Attachment 03 - Set 1_G Series_Part1.pdf
PDF 25 MB Posted
- Attached to
- Y1DA--636-502 Construct Sterile Processing Service VISN 23 Federal contract opportunity
- Solicitation number
- 36C77625R0063
About this file
This file contains construction documents for a VA Medical Center project to Design/Construct a Sterile Processing Service (SPS) addition at the Omaha VA Medical Center. The project involves a two-story addition on top of an existing one-story structure, with a total floor area of approximately 11,872 gross square feet on the third level and an 11,430 square foot interstitial space on the second level.
The project scope includes comprehensive renovation and new construction, with specific areas such as a decontamination room, prep assembly space, sterilization area, cart wash facilities, offices, and support spaces. The design follows VA design guidelines and meets International Building Code (2018) and NFPA 101 (2018) standards. Key technical specifications include a Type 1B construction classification, full sprinkler protection, fire-rated barriers, and a single smoke zone. The project is part of Solicitation Number 36C77625R0063 issued by the Department of Veterans Affairs Technology Acquisition Center Austin, with the specific project number being 636-502.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
16.2330.A08
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
TERRASITE DESIGN
1635 DEADWOOD AVENUE
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 791-1736
2/23/2024COMPLIANCY REVIEW COMPLETED
/1
/2
:4
:2
P
M
CONSTRUCTION DOCUMENTS
11/23/2020
COVER SHEET
G-000
Design/Construct Sterile Processing Service- Omaha VA Medical Center
JGCJL
4101 Woolworth Ave #4199 Omaha, Ne 68105Omaha VA Medical Center
1 138
STERILE PROCESSING SERVICE
OMAHA VA MEDICAL CENTER
DEPARTMENT OF VETERAN'S AFFAIRS
4101 WOOLWORTH AVE #4199,
OMAHA, NE 68105
PROJECT NO. 636-502
VA
U.S DEPARTMENT OF VETERAN'S AFFAIRS
VETERAN'S HEALTH ADMINISTRATION
SPS NEW ADDITION_________________________________
PARKING #1
PROJECT
LOCATION
PARKING #2
PARKING #3
PARKING #4
PARKING #5
PARKING #6
PARKING #7
PARKING #8
PARKING #9
PARKING #10
PARKING #11
PARKING #12
PARKING #13
SIDEWALKS LOCATED
OUTSIDE OF BOUNDARY
TO REMAIN OPEN FOR
PUBLIC USE
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
CONTRACTOR SHALL NOT SCALE DRAWINGS BUT
SHALL REQUEST THE DESIRED DIMENSIONS FROM
THE ARCHITECT.
2. SEE SHEET G-002 FOR GENERAL NOTES
3. MAINTAIN FIRE WATCH WHEN DOUBLE EGRESS
DOOR IS BLOCKED.
MAP LEGEND
TEMPORARY
CONSTRUCTION SAFETY
FENCE.
HAUL ROUTE
MATERIAL DELIVERY ROUTE
AREA FOR CONSTRUCTION
MATERIAL LAYDOWN AND CRANE
LIFTS. LIFT BOUNDARIES TO BE
COORDINATED AND REQUIRE
APPROVAL FROM CONTRACTING
OFFICER REPRESENTATIVE.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
16.2330.A08
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
TERRASITE DESIGN
1635 DEADWOOD AVENUE
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 791-1736
2/23/2024COMPLIANCY REVIEW COMPLETED
/1
/2
:4
:2
P
M
CONSTRUCTION DOCUMENTS
11/23/2020
LOCATION MAP
G-001
Design/Construct Sterile Processing Service- Omaha VA Medical Center
JGCJL
4101 Woolworth Ave #4199 Omaha, Ne 68105Omaha VA Medical Center
2 138
3/4" = 1'-0"
LOCATION MAP
11 ACC CONSTRUCTION AREA
10 DIALYSIS, WAREHOUSE, LAUNDRY
9 PSYCHOSOCIAL REHABILITATION AND RECOVERY CENTER (PRRC)
8 MAIN BUILDING
7 DENTAL CLINIC
6 CONSTRUCTION AREA
5 VETERAN/VISITOR SMOKING SHELTER
1 FISHER HOUSE CONSTRUCTION AREA
NO. BUILDING NAME
BUILDING SCHEDULE
13 RESTRICTED
12 EMPLOYEE
11 VETERAN
10 RESTRICTED
9 VETERAN
8 RESTRICTED
7 WHITE DECAL
6 SERVICE CONNECTED
5 HANDICAP EMPLOYEE
4 PATIENT, VOLUNTEER, VISITOR
3 VETERAN
2 VETERAN
1 PARKING STRUCTURE
NO. BUILDING NAME
PARKING SCHEDULE
GENERAL NOTES:
N
N
PLAN
NORTH
TRUE
NORTH
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
16.2330.A08
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
TERRASITE DESIGN
1635 DEADWOOD AVENUE
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 791-1736
2/23/2024COMPLIANCY REVIEW COMPLETED
/1
/2
:5
:5
A
M
CONSTRUCTION DOCUMENTS
11/23/2020
PROJECT DIRECTORY, DRAWING
INDEX AND GENERAL NOTES
G-002
Design/Construct Sterile Processing Service- Omaha VA Medical Center
JGCJL
4101 Woolworth Ave #4199 Omaha, Ne 68105Omaha VA Medical Center
3 138
ARCHITECT
JOEL SIMONYAK, AIA, NCARB
MECHANICAL ENGINEER
MATT KOSCAK, PE
ELECTRICAL ENGINEER
RAY DAWES, PE
STRUCTURAL ENGINEER
LUCAS FRIED, PE, SE
FOURFRONT DESIGN INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PHONE (605) 342-9470
ALBERTSON ENGINEERING INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PHONE (605) 274-0880
FIRE PROTECTION ENGINEER
DONNA KOHLAN, PE, FPE
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
(402) 330-5900
PROJECT DIRECTORY:
GENERAL NOTES:
1. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, REGULATIONS, AND
ORDINANCES.
2. THE CONTRACTOR SHALL PERFORM ALL TESTING AND INSPECTIONS AS
SPECIFIED, OR AS NECESSARY TO DEMONSTRATE A COMPLETE AND
SATISFACTORY INSTALLATION.
3. THE CONTRACTOR SHALL PROTECT EXISTING BUILDING AND SITE
MATERIALS SCHEDULED TO REMAIN, AND SHALL BE RESPONSIBLE FOR
DAMAGE TO THE SAME RESULTING FROM WORK UNDER THIS CONTRACT.
THE CONTRACTOR SHALL RESTORE DAMAGED EXISTING BUILDING
AND SITE MATERIALS TO THEIR ORIGINAL CONDITION.
4. CONTRACTOR SHALL EXERCISE CAUTION TO AVOID ANY DAMAGE WHEN
PERFORMING EARTHWORK, PAVING, OR ANY CONSTRUCTION IN THE
VICINITY OF EXISTING UTILITIES, BUILDINGS, AND LANDSCAPING.
5. CONTRACTOR SHALL INSPECT SITE AND FIELD VERIFY ALL DIMENSIONS AND
CONDITIONS PRIOR TO COMMENCING CONSTRUCTION. CONTRACTOR
SHALL NOTIFY ARCHITECT/CONTRACTING OFFICER REPRESENTATIVE
IMMEDIATELY OF ANY DISCREPANCIES.
6. CONTRACTOR SHALL COORDINATE ALL WORK AND SHOP DRAWINGS WITH
OTHER TRADES.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF ALL WORK.
CONTRACTOR SHALL ANTICIPATE AREAS WHERE THE INSTALLATION OF
MECHANICAL AND ELECTRICAL WORK WILL BE RESTRICTED, CONGESTED, OR
DIFFICULT TO INSTALL, AND SHALL COORDINATE INSTALLATION BETWEEN ALL
TRADES.
8. SUB-CONTRACTOR SHALL COORDINATE LOCATIONS FOR ALL MECHANICAL
AND ELECTRICAL ITEMS WITH THE GENERAL CONTRACTOR. CONTRACTOR
SHALL NOTIFY ARCHITECT/CONTRACTING OFFICER REPRESENTATIVE OF ANY
DISCREPANCIES PRIOR TO INSTALLATION AND/OR FABRICATION.
9. ALL DIMENSIONS LOCATING BUILDING AND SITE IMPROVEMENTS ARE TO FACE
OF BUILDING, BACK OF CURB, OR EDGE OF WALK, AND RUN PARALLEL OR
PERPENDICULAR TO EXISTING ROADS.
10. ALL BUILDING DIMENSIONS ARE TO FACE OF STUD, FACE OF MASONRY, AND
EXTERIOR WINDOW OR DOOR ROUGH OPENING.
11. ALL ANGLES ON PLANS ARE 45- OR 90-DEGREES, UNLESS NOTED OTHERWISE.
CURVED ELEMENTS ARE LOCATED AS DIMENSIONED.
12. ALL ELEVATIONS INDICATED ON THE DRAWINGS ARE BASED ON A FIRST
FLOOR DATUM OF +100'-0”. WHERE ITEMS ARE LABELED A.F.F. (ABOVE
FINISHED FLOOR), CONTRACTOR SHALL SET THE ITEM AS MEASURED FROM
THE LOCAL FLOOR ELEVATION. COORDINATE ANY DISCREPANCIES
REGARDING THIS SITUATION TO ASSURE THAT ALL BUILDING COMPONENTS
ARE PROPERLY SET TO FUNCTION AS INTENDED.
14. ALL ITEMS ARE NEW UNLESS SPECIFICALLY IDENTIFIED AS EXISTING.
15. SEE FIRE PROTECTION PLANS FOR LOCATIONS OF FIRE- AND SMOKE-RATED
PARTITIONS.
16. INSTALL BLOCKING WITHIN PARTITIONS AS REQUIRED FOR INSTALLATION OF
WALL-MOUNTED CABINETS, TOILET ACCESSORIES, WALL STOPS, AND
MISCELLANEOUS ITEMS.
17. LOCATE INTERIOR CONTROL JOINTS WHERE INDICATED, BUT AT A MINIMUM
TO DIVIDE ALL GYPSUM BOARD INTO SECTIONS NOT EXCEEDING 30-FEET IN
LENGTH.
18. ALL CEILING GRID SHALL BE CENTERED WITHIN THE ROOM OR CORRIDOR IN
WHICH IT OCCURS, UNLESS SHOWN OTHERWISE.
19. ALL CEILING HEIGHTS LISTED IN THE ROOM FINISH SCHEDULE ARE FROM THE
FINISH FLOOR OF THE LISTED ROOM, UNLESS NOTED OTHERWISE.
20. ALL CHANGES IN FLOOR MATERIALS OCCUR AT THE FOLLOWING LOCATIONS,
UNLESS NOTED OTHERWISE: 1) AT THE CENTER LINE OF DOORS IN THE
CLOSED POSITION, OR; 2) AT THE CENTER LINE OF OPENINGS SEPARATING
ROOMS.
24. WHERE METAL STUDS EXTEND TO THE STRUCTURE ABOVE, PROVIDE
DOUBLE-HEAD TRACK TO ALLOW FOR 3/4” MINIMUM DEFLECTION OF THE
STRUCTURE.
25. ALL MASONRY REINFORCEMENT IS INDICATED ON THE STRUCTURAL
DRAWINGS.
26. ALL EXTERIOR CONTROL JOINTS SHALL RECEIVE BACKER ROD AND SEALANT.
27. IN SOME INSTANCES, THERMAL AND SOUND INSULATION HAS BEEN OMITTED
FROM DETAILS FOR CLARITY. SEE SPECIFICATIONS, PARTITION TYPES, AND
WALL SECTIONS FOR LOCATIONS REQUIRING INSULATION.
28. THE PLANS AND SPECIFICATIONS ARE NOT INTENDED TO DEPICT EACH AND
EVERY CONDITION OR DETAIL OF CONSTRUCTION IN REGARD TO THE AIR AND
MOISTURE RETARDER. THE CONTRACTOR HAS RESPONSIBILITY FOR
ENSURING THE AIR- AND WATER-TIGHT INTEGRITY OF THE STRUCTURE.
SHEET INDEX
MECHANICAL
M 0.00 SYMBOLS, LEGENDS AND ABBREVIATIONS
M 1.01 MECHANICAL ROOF DEMOLITION PLAN
M 2.01 INTERSTITIAL SPACE PIPING REMODEL PLAN
M 2.02 LEVEL 3 MECHANICAL PIPING REMODEL PLAN
M 2.03 INTERSTITIAL SPACE HVAC DUCT REMODEL PLAN
M 2.04 LEVEL 3 HVAC DUCT REMODEL PLAN
M 2.05 STEAM PIPING REMODEL PLAN
M 2.06 MECHANICAL ROOF PLAN
M 3.01 MECHANICAL SECTIONS
M 4.01 LARGE - SCALE VIEWS
M 5.00 MECHANICAL DETAILS BUILDING 5 - DRY SIDE 1
M 5.01 MECHANICAL DETAILS BUILDING 5 - DRY SIDE 2
M 5.10 MECHANICAL DETAILS BUILDING 5 - WET SIDE 1
M 5.11 MECHANICAL DETAILS BUILDING 5 - WET SIDE 2
M 5.12 MECHANICAL DETAILS BUILDING 5 - WET SIDE 3
M 6.01 MECHANICAL SCHEDULES (PID)
M 6.01A MECHANICAL SCHEDULES 2 (PID)
M 6.02 PIPING AND INSTRUMENTATION DIAGRAM (PID)
M 6.03 ZONE/ROOM PRESSURE AND FLOWS DIAGRAM
M 6.04 CONTROL DIAGRAMS AHU-1 AND EF-1
M 6.05 CONTROL DIAGRAMS AHU-2
M 6.06 CONTROL DIAGRAMS VAV’S AND VV’S
M 6.07 CONTROL DIAGRAMS CHILLED WATER SYSTEMS
M 6.08 MECHANICAL CONTROLS CHILLED WATER SEQUENCE OF
OPERATIONS
M 7.01 DUCTWORK ISOMETRIC VIEWS
M 7.02 MECHANICAL PIPING ISOMETRIC VIEWS
PLUMBING
P 0.00 SYMBOLS, LEGENDS AND ABBREVIATIONS
P 1.00 EXISTING ROOF PLUMBING DEMOLITION PLAN
P 1.01 FIRST FLOOR DRAIN, WASTE AND VENT PLAN
P 1.02 INTERSTITIAL SPACE WATER AND COMPRESSED AIR PLAN
P 1.03 INTERSTITIAL SPACE DRAIN, WASTE AND VENT PLAN
P 1.04 LEVEL 3 SPS WATER AND COMPRESSED AIR PLAN
P 1.05 LEVEL 3 DRAIN, WASTE AND VENT PLAN
P 1.06 PLUMBING ROOF PLAN
P 2.01 WATER AND COMPRESSED AIR ISOMETRIC VIEWS
P 2.02 DRAIN, WASTE AND VENT ISOMETRIC VIEWS
P 3.01 PLUMBING SECTIONS
P 5.01 PLUMBING DETAILS
P 5.02 PLUMBING DETAILS
P 6.01 PLUMBING SCHEDULES
ELECTRICAL
E-000 LEGENDS AND ABBREVIATIONS
E-001 PANEL SCHEDULES
E-002 PANEL SCHEDULES CONTINUED
E-003 ELECTRICAL SCHEDULES
E-004 ELECTRICAL DETAILS
E-005 TELECOMMUNICATIONS DETAILS
E-006 TELECOMMUNICATIONS DETAILS
E-007 ELECTRICAL SERVICE DETAILS
E-008 ELECTRICAL SERVICE PATHWAY PLANS
E-009 ELECTRICAL POWER SCHEMATIC AND INTERSTITIAL SPACE
PLANS
E-010 THIRD LEVEL POWER DISTRIBUTION PLAN
ED-100 SECOND LEVEL ELECTICAL DEMOLITION PLAN
ED-101 ICU CEILING DEMOLITION PLAN
E-100 SECOND LEVEL POWER PLAN
E-101 THIRD LEVEL POWER PLAN
E-102 ROOF LEVEL ELECTRICAL PLAN
E-200 SECOND LEVEL LIGHTING PLAN
E-201 THIRD LEVEL LIGHTING PLAN
E-301 LEVEL THREE SPECIAL SYSTEMS PLAN
E-302 LEVEL 3 SPECIAL SYSTEMS ROUTING PLAN
FIRE PROTECTION
FA-000 FIRE ALARM GENERAL NOTES & SYMBOLS
FA-100 FIRE ALARM PLAN - 1ST AND 2ND LEVEL
FA-101 FIRE ALARM PLAN - 3RD LEVEL
FX-000 FIRE SUPPRESSION GENERAL NOTES AND DETAILS
FX-100 FIRE SUPPRESSION PLAN - 1ST AND 2ND LEVEL
FX-101 FIRE SUPPRESSION PLAN - 3RD LEVEL
FX-400 FIRE SUPPRESSION LARGE SCALE PLAN AND SECTIONS
SHEET INDEX
GENERAL
G-000 COVER SHEET
G-001 LOCATION MAP
G-002 PROJECT DIRECTORY, DRAWING INDEX AND GENERAL NOTES
G-003 ABBREVIATIONS, LEGENDS AND SYMBOLS
G-004 INFECTION CONTROL RISK ASSESSMENT
G-005 PHASING PLAN - LEVEL 1, 2 & 3
G-101 CODE PLAN
G-200 LIFE SAFETY PLAN - 2ND LEVEL
G-201 LIFE SAFETY PLAN - 3RD LEVEL
CIVIL
V-100 SITE TOPOGRAPHICAL SURVEY
C-100 SITE GENERAL NOTES
CD100 DEMOLITION PLAN
CS100 SITE PLAN
CG100 GRADING AND STAKEOUT PLAN
CG101 EROSION CONTROL PLAN
CU100 SANITARY SEWER PLAN
CP100 JOINTING PLAN
CT100 TRAFFIC CONTROL PLAN
C-500 CIVIL DETAILS #1
C-501 CIVIL DETAILS #2
C-502 CIVIL DETAILS #3
ARCHITECTURAL
AD-100 DEMOLITION CEILING PLAN - FIRST LEVEL
AD-101 DEMOLITION PLAN - 2ND LEVEL
AD-102 DEMOLITION CEILING PLAN - 2ND LEVEL
AD-103 DEMOLITION PLAN - 3RD LEVEL
AD-104 DEMOLITION - NORTH ELEVATION & DETAILS
A-000 WALL TYPES & DETAILS
A-001 PARTITION FRAMING DETAILS
A-010 HEAD OF WALL DETAILS
A-020 PLAN DETAILS
A-021 PLAN DETAILS
A-100 NEW FLOOR PLAN - 2ND LEVEL
A-101 NEW FLOOR PLAN - 3RD LEVEL
A-103 DIMENSION PLAN 3RD LEVEL
A-110 REFLECTED CEILING PLAN - 2ND LEVEL
A-111 REFLECTED CEILING PLAN - 3RD LEVEL
A-112 CEILING DETAILS
A-120 NEW ROOF PLAN
A-121 ROOF DETAILS
A-200 EXTERIOR ELEVATIONS
A-201 EXTERIOR ELEVATIONS
A-300 BUILDING SECTIONS
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-400 ENLARGED STAIR PLANS, SECTIONS AND DETAILS
A-401 SECTION DETAILS
A-402 SECTION DETAILS
A-403 SECTION DETAILS
A-404 CART WASH DETAILS
A-500 ROOM FINISH SCHEDULE
A-510 FLOOR FINISH PLAN - 2ND LEVEL
A-511 FLOOR FINISH PLAN - 3RD LEVEL AND FLOORING TRANSITION
DETAILS
A-512 WALL PROTECTION PLANS
A-513 WALL PROTECTION DETAILS
A-520 ENLARGED PLAN AND INTERIOR ELEVATIONS
A-521 ENLARGED PLANS AND INTERIOR ELEVATIONS
A-522 INTERIOR ELEVATIONS
A-530 SIGNAGE DETAILS
A-600 DOOR SCHEDULE, ELEVATIONS AND DETAILS
A-610 WINDOW ELEVATIONS AND DETAILS
EQUIPMENT
QH-100 SPS MEDICAL EQUIPMENT PLAN
QH-101 SPS MEDICAL EQUIPMENT SCHEDULE
STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 IBC INSPECTION TABLES
S-003 SNOW DRIFT AND WIND UPLIFT PLANS
S-102 LEVEL (02) INTERSTITIAL FRAMING PLAN LEVEL
S-103 LEVEL (03) FLOOR FRAMING PLAN
S-104 LEVEL (04) ROOF FRAMING PLAN
S-401 LATERAL FRAMING ELEVATIONS
S-402 LATERAL FRAMING ELEVATIONS
S-403 LATERAL FRAMING DETAILS & SCHEDULE
S-404 ENLARGED STAIR FRAMING PLANS
S-501 DETAILS
S-502 DETAILS
S-503 DETAILS
S-601 STANDARD DETAILS/SCHEDULES
CIVIL ENGINEER
SHANE MATT, PE
TERRASITE DESIGN
1635 DEADWOOD AVENUE
RAPID CITY, SOUTH DAKOTA 57702
PHONE (605) 791-1736
# POUND OR NUMBER
& AND
@ AT
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
AFF ABOVE FINISH FLOOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALUM ALUMINUM
ANOD ANODIZED
ASD ALTERNATE STRESS DESIGN
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
AWS AMERICAN WELDING SOCIETY
BD BOARD
BLK BLOCK
BM BEAM
B.O. BOTTOM OF
BOT BOTTOM
BRG BEARING
BRKT BRACKET
BSMT BASEMENT
BLDG BUILDING
BYND BEYOND
CAB CABINET
CER CERAMIC
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMPR COMPRESSIBLE
CONC CONCRETE
CONST JT CONSTRUCTION JOINT
CONT CONTINUOUS
CPT CARPET TILE
CRSI CONCRETE REINFORCING STEEL INSTITUTE
DBL DOUBLE
DEMO DEMOLISH OR DEMOLITION
DET DETAIL
DIA DIAMETER
DIM DIMENSION
DIR DIRECTION
DN DOWN
DR DOOR
DWG DRAWING
EA EACH
EE EACH END
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR OR ELEVATION
EPDM ETHYLENE PROPYLENE DIENE M-CLASS (ROOFING)
EQ EQUAL
ES EACH SIDE
EXIST. EXISTING
EXP BLT EXPANSION BOLT
EXP JT EXPANSION JOINT
EXT EXTERIOR
FD FLOOR DRAIN OR FIRE DEPARTMENT
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FM FILLED METAL
FND FOUNDATION
F.O. FACE OF
FT FOOT OR FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GP GUSSET PLATE
GR GRADE
GYP GYPSUM
HC HOLLOW CORE
HDR HEADER
HEF HORIZONTAL EACH FACE
HI HIGH
HIF HORIZONTAL INSIDE FACE
HM HOLLOW METAL
HOF HORIZONTAL OUTSIDE FACE
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
ABBREVIATIONS
R RADIUS
RB RUBBER BASE
RBT RUBBER TILE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REINF REINFORCED
REF REFERENCE
REQD REQUIRED
RET RETURN
RM ROOM
R.O. ROUGH OPENING
ROW RIGHT OF WAY
SAB SOUND ATTENUATION BLANKET
SC SOLID CORE
SECT SECTION
SHT SHEET
SIM SIMILAR
SL SPLICE LENGTH
SLC SEALED CONCRETE
SLV SHORT LEG VERTICAL
SOG SLAB ON GRADE
SPEC SPECIFIED OR SPECIFICATION
SPK SPRINKLER OR SPEAKER
SQ SQUARE
SSTL STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIFF STIFFENER
STL STEEL
STR STAIR
STRUCT STRUCTURE OR STRUCTURAL
SUP SUPPORT
SYM SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
T/D TELEPHONE/DATA
TEL TELEPHONE
TEMP TEMPERATURE
THK THICK OR THICKNESS
TLT TOILET
T.O. TOP OF
T.O.C TOP OF CONCRETE
T.O.F TOP OF FRAMING
T.O.S TOP OF STEEL/STUD
T.O.W TOP OF WALL
TPD TOILET PAPER DISPENSER
TYP TYPICAL
U/S UNDERSIDE
UNO UNLESS NOTED OTHERWISE
US UNDERSIDE
VB VAPOR BARRIER
VCT VINYL COMPOSITE TILE
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERIFY IN FIELD
VWC VINYL WALL COVERING
W/ WITH
WD WOOD
WDW WINDOW
WP WORKING POINT
WRB WEATHER RESISTANT BARRIER
WWF WELDED WIRE FABRIC
FD FLOOR DRAIN OR FIRE DEPARTMENT
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIXT FIXTURE
FLR FLOOR
FM FILLED METAL
FND FOUNDATION
F.O.M. FACE OF MASONRY
FT FOOT OR FEET
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GND GROUND
GP GUSSET PLATE
GR GRADE
GYP GYPSUM
HC HOLLOW CORE
HDR HEADER
HEF HORIZONTAL EACH FACE
HI HIGH
HIF HORIZONTAL INSIDE FACE
HM HOLLOW METAL
HOF HORIZONTAL OUTSIDE FACE
HOR HORIZONTAL
HP HIGH POINT
HR HOUR
HS HIGH STRENGTH
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
ICBO INTERNATIONAL CONFERENCE OF BUILDING OFFICIALS
ID INSIDE DIAMETER
ILO IN LIEU OF
IN INCH
INCL INCLUDE
INSUL INSULATED OR INSULATION
INT INTERIOR
INV INVERT
IRGWB IMPACT RESISTANT GYPSUM WALL BOARD
JST JOIST
JT JOINT
K KIP (1000 POUNDS)
LLV LONG LEG VERTICAL
LP LOW POINT
LVL LEVEL
LW LIGHT WEIGHT
LWC LIGHT WEIGHT CONCRETE
MAS MASONRY
MAX MAXIMUM
MCB METAL CORNER BEAD
MECH MECHANICAL
MEMBR MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURED
MIN MINIMUM
M.O. MASONRY OPENING
MRGWB MOISTURE-RESISTANT GYPSUM WALL BOARD
MTL METAL
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
NWC NORMAL WEIGHT CONCRETE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OPPOSITE HAND
OPNG OPENING
OZ OUNCE
P PAINT
PC PILE CAP
PCC PRE-CAST CONCRETE
PL PLATE
P.LAM PLASTIC LAMINATE
PLUMB PLUMBING
PLY PLYWOOD
PORC PORCELAIN
PNL PANEL
PNT PAINT OR PAINTED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PT POINT
PR PAIR
PROP PROPERTY
PVC POLYVINYL CHLORIDE
THE LIST OF ABBREVIATIONS MAY
CONTAIN ITEMS THAT ARE NOT SHOWN
ON THE DRAWINGS AND DO NOT OCCUR
IN THE PROJECT.
STEEL/METAL
WOOD (ROUGH) BLOCKING OR SHIM
BRICK
GRAVEL
EARTH/ENGINEERED FILL
CONCRETE MASONRY
PLAN AND SECTION
WOOD (ROUGH)
ACOUSTIC CEILING TILE
GYPSUM BOARD
CEILING
CONCRETE
ELEVATION
CENTER LINE
LINE SYMBOLS
GRID LINE
PROPERTY LINE
CUT LINE
BATT INSULATION
WOOD SUBSTRATE
RIGID INSULATION
MATERIAL LEGEND
WM - WALK OFF MAT
EF - EPOXY FLOORING (TROWELED)
FLOORING
BID ALTERNATE
CPT - CARPET
CONC - CONCRETE
PT - PORCELAIN TILE
FIBER CEMENT PANEL SIDING
CORRUGATED METAL PANEL
STANDING SEAM METAL ROOF/
SIDING PANEL
SPRAY FOAM INSULATION
Room name
1t
VIEW NAME
1/8" = 1'-0"1 DRAWING TITLE
SCALE
BUILDING SECTION
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
WALL SECTION
DETAIL CUT
A101
DETAIL CALLOUT
A101
A101
A101
A101
DIRECTION OF SIGHT
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
DRAWING NUMBER
SHEET NUMBER
EXTERIOR/INTERIOR
ELEVATION
DRAWING NUMBER
DIRECTION OF SIGHT
SHEET NUMBER
ROOM TAG
ROOM NAME
ROOM NUMBER
KEYNOTE TAG
5-04
KEYNOTE DESIGNATION
101 DOOR TAG
DOOR NUMBER
1i
PARTITION TAG
WALL DESIGNATION
WINDOW TAG
WINDOW DESIGNATION
ELEVATION MARKER
HEIGHT
NAME
ELEVATION
ARCHITECTURAL SYMBOLS
HEIGHT DESIGNATION(8'-0")
XX
EQUIPMENT TAG
EQUIPMENT NUMBER
XXXXX
FURNISHING TAG
FURNISHING NUMBER
V.A. SYMBOLS
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE RESISTIVE RATED LINE, 3 HOUR
FIRE RESISTIVE RATED LINE, 4 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 2 HOUR
V V ITEM - VA SUPPLIED AND INSTALLED
VC ITEM - VA SUPPLIED AND CONTRACTOR INSTALLED
CC ITEM - CONTRACTOR SUPPLIED AND INSTALLED
A
COLUMN GRID
DIMENSION LINE
NORTH ARROW
CL CENTER LINE
LEGEND NOTES:
1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS
AND ARE PERNTINENT TO THE CONDITIONS ON THIS SET OF
DRAWINGS TO THE EXTENT APPLICABLE.
2. ADDITIONAL LEGENDS AND/OR OTHER LEGENDS MAY
APPEAR IN THIS SET OF DRAWINGS TO INDICATE SPECIFIC
CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
16.2330.A08
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
TERRASITE DESIGN
1635 DEADWOOD AVENUE
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 791-1736
2/23/2024COMPLIANCY REVIEW COMPLETED
/1
/2
:4
:2
P
M
CONSTRUCTION DOCUMENTS
11/23/2020
ABBREVIATIONS, LEGENDS AND
SYMBOLS
G-003
Design/Construct Sterile Processing Service- Omaha VA Medical Center
JGCJL
4101 Woolworth Ave #4199 Omaha, Ne 68105Omaha VA Medical Center
4 138143
INFECTION CONTROL RISK ASSESSMENT
STEP ONE:
USING THE FOLLOWING TABLE, IDENTIFY THE TYPE OF CONSTRUCTION PROJECT ACTIVITY (TYPE A-D)
TYPE D
TYPE A
INSPECTION AND NON-INVASIVE ACTIVITIES.
INCLUDES, BUT IS NOT LIMITED TO:
• REMOVAL OF CEILING TILES FOR VISUAL INSPECTION ONLY, E.G., LIMITED TO 1 TILE PER 50
SQUARE FEET.
• PAINTING (BUT NOT SANDING).
• WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO
NOT GENERATE DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER
THAN FOR VISUAL INSPECTION.
TYPE B
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST
INCLUDES, BUT IS NOT LIMITED TO:
• INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
• ACCESS TO CHASE SPACE.
• CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
TYPE C
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION
OR REMOVAL OF OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES.
INCLUDES, BUT IS NOT LIMITED TO:
• SANDING OF WALLS FOR PAINTING OR WALL COVERING.
• REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK.
• NEW WALL CONSTRUCTION.
• MINOR DUCT WORK OR E1ECU?CA? WORK ABOVE CEILINGS.
• MAJOR CABLING ACTIVITIES.
• ANY ACTIVITY WHICH CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT.
TYPE D
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES, BUT IS NOT LIMITED TO:
• ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS
• REQUIRES HEAVY DEMOLITION ON REMOVAL OF A COMPLETE CABLING SYSTEM
• NEW CONSTRUCTION
STEP TWO: HIGHEST RISK
USING THE FOLLOWING TABLE, IDENTIFY THE PATIENT RISK GROUPS THAT WILL BE AFFECTED. IF
MORE THAN ONE RISK GROUP WILL BE AFFECTED, SELECT THE HIGHER RISK GROUP
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
• OFFICE AREA • CARDIOLOGY
• ECHOCARDIOGRAPHY
• ENDOSCOPY
• NUCLEAR MEDICINE
• PHYSICAL THERAPY
• RADIOLOGY / MRI
• RESPIRATORY THERAPY
• CCU
• EMERGENCY ROOM
• LABOR AND DELIVERY
• LABORATORIES (SPECIMEN)
• MEDICAL UNITS
• NEWBORN NURSERY
• OUTPATIENT SURGERY
• PEDIATRICS
• PHARMACY
• POST ANESTHESIA CARE
UNIT
• SURGICAL UNITS
• ANY AREA CARING FOR
IMMUNOCOMPROMISED
PATIENTS
• BURN UNITS
• CARDIAC CATH LAB
• CENTRAL STERILE SUPPLY
• INTENSIVE CARE UNIT
• NEGATIVE PRESSURE
ISOLATION ROOMS
• ONCOLOGY
• OPERATING ROOMS
INCLUDING C SECTION
ROOMS
STEP THREE:
MATCH THE PATIENT RISK GROUP (LOW, MEDIUM, HIGH, HIGHEST) WITH THE PLANNED ...
CONSTRUCTION PROJECT TYPE (A, B, C, D) ON THE FOLLOWING MATRIX, TO FIND THE ...
CLASS OF PRECAUTIONS ( I, II, III OR IV) OR LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED.
CLASS I - IV OR COLOR-CODED PRECAUTIONS ARE DELINEATED ON THE FOLLOWING PAGE.
IC MATRIX - CLASS OF PRECAUTIONS: CONSTRUCTION PROJECT BY PATIENT RISK
CONSTRUCTION PROJECT TYPE
PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP I II II III / IV
MEDIUM RISK GGROUP I II III IV
HIGH RISK GROUP I II III / IV IV
HIGHEST RISK GROUP II III / IV III / IV IV
NOTE: INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND
RISK LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
STEP THREE: CLASS IV
DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS
UPON COMPLETION OF PROJECTDURING CONSTRUCTION PROJECT
CLASS I
1. EXECUTE WORK BY METHODS TO MINIMIZE
RAISING DUST FROM CONSTRUCTION
OPERATIONS
2. IMMEDIATELY REPLACE A CEILING TILE
DISPLACED FOR VISUAL INSPECTION
1. CLEAN WORK AREA UPON COMPLETION OF
TASK.
CLASS II
1. PROVIDE ACTIVE MEANS TO PREVENT
AIRBORNE DUST FROM DISPERSING INTO
ATMOSPHERE
2. WATER MIST WORK SURFACE TO CONTROL
DUST WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT
OF WORK AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
1. WIPE WORK SURFACES WITH CLEANER /
DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. WET MOP AND / OR VACUUM WITH HEPA
VACUUM BEFORE LEAVING WORK AREA.
4. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
CLASS III
1. REMOVE OR ISOLATE HVAC SYSTEM IN
AREA WHERE WORK I.E. BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT)
BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
1. DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND INFECTION PREVENTION
AND CONTROL DEPARTMENT AND
THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPARTMENT.
2. REMOVE BARRIER MATERIALS CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. VACUUM WORK AREA WITH HEPA FILTERED
VACUUMS.
4. WET MOP AREA WITH CLEANER /
DISINFECTANT.
5. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
CLASS IV
1. ISOLATE HVAC SYSTEM IN AREA WHERE
WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E.
SHEETROCK, PLYWOOD, PLASTIC, TO SEAL
AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED
CONNECTION TO WORK SITE WITH HEPA
VACUUM FOR VACUUMING PRIOR TO EXIT)
BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND
PUNCTURES.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM
SO THEY CAN BE VACUUMED USING A HEPA
VACUUM CLEANER BEFORE LEAVING WORK
SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME
THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING THE WORK
SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED
EACH TIME THE WORKER EXITS THE WORK
AREA.
1. DO NOT REMOVE BARRIERS FROM WORK
AREA UNTIL COMPLETED PROJECT IS
INSPECTED BY THE OWNER'S SAFETY
DEPARTMENT AND INFECTION PREVENTION
AND CONTROL DEPARTMENT AND
THOROUGHLY CLEANED BY THE OWNER'S
ENVIRONMENTAL SERVICES DEPT.
2. REMOVE BARRIER MATERIAL CAREFULLY
TO MINIMIZE SPREADING OF DIRT AND
DEBRIS ASSOCIATED WITH CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE
TRANSPORT IN COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR
CARTS. TAPE COVERING UNLESS SOLID LID.
5. VACUUM WORK AREA WITH I-IEPA
FILTERED VACUUMS.
6. WET MOP AREA WITH CLEANER /
DISINFECTANT.
7. UPON COMPLETION, RESTORE HVAC
SYSTEM WHERE WORK WAS PERFORMED
DN
UP
1. SHEET SIZE FOR PROPER SCALE IS 30X42.
CONTRACTOR SHALL NOT SCALE DRAWINGS BUT
SHALL REQUEST THE DESIRED DIMENSIONS FROM
THE ARCHITECT.
2. SEE SHEET G-002 FOR GENERAL NOTES
3. MAINTAIN FIRE WATCH WHEN DOUBLE EGRESS
DOOR IS BLOCKED.
1 HOUR SMOKE RATED
TEMPORARY CONSTRUCTION
PARTITION
TEMPORARY CONSTRUCTION BARRIER
PROJECT SCOPE
1906B
1900A
C
C
1908B1907B
1907A 1908A
1902A
1913A
A
1900B
SEE DETAIL 3/G-004 FOR
TEMPORARY CONSTRUCTION
VESTIBULE
1802B
1802A
1802C
E2418
E2543B
E2543C
E2419E
E2420
E2421 E2421A
E2443 E2442
E2417
SEE DETAIL 3/G-004 FOR
TEMPORARY CONSTRUCTION
VESTIBULE
SUPPLY DUCTS EITHER
KEEP RUNNING OR
COVER WHEN
RUNNING TO KEEP
DUST OUT
COVER ALL RETURNS AT
THE GRATE/DIFFUSERS
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
SUSPENDED PLASTIC
ZIPPER WALL CURTAIN
BARRIER
FIRE PULL
STATION WITH
AUDIO / VISUAL
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
F L E
X D
U C
T
2' - 11 1/2"
G-006
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
A
B
C
D
F
H
K
13455'7 68910
G
22.7
E1510E1511 E1512
E1514
E1515
E1516
E1517E1519
E1520
E1557
EC250
EC250
E1700
E1701
E1702 E1704
E1705 E1707
E1708
E1709
E1710
E1711
E1712
E1713
E1711A
E1711B
E1731
E1732
E1733
E1734
E1735
E1736
E1737
E1738 E1738A
E1755
E1756
E1757
E1758
E1759
E1760
E1761
E1762
E1763
EC255
EC255
EC250
EC255
E1777
E1779 E1781 E1783 E1785E1787
E1788
E1789
E1786A
EM101
E1732
E1431E1429E1427E1425E1423E1421
EC245
E1501 E1502 E1503E1504
E1505AE1505
E1508
E1507
E1509 E1506
E1513
E1786E1784
E1782 E1625
E1801
E1778 E1778A
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
16.2330.A08
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
TERRASITE DESIGN
1635 DEADWOOD AVENUE
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 791-1736
2/23/2024COMPLIANCY REVIEW COMPLETED
/1
/2
:4
:3
P
M
CONSTRUCTION DOCUMENTS
11/23/2020
INFECTION CONTROL RISK
ASSESSMENT
G-004
Design/Construct Sterile Processing Service- Omaha VA Medical Center
JGCJL
4101 Woolworth Ave #4199 Omaha, Ne 68105Omaha VA Medical Center
5 138
GENERAL NOTES:
1/16" = 1'-0"
INFECTION CONTROL - LEVEL 3
ROOM SCHEDULE, THIRD LEVEL
Number Name
1802 INTERSTITIAL SPACE
1802A ELECTRICAL
1802B ELECTRICAL
1802C ELECTRICAL
1803 STAIRS
1900 CORRIDOR
1900A CORRIDOR
1900B CORRIDOR
1901 OPEN SPACE
1902 IT
1902A MECH. CHASE
1903 ANTEROOM, SOILED TRANSITION / DROP-OFF
1904 SCOPE DROP OFF
1905 SCOPE PROC
1906A SCOPE ANTE
1906B SCOPE STG
1907 WOMEN'S LOCKER
1907A WOMEN'S RR
1907B WOMEN'S RR
1907C WOMEN'S SHOWER
1908 MEN'S LOCKER
1908A MEN'S RR
1908B MEN'S RR
1908C MEN'S SHOWER
1909 BREAK ROOM
1910 OPEN OFFICE/TRAINING
1911 ANTE VENDOR DROP OFF
1912 H2O
1913 CART PASS
1913A MECH. CHASE
1914 HAC
1915 DECON
1916 MANUAL CART WASH
1917 AUTOMATIC CART WASH AREA
1918 MECH CHASE
1919 CART DRY
1920 STERILIZATION
1921 STERILE STG
1921A MECH. CHASE
1923 PREP ASSEMBLY
1924 ANTE
1925 HAC
1926 CONFERENCE
1927 OPEN OFFICE
1928 OFFICE
1929 OFFICE
1930 COPIER ROOM
1931 STAIRS
1/16" = 1'-0"
INFECTION CONTROL - LEVEL 2
ROOM SCHEDULE, SECOND LEVEL
NUMBER NAME
1802 INTERSTITIAL SPACE
1802A ELECTRICAL
1802B ELECTRICAL
1802C ELECTRICAL
1803 STAIRS
E2417 STORAGE
E2418 CORRIDOR
E2419E DEXA
E2420 SLEEP RM
E2421 SLEEP RM
E2421A TLT
E2442 CHECK IN
E2443 SPACE
E2543B SPACE
E2543C SPACE
1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
12" = 1'-0"
ILSM TEMPORARY BARRIER TAG
INFECTION CONTROL NOTES - CLASS IV CONSTRUCITON:
A. THE ONE-HOUR FIRE-RATED CONSTRUCTION BARRIERS SHALL BE CONSTRUCTED PRIOR TO BEGINNING OTHER WORK.
B. FIRE PROTECTION SYSTEMS SHALL REMAIN FUNCTIONAL FOR OCCUPIED AREAS OF THE FLOOR.
C. PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREA; REVIEW WITH COR AND VA SAFETY GROUP.
D. CONTRACTOR SHALL PROVIDE FIRE WATCH FOR ALL HOT WORK ACTIVITIES AND WHEN FIRE ALARM OR SPRINKLER SYSTEMS
ARE OFFLINE MORE THAN 4HOURS IN A 24 HOUR PERIOD.
E. MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL TIMES (24/7), WHETHER OCCUPIED OR NOT, THROUGHOUT
DURATION OF PROJECT USING HEPA EQUIPPED AIR FILTRATION UNITS.
F. MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.
G. CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR
EXHAUST SHALL PASS INTO THE AREAS OUTSIDE THE CONSTRUCTION AREA.
H. REDIRECT ALL MEDICAL CENTER PERSONNEL, PATIENTS, AND VISITORS SO THEY DO NOT EXIT THROUGH THE CONSTRUCTION
AREA. PROVIDE SIGNS ON DOORS INTO THE CONSTRUCTION AREA THAT RED: "CONSTRUCTION AREA -DO NOT ENTER".
I. GENERAL CONTRACTOR SHALL MAINTAIN DAILY LOGS AND KEEP A CURRENT HOT WORK PERMIT ON SITE.
J. TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE CONSTRUCTION AREA AND SHALL BE MONITORED TO MAKE SURE THEY
REMAIN EFFECTIVE.
K. MAINTAIN A CLEAN AND ORDERLY CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEMS.
L. OBTAIN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.
M. ISOLATE HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT CONTAMINATION OF EXISTING DUCT SYSTEM.
N. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON WORK AREA OR IMPLEMENT
CONTROL CUBE METHOD (CART WITH
PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT0 BEFORE
CONSTRUCTION BEGINS.
O. AFTER COMPLETION OF WORK AND BETWEEN PHASES; VACUUM CONSTRUCTION AREA WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT, REMOVE CONSTRUCTION BARRIERS (UPON APPROVAL), PATCH OR REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL, AND REMOVE ISOLATION OF HVAC SYSTEM. UPON COMPLETION, RESTORE HVAC SYSTEM
WHERE WORK WAS PERFORMED.
P. SEAL ALL HOLES, PUNCTURES, AND PENETRATIONS FROM PIPES AND/OR CONDUITS APPROPRIATELY AND IMMEDIATELY TO
MAINTAIN DUCT PROTECTION AND NEGATIVE AIR PRESSURE.
Q. CONSTRUCT ANTEROOM ART ENTRANCES TO CONSTRUCTION AREAS AND REQUIRE ALL CONSTRUCTION PERSONNEL TO PASS THROUGH THIS ROOM TO BEVACUUMED WITH A HEPA VACUUM CLEANER PRIOR TO LEAVING THE SITE OR THEY CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.
Q.A. CONSTRUCTION WORKERS WILL NOT BE ENTERING ANY OCCUPIED VA SPACES.
Q.B. DIRECT ACCESS TO OUT THROUGH ANTEROOM(EXIT/ENTRANCE)
R. ALL PERSONNEL ENTERING WORK SITE (ONLY IF ENTERING VA SPACE) ARE REQUIRED TO WEAR SHOE COVERING.
S. CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL PROJECT IS COMPLETED AND INSPECTION BY VA SAFETY
PERSONNEL, INFECTION CONTROL GROUP, AND COR.
T. REMOVE BARRIERS MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS. COVER TRANSPORT RECEPTACLES
OR CARTS. TAPE COVERING UNLESS SOLID LID.
1/16" = 1'-0"
INFECTION CONTROL - LEVEL 1
UP
DN
A
B
C
D
F
H
K
13455'7 68910
G
22.7
E1510E1511 E1512
E1514
E1515
E1516
E1517E1519
E1520
E1557
EC250
EC250
E1700
E1701
E1702 E1704
E1705 E1707
E1708
E1709
E1710
E1711
E1712
E1713
E1711A
E1711B
E1731
E1732
E1733
E1734
E1735
E1736
E1737
E1738 E1738A
E1755
E1756
E1757
E1758
E1759
E1760
E1761
E1762
E1763
EC255
EC255
EC250
EC255
E1777
E1779 E1781 E1783 E1785E1787
E1788
E1789
E1786A
EM101
E1732
E1431E1429E1427E1425E1423E1421
EC245
E1501 E1502 E1503E1504
E1505AE1505
E1508
E1507
E1509 E1506
E1513
E1786E1784
E1782 E1625
E1801
E1778 E1778A
GENERAL NOTE: CONTRACTOR SHALL CLOSELY COORDINATE PHASING AND
TEMPORARY BARRIERS WITH COR FOR ABOVE CEILING WORK ON LEVEL 1
CONTRACTOR SHALL PLAN FOR WORK TO BE COMPLETED AFTER NORMAL
BUSINESS HOURS OF THE HOSPITAL. TEMPORARY BARRIERS SHALL BE
INSTALLED AND REMOVED AS NEEDED TO EXECUTE THE IMMEDIATE WORK
FOR EACH AREA OF THIS PLAN.
1802B
1802A
1802C
E2418
E2543B
E2543C
E2419E
E2420
E2421 E2421A
E2443 E2442
E2417
SEE DETAIL 3/G-004 FOR
TEMPORARY CONSTRUCTION
VESTIBULE
1906B
1900A
C
C
1908B1907B
1907A 1908A
1902A
1913A
A
1900B
SEE DETAIL 3/G-004 FOR
TEMPORARY CONSTRUCTION
VESTIBULE
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COM
FOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of
Veterans Affairsof
16.2330.A08
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
TERRASITE DESIGN
1635 DEADWOOD AVENUE
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 791-1736
2/23/2024COMPLIANCY REVIEW COMPLETED
/1
/2
:4
:3
P
M
CONSTRUCTION DOCUMENTS
11/23/2020
PHASING PLAN - LEVEL 1, 2 & 3
G-005
Design/Construct Sterile Processing Service- Omaha VA Medical Center
AuthorChecker
4101 Woolworth Ave #4199 Omaha, Ne 68105Omaha VA Medical Center
6 138
1/16" = 1'-0"
PHASING PLAN - LEVEL 1
1/16" = 1'-0"
PHASING PLAN - LEVEL 2
1/16" = 1'-0"
PHASING PLAN - LEVEL 3
PRECONSTRUCTION ACTIVITIES
• ESTABLISH CONTRACTOR STAGING AREA IN COORDINATION WITH THE COR ON
STATION.
• SUBMIT PROJECT SCHEDULE TO COR. IDENTIFY ALL TRADES THAT WILL BE
NECESSARY TO COMPLETE DEMOLITION EFFICIENTLY AND CONCURENTLY.
• INSTALL TEMPORARY ONE-HOUR FIRE RATED CONSTRUCTION BARRIERS
WHERE SHOWN TO SEPARATE AREAS OF CONSTRUCTION ACTIVITY FROM
ADJACENT AREAS OF THE HOSPITAL THAT WILL REMAIN OCCUPIED AND
OPERATIONAL.
• INSTALL HEPA FILTERS AND SEAL PROJECT BOUNDARY TO ENSURE NEGATIVE
AIR PRESSURE AS PER INFECTION CONTROL REQUIREMENTS.
• PERFORM AND SUBMIT A PRE-CONSTRUCTION RISK ASSESSMENT AS PER VA
REQUIREMENTS.
• PROTECT ALL ITEMS AND EQUIPMENT NOTED TO REMAIN AS NECESSARY.
THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN THE
EXISTING CONDITION AND REPAIR ANY DAMAGE TO PRE-CONSTRUCTION
CONDITION PRIOR TO PROJECT COMPLETION.
INTERSTITIAL AND SPS ADDITION PHASE
• PERFORM DEMOLITION WORK IDENTIFIED IN LEVEL 1.
• TURN OVER ITEMS NOTED TO BE SALVAGED TO THE OWNER TO A LOCATION
DESIGNATED BY THE COR (ON-SITE). IT WILL BE THE RESPONSIBILITY OF THE
GENERAL CONTRACTOR TO RELOCATE SALVAGED ITEMS AND TO PREVENT
DAMAGE TO THEIR PRE-CONSTRUCTIONCONDITION.
• REMOVE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED FOR
DEMOLITION.
• CLEAN AND REPAIR EXISTING CONCRETE SLAB FOR FUTURE INSTALLATION OF
FINISH FLOORING SEALANT.
• CONSTRUCT NEW PARTITION WALLS INCLUDING ROUGH-IN FOR MECHANICAL,
ELECTRICAL, PLUMBING AND FIRE PROTECTION.
• REPAIR BASEMENT LEVEL CEILING AS SOON AS UNDERFLOOR ROUGH-IN HAS
EEN COMPLETED. DO NOT LEAVE EXISTING UNREPAIRED FOR MORE THAT 24
HOURS AFTER COMPLETION OF ABOVE CEILING ROUGH-IN.
• INSTALL ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION
YSTEMS.
• INSTALL ALL CASEWORK, EQUIPMENT DOORS AND HARDWARE IDENTIFIED IN
HE CONSTRUCTION DOCUMENTS.
• COORDINATE THE INSTALLATION OF OWNER PROVIDED CONTRACTOR
NSTALLED AND OWNER PROVIDED, OWNER INSTALLED EQUIPMENT WITH THE
OWNER AND THEIR VENDORS.
• COMPLETE FINISHES AND REMOVE TEMPORARY PARTITIONS. REPAIR EXISTING
S NECESSARY.
• TURN THE NEWLY REMODELED SPACE OVER TO THE OWNER. THE INTENT OF
HASE 1 IS TO PROVIDE A FULLY OPERATIONAL INPATIENT COMPOUNDING
UITE THAT WILL REPLACE THE EXISTING SUITE THAT WILL BE DEMOLISHED AND
EMODELED AS PART OF PHASE 2.
ICU PHASE (LEVEL 2)/CLINIC PHASE (LEVEL 1)
• PERFORM DEMOLITION WORK IDENTIFIED ABOVE CEILING AREAS AND ROOF
EA.
• REMOVE AND REPLACE ALL MECHANICAL AND ELECTRICAL SYSTEMS NOTED.
• CLEAN AND REPAIR EXISTING FINISH FLOOR AFTER WORK IS COMPLETED.
NOTE:
DEMOLITION WORK OF EXISTING CONCRETE FLOORS (ANY JACK HAMMERING OR
CORE DRILLING) SHALL BE CONDUCTED IN THE EVENINGS AFTER VA NORMAL
BUSINESS HOURS (8AM-5PM).
THE FIRE SUPPRESSION SYSTEM MUST REMAIN ACTIVE THROUGHOUT THE
DURATION OF CONSTRUCTION. SHOULD AT ANYTIME THE SYSTEM BE SHUT DOWN
THE GENERAL CONTRACTOR SHALL PROVIDE 24 HOUR FIRE WATCH TO SUPERVISE
THE CONSTRUCTION AREA.
THE FIRE ALARM SHALL BE FUNCTIONAL AT ALL TIMES DURING CONSTRUCTION.
COORDINATE WITH COR TO SHUT OFF FIRE ALARM FOR CONSTRUCTION
ACTIVITIES, FIRE ALARM MUST BE ACTIVATED PRIOR TO LEAVING THE SITE.
OCCUPANCY LOAD AND REQUIRED EGRESS WIDTH CALCULATIONS - THIRD LEVEL BUILDING SUMMARY
ROOM
NUMBER
ROOM NAME OCCUPANCY USE TYPE (NFPA 101) AREA
OCCUPANT LOAD
FACTOR
SF/PERSON
OCCUPANT
LOAD
1900 CORRIDOR BUSINESS USE 353 SF 150 3
1900A CORRIDOR BUSINESS USE 1,066 SF 150 8
1900B CORRIDOR BUSINESS USE 681 SF 150 5
1901 OPEN SPACE STORAGE USE & MECH. EQUIP. ROOMS 146 SF 500 1
1902 IT STORAGE USE & MECH. EQUIP. ROOMS 92 SF 500 1
1903 ANTEROOM, SOILED TRANSITION/DROP-OFF STORAGE USE & MECH. EQUIP. ROOMS 70 SF 500 1
1904 SCOPE DROP OFF STORAGE USE & MECH. EQUIP. ROOMS 70 SF 500 1
1905 SCOPE PROC BUSINESS USE 353 SF 150 3
1906A ANTE BUSINESS USE 66 SF 150 1
1906B SCOPE STG STORAGE USE & MECH. EQUIP. ROOMS 206 SF 500 1
1907 WOMEN'S LOCKER, SHOWER AND RESTROOMS BUSINESS USE 374 SF 150 3
1908 MEN'S LOCKER, SHOWER AND RESTROOMS BUSINESS USE 375 SF 150 3
1909 BREAK ROOM BUSINESS USE 282 SF 150 2
1910 OPEN OFFICE/TRAINING BUSINESS USE 363 SF 30 13
1911 ANTE VENDOR DROP OFF STORAGE USE & MECH. EQUIP. ROOMS 225 SF 500 1
1912 H20 STORAGE USE & MECH. EQUIP. ROOMS 143 SF 500 1
1913 CART PASS STORAGE USE & MECH. EQUIP. ROOMS 114 SF 500 1
1914 HAC STORAGE USE & MECH. EQUIP. ROOMS 71 SF 500 1
1915 DECON BUSINESS USE 1,402 SF 150 10
1916 MANUAL CART WASH STORAGE USE & MECH. EQUIP. ROOMS 88 SF 500 1
1917 AUTOMATIC CARTWASH AREA STORAGE USE & MECH. EQUIP. ROOMS 149 SF 500 1
1919 CART DRY STORAGE USE & MECH. EQUIP. ROOMS 353 SF 500 1
1920 STERILIZATION BUSINESS USE 493 SF 150 4
1921 STERILE STG STORAGE USE & MECH. EQUIP. ROOMS 937 SF 500 2
1923 PREP ASSEMBLY BUSINESS USE 1,476 SF 150 10
1924 ANTE BUSINESS USE 67 SF 150 1
1925 HAC STORAGE USE & MECH. EQUIP. ROOMS 49 SF 500 1
1926 CONFERENCE BUSINESS USE 98 SF 150 1
1927 OPEN OFFICE BUSINESS USE 168 SF 150 2
1928 OFFICE BUSINESS USE 98 SF 150 1
1929 OFFICE BUSINESS USE 102 SF 150 1
1930 COPIER ROOM BUSINESS USE 128 SF 150 1
1931 STAIRS BUSINESS USE 199 SF 150 2
TOTAL LEVEL THREE TOTAL AREA OF SPS 10,857 SF 89
S
S
SP
SUPPLEMENTAL SYMBOLS LEGEND
(AS APPLICABLE)
FIRE EXTINGUISHER
FIRE EXTINGUISER CABINET
LABEL INFORMATION - LETTER
INDICATES LUMINAIRE MARK,
'E' INDICATES EMERGENCY LUMINAIRE
OCCUPANCY/VACANCY SENSOR
CAMERA - CEILING MOUNTED
OS
DESCRIPTIONSYMBOLDESCRIPTIONSYMBOL
FE
FEC
PAGING SPEAKER - CEILING MOUNTEDS
EXIT SIGN - WALL/CEILING MOUNTED
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
LUMINAIRE
LUMINAIRE
A
LUMINAIRE
LUMINAIRE
AE
FIRE DAMPERFD
1 HOUR FIRE BARRIER. DOORS SHALL BE 3/4 HOUR
RATED WITH AUTOMATIC CLOSING DEVICES.
SMOKE BARRIER WITH A 1 HOUR FIRE RATING.
DOORS SHALL BE 3/4 HOUR RATED WITH AUTOMATIC
CLOSING AND SELF LATCHING DEVICES (U.N.O.).
2 HOUR FIRE BARRIER. DOORS SHALL BE 1-1/2 HOUR
RATED WITH AUTOMATIC CLOSING DEVICES.
SMOKE BARRIER WITH A 2 HOUR FIRE RATING.
DOORS SHALL BE 1-1/2 HOUR RATED WITH AUTOMATIC
CLOSING AND SELF LATCHING DEVICES (U.N.O.)
SMOKE PARTITION. DOOR SHALL HAVE AUTOMATIC
CLOSING DEVICES (U.N.O.).
WALL RATING LEGEND
OMAHA | LINCOLN | COLORADO SPRINGS | SIDNEY
FARRIS ENGINEERING
farris-usa.com FE#:202039
FOURFRONT DESIGN, INC.
517 7TH STREET
RAPID CITY, SOUTH DAKOTA 57701
PH: (605) 342-9470
FAX: (605) 342-2377
WWW.FOURFRONTDESIGN.COMFOURFRONT
D E S I G N I N C.
Office of Construction and Facilities Management
Project Number
Building Number
Drawing Number
Dwg.
DrawnCheckedDate
Location
Project TitleDrawing Title
Approved: Project Director
ARCHITECTCONSULTANTS:
DateRevisions:
VA FORM 08-6231
o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
F
E
D
C
B
A
1 2 3 4 5 6 7 8 9
Department of Veterans Affairsof
16.2330.A08
ALBERTSON ENGINEERING, INC.
315 NORTH MAIN AVENUE, SUITE 200
SIOUX FALLS, SOUTH DAKOTA 57104
PH: (605) 274-0880
TERRASITE DESIGN
1635 DEADWOOD AVENUE
RAPID CITY, SOUTH DAKOTA 57702
PH: (605) 791-1736
FARRIS ENGINEERING
12700 WEST DODGE ROAD
OMAHA, NEBRASKA 68154
PH: (402) 330-5900
/2
/2
:1 :3
P
M
BID DOCUMENTS
11/23/2020
CODE PLAN
G-101
Design/Construct Sterile Processing Service- Omaha VA Medical Center
DGKDGK
4101 Woolworth Ave #4199 Omaha, Ne 68105Omaha VA Medical Center
16.2330.A08 11/23/2020
MAXIMUM
ROUTE DESCRIPTION SYMBOL PROVIDED PERMITTED
CP-A COMMON PATH A CP-A 32'-0" 100'-0"
TP-A TOTAL TRAVEL PATH A TP-A 180'-0" 300'-0"
CP-B COMMON PATH B CP-B 60'-6" 100'-0"
TP-B TOTAL TRAVEL PATH B TP-B 147'-0" 300'-0"
CP-C COMMON PATH C CP-C 62'-3" 100'-0"
TP-C TOTAL TRAVEL PATH C TP-C 135'-0" 300'-0"
CP-D COMMON PATH D CP-D 96'-9" 100'-0"
PROJECT NAME: VA NWIHCS OMC CAMPUS - AE CONSTRUCT STERILE PROCESSING SERVICE
BUILDING NAME: BUILDING 25
BUILDING OWNER: DEPARTMENT OF VETERANS AFFAIRS
STREET ADDRESS: 4101 WOOLWORTH AVE #4199
CITY: OMAHA, NEBRASKA
1. OCCUPANCY:
A. PROJECT ADDITION OCCUPANCY PER NFPA 101 IS CHAPTER 38 - NEW BUSINESS OCCUPANCY (IBC 2018
(SECTION 304) - GROUP B OCCUPANCY - BUSINESS). ADDITION IS A TWO-STORY ADDITION DESIGNED TO BE
INSTALLED ON TOP OF A ONE-STORY PORTION OF A MULTI-STORY FACILITY.
B. EXISTING FACILITY IS A MULTIPLE OCCUPANCY FACIITY THAT IS PRIMARILY SEPARATED USE, WITH THE 10TH FLOOR BEING A MIXED USE OCCUPANCY. ALL FLOORS EXCEPT THE 1ST AND 10TH ARE SINGLE OCCUPANCY.
FLOORS 2 AND 4 THROUGH 7 ARE HEALTH CARE OCCUPANCY. THE BASEMENT AND FLOORS 3, 9, 11 AND 12 ARE BUSINESS OCCUPANCY. THE FIRST LEVEL IS A SEPARATED OCCUPANCY WHICH IS PART AMBULATORY HEALTH CARE AND PART BUSINESS WHICH IS SEPARATED BY A 1-HOUR RATED CONSTRUCTION. THE 10TH FLOOR IS A MIXED OCCUPANCY WHICH IS PART HEALTH CARE, PART LARGE RESIDENTIAL BOARD AND CARE OCCUPANCY. ALL DESIGNATIONS PER NFPA 101. ONE-STORY PORTION OF EXISTING FACILITY THAT THIS PROJECT WILL BE PLACED ON TOP OF IS CURRENTLY PART BUSINESS OCCUPANCY AND PART AMBULATORY HEALTH CARE. MULTI-STORY PORTION OF BUILDING THAT THIS PROJECT SHALL BUTT UP AGAINST IS CURRENTLY A HEALTH CARE OCCUPANCY ON THE SECOND LEVEL AND BUSINESS OCCUPANCY ON THE THIRD LEVEL. NO RATED SEPARATION IS REQUIRED ON THE THIRD LEVEL, WHICH IS CURRENTLY A BUSINESS OCCUPANCY AND THIS PROJECT WILL MERELY EXTEND THAT OCCUPANCY. A 2-HOUR FIRE SMOKE BARRIER WILL BE REQUIRED WHERE THE INTERSTITIAL SPACE CONNECTS TO THE EXISTING STRUCTURE ON THE SECOND FLOOR TO MEET THE VA DESIGN GUIDELINE REQUIREMENTS FOR AN INTERSTITIAL SPACE. ONE NEW STAIR TOWER WILL BE PROVIDED AND WILL REQUIRE A 2-HOUR RATED
ENCLOSURE.
2. TYPE OF CONSTRUCTION (SECTION 602.5) - TYPE 1B; NFPA 101, TYPE ll (222).
3. ALLOWABLE FLOOR AREA (SECTIONS 504 & 506, TABLE 506): 44,000 SQ. FT. ON THE SECOND FLOOR (I2 OCCUPANCY PER THE IBC) AND 92,000 SQ. FT. ON THE THIRD FLOOR (B OCCUPANCY PER THE IBC). ACTUAL FLOOR AREA OF THE SPS IS APPROXIMATELY 11,872 GSF (INTERNAL DIMENSIONS) WHICH BRINGS THE TOTAL LEVEL THREE FLOOR AREA TO 50,602 GSF OF 'B' OCCUPANCY. THE ACTUAL FLOOR AREA OF THE INTERSTITIAL SPACE IS APPROXIMATELY 11,430 GSF (INTERNAL DIMENSIONS). THE TOTAL FLOOR AREA, WITH THE ADDITION OF THE INTERSTITIAL SPACE IS 72,174 GSF. THE INTERSTITIAL SPACE SHALL BE SEPARATED FROM THE REMAINDER OF THIS FLOOR WITH A TWO HOUR FIRE SMOKE BARRIER; THEREFORE, ALLOWABLE SQUARE FOOTAGE SHALL REMAIN IN COMPLIANCE WITH IBC
GUIDELINES.
4. AN INTERSTITIAL SPACE IS BEING CREATED BELOW THE SPS AND IS SHOWN AS LEVEL TWO ON THE PLANS. PER THE VA FIRE PROTECTION MANUAL, THE FLOOR OF THIS SPACE MUST HAVE A 2-HOUR FIRE RATING. THE VERTICAL WALL SEPARATING THIS SPACE FROM THE FUNCTIONAL SPACE SHALL HAVE A 2-HOUR FIRE RATING; HOWEVER, THIS IS TO BE A SEPARATE SMOKE ZONE SO THE BARRIER SEPARATING THE INTERSTITIAL SPACE FROM THE EXISTING MULTI-STORY STRUCTURE SHALL BE A 2-HOUR SMOKE BARRIER. ALL COLUMNS, GIRDERS, AND TRUSSES WITHIN
THE INTERSTITIAL SPACE SHALL HAVE A MINIMUM 2-HOUR FIRE RATING.
5. PROTECT HORIZONTAL AND VERTICAL PENETRATIONS (DUCTS, CABLES, PIPES, ETC.) OF ALL RATED WALLS AND
FLOORS WITH THROUGH PENETRATION PROTECTION SYSTEMS.
6. FIRE ALARM PULL STATIONS WILL BE PROVIDED AT EXIT DOORS FROM INTERSTITIAL SPACES AND PROPER NOTIFICATION WILL BE PROVIDED WITHIN THE INTERSTITIAL SPACE. LIKEWISE, FIRE ALARM PULL STATIONS WILL BE PROVIDED AT THE NEW EGRESS FROM THE SPS ON THE THIRD FLOOR AND PROPER NOTIFICATION DEVICES WILL BE PROVIDED THROUGHOUT THE SPS IN ACCORDANCE WITH NFPA 72 GUIDELINES (CURRENT EDITION).
7. EXIT SIGNS WILL BE PROVIDED BY THE EXIT DOOR AND AT OTHER LOCATIONS TO PROVIDE CLEAR DIRECTION
TOWARD THE EXITS FROM THE INTERSTITIAL SPACE AND FROM THE SPS SPACE.
8. EMERGENCY LIGHTING WILL BE PROVIDED WITHIN THE INTERSTITIAL SPACE AND THE SPS.
9. SPRINKLER PROTECTION WILL BE PROVIDED WITHIN THE INTERSTITIAL SPACE AND THROUGHOUT THE SPS THIRD
FLOOR ADDITION.
10. FIRE RESISTANCE OF EXTERIOR WALLS (SECTION 602.1, TABLE 602) - NO RATING REQUIRED EXCEPT FOR THE NEW
STAIR TOWER WHICH SHALL CARRY A 2-HOUR FIRE RATING.
11. ALLOWABLE HEIGHT FOR EXISTING BUILDING OCCUPANCY IS 5 STORIES. CURRENTLY, STRUCTURE IS 1 STORY IN HEIGHT. ALLOWABLE CONSTRUCTION FOR NEW OCCUPANCY IS 12 STORIES. PROJECT IS ADDING TWO STORIES TO
THE TOP OF THE EXISTING ONE STORY STRUCTURE WITH A BASEMENT.
12. OCCUPANT LOAD FOR THE 3RD FLOOR SPS ADDITION IS 88.
This is the start of the file's text. The full file is on GovTribe.