This is a technical questions and answers document for VA RFP 36C77625R0063, addressing contractor inquiries about the construction of a Sterile Processing Service facility in Omaha, NE. The document contains four specific technical clarifications regarding roofing specifications and materials.

The government responses clarify that R-33 roof insulation thickness is required (not the 5" R28.5 shown in some plan details), 1/2" gypsum roof board is required, 60 mil EPDM roofing membrane thickness is specified (correcting the non-existent 100 mil thickness referenced in specifications), and confirms that any references to PVC membrane in the plans are incorrect as EPDM membrane is required. This Q&A document represents one of multiple amendments to the original solicitation, with the federal contract opportunity indicating at least five amendments have been issued including site visit documentation, multiple technical Q&A sessions, communications addendums, and wage determination updates.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--636-502 Construct Sterile Processing Service VISN 23, newest first.
File Type Posted
Attachment 2 - Attachment 22 - WD - NEW20250057 Rev 7 - 8-1-25.pdf PDF
36C77625R0063 0005.docx DOCX document
36C77625R0063 0004.docx DOCX document
Addendum 001 Division 27 - Communications - dated 7-31-25.pdf PDF
36C77625R0063 0003.docx DOCX document
Attachment 1 - RFP 36C77625R0063 Tech Questions - dated 7-31-25.docx DOCX document
Attachment 1 _ RFP 36C77625R0063 Tech Questions _ dated 7-17-25.docx DOCX document
36C77625R0063 0002.docx DOCX document
Attachment 1 - Sign-In Sheet - 636-502 Construct SPS - Omaha 7-7-25.pdf PDF
36C77625R0063 0001.docx DOCX document
Attachment 03 - Set 1_G Series_Part2.pdf PDF
Attachment 08 - Set 6_Arch4.pdf PDF
Attachment 12 - Set 10_Mech2.pdf PDF
Attachment 15 - Set 13_Fire Protect.pdf PDF
Attachment 03 - Set 1_G Series_Part3.pdf PDF
Attachment 03 - Set 1_G Series_Part4.pdf PDF
Attachment 10 - Set 8_Structure.pdf PDF
Attachment 11 - Set 9_Mech1.pdf PDF
Attachment 14 - Set 12_Electrical.pdf PDF
Attachment 16 - VHA ICRA - 6-25-25.pdf PDF
Attachment 02 - Vol 2 Combined Specs - FINAL.pdf PDF
Attachment 04 - Set 2_Civil.pdf PDF
Attachment 07 - Set 5_Arch3.pdf PDF
Attachment 09 - Set 7_Equipment.pdf PDF
Attachment 13 - Set 11_Plumbing.pdf PDF
Attachment 01 - Vol 1 Combined Specs - FINAL.pdf PDF
Attachment 03 - Set 1_G Series_Part1.pdf PDF
Attachment 05 - Set 3_Arch1.pdf PDF
Attachment 06 - Set 4_Arch2.pdf PDF
Attachment 18 - PPQ.docx DOCX document
Attachment 19 - Subcontractor Information and Consent Form.docx DOCX document
Attachment 22 - WD - NE20250057 Rev 4 - 5-16-25.pdf PDF
36C77625R0063.docx DOCX document
Attachment 17 - Project Information Sheet for Contractors.docx DOCX document
Attachment 21 - Site Visit Instructions - Construct SPS - Omaha.docx DOCX document
Attachment 20 - Limitations on Subcontracting - Construction.docx DOCX document
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION # 36C77625R0063

PROJECT NAME: 636-502 Construct Sterile Processing Service – Omaha NE

TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET

Item No.
QUESTION
GOVERNMENT RESPONSE
16
07 22 00 Roof Insulation - ISO thickness is listed as R-33 (5.78") - But in plan details 5" (R28.5) is listed. What is the desired ISO thickness
R-33 is required
17
07 22 00 Roof Insulation - 1/4" Gypsum roof board is listed, but in plans 1/2" Gypsum is listed - what is the desired roof board thickness?
½” roof board is required
18
07 53 23 EPDM - An Internally Reinforced EPDM 100 Mil Thickness membrane is listed. 100 Mil Membrane does not exist. No manufacturer has 100 mil thickness. The common thickness for reinforced EPDM is 25 - 60 - 75 Mils. What is the Desired Membrane thickness
60 mil roofing
19
07 53 23 EPDM - a detail on the plans listed PVC membrane. Please confirm this is incorrect
Any references to PVC are incorrect. EPDM membrane is required.