| ELIN 1021AC | RPR of Drainage and Culverts – Storm Water | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | ||||||
| CLIN 1022 | Annex J - Preventative Maintenance - Surfaced and Unsurfaced Areas - Monthly - 132 | |||||||||||||||
| ELIN 1022AA | PM of Surfaces – Paved | Mth | 12 | 0 | ||||||||||||
| ELIN 1022AB | PM of Surfaces – Unpaved | Mth | 12 | 0 | ||||||||||||
| ELIN 1022AC | PM of Drainage and Culverts – Storm Water | Mth | 12 | 0 | ||||||||||||
| CLIN 1025 | Annex L - Wastewater Services - Job - 131 | |||||||||||||||
| Sanitation Services | Job | 5 | 1 | 0 | 1 | 0 | 3 | 0 | 0 | |||||||
| CLIN 1028 | Annex M - Scheduled Pest Control Services - Job - 131 | |||||||||||||||
| Scheduled Pest Control Services | Job | 125 | 0 | |||||||||||||
| CLIN 1029 | Pest Control Services – Job - 131 | |||||||||||||||
| Pest Control Services | Job | 81 | 3 | 0 | 9 | 0 | 69 | 0 | 0 | |||||||
| CLIN 1030 | Contingency Response Services - 131 | |||||||||||||||
| NTE $40,800 | Contingency Response Services - 131 | 0 | NTE $40,800 | |||||||||||||
| CLIN 1031 | Contingency Response Services - 132 | |||||||||||||||
| NTE $20,400 | Contingency Response Services - 132 | 0 | NTE $20,400 | |||||||||||||
| CLIN 1032 | Materials and Supplies - (Garrison Funded) - 131 | |||||||||||||||
| NTE $400,800 | Materials and Supplies (Cost Reimbursable) - 131 | 0 | NTE $400,800 | |||||||||||||
| CLIN 1033 | Materials and Supplies - (Non-Garrison Funded) - 131 | |||||||||||||||
| NTE $1,800,000 | LOGCAP Materials and Supplies (Cost Reimbursable) - 131 | 0 | NTE $1,800,000 | |||||||||||||
| CLIN 1034 | Materials and Supplies (Cost Reimbursable) - (Garrison Funded) - 132 | |||||||||||||||
| NTE $140,000 | Materials and Supplies (Cost Reimbursable) - 132 | 0 | NTE $140,000 | |||||||||||||
| CLIN 1035 | Materials and Supplies (Cost Reimbursable) - (Non-Garrison Funded) - 132 | |||||||||||||||
| NTE $120,000 | Grey Eagle De-icing Materials and Supplies (Cost Reimbursable) - 132 | 0 | NTE $120,000 | |||||||||||||
| CLIN 1036 | Project Work Orders - 132 | |||||||||||||||
| NTE $500,000 | Project Work Orders - 1 $500-$25,000 | 7 | 25000 | 0 | NTE $500,000 | |||||||||||
| CLIN 1037 | Project Work Orders - 2 $25,001-$50,000 | |||||||||||||||
| NTE $250,000 | Project Work Orders - 2 $25,001-$50,000 | 7 | 50000 | 0 | NTE $250,000 | |||||||||||
| CLIN 1038 | Project Work Orders - 3 $50,001-$100,000 | |||||||||||||||
| NTE $100,000 | Project Work Orders - 3 $50,001-$100,000 | 1 | 100000 | 0 | NTE $100,000 | |||||||||||
| CLIN 1039 | Project Work Orders - 4 $100,001-$150,000 | |||||||||||||||
| NTE $150,000 | Project Work Orders - 4 $100,001-$150,000 | 1 | 150000 | 0 | NTE $150,000 |
2nd Option Period
| CLIN Number | ELIN Number | Description | # of Pri 1 Jobs | Unit Price | Total Price | # of Pri 2 Jobs | Unit Price | Total Price | # of Pri 3 Jobs | Unit Price | Total Price | TOTAL VALUE | ||||
| Priority 1 | Priority 2 | Priority 3 | ||||||||||||||
| CLIN 2001 | Annex A (Overarching PWS) – Administrative – Job - 131 | |||||||||||||||
| ELIN 2001AB | RPR of DPW Owned/Operated Wheeled Equipment | Job | 5 | 1 | 0 | 1 | 0 | 3 | 0 | 0 | ||||||
| CLIN 2002 | Annex A (Overarching PWS) – Administrative - Job – 132 | |||||||||||||||
| ELIN 2002AA | CBA Adjustment | Job | 1 | 0 | 0 | |||||||||||
| ELIN 2002AB | Service Contract Report | Job | 1 | 0 | 0 | |||||||||||
| CLIN 2003 | Annex E - Solid Waste - Monthly - 131 | |||||||||||||||
| ELIN 2003AA | Refuse Collection and Relocation | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 2003AB | Dumpster Maintenance | Mth | 12 | 0 | 0 | |||||||||||
| CLIN 2004 | Annex F - Maintenance Grounds - Monthly - 131 | |||||||||||||||
| Ground Maintenance Services | Mth | 12 | 0 | 0 | ||||||||||||
| CLIN 2005 | Annex F - Maintenance Grounds - Job - 131 | |||||||||||||||
| ELIN 2005AA | Ground Maintenance Services | Job | 41 | 1 | 0 | 5 | 0 | 35 | 0 | 0 | ||||||
| ELIN 2005AB | Hauling, Structural Lift/Transport | Job | 45 | 1 | 0 | 5 | 0 | 39 | 0 | 0 | ||||||
| CLIN 2006 | Annex G - Snow, Ice, and Sand Removal - Monthly - 131 | |||||||||||||||
| ELIN 2006AA | Snow, Ice, Sand Removal Services – Airfield | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 2006AB | Snow, Ice, Sand Removal Services - FWA Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 2006AC | Snow, Ice, Sand Removal Services - YTA Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 2006AD | Snow, Ice, Sand Removal Services - DTA/Black Rapids Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 2006AE | Snow, Ice, Sand Removal Services - Non Org Park | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 2006AF | Snow, Ice, Sand Removal Services - Org Park | Mth | 12 | 0 | 0 | |||||||||||
| CLIN 2007 | Annex G - Snow, Ice, and Sand Removal – Job - 131 | |||||||||||||||
| ELIN 2007AA | Snow, Ice, Sand, and Debris Removal Services | Job | 39 | 2 | 0 | 4 | 0 | 33 | 0 | 0 | ||||||
| ELIN 2007AB | Parking Lot Pass-Through Lane | Job | 13 | 1 | 0 | 1 | 0 | 11 | 0 | 0 | ||||||
| ELIN 2007AC | Small Scale Snow Removal Up to 500 SF | Job | 8 | 1 | 0 | 6 | 0 | 1 | 0 | 0 | ||||||
| CLIN 2008 | Annex G - Snow, Ice, Sand Removal Services - Airfield Grey Eagle De-Icing - Monthly - 131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - Airfield Grey Eagle De-Icing | Mth | 12 | ||||||||||||||
| CLIN 2009 | Snow, Ice, Sand Removal Services - BLM - Job - 131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - BLM | Job | 1 | 0 | |||||||||||||
| CLIN 2010 | LOGCAP Snow, Ice and Sand Removal Services -Job -131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - LOGCAP | Job | 18 | 1 | 0 | 2 | 0 | 15 | 0 | 0 | |||||||
| CLIN 2011 | LOGCAP Snow, Ice and Sand Removal Services - Monthly - 131 | |||||||||||||||
| Snow, Ice, and Sand Removal Services - LOGCAP | Mth | 12 | ||||||||||||||
| CLIN 2012 | Annex H - Facility Preventative Maintenance – Job - 132 | |||||||||||||||
| ELIN 2012AA | PM of Air Compressors | Job | 825 | 0 | A | |||||||||||
| ELIN 2012AB | PM of Air Systems and Fans | Job | 1458 | 0 | C | |||||||||||
| ELIN 2012AC | PM of Automatic Doors | Job | 3 | 0 | ERROR:#REF! | A | ||||||||||
| ELIN 2012AD | PM of Backflow Prevention Systems | Job | 59 | 0 | D | C | ||||||||||
| ELIN 2012AE | PM of Boilers, Fireplaces and Furnaces | Job | 457 | 0 | E | C | ||||||||||
| ELIN 2012AF | PM of Clothes Dryer Venting | Job | 25 | 0 | F | C | ||||||||||
| ELIN 2012AG | PM of Domestic Hot Water Systems | Job | 33 | 0 | G | D | ||||||||||
| ELIN 2012AH | PM of Emergency/Exit Light Systems | Job | 361 | 0 | H | E | ||||||||||
| ELIN 2012AI | PM of Fire Alarm and Control Systems | Job | 433 | 0 | I | F | ||||||||||
| ELIN 2012AJ | PM of Gate Controllers | Job | 6 | 0 | J | G | ||||||||||
| ELIN 2012AK | PM of Fire Suppression Engines | Job | 12 | 0 | K | H | ||||||||||
| ELIN 2012AL | PM of Fire Suppression Systems | Job | 81 | 0 | L | I | ||||||||||
| ELIN 2012AM | PM of Fuel Dispensing Systems | Job | 8 | 0 | M | J | ||||||||||
| ELIN 2012AN | PM of Gas Monitoring and CO Sensors | Job | 428 | 0 | N | K | ||||||||||
| ELIN 2012AO | PM of Generators | Job | 240 | 0 | O | K | ||||||||||
| ELIN 2012AP | PM of Grounding Points | Job | 27 | 0 | P | L | ||||||||||
| ELIN 2012AQ | PM of High Pressure Washers | Job | 76 | 0 | Q | M | ||||||||||
| ELIN 2012AR | PM of Kitchen Equipment – Commercial | Job | 160 | 0 | R | N | ||||||||||
| ELIN 2012AS | PM of Lightning Protection | Job | 44 | 0 | S | O | ||||||||||
| ELIN 2012AT | PM of Overhead Doors | Job | 102 | 0 | T | P | ||||||||||
| ELIN 2012AU | PM of Playground Equipment and Areas | Job | 17 | 0 | U | Q | ||||||||||
| ELIN 2012AV | PM of Recycle Wash Water Systems | Job | 132 | 0 | V | R | ||||||||||
| ELIN 2012AW | PM of Refrigeration Equipment Systems | Job | 197 | 0 | W | S | ||||||||||
| ELIN 2012AX | PM of Ski Hill Lifts | Job | 5 | 0 | X | T | ||||||||||
| ELIN 2012AY | PM of Traffic Signals | Job | 8 | 0 | Y | U | ||||||||||
| ELIN 2012AZ | PM of UPS Systems | Job | 38 | 0 | Z | V | ||||||||||
| ELIN 2012BA | PM of Water Distribution | Job | 8 | 0 | A | W | ||||||||||
| ELIN 2012BB | PM of Between Occupancy Maintenance | Job | 1271 | 0 | B | X | ||||||||||
| ELIN 2012BC | PM of Air Conditioning Systems | Job | 632 | 0 | ||||||||||||
| ELIN 2012BC | PM of Heating Systems | Job | 1063 | 0 | ||||||||||||
| ELIN 2012BD | PM of Lift Stations and Grease Traps | Job | 270 | 0 | ||||||||||||
| CLIN 2013 | Annex H - Facility Maintenance – Monthly - 132 | C | Y | |||||||||||||
| PM of Signs | Mth | 12 | 0 | D | Z | |||||||||||
| CLIN 2014 | Annex H - Facility Maintenance (DMO) - Job - 132 | E | Z | |||||||||||||
| ELIN 2014AA | Abatement Services – Asbestos | Job | 3 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | F | AA | ||||
| ELIN 2014AB | Abatement Services – Mold | Job | 3 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | G | AB | ||||
| ELIN 2014AC | RPR of Air Compressors and Systems | Job | 58 | 2 | 0 | 6 | 0 | 50 | 0 | 0 | H | AC | ||||
| ELIN 2014AD | RPR of Bailers and Compactors | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | I | AD | ||||
| ELIN 2014AE | RPR of Boilers, Fireplaces, and Furnaces | Job | 60 | 3 | 0 | 6 | 0 | 51 | 0 | 0 | J | AE | ||||
| ELIN 2014AF | RPR of Cabinets and Counter Tops | Job | 35 | 1 | 0 | 4 | 0 | 30 | 0 | 0 | K | AF | ||||
| ELIN 2014AG | RPR of Ceilings | Job | 75 | 3 | 0 | 8 | 0 | 64 | 0 | 0 | L | AG | ||||
| ELIN 2014AH | RPR of Clothes Dryer Vents | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | M | AH | ||||
| ELIN 2014AI | RPR of Coatings | Job | 20 | 1 | 0 | 2 | 0 | 17 | 0 | 0 | N | AH | ||||
| ELIN 2014AJ | RPR of Cranes – Overhead | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | O | AI | ||||
| ELIN 2014AK | RPR of Dock Levelers | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | AJ | |||||
| ELIN 2014AL | RPR of Domestic Water Systems | Job | 220 | 11 | 0 | 22 | 0 | 187 | 0 | 0 | AK | |||||
| ELIN 2014AM | RPR of Doors | Job | 503 | 18 | 0 | 38 | 0 | 347 | 0 | 0 | AL | |||||
| ELIN 2014AN | RPR of Electrical Systems | Job | 1665 | 72 | 0 | 146 | 0 | 1347 | 0 | 0 | AM | |||||
| ELIN 2014AO | RPR of Exhaust and Supply Air Systems | Job | 98 | 4 | 0 | 10 | 0 | 84 | 0 | 0 | AN | |||||
| ELIN 2014AP | RPR of Eyewash Stations/Safety Showers | Job | 57 | 2 | 0 | 5 | 0 | 50 | 0 | 0 | AO | |||||
| ELIN 2014AQ | RPR of Fences and Gates | Job | 55 | 2 | 0 | 6 | 0 | 47 | 0 | 0 | AP | |||||
| ELIN 2014AR | RPR of Fire Alarm Systems | Job | 439 | 21 | 0 | 44 | 0 | 374 | 0 | 0 | AQ | |||||
| ELIN 2014AS | RPR of Fire Suppression Engines | Job | 11 | 1 | 0 | 1 | 0 | 9 | 0 | 0 | AR | |||||
| ELIN 2014AT | RPR of Fire Suppression Systems | Job | 22 | 1 | 0 | 2 | 0 | 19 | 0 | 0 | AS | |||||
| ELIN 2014AU | RPR of Floors, Decks, Ramps and Stairs | Job | 105 | 4 | 0 | 11 | 0 | 90 | 0 | 0 | AT | |||||
| ELIN 2014AV | RPR of Fuel Dispensing Systems | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | AU | |||||
| ELIN 2014AW | RPR of Generators | Job | 88 | 4 | 0 | 9 | 0 | 75 | 0 | 0 | AV | |||||
| ELIN 2014AX | RPR of Heating Systems | Job | 741 | 36 | 0 | 75 | 0 | 630 | 0 | 0 | AW | |||||
| ELIN 2014AY | RPR of High Pressure Washers | Job | 23 | 1 | 0 | 2 | 0 | 20 | 0 | 0 | AX | |||||
| ELIN 2014AZ | RPR of Kitchen Equipment | Job | 127 | 6 | 0 | 13 | 0 | 108 | 0 | 0 | AY | |||||
| ELIN 2014BA | RPR of Masonry | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | AZ | |||||
| ELIN 2014BB | RPR of Miscellaneous Items | Job | 153 | 7 | 0 | 15 | 0 | 131 | 0 | 0 | BA | |||||
| ELIN 2014BC | RPR of Overhead Doors | Job | 182 | 8 | 0 | 19 | 0 | 155 | 0 | 0 | BB | |||||
| ELIN 2014BD | RPR of Playground Equip/Areas | Job | 4 | 1 | 0 | 1 | 0 | 2 | 0 | 0 | BC | |||||
| ELIN 2014BE | RPR of Plumbing Fixtures | Job | 631 | 30 | 0 | 64 | 0 | 537 | 0 | 0 | BD | |||||
| ELIN 2014BF | RPR of Pumps | Job | 181 | 8 | 0 | 19 | 0 | 154 | 0 | 0 | BE | |||||
| ELIN 2014BG | RPR of Recycle Wash Water Systems | Job | 8 | 1 | 0 | 1 | 0 | 6 | 0 | 0 | BF | |||||
| ELIN 2014BH | RPR of Refrigeration Systems | Job | 150 | 7 | 0 | 15 | 0 | 128 | 0 | 0 | BG | |||||
| ELIN 2014BI | RPR of Roofs | Job | 65 | 2 | 0 | 7 | 0 | 56 | 0 | 0 | BH | |||||
| ELIN 2014BJ | RPR of Signs | Job | 93 | 3 | 0 | 10 | 0 | 80 | 0 | 0 | BI | |||||
| ELIN 2014BK | RPR of Ski Hill Lifts | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | BJ | |||||
| ELIN 2014BL | RPR of Snow Making Equipment | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | BK | |||||
| ELIN 2014BM | RPR of Vehicle Lifts | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | BO | |||||
| ELIN 2014BN | RPR of Walls | Job | 150 | 7 | 0 | 15 | 0 | 128 | 0 | 0 | BP | |||||
| ELIN 2014BO | RPR of Water Utility Systems - Seward | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | BQ | |||||
| ELIN 2014BP | RPR of Window Attachments | Job | 49 | 2 | 0 | 5 | 0 | 42 | 0 | 0 | BR | |||||
| ELIN 2014BQ | RPR of Windows | Job | 126 | 5 | 0 | 13 | 0 | 108 | 0 | 0 | BS | |||||
| ELIN 2014BR | RPR of Air Conditioning Systems | Job | 77 | 3 | 0 | 8 | 0 | 66 | 0 | 0 | ||||||
| ELIN 2014BS | RPR of Air Handling Units and Ventilation | Job | 170 | 8 | 0 | 17 | 0 | 145 | 0 | 0 | ||||||
| ELIN 2014BT | RPR of Lift Stations | Job | 17 | 1 | 0 | 1 | 0 | 15 | 0 | 0 | ||||||
| ELIN 2014BU | RPR of Drain, Waste and Vent Systems | Job | 452 | 21 | 0 | 46 | 0 | 385 | 0 | 0 | ||||||
| CLIN 2015 | Annex H - Facility Maintenance - Self Help Program - Monthly - 132 | BT | ||||||||||||||
| Self Help Program | Mth | 12 | 0 | BU | ||||||||||||
| CLIN 2016 | Annex H - Facility Maintenance – Monthly - 131 | BW | ||||||||||||||
| Utility Locate Services | Mth | 12 | 0 | BX | ||||||||||||
| CLIN 2017 | Annex H - Facility Maintenance (PM LOGCAP) (Non-Garrison Funded) – Job - 131 | BY | ||||||||||||||
| ELIN 2017AA | PM of Concrete Anchors - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 2017AB | PM of Membrane - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 2017AC | PM of Doors - LOGCAP | Job | 40 | 0 | ||||||||||||
| ELIN 2017AD | PM of Rolling Service Doors - LOGCAP | Job | 16 | 0 | ||||||||||||
| ELIN 2017AE | PM of HVAC - LOGCAP | Job | 18 | 0 | ||||||||||||
| ELIN 2017AF | PM of Methane or Propane Systems - LOGCAP | Job | 0 | 0 | ||||||||||||
| ELIN 2017AG | PM of CO or NO2 Systems - LOGCAP | Job | 8 | 0 | ||||||||||||
| ELIN 2017AH | PM of Series MUH Series Modular Unit Heaters - LOGCAP | Job | 8 | 0 | ||||||||||||
| ELIN 2017AI | PM of Exit Signs - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 2017AJ | PM of Interior Lighting - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 2017AK | PM of Fire Detection and Alarms - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 2017AL | PM of Articial Turf - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 2017AM | PM of Aboveground Storage Tanks - LOGCAP | Job | 12 | 0 | ||||||||||||
| CLIN 2018 | Annex H - Facility Maintenance (DMO LOGCAP) (Non-Garrison Funded) - Job - 131 | |||||||||||||||
| ELIN 2018AA | RPR of Concrete Anchors - LOGCAP | Job | 12 | 4 | 0 | 4 | 0 | 4 | 0 | 0 | ||||||
| ELIN 2018AB | RPR of Membrane - LOGCAP | Job | 12 | 4 | 0 | 4 | 0 | 4 | 0 | 0 | ||||||
| ELIN 2018AC | RPR of Doors - LOGCAP | Job | 40 | 4 | 0 | 8 | 0 | 28 | 0 | 0 | ||||||
| ELIN 2018AD | RPR of Rolling Service Doors - LOGCAP | Job | 40 | 2 | 0 | 4 | 0 | 34 | 0 | 0 | ||||||
| ELIN 2018AE | RPR of HVAC - LOGCAP | Job | 40 | 2 | 0 | 8 | 0 | 30 | 0 | 0 | ||||||
| ELIN 2018AF | RPR of Methane or Propane Systems - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 2018AG | RPR of CO or NO2 Systems - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 2018AH | RPR of Series Modular Unit Heaters - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 2018AI | RPR of Exit Signs - LOGCAP | Job | 40 | 2 | 0 | 2 | 0 | 18 | 0 | 0 | ||||||
| ELIN 2018AJ | RPR of Interior Lighting - LOGCAP | Job | 80 | 2 | 0 | 2 | 0 | 76 | 0 | 0 | ||||||
| ELIN 2018AK | RPR of Fire Detection and Alarms - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 2018AL | RPR of Articial Turf - LOGCAP | Job | 6 | 2 | 0 | 2 | 0 | 2 | 0 | 0 | ||||||
| ELIN 2018AM | RPR of Aboveground Storage Tanks - LOGCAP | Job | 40 | 4 | 0 | 4 | 0 | 32 | 0 | 0 | ||||||
| CLIN 2019 | Annex J - Maintenance Scheduled Sweeping Support – Paved Surfaces - Monthly - 131 | |||||||||||||||
| Scheduled Sweeping Support – Paved Surfaces | Mth | 12 | 0 | |||||||||||||
| CLIN 2020 | Sweeping Services – Paved Surfaces - Job - 131 | |||||||||||||||
| Sweeping Services – Paved Surfaces | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | |||||||
| CLIN 2021 | Annex J - Maintenance (DMO) - Surfaced and Unsurfaced Areas - Job - 132 | |||||||||||||||
| ELIN 2021AA | RPR of Surfaces – Paved | Job | 16 | 1 | 0 | 1 | 0 | 14 | 0 | 0 | ||||||
| ELIN 2021AB | RPR of Surfaces – Unpaved | Job | 29 | 1 | 0 | 3 | 0 | 25 | 0 | 0 | ||||||
| ELIN 2021AC | RPR of Drainage and Culverts – Storm Water | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | ||||||
| CLIN 2022 | Annex J - Preventative Maintenance - Surfaced and Unsurfaced Areas - Monthly - 132 | |||||||||||||||
| ELIN 2022AA | PM of Surfaces – Paved | Mth | 12 | 0 | ||||||||||||
| ELIN 2022AB | PM of Surfaces – Unpaved | Mth | 12 | 0 | ||||||||||||
| ELIN 2022AC | PM of Drainage and Culverts – Storm Water | Mth | 12 | 0 | ||||||||||||
| CLIN 2025 | Annex L - Wastewater Services - Job - 131 | |||||||||||||||
| Sanitation Services | Job | 5 | 1 | 0 | 1 | 0 | 3 | 0 | 0 | |||||||
| CLIN 2028 | Annex M - Scheduled Pest Control Services - Job - 131 | |||||||||||||||
| Scheduled Pest Control Services | Job | 125 | 0 | |||||||||||||
| CLIN 2029 | Pest Control Services – Job - 131 | |||||||||||||||
| Pest Control Services | Job | 81 | 3 | 0 | 9 | 0 | 69 | 0 | 0 | |||||||
| CLIN 2030 | Contingency Response Services - 131 | |||||||||||||||
| NTE $40,800 | Contingency Response Services - 131 | 0 | NTE $40,800 | |||||||||||||
| CLIN 2031 | Contingency Response Services - 132 | |||||||||||||||
| NTE $20,400 | Contingency Response Services - 132 | 0 | NTE $20,400 | |||||||||||||
| CLIN 2032 | Materials and Supplies - (Garrison Funded) - 131 | |||||||||||||||
| NTE $400,800 | Materials and Supplies (Cost Reimbursable) - 131 | 0 | NTE $400,800 | |||||||||||||
| CLIN 2033 | Materials and Supplies - (Non-Garrison Funded) - 131 | |||||||||||||||
| NTE $1,800,000 | LOGCAP Materials and Supplies (Cost Reimbursable) - 131 | 0 | NTE $1,800,000 | |||||||||||||
| CLIN 2034 | Materials and Supplies (Cost Reimbursable) - (Garrison Funded) - 132 | |||||||||||||||
| NTE $140,000 | Materials and Supplies (Cost Reimbursable) - 132 | 0 | NTE $140,000 | |||||||||||||
| CLIN 2035 | Materials and Supplies (Cost Reimbursable) - (Non-Garrison Funded) - 132 | |||||||||||||||
| NTE $120,000 | Grey Eagle De-icing Materials and Supplies (Cost Reimbursable) - 132 | 0 | NTE $120,000 | |||||||||||||
| CLIN 2036 | Project Work Orders - 132 | |||||||||||||||
| NTE $500,000 | Project Work Orders - 1 $500-$25,000 | 7 | 25200 | 0 | NTE $500,000 | |||||||||||
| CLIN 2037 | Project Work Orders - 2 $25,001-$50,000 | |||||||||||||||
| NTE $250,000 | Project Work Orders - 2 $25,001-$50,000 | 7 | 52000 | 0 | NTE $250,000 | |||||||||||
| CLIN 2038 | Project Work Orders - 3 $50,001-$100,000 | |||||||||||||||
| NTE $100,000 | Project Work Orders - 3 $50,001-$100,000 | 1 | 120000 | 0 | NTE $100,000 | |||||||||||
| CLIN 2039 | Project Work Orders - 4 $100,001-$150,000 | |||||||||||||||
| NTE $150,000 | Project Work Orders - 4 $100,001-$150,000 | 1 | 152000 | 0 | NTE $150,000 |
3rd Option Period
| CLIN Number | ELIN Number | Description | # of Pri 1 Jobs | Unit Price | Total Price | # of Pri 2 Jobs | Unit Price | Total Price | # of Pri 3 Jobs | Unit Price | Total Price | TOTAL VALUE | ||||
| Priority 1 | Priority 2 | Priority 3 | ||||||||||||||
| CLIN 3001 | Annex A (Overarching PWS) – Administrative – Job - 131 | |||||||||||||||
| ELIN 3001AB | RPR of DPW Owned/Operated Wheeled Equipment | Job | 5 | 1 | 0 | 1 | 0 | 3 | 0 | 0 | ||||||
| CLIN 3002 | Annex A (Overarching PWS) – Administrative - Job – 132 | |||||||||||||||
| ELIN 3002AA | CBA Adjustment | Job | 1 | 0 | 0 | |||||||||||
| ELIN 3002AB | Service Contract Report | Job | 1 | 0 | 0 | |||||||||||
| CLIN 3003 | Annex E - Solid Waste - Monthly - 131 | |||||||||||||||
| ELIN 3003AA | Refuse Collection and Relocation | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 3003AB | Dumpster Maintenance | Mth | 12 | 0 | 0 | |||||||||||
| CLIN 3004 | Annex F - Maintenance Grounds - Monthly - 131 | |||||||||||||||
| Ground Maintenance Services | Mth | 12 | 0 | 0 | ||||||||||||
| CLIN 3005 | Annex F - Maintenance Grounds - Job - 131 | |||||||||||||||
| ELIN 3005AA | Ground Maintenance Services | Job | 41 | 1 | 0 | 5 | 0 | 35 | 0 | 0 | ||||||
| ELIN 3005AB | Hauling, Structural Lift/Transport | Job | 45 | 1 | 0 | 5 | 0 | 39 | 0 | 0 | ||||||
| CLIN 3006 | Annex G - Snow, Ice, and Sand Removal - Monthly - 131 | |||||||||||||||
| ELIN 3006AA | Snow, Ice, Sand Removal Services – Airfield | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 3006AB | Snow, Ice, Sand Removal Services - FWA Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 3006AC | Snow, Ice, Sand Removal Services - YTA Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 3006AD | Snow, Ice, Sand Removal Services - DTA/Black Rapids Roads | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 3006AE | Snow, Ice, Sand Removal Services - Non Org Park | Mth | 12 | 0 | 0 | |||||||||||
| ELIN 3006AF | Snow, Ice, Sand Removal Services - Org Park | Mth | 12 | 0 | 0 | |||||||||||
| CLIN 3007 | Annex G - Snow, Ice, and Sand Removal – Job - 131 | |||||||||||||||
| ELIN 3007AA | Snow, Ice, Sand, and Debris Removal Services | Job | 39 | 2 | 0 | 4 | 0 | 33 | 0 | 0 | ||||||
| ELIN 3007AB | Parking Lot Pass-Through Lane | Job | 13 | 1 | 0 | 1 | 0 | 11 | 0 | 0 | ||||||
| ELIN 3007AC | Small Scale Snow Removal Up to 500 SF | Job | 8 | 1 | 0 | 6 | 0 | 1 | 0 | 0 | ||||||
| CLIN 3008 | Annex G - Snow, Ice, Sand Removal Services - Airfield Grey Eagle De-Icing - Monthly - 131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - Airfield Grey Eagle De-Icing | Mth | 12 | ||||||||||||||
| CLIN 3009 | Snow, Ice, Sand Removal Services - BLM - Job - 131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - BLM | Job | 1 | 0 | |||||||||||||
| CLIN 3010 | LOGCAP Snow, Ice and Sand Removal Services -Job -131 | |||||||||||||||
| Snow, Ice, Sand Removal Services - LOGCAP | Job | 18 | 1 | 0 | 2 | 0 | 15 | 0 | 0 | |||||||
| CLIN 3011 | LOGCAP Snow, Ice and Sand Removal Services - Monthly - 131 | |||||||||||||||
| Snow, Ice, and Sand Removal Services - LOGCAP | Mth | 12 | ||||||||||||||
| CLIN 3012 | Annex H - Facility Preventative Maintenance – Job - 132 | |||||||||||||||
| ELIN 3012AA | PM of Air Compressors | Job | 825 | 0 | A | |||||||||||
| ELIN 3012AB | PM of Air Systems and Fans | Job | 1458 | 0 | C | |||||||||||
| ELIN 3012AC | PM of Automatic Doors | Job | 3 | 0 | ERROR:#REF! | A | ||||||||||
| ELIN 3012AD | PM of Backflow Prevention Systems | Job | 59 | 0 | D | C | ||||||||||
| ELIN 3012AE | PM of Boilers, Fireplaces and Furnaces | Job | 457 | 0 | E | C | ||||||||||
| ELIN 3012AF | PM of Clothes Dryer Venting | Job | 25 | 0 | F | C | ||||||||||
| ELIN 3012AG | PM of Domestic Hot Water Systems | Job | 33 | 0 | G | D | ||||||||||
| ELIN 3012AH | PM of Emergency/Exit Light Systems | Job | 361 | 0 | H | E | ||||||||||
| ELIN 3012AI | PM of Fire Alarm and Control Systems | Job | 433 | 0 | I | F | ||||||||||
| ELIN 3012AJ | PM of Gate Controllers | Job | 6 | 0 | J | G | ||||||||||
| ELIN 3012AK | PM of Fire Suppression Engines | Job | 12 | 0 | K | H | ||||||||||
| ELIN 3012AL | PM of Fire Suppression Systems | Job | 81 | 0 | L | I | ||||||||||
| ELIN 3012AM | PM of Fuel Dispensing Systems | Job | 8 | 0 | M | J | ||||||||||
| ELIN 3012AN | PM of Gas Monitoring and CO Sensors | Job | 428 | 0 | N | K | ||||||||||
| ELIN 3012AO | PM of Generators | Job | 240 | 0 | O | K | ||||||||||
| ELIN 3012AP | PM of Grounding Points | Job | 27 | 0 | P | L | ||||||||||
| ELIN 3012AQ | PM of High Pressure Washers | Job | 76 | 0 | Q | M | ||||||||||
| ELIN 3012AR | PM of Kitchen Equipment – Commercial | Job | 160 | 0 | R | N | ||||||||||
| ELIN 3012AS | PM of Lightning Protection | Job | 44 | 0 | S | O | ||||||||||
| ELIN 3012AT | PM of Overhead Doors | Job | 102 | 0 | T | P | ||||||||||
| ELIN 3012AU | PM of Playground Equipment and Areas | Job | 17 | 0 | U | Q | ||||||||||
| ELIN 3012AV | PM of Recycle Wash Water Systems | Job | 132 | 0 | V | R | ||||||||||
| ELIN 3012AW | PM of Refrigeration Equipment Systems | Job | 197 | 0 | W | S | ||||||||||
| ELIN 3012AX | PM of Ski Hill Lifts | Job | 5 | 0 | X | T | ||||||||||
| ELIN 3012AY | PM of Traffic Signals | Job | 8 | 0 | Y | U | ||||||||||
| ELIN 3012AZ | PM of UPS Systems | Job | 38 | 0 | Z | V | ||||||||||
| ELIN 3012BA | PM of Water Distribution | Job | 8 | 0 | A | W | ||||||||||
| ELIN 3012BB | PM of Between Occupancy Maintenance | Job | 1271 | 0 | B | X | ||||||||||
| ELIN 3012BC | PM of Air Conditioning Systems | Job | 632 | 0 | ||||||||||||
| ELIN 3012BC | PM of Heating Systems | Job | 1063 | 0 | ||||||||||||
| ELIN 3012BD | PM of Lift Stations and Grease Traps | Job | 270 | 0 | ||||||||||||
| CLIN 3013 | Annex H - Facility Maintenance – Monthly - 132 | C | Y | |||||||||||||
| PM of Signs | Mth | 12 | 0 | D | Z | |||||||||||
| CLIN 3014 | Annex H - Facility Maintenance (DMO) - Job - 132 | E | Z | |||||||||||||
| ELIN 3014AA | Abatement Services – Asbestos | Job | 3 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | F | AA | ||||
| ELIN 3014AB | Abatement Services – Mold | Job | 3 | 0 | 0 | 1 | 0 | 1 | 0 | 0 | G | AB | ||||
| ELIN 3014AC | RPR of Air Compressors and Systems | Job | 58 | 2 | 0 | 6 | 0 | 50 | 0 | 0 | H | AC | ||||
| ELIN 3014AD | RPR of Bailers and Compactors | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | I | AD | ||||
| ELIN 3014AE | RPR of Boilers, Fireplaces, and Furnaces | Job | 60 | 3 | 0 | 6 | 0 | 51 | 0 | 0 | J | AE | ||||
| ELIN 3014AF | RPR of Cabinets and Counter Tops | Job | 35 | 1 | 0 | 4 | 0 | 30 | 0 | 0 | K | AF | ||||
| ELIN 3014AG | RPR of Ceilings | Job | 75 | 3 | 0 | 8 | 0 | 64 | 0 | 0 | L | AG | ||||
| ELIN 3014AH | RPR of Clothes Dryer Vents | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | M | AH | ||||
| ELIN 3014AI | RPR of Coatings | Job | 20 | 1 | 0 | 2 | 0 | 17 | 0 | 0 | N | AH | ||||
| ELIN 3014AJ | RPR of Cranes – Overhead | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | O | AI | ||||
| ELIN 3014AK | RPR of Dock Levelers | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | AJ | |||||
| ELIN 3014AL | RPR of Domestic Water Systems | Job | 220 | 11 | 0 | 22 | 0 | 187 | 0 | 0 | AK | |||||
| ELIN 3014AM | RPR of Doors | Job | 503 | 18 | 0 | 38 | 0 | 347 | 0 | 0 | AL | |||||
| ELIN 3014AN | RPR of Electrical Systems | Job | 1665 | 72 | 0 | 146 | 0 | 1347 | 0 | 0 | AM | |||||
| ELIN 3014AO | RPR of Exhaust and Supply Air Systems | Job | 98 | 4 | 0 | 10 | 0 | 84 | 0 | 0 | AN | |||||
| ELIN 3014AP | RPR of Eyewash Stations/Safety Showers | Job | 57 | 2 | 0 | 5 | 0 | 50 | 0 | 0 | AO | |||||
| ELIN 3014AQ | RPR of Fences and Gates | Job | 55 | 2 | 0 | 6 | 0 | 47 | 0 | 0 | AP | |||||
| ELIN 3014AR | RPR of Fire Alarm Systems | Job | 439 | 21 | 0 | 44 | 0 | 374 | 0 | 0 | AQ | |||||
| ELIN 3014AS | RPR of Fire Suppression Engines | Job | 11 | 1 | 0 | 1 | 0 | 9 | 0 | 0 | AR | |||||
| ELIN 3014AT | RPR of Fire Suppression Systems | Job | 22 | 1 | 0 | 2 | 0 | 19 | 0 | 0 | AS | |||||
| ELIN 3014AU | RPR of Floors, Decks, Ramps and Stairs | Job | 105 | 4 | 0 | 11 | 0 | 90 | 0 | 0 | AT | |||||
| ELIN 3014AV | RPR of Fuel Dispensing Systems | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | AU | |||||
| ELIN 3014AW | RPR of Generators | Job | 88 | 4 | 0 | 9 | 0 | 75 | 0 | 0 | AV | |||||
| ELIN 3014AX | RPR of Heating Systems | Job | 741 | 36 | 0 | 75 | 0 | 630 | 0 | 0 | AW | |||||
| ELIN 3014AY | RPR of High Pressure Washers | Job | 23 | 1 | 0 | 2 | 0 | 20 | 0 | 0 | AX | |||||
| ELIN 3014AZ | RPR of Kitchen Equipment | Job | 127 | 6 | 0 | 13 | 0 | 108 | 0 | 0 | AY | |||||
| ELIN 3014BA | RPR of Masonry | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | AZ | |||||
| ELIN 3014BB | RPR of Miscellaneous Items | Job | 153 | 7 | 0 | 15 | 0 | 131 | 0 | 0 | BA | |||||
| ELIN 3014BC | RPR of Overhead Doors | Job | 182 | 8 | 0 | 19 | 0 | 155 | 0 | 0 | BB | |||||
| ELIN 3014BD | RPR of Playground Equip/Areas | Job | 4 | 1 | 0 | 1 | 0 | 2 | 0 | 0 | BC | |||||
| ELIN 3014BE | RPR of Plumbing Fixtures | Job | 631 | 30 | 0 | 64 | 0 | 537 | 0 | 0 | BD | |||||
| ELIN 3014BF | RPR of Pumps | Job | 181 | 8 | 0 | 19 | 0 | 154 | 0 | 0 | BE | |||||
| ELIN 3014BG | RPR of Recycle Wash Water Systems | Job | 8 | 1 | 0 | 1 | 0 | 6 | 0 | 0 | BF | |||||
| ELIN 3014BH | RPR of Refrigeration Systems | Job | 150 | 7 | 0 | 15 | 0 | 128 | 0 | 0 | BG | |||||
| ELIN 3014BI | RPR of Roofs | Job | 65 | 2 | 0 | 7 | 0 | 56 | 0 | 0 | BH | |||||
| ELIN 3014BJ | RPR of Signs | Job | 93 | 3 | 0 | 10 | 0 | 80 | 0 | 0 | BI | |||||
| ELIN 3014BK | RPR of Ski Hill Lifts | Job | 10 | 1 | 0 | 1 | 0 | 8 | 0 | 0 | BJ | |||||
| ELIN 3014BL | RPR of Snow Making Equipment | Job | 7 | 1 | 0 | 1 | 0 | 5 | 0 | 0 | BK | |||||
| ELIN 3014BM | RPR of Vehicle Lifts | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | BO | |||||
| ELIN 3014BN | RPR of Walls | Job | 150 | 7 | 0 | 15 | 0 | 128 | 0 | 0 | BP | |||||
| ELIN 3014BO | RPR of Water Utility Systems - Seward | Job | 3 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | BQ | |||||
| ELIN 3014BP | RPR of Window Attachments | Job | 49 | 2 | 0 | 5 | 0 | 42 | 0 | 0 | BR | |||||
| ELIN 3014BQ | RPR of Windows | Job | 126 | 5 | 0 | 13 | 0 | 108 | 0 | 0 | BS | |||||
| ELIN 3014BR | RPR of Air Conditioning Systems | Job | 77 | 3 | 0 | 8 | 0 | 66 | 0 | 0 | ||||||
| ELIN 3014BS | RPR of Air Handling Units and Ventilation | Job | 170 | 8 | 0 | 17 | 0 | 145 | 0 | 0 | ||||||
| ELIN 3014BT | RPR of Lift Stations | Job | 17 | 1 | 0 | 1 | 0 | 15 | 0 | 0 | ||||||
| ELIN 3014BU | RPR of Drain, Waste and Vent Systems | Job | 452 | 21 | 0 | 46 | 0 | 385 | 0 | 0 | ||||||
| CLIN 3015 | Annex H - Facility Maintenance - Self Help Program - Monthly - 132 | BT | ||||||||||||||
| Self Help Program | Mth | 12 | 0 | BU | ||||||||||||
| CLIN 3016 | Annex H - Facility Maintenance – Monthly - 131 | 1 | BW | |||||||||||||
| Utility Locate Services | Mth | 12 | 0 | BX | ||||||||||||
| CLIN 3017 | Annex H - Facility Maintenance (PM LOGCAP) (Non-Garrison Funded) – Job - 131 | BY | ||||||||||||||
| ELIN 3017AA | PM of Concrete Anchors - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 3017AB | PM of Membrane - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 3017AC | PM of Doors - LOGCAP | Job | 40 | 0 | ||||||||||||
| ELIN 3017AD | PM of Rolling Service Doors - LOGCAP | Job | 16 | 0 | ||||||||||||
| ELIN 3017AE | PM of HVAC - LOGCAP | Job | 18 | 0 | ||||||||||||
| ELIN 3017AF | PM of Methane or Propane Systems - LOGCAP | Job | 0 | 0 | ||||||||||||
| ELIN 3017AG | PM of CO or NO2 Systems - LOGCAP | Job | 8 | 0 | ||||||||||||
| ELIN 3017AH | PM of Series MUH Series Modular Unit Heaters - LOGCAP | Job | 8 | 0 | ||||||||||||
| ELIN 3017AI | PM of Exit Signs - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 3017AJ | PM of Interior Lighting - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 3017AK | PM of Fire Detection and Alarms - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 3017AL | PM of Articial Turf - LOGCAP | Job | 12 | 0 | ||||||||||||
| ELIN 3017AM | PM of Aboveground Storage Tanks - LOGCAP | Job | 12 | 0 | ||||||||||||
| CLIN 3018 | Annex H - Facility Maintenance (DMO LOGCAP) (Non-Garrison Funded) - Job - 131 | |||||||||||||||
| ELIN 3018AA | RPR of Concrete Anchors - LOGCAP | Job | 12 | 4 | 0 | 4 | 0 | 4 | 0 | 0 | ||||||
| ELIN 3018AB | RPR of Membrane - LOGCAP | Job | 12 | 4 | 0 | 4 | 0 | 4 | 0 | 0 | ||||||
| ELIN 3018AC | RPR of Doors - LOGCAP | Job | 40 | 4 | 0 | 8 | 0 | 28 | 0 | 0 | ||||||
| ELIN 3018AD | RPR of Rolling Service Doors - LOGCAP | Job | 40 | 2 | 0 | 4 | 0 | 34 | 0 | 0 | ||||||
| ELIN 3018AE | RPR of HVAC - LOGCAP | Job | 40 | 2 | 0 | 8 | 0 | 30 | 0 | 0 | ||||||
| ELIN 3018AF | RPR of Methane or Propane Systems - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 3018AG | RPR of CO or NO2 Systems - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 3018AH | RPR of Series Modular Unit Heaters - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 3018AI | RPR of Exit Signs - LOGCAP | Job | 40 | 2 | 0 | 2 | 0 | 18 | 0 | 0 | ||||||
| ELIN 3018AJ | RPR of Interior Lighting - LOGCAP | Job | 80 | 2 | 0 | 2 | 0 | 76 | 0 | 0 | ||||||
| ELIN 3018AK | RPR of Fire Detection and Alarms - LOGCAP | Job | 20 | 2 | 0 | 2 | 0 | 16 | 0 | 0 | ||||||
| ELIN 3018AL | RPR of Articial Turf - LOGCAP | Job | 6 | 2 | 0 | 2 | 0 | 2 | 0 | 0 | ||||||
| ELIN 3018AM | RPR of Aboveground Storage Tanks - LOGCAP | Job | 40 | 4 | 0 | 4 | 0 | 32 | 0 | 0 | ||||||
| CLIN 3019 | Annex J - Maintenance Scheduled Sweeping Support – Paved Surfaces - Monthly - 131 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .