This solicitation seeks proposals for base operations support services at Fort Wainwright, Alaska. Key details include that the requirement is for non-personal services including facilities maintenance, solid waste management, grounds maintenance, HVAC, plumbing and other services. The performance work statement outlines the services required. The acquisition is a 100% small business set-aside and proposals are due by the date specified in the solicitation. The opportunity is for an indefinite delivery, indefinite quantity contract with a period of performance through base and option years. Relevant agencies involved include the 413th Regional Contracting Office and U.S. Army Garrison at Fort Wainwright.

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, Ft. Wainwright, AK, newest first.
File Type Posted
W912CN-22-R-0013-0002.pdf PDF
Attachment 03 - Personnel Qualifications.pdf PDF
Attachment 04 - Exhibit Line Item Number Sheet 7-26-2022.xlsx XLSX spreadsheet
TE 53 - PMO - WORKLOAD_DATA 07252022 - Final.pdf PDF
TE 94 Lightning Protection.pdf PDF
Attachment 02 - Subcontractor Teaming Partner Consent Letter.docx DOCX document
Attachment 04 - Exhibit Line Item Number Sheet.xlsx XLSX spreadsheet
Annex B- Facilities Maintenance Instruction -13 May 2022 - F.pdf PDF
Annex D - RESERVED.pdf PDF
Annex K Heating and Cooling Services - 18 May 22.pdf PDF
Annex M Pest Management - 13 May 22.pdf PDF
TE 01 - Lists of Facilities and Roads.pdf PDF
TE 17 - Fire Roll Up Doors.pdf PDF
TE 28 - HVAC.pdf PDF
TE 31 - Overhead Doors.pdf PDF
TE 32 - Contractor Space.pdf PDF
TE 49 - Crosswalks.pdf PDF
TE 50 - Ammunition Bunkers.pdf PDF
TE 55 - Tip Sheets.pdf PDF
TE 58 - Fort Wainwright List of Possible DMOs 26 April 2022.pdf PDF
TE 74 - Cranes and Hoists.pdf PDF
TE 78 - Generator PM Schedule.pdf PDF
TE 79 - Snow Event Gravel Route - 11 APR 22.pdf PDF
TE 14 - Dumpster Tips Workload.pdf PDF
W912CN-22-R-0013.pdf PDF
Attachment 06 - Wage Determination 2015-5683.pdf PDF
Attachment 08 - DBA Wage Determination 15 April 2022.pdf PDF
Annex C - RESERVED.pdf PDF
Annex F Maintenance-Grounds - 26 Apr 22.pdf PDF
Annex H Facility Maintenance - 18 May 22.pdf PDF
Annex J Maintenance - Surfaced and Unsurfaced Areas -13 May 22.pdf PDF
TE 02 - Area Maps - 31 Mar 22.pdf PDF
TE 03 - FWA Real Property Facilities.pdf PDF
TE 05 - Monthly Materials List - 30 Mar 22.pdf PDF
TE 08 - Interior and Exterior Lighting Systems and Controls.pdf PDF
TE 13 - Scheduled Pest Control Services - 15 Mar 22.pdf PDF
TE 15 - TM 5-624 Maintenance and Repair of Surface Areas.pdf PDF
TE 16 - Eyewash Stations.pdf PDF
TE 19 - Cooling Systems.pdf PDF
TE 20 - Boilers and Furnances.pdf PDF
TE 22 - Playgrounds - 13 APR 22.pdf PDF
TE 25 - Emergency Exit Lights.pdf PDF
TE 30 - Gates.pdf PDF
TE 34 - Generators - 13 Apr 22.pdf PDF
TE 35 - Fuel Powered Pumps.pdf PDF
TE 37 - Traffic Lights.pdf PDF
TE 38 - UPS.docx.pdf PDF
TE 41 - Geographical History.pdf PDF
TE 43 - Spill Prevention Control and Countermeasure Plan.pdf PDF
TE 48 - Preventative Maintenance Inventory of Installed Equipment.pdf PDF
Show all 50

Base Operations Support Services, Ft. Wainwright, AK has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question/Comment #Document in Question
(PWS, TE, etc.)Page/Paragraph in Question
(be as specific as possible)Question/Comment
(one per line)Government Response/Disposition
1TE Library Index 03 Apr 22Page 2 of 3, TE 39, 52 and 53Will the Government provide TE 39 Wage Determination, TE 52 DMO Workload Data and TE 53 PMO Workload Data as they were not posted to SAM.GOV?Yes; however, historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
2TE Library Index 03 Apr 22Page 2 of 3, TE 43 Not UsedWill the Government update the list as Spill Prevention Control and Countermeasure was provided on SAM.GOV?The TE Library has been updated
3TE Library Index 03 Apr 22Page 2 of 3, TE 58This was listed ast Ft Wainwright Specific Task to be Performed but instead the file was Ft Wainwrigth List of Possible DMOs 26 Apr 22. Will the TE Library be updated?The TE Library has been updated
4Attachment 4- Exhibit Line Item Number SheetsWill the Government provide a TAB at beginning with Instructions for filing out this Attachment?Instructions for completing the pricing section are found in the addendum to 52.212-1, paragraph 10.1. Per paragraph 10.1: Offerors shall not change or alter the associated quantities of the CLINs/ELINs within Attachment 04. Offeror’s are to fill out the yellow cells within Attachment 04, ensure consistency with values reported on Schedule B CLINs, and verify the integrity of all formulas prior to submission.
5Attachment 4- Exhibit Line Item Number SheetsWill the Government provide a TAB before Base year or after the Option Yr 4 with rollup sheet?Rollup sheet has been added to Attachment 4
6Attachment 7 - CBA FJCC 05.01.19Pages 27 thru 29 of 29Will the Government provide job descriptions for the labor categroies listed on pages 27 thru 29 of 29?The job descriptions are left to the Contractor to determine what labor categories are necessary for performance under the contract.
7TE 18 Pest Control FacilitiesPage 1 of 1Are all of these facilities food handling establishments ?Yes, all of these establishments handle food.
8TE 05 Monthly Materials List 30 Mar 22Will the Government provide the historical monthly usage of materials for the past year?No, that would require providing proprietary information as this is provided by the current contractor.
9TE 11 Ft Wainwright Bridges 16 Mar 22Will the Government add the type of bridge (i.e. cement, wood, asphalt, etc.)?This info is already spelled out in TE 11
10TE 63 Grey Eagle Snow Removal MapWhich CLS and paragraph is this associated with?Annex G Para 1.2.2
11TE 63 Grey Eagle Snow Removal MapWill the government add the square footage to Legend at top left for each?Grey Eagle measurements are already identified on the map
12TE 21 Heating SystemsAll PagesCan government provide more detail other than Heat Systems i.e. Quantities per building, size, make, Model, year installed?The government is in the process of updating Builder. This list will be provided as it comes available. Primarily, we have Steam heat and oil fired furnaces/boilers.
13TE 22 PlaygroundsCan government add pictures of the playgrounds for each location so we can tell how big and how much equipment is at each location to be maintained?TE 22 Has been updated with photos of each playground. The photos do not necessarily capture all equipment to be maintained.
14TE 24 Grounding PointsHow many grounding points are at each location listed?TE 24 has been updated with known number of grounding points; however, the actual number of grounding points might differ at each site (Contractor to consider all risk on this element).
15TE 31 Overhead DoorsAll PagesWhat are the sizes of each door?Door sizes vary
16TE 31 Overhead DoorsAll PagesAre they manual or electric?Most are electric, but few are manual.
17T 33 Backflow PreventorsAll PagesWhat are the sizes of each preventer?Back Flow Preventor sizes Vary
18T 33 Backflow PreventorsAll PagesPlease confirm there is only one per building, if not will the numbers be added next to Frequency?Some facilities have multiple BFPs. PMOs will be issued for each.
19TE 35 Fuel Powered PumpsWhat is the make, model, serial number ?This TE will have to be updated as there are more Fire Suppression Engines to be identified.
20TE 37 Traffic LightsHow many traffic signals are at each location listed?8 sets of signals on FTWW only. All listed in TE 37
21TE 38 UPSWhat is the make, model, serial number and size of the UPS ?This information is not readily available.
22TE 41 Geographical HistoryPage 2 of 2 Seward Military Resort (SMR)Will the government specify what responsibilities the contractor has at SMR?Annex A Para 1.2. The contractor has the same maintenance responsibilities as other all areas. Note: There will be no grounds Maint, Snow Clearing or Refuge Collection
23TE 41 Geographical HistoryPage 2 of 2 Seward Military Resort (SMR)Will as TE be provided with all the items that are to be maintained by the contractor?This TE is not currently available
24TE 41 Geographical HistoryPage 2 of 2 Seward Military Resort (SMR)Are the DMO's and PMO's contained in the workload not provided yet?Seward Military Resort DMO and PMO count is listed in work load data TE 52 and TE 53. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
25TE 42 Light PolesOwned by DoyonDoes the contractor have any responsibility for the Doyon poles or not?No. Doyon is responsible for their poles.
26TE 44 Automatic DoorsWhat is the make, model, serial number and size fo the doors?The doors are Stanley. Model, Serial Number and Size is not currently available.
27TE 59 FWA Road InventoryLegend on right side middleWill the government provide the miles for the 5 colors listed (Paved, Unpaved, Bike, Paved Running , Unpaved Running)?TE 59 has been removed. Road and facility measurements are listed in TE 01 and again in TE 80
28Annex E Solid Waste ManagementPara 2.2.1, page 5 of 12Will the Government provide a TE with the locations where refuse is to be collected in order to develop the schedule?This info is provided in TE 61
29Annex E Solid Waste ManagementPara 2.3.1.3, page 6 of 12What has been the historical workload for hazardous item for the past 3 years?No data available. Please read this paragraph again. Hazardous items will be left in place.
30Annex E Solid Waste ManagementPara 2.5.1 page 8 of 12How many collections vehicles are currently being used?4 GFE Refuse Collection Vehicles
31Annex E Solid Waste ManagementPara 2.5.3 Page 8 of 12The description provided does not talk about scales, will this be corrected?This is part of the template.
32Annex E Solid Waste ManagementPara 2.6.1 page 9 of 12How many special events or task historically happen per year?Aprox 6
33Annex E Solid Waste ManagementPara 2.7.1 page 9 of 12Historically over the past 3 years, how many time has contractor needed to provide additional containers?Aprox 6
34Annex E Solid Waste ManagementPar 2.7 .4 page 9 of 12Historically over the past 3 years, how many unscheduled clean up happen?There is no historical data to provide here.
35Annex E Solid Waste ManagementPara 2.7.6 Page 10 of 12Historically over past 3 years, how many emergency work orders have been issued?0
36Annex E Solid Waste ManagementPara 3.2 Page 11 of 12Will the government provide a TE with the container type, size, condition, routine maintenance, repair or replacement date, repair type, location, buildings servicing, and inventory number ?All dumpsters are 8 yard dumpsters. The current contractor has maintained 1/3 of all dumpsters annually. Locatoin of dumpsters is located in TE 61
37Annex M Pest ManagementPara 1.5 page 7 of 25Will references to Texas and New Mexico be updated to to Alaska?Annex M para 1.5 has been updated.
38Annex M Pest ManagementPara 2.2 page 15 of 25Will the government provide a map of what outdoor areas are treaded and historically how often?Mosquito Abatement Map can be found in TE 02
39Annex M Pest ManagementPar 3.2 page 18 of 25How many pest control vehicles are currently in use?No GFE pest control vehicles are available
40Annex F Maintenance GroundsPara 2.2.1 Page 3 of 10Will the Government provide TE 52 that is mentions as it was not posted with initial upload on Sam.Gov?Please see answer to Question #1
41Annex F Maintenance GroundsPara 2.2.2 Page 4 of 10What is the Linear feet of edging to be accomplished?Not available
42Annex F Maintenance GroundsPara 2.2.3 Page 4 of 10What is the Linear feet of trimming to be accomplished?Not available
43Annex F Maintenance GroundsPara 2.2.9 page 6 of 10How many trees must be maintained as there are no quantities in TE 2?Trees on the main Garrison property. There is no count.
44Annex F Maintenance GroundsPara 2.2.13 Page 7 of 10How many athletic fields are maintained ?10
45Annex F Maintenance GroundsPara 2.2.14 Page 7 of 10How many special services historically happen per year?No historical data available. These special services may range from 0 to 15 depending on the year.
46Annex F Maintenance Groundspara 2.5 Page 8 of 10What the amount of acres as TE 2 does not provide the quantity?Please see revised TE 2
47Annex H Facility MaintenancePara 2.1 Page 12 of 60Will the Government provide TE 53 as it is not posted on Sam.Gov?TE 53 is attached to the Solicitation. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
48Annex H Facility MaintenancePara 2.8 page 19 of 60Will the Government provide a TE be with all the Gates, fences, barriers and Dock Levelers the contractor is responsible for?This information is located in TE 01
49Annex H Facility MaintenancePara 2.34 Page 42 of 60Will the Government provide a TE with the Ski Lift inventory the contractor is responsible for?This information is located in TE 01
50Annex H Facility MaintenancePara 2.35 Page 42 of 60Will the Government provide a TE with the Snow Making Equipment the contractor is responsible for?This information is located in TE 01
51Annex H Facility MaintenancePara 2.38 page 43 of 60Will the Government provide historical data for Repairs of Miscellaneous Items?This information is in TE 52
52Annex H Facility MaintenancePara 2.38 page 43 of 60Are these consider OWO or DMO? Please clarifyRepair of Miscellaneous Items will be acomplished by DMO
53Annex H Facility MaintenancePara 5.1.2 Page 48 of 60How many roofs have Solar Day Lighting Systems Intalled?0
54Annex H Facility MaintenancePara 5.1.2 Page 48 of 60What has been the historical workload for roof leaks associated with this equipment in the past 3 years?The government is not aware of any roof leaks associated with Solar Panels
55Annex H Facility MaintenancePara 6.0 thru 6.1.7 pages 48 to 50 of 60Will the government provide historical data for Sign Shop Operations for the past 3 years?TE 52
56Annex H Facility MaintenancePara 6.0 thru 6.1.7 pages 48 to 50 of 60Is this considered OWO, DMO or PMO? Please break the workload out as needed to each type.TE 52
57Annex H Facility MaintenancePara 7.0.1 page 50 of 60Will the government provide the workload data in TE for the Electrical distribution System as only TE 71 Demarcation Points is currently provided?TE 52
58Annex H Facility MaintenancePara 7.0.1 page 50 of 60Will this work be accomplished as OWO, DMO or PMO? Please clearly define for pricing.Could be PMO or DMO
59Annex H Facility MaintenancePara 14.0 thru 14.11 pages 54 and 56 of 60Will the Government provide a TE of Water Distributions systems and Secondary Systems the contractor is responsible for ?Secondary water distribution systems are in every facility. Too much information to list.
60Annex H Facility MaintenancePara 14.0 thru 14.11 pages 54 and 56 of 60Is this work done as OWO, DMO or PMO? Please clarifyCould be DMO or PMO
61Annex H Facility MaintenancePara 14.9 Page 55 of 60How many Disease Traps and Solids Waste Interceptors are there to be maintained by the contractor?listed in TE 27
62Annex H Facility MaintenancePara 14.9 Page 55 of 60Will Government add a TE with Location, Type, year installed, and size?TE 27 lists location, but not type and year
63Annex H Facility MaintenancePara 15.0 Page 56 of 60Will the Government provide a TE with all Storm Water Collections systems the contractor will be responsible for?See TE 60
64Annex H Facility MaintenancePara 21.0 Page 59 of 60Will the Government provide a TE with Fuel Distribution Systems the contractor will be responsible for?See TE 01
65Annex A Overarching PWSPara 2.2.3.2 Page 10 of 90State in part: "A Directorate of Public Work (DPW) Work Reception (WR) will be operated 24 hours a day, 7 days a week and be capable of response to DMOs and/or customer requests outside of standard working hours." is the contractor operated or Government operated, please clearly define?The Government provides a 24-hour customer service call center. DMOs will be issued to the contractor during normal duty hours. After hours, the Government will call the on-call contractor technician and issue the DMO the following duty day.
66TE 2 Area MapsPage 3 of 21 Snow Removal Parking Map Ft Wainwright Main PostWill the legend be updated to add the square feet for areas?See TE 01
67TE 2 Area MapsPage 4 of 21 Snow Removal Map Ft Wainwright Main PostWill the legend be updated to add the miles and square feet for areas?See TE 01
68TE 2 Area MapsPage 7 of 21 Ground and Vegetation Management MapWill the legend be updated with acres?See Annex F for acreage
69TE 2 Area MapsPage 8 of 21 Grey Eagle Snow Removal Ft Wainwright Main PostWill the legend be updated to add the square feet and or Linear feet for areas?See TE 63
70TE 2 Area MapsPage 9 of 21 Ft Wainwright Vegetation ManagementWill the legend be updated with acres?TE 2 Vegitation Map already has this info in the lower left corner of the map.
71TE 2 Area MapsPage 11 of 21 Pest ControlWill the legend be updated with acres?This information is not currently available
72Attachment 4 Exhibit Line Item Number SheetCLIN x020, Sweeping Services-Paved Surfaces Job 131There are 3 Jobs, 1 ea across Priority 1, 2 and 3. Will the Government expand how many miles, feet or length of time will be required for each job for each priority to make it a level playing field for all bidders as right now no one has any idea?Paved surface sweeping is normally completed as standing work. The government has created this CLIN in the event additional sweeping above this standing work becomes necessary.
73Attachment 4 Exhibit Line Item Number SheetCLIN x021, Annex J Maintenance (DMO) Surfaced and Unsurfaced Areas Job 132 to include ELINs x021AA, AB and ACWill the Government provide the DMO file (TE 52 DMO Workload Data) in order to Staff and Price this requirement as the Incumbent has an advantage right now?See anwser to question #1
74Attachment 4 Exhibit Line Item Number SheetCLIN x021, Annex J Maintenance (DMO) Surfaced and Unsurfaced Areas Job 132 to include ELINs x0212AA, AB and ACIf not, will the Government expand how many miles, feet, number of items or length of time will be required for each job for each priority to make it a level playing field for all bidders as right now no one has any idea?A DMO for Surfaced and Unsurfaced Areas may be as small as repairing a 25sf Pothole or as big as grading a gravel landing strip. No DMO will exceed 32 hours.
75Attachment 4 Exhibit Line Item Number SheetCLIN x022, Annex J Maintenance (DMO) Surfaced and Unsurfaced Areas Job 132 to include ELINs x012AA, AB and ACWill the Government provide the PMO file (TE 54 PMO Workload Data) in order to Staff and Price this requirement as the Incumbent has an advantage right now?See anwser to question #1
76Attachment 4 Exhibit Line Item Number SheetCLIN x022, Annex J Maintenance (DMO) Surfaced and Unsurfaced Areas Job 132 to include ELINs x012AA, AB and ACIf not, will the Government expand how many miles, feet, number of items or length of time will be required for each job for each priority to make it a level playing field for all bidders as right now no one has any idea?CLIN x022 adresses PMO, not DMO. Annex J identifies the requirements for PMOs
77Attachment 4 Exhibit Line Item Number SheetCLIN x005 Annex F Maintenance Grounds Job 131 to include ELINs x005AAThere are 41 Job across Priority 1, 2 and 3. Will the Government expand how many acres, feet or length of time will be required for each job for each priority to make it a level playing field for all bidders as right now no one has any idea?A DMO for Grounds Maintenance may be as small as filling a small sink hole or as large as removing a fallen tree. No DMO will exceed 32 hours.
78Attachment 4 Exhibit Line Item Number SheetCLIN x005 Annex F Maintenance Grounds Job 131 to include ELINs x005ABThere are 45 Job across Priority 1, 2 and 3. Will the Government expand how much hauling, and structural lift and transport services including but not limited to water tanks, broken concrete slabs and block, gravel, dirt, wood, brush, trees, rock, hot and cold asphalt mixes, barriers, barricades, and safety fences along with how much will need demolish, disassemble, lift and load and unload for transport that will be required for each job for each priority to make it a level playing field for all bidders as right now no one has any idea?This chapter speaks for itself. The Government does not have the list of items that may need to be hauled in the future. This DMO is issued as the requirement materializes.
79Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 1.2.1.2 Maintenance and Repair of Barriers and associated sub paragraphsWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
80Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 1.2.1.5, Parking Lot PaintingWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
81Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 2.1.2, 2.1.2.a, 2.1.2.b, Road Pavement Marking and Paint Removal on Surfaced AreasWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
82Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 2.1.2.1 Crosswalk PaintingWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
83Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 2.1.3 Range Road MaintenanceWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
84Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 2.1.5 Bridge MaintenanceWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
85Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 2.1.7.6 and sub paragraphs Vegetation ControlWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
86Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 2.1.7.8 Airfield Fencing and SignsWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
87Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetAnnex J, Para 2.1.9 Berms/ BunkersWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
88Annex G Snow and Ice Removal and Attachment 4 Exhibit Line Item Number SheetCLIN x009 Snow Ice Sand Removal Services, BLM Job 131Will the Government update Annex G to include BLM as there are no references currently in the Final version?TE-86 covers this
89Attachment 4 Exhibit Line Item Number SheetCLIN x007 Annex G Snow Ice Sand Removal Job 131 ELIN x007AAThere are 39 Jobs across Priority 1, 2 and 3. Will the Government define how much snow, ice and Debris Removal is associated (miles, sq. ft., or amount of time) with Priority 1, 2 and 3 as the number of jobs is vague and will be no consistency between bidders and Government will not be able to determine reasonable cost for each?DMO's are limited to 32 hours
90Attachment 4 Exhibit Line Item Number SheetCLIN x007 Annex G Snow Ice Sand Removal Job 131 ELIN x007ABThere are 13 Jobs across Priority 1, 2 and 3. Will the Government define the amount Parking Lot Pass - Through Lane in linear feet for each prior priority that will be required for each job by each priority?No, we don't have that information, TE-81 and 82 has the square footage of the parking lots.
91Annex G Snow and Ice Removal and Attachment 4 Exhibit Line Item Number SheetPara 2.0.1.2 Parking Areas.States in part: " The government estimates approx. 600 (jobs) snow clearing events per season to be actioned at the request of the government. " What CLIN / ELIN are there's jobs to be priced and staffed against?CLIN0006
92Annex G Snow and Ice Removal and Attachment 4 Exhibit Line Item Number SheetPara 2.0.1.2 Parking Areas.States in part: " The government estimates approx. 600 (jobs) snow clearing events per season to be actioned at the request of the government. " How many of the 600 jobs are priced and staffed against Non Org Parking and Org Parking?All of them
93Attachment 4 Exhibit Line Item Number Sheet and Annex G Snow and Ice RemovalCLIN x006 Annex G Snow Ice Sand Removal Monthly 131 ELIN x006AD Snow, Ice, Sand Removal Services - DTA/Black Rapids RoadsWill Annex G be updated to include mention of DTA/Black River Roads and provide TE references where they are located as current version has no mention and therefore cannot price or staff this ELIN?Annex G refers you to TE-86 which covers snow removal, TE-02 covers locations. NOTE: There is no snow removal requirement at Black Rapids.
94Attachment 4 Exhibit Line Item Number Sheet and Annex G Snow and Ice RemovalCLIN x006 Annex G Snow Ice Sand Removal Monthly 131 ELIN x006AC Snow, Ice, Sand Removal Services - YTA RoadsWill Annex G be updated to include mention of YTA Roads and provide TE references where they are located as current version has no mention and therefore cannot price or staff this ELIN?Annex G refers you to TE-86 which covers snow removal, TE-02 covers locations
95Attachment 4 Exhibit Line Item Number Sheet and Annex G Snow and Ice RemovalCLIN x010 LOGCAP Snow Ice and Sand Removal Services Job 131Will Annex G be updated to include mention of LOGCAP Services and provide TE references where they are located as current version has no mention and therefore cannot price or staff this ELIN?Services for LogCap will be the same for any other facility. LogCap locations are found in TE slide 6
96Attachment 4 Exhibit Line Item Number Sheet and Annex G Snow and Ice RemovalCLIN x010 LOGCAP Snow Ice and Sand Removal Services Job 131There are 18 Jobs across Priority 1, 2 and 3. Will the Government define the amount LOGCAP Services in linear feet, square yard or miles for each prior priority that will be required for each job by each priority?Services for LogCap will be the same as any other facility.
97Attachment 4 Exhibit Line Item Number Sheet and Annex G Snow and Ice RemovalCLIN x011 LOGCAP Snow Ice and Sand Removal Services Monthly 131Will Annex G be updated to include mention of LOGCAP Services and provide TE references where they are located as current version has no mention and therefore cannot price or staff this ELIN?Services for LogCap will be the same for any other facility. LogCap locations are found in TE slide 6
98Attachment 4 Exhibit Line Item Number Sheet and Annex G Snow and Ice RemovalAnnex G, Para 1.2 last Sentence states: " Contractor shall clear approximately 23,900 lineal feet of sidewalks listed in TE 67."What CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0006
99Attachment 4 Exhibit Line Item Number Sheet and Annex G Snow and Ice RemovalAnnex G, Para 2.0.1.3 thru 2.0.1.9What CLIN / ELIN in Attachment 4 is these to be staffed and priced?CLIN0006
100Attachment 4 Exhibit Line Item Number Sheet and Annex G Snow and Ice RemovalAnnex G, Para 2.3 thru 2.3.2What CLIN / ELIN in Attachment 4 is these to be staffed and priced?CLIN0006
101Annex J Maintenance - Surfaced and Unsurfaced AreasPara 2.14.1 Grading Roads and TrailsWhat TE had the amount of miles for grading roads and trail as it is not referenced in the PWS para?TE-2 has milage
102Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetPara 2.14.1 Grading Roads and TrailsWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
103Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetPara 2.1.7 (Arm Airfield Pavement Maintenance) thru 2.1.7.4What CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
104Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetPara 2.1.8.3 Maintain Signage and MarkingsWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
105Attachment 4 Exhibit Line Item Number SheetCLIN x001 Annex A (Overarching PWS ) Administrative Job 131; RPR of DPW Owned/Operated Wheeled EquipmentWill the Government provide a TE with the equipment the contractor will be responsible to repair?TE 76
106Attachment 4 Exhibit Line Item Number SheetCLIN x001 RPR of DPW Owned/Operated Wheeled EquipmentWill these repairs be included in TE 52 DMO Workload Data that hasn’t been provided to date?No.
107TE 52 DMO Workload DataNot provided yetWill the LOGCAP data be broken out when provided?No it will not be
108TE 54 PMO Workload DataNot provided yetWill the LOGCAP data be broken out when provided?No it will not be
109Annex H (CLS 411 Facilities Maintenance)Whole Document, no mention of LOGCAP requirement as shown in Attachment 4 Exhibit Line Item Number SheetWill Annex H be update to include discussion of LOGCAP requirement that are part of Attachment 4?LogCap structures will be treated the same as any other facility
110Annex Heating and Cooling Services and Attachment 4 Exhibit Line Item Number SheetWhole DocumentWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced as there is no mention of Annex H in current version of Attachment 4, will this be revised / updated?Annex H is throughly covered in Attachment 4, look under the tab "Base Year" CLIN's0012-0018
111TE 06 Staffing Matrix and Attachment 4 Exhibit Line Item Number SheetOverarching PWS Tab, Column C named "CLIN"Will a CLIN / ELIN be added to Attachment 4 as there is not currently one to staff and price the Overarching PWS?CLIN0001
112Attachment 4 Exhibit Line Item Number SheetMissing CLINs x023 and x024Will Attachment 4 be updated to include CLINs x023 and 24 or revise the Current CLINS not to have any gaps?No
113RFP Document W912CN-22-R-0013 and Attachment 4 Exhibit Line Item Number SheetPages 14, 33, 34, 52, 53, 71, 72, 90, & 91 of 179 shows CLINs x023 and x024 for Heating and Cooling ServicesWill these be added to Attachment 4 as they are currently missing there?HVAC is covered under CLIN 0014 and CLIN 0012
114TE 06 Staffing MatrixAll Tabs have columns for Base Year #2, #3, #4 and #5Will TE 06 Staffing Matrix tabs be updated to remove Base Yr #2, #3, #4 and 5 as the RFP document and Attachment 4 do not have them?TE-06 has been corrected
115Annex J Maintenance - Surfaced and Unsurfaced AreasPara 2.1 Surfaced AreasWill TE 52 DMO Workload Data have paving actions in the file, if now will it be added?C.5.1.1.43 on page 46 of 61 in TE 52 Repair Surfaces Paved
116Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetPara 2.1 Surfaced AreasWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
117Annex J Maintenance - Surfaced and Unsurfaced AreasPara 2.1.1 Pothole RepairWill TE 52 DMO Workload Data have pothole actions in the file, if now will it be added?C.5.1.1.43 on page 46 of 61 in TE 52 Repair Surfaces Paved
118Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetPara 2.1.1 Pothole RepairWhat CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
119Annex J Maintenance - Surfaced and Unsurfaced AreasPara 2.1.1.1 Maintenance and Repair of Bituminous and Cement Concrete Pavement.Will TE 52 DMO Workload Data have Maintenance and Repair of Bituminous and Cement Concrete Pavement actions in the file, if now will it be added?C.5.1.1.43 on page 46 of 61 in TE 52 Repair Surfaces Paved
120Annex J Maintenance - Surfaced and Unsurfaced Areas and Attachment 4 Exhibit Line Item Number SheetPara 2.1.1.1 Maintenance and Repair of Bituminous and Cement Concrete Pavement and sub paragraphs.What CLIN / ELIN in Attachment 4 is this to be staffed and priced?CLIN0021-0022
121PWSPage 132 of 179/INSTRUCTIONS TO OFFERORS, Section 5.3.2Would the Government allow a font size smaller than 10 point Times New Roman for graphics?No.
122PWSPage 139 of 179/INSTRUCTIONS TO OFFERORS, Section 8.1.2Will the experience and past performance of parent or subsidiary companies be evaluated if the proposal shows that a sister company lending its experience and past performance has made a firm commitment to have a meaningful involvement in contract performance?See revision to 52.212-1 Addendum, paragraph 8.1.4.
123PWSPage 139 of 179/INSTRUCTIONS TO OFFERORS, Section 8.1.2Are there any additional requirements that an offeror must address in its proposal in order to utilize parent or subsidiary company experience and past performance if the proposal shows that a sister company lending its experience and past performance has made a firm commitment to have a meaningful involvement in contract performance?See revision to 52.212-1 Addendum, paragraph 8.1.4.
124PWSPage 139 of 179/INSTRUCTIONS TO OFFERORS, Section 8.1.2Are there specific or special evaluation criteria for rating the experience and past performance of an offeror who utilizes parent or subsidiary company experience and past performance if the proposal shows that a sister company lending its experience and past performance has made a firm commitment to have a meaningful involvement in contract performance?No
125PWSPage 144 of 179/INSTRUCTIONS TO OFFERORS, Section 14Would the Government please extend the due date for questions by one (1) week to 7/7/2022 to allow Offerors time to incorporate findings from the site visit?No
126Attachment 01 - Past Performance Information (PPI) Contract ReferencesPage 1 of 2/Section A, Row 2Will the Government confirm the requirement for DUNS number on Attachment 01, rather than the newly adopted UEI?Attachment 01 has been updated to include only the UEI
127Annex M Pest ManagementPara 1.7.1.d, e &fWill the Government provide workload for these paragraphs as there is none currently provided?Yes, See anwser to question #1
128Annex M Pest Management Attachment 4 and TE 06All of Annex M; CLINs x028 and x029 of Attachment 4; Column C (CLIN) of TE 06Will the Government provide a cross walk between Attachment 4 to Annex M and TE 06 which paras apply to CLIN x028 and x029?CLIN0028 is preventive, CLIN0029 is DMO
129Annex M Pest ManagementPara 1.9 Miscellaneous PestsWhich CLIN does this apply to x028 or x029?CLIN 0029
130Annex M Pest ManagementPara 1.9 Miscellaneous PestsWhat has been the historical workload for the past 3 years as there is no TE reference to go to?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
131Annex M Pest ManagementPara 2.2.1.4 Other Pests of Medical Importance thru 2.2.1.4.eWhat has been the historical workload for the past 3 years as there is no TE reference to go to?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
132Annex M Pest ManagementPara 2.2.1.4 Other Pests of Medical Importance thru 2.2.1.4.eWhich CLIN does this apply to x028 or x029?both 028 and 029
133Annex M Pest ManagementPara 2.2.3.1.1 and 2.2.3.1.2What has been the historical workload for the past 3 years as there is no TE reference to go to?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
134Annex M Pest ManagementPara 2.2.3.1.1 and 2.2.3.1.2Which CLIN does this apply to x028 or x029?CLIN0029
135Annex M Pest ManagementPara 2.2.4What has been the historical workload for the past 3 years as there is no TE reference to go to?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
136Annex M Pest ManagementPara 2.2.4Which CLIN does this apply to x028 or x029?CLIN0029
137Annex M Pest ManagementPara 2.2.5Firebreaks have been removed elsewhere, should they be removed here too?no refer to TE-02 for vegetation control map
138Annex M Pest ManagementPara 2.3.2 Special Event ServicesWhich CLIN does this apply to x028 or x029?CLIN0029
139Annex M Pest ManagementPara 2.3.3 Food Service Facility InspectionWhich CLIN does this apply to x028 or x029?CLIN0028
140Annex M Pest ManagementPara 2.3.4 Commissary InspectionWhich CLIN does this apply to x028 or x029?CLIN 0028
141Attachment 4CLIN x025 Annex L Wastewater Services Job 131; Sanitation ServicesAttachment 4 has total of 5 Jobs for Sanitation Services for Annex L, Will the Government define what this exactly is as Annex L only talks about Lift stations and they appear to be covered in Annex H Facility maintenance? Please clarifyAnnex L referrs to the entire wastewater treatment system; collection lines, sewer mains, and lift stations and all ancillary components and support systems.
142Annex K Heating and Cooling ServicesPara 2.8 Boiler/ Furnaces/ Water HeatersWill the Government provide the historical DMO data for this requirement?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
143Annex K Heating and Cooling ServicesPara 2.13 EmergenciesWill the Government provide the historical DMO data for this requirement?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
144RFP Document W912CN-22-R-0013, Schedule B; Attachment 04CLINs x026 and x027These are missing in Attachment 4, Will they be added or deleted from RFP Document?These CLINs are not being used for the purpose of the solicitation. CLIN 23,24, 26, and 27 have been removed. The contract writing system will not allow actual removal of the CLINs once established.
145RFP Document W912CN-22-R-0013, Schedule B; Attachment 04CLIN x026 List 469 JobsWill the Government define what the contractor is responsible for as the PWS Annex L only talks to Lift station, please clarify?Annex L referrs to the entire wastewater treatment system; collection lines, sewer mains, and lift stations and all ancillary components and support systems.
146RFP Document W912CN-22-R-0013, Schedule B; Attachment 04CLIN x027 List 270 JobsWill the Government define what the contractor is responsible for as the PWS Annex L only talks to Lift station, please clarify?Annex L referrs to the entire wastewater treatment system; collection lines, sewer mains, and lift stations and all ancillary components and support systems.
147Annex E Solid Waste ManagementPara 2.6.1 Special Event PlanningHistorically, how many special event happen per year?no historical data available
148Annex E Solid Waste ManagementPara 2.7.1 Storms and Natural DisastersHistorically over the past 3 years, how many storms or natural disasters have been responded to?zero
149Annex E Solid Waste ManagementPara 2.7.4 Unscheduled Clean upsHistorically over the past 3 years, how many unscheduled cleanup have been requested?zero
150Annex E Solid Waste ManagementPara 2.7.6 Emergency WorkOver past 3 years, How many Emergency work orders have been issued and what was the work for and amount of time for each?zero
151Attachment 4CLIN x003 Annex E Solid WasteWill an additional ELIN be added to cover Emergency work as described in Para 2.7.6 of Annex E as there is currently none provided?negative
152Annex E Solid Waste ManagementPara 3.2 Container InventoryWhat is the current number of Government provided containers?300 Approximately
153Annex E Solid Waste ManagementPara 3.3 Container UpkeepWhat has been the historical workload for container upkeep for the past 3 years?mainatin 1/3 of the inventory per year
154Annex E Solid Waste ManagementPara 3.4 Serialized ContainersHow many Serialized Containers are there currently?appropximately 300. all containers are serialized
155Annex F Maintenance GroundsPara 2.2 Service High Visibility AreasWill the Government provide the acres that are high visibility along with the number of athletic fields, plants, shrubs and flowers that are to be maintained and amount of sidewalks?Annex F para 2.2.1
156Annex F Maintenance GroundsPara 2.2.4.1 Fertilizing and LimingHow many acres are required to get this service twice a year?to all high visibility areas
157Annex F Maintenance GroundsPara 2.2.7 Weed ControlHow many parade and athletic fields receive weed control and the size of each one?TE 2 all parade fields and athletic fields receive weed control, there is a legend in the lower right corner of the map
158Annex F Maintenance GroundsPara 2.2.8 Remove Debris, Leave and LitterWill the government provide the historical data for the past 3 years for this requirement?this data is not available
159Annex F Maintenance GroundsPara 2.2.9.4 Tree PruningHow many trees required pruning from May to Sept?all the trees in high visibility areas
160Annex F Maintenance GroundsPara 2.2.9.5 Tree RemovalOver the past 3 years, how many trees have been removed on annual basis?approximately 2 dozen
161Annex F Maintenance GroundsPara 2.2.9.5.1 Emergency Tree RemovalOver the past 3 years, how many trees have been removed as emergency on annual basis?none
162Annex F Maintenance GroundsPara 2.6.a).1), 2), 4)Will the Government provide the number and area of Ammo Supply Points, length of Post Perimeter Fence and length of Railroad that requires service?See revised TE 02
163Annex F Maintenance GroundsPara 2.6.b) 1) thru 3) and 5)Will the Government provide the workload for these areas as it did for Para 2.6.b).4)?once annually
164TE 50TE 50 Ammunition BunkersWhat is the length of fencing around each of the 17 bunkers?one fence sorrounds the enire ASP
165Annex F Maintenance GroundsPara 2.6.c) 4) Skill HillsWhat is the amount of area for Ft Wainwright and Black Hills Ski area that is to be brush mowed annually?See revised TE 02
166Annex H Facility MaintenancePara 1.1.1 Diagnosis and Analysis and sub paragraphsWill the government provide the historical data for the past 3 years for this requirement?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
167Annex H Facility Maintenance and Attachment 4Para 1.1.1 Diagnosis and Analysis and sub paragraphsWhat CLIN or ELIN is this to be priced and staffed against?This is part of every PM and DMO that you execute so it will be on the CLIN for that job
168Annex H Facility Maintenance2.1 Facility WorkloadWil the Government provide TE 53 ?TE 53 has been added to the solicitation.
169TE 53 PMO Workload DataMissing fileWill the this TE include OWO data along with PWO data as implied by Annex H, Para 2.1?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
170Annex H Facility MaintenancePara 21.0 Fuel Distribution SystemsWill the government provide the historical data for the past 3 years for this requirement or list of equipment the contractor is responsible?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
171Annex H Facility Maintenance and Attachment 4Para 21.0 Fuel Distribution SystemsWhat CLIN or ELIN is this to be priced and staffed against?CLIN0014
172Annex H Facility Maintenance and TE 09 Storm Water SystemPara 16.0 Preventative Maintenance thru 16.4 and TE 09Will the Government provide the number of pipes, culverts, conduits, headwalls, drop boxes, grates, and open concrete lined channels, ditches, manholes and curb inlets at TE 09 does not have table listing that data?Use the legend in TE-09 to extract the data from the maps provided.
173Annex H Facility Maintenance and Attachment 4Para 16.0 Preventative Maintenance thru 16.4 and TE 09What CLIN or ELIN is this to be priced and staffed against?CLIN0012
174Annex H Facility MaintenancePara 15.0 Storm Water Collection System thru 15.6Will the Government provide the historical DMO, OWO and PMO data for the past 3 years for each requirement?TE's 52 and 53 have been updated. Historical data is provided for the sole purpose of assisting prospective offerors with the formulation of proposals; however, prospective offerors are strongly cautioned that the historical data provided is not guaranteed to represent the entire magnitude of the scope of work being solicited. Further, the Government makes no representation that the historical data is an indicator of future requirements. Prospective offerors are advised to provide their own independent analysis and assessment for formulating their associated labor mix and pricing submission inclusive of all performance risk. The Government will not entertain claims based on the integrity of the historical data provided.
175Annex H Facility Maintenance and Attachment 4Para 15.0 Storm Water Collection System thru 15.6What CLIN or ELIN is this to be priced and staffed against?Storm water will be moved to Annex J and billed under CLIN0021-0022.

This is the start of the file's text. The full file is on GovTribe.