This document is a comprehensive technical specification file for HVAC and plumbing systems for a VA Medical Center project, specifically a Sterile Processing Service (SPS) Addition at the Omaha VAMC. The specification details direct-digital control systems, outlining extensive technical requirements for building automation and control networks using BACnet/IP protocol. The project involves installing a native BACnet control system with peer-to-peer networked controllers, an Engineering Control Center, and web-based user access, with specific performance requirements including graphic display capabilities, refresh rates, command response times, and measurement accuracies for various environmental parameters.

The specification covers multiple technical divisions including mechanical systems, electrical installations, control systems, and communication networks. Key technical specifications include requirements for controllers, sensors, actuators, communication protocols, and system integration, with strict standards for performance, accuracy, and reliability. The project involves comprehensive coordination between various contractors, including a separate Control System Integrator, and requires detailed documentation, commissioning, and training. The control system must accommodate multiple simultaneous users, provide stand-alone operational capabilities for each mechanical system, and integrate with existing VA control infrastructure, with a focus on creating a robust, interoperable building automation solution.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--636-502 Construct Sterile Processing Service VISN 23, newest first.
File Type Posted
Attachment 1 - RFP 36C77625R0063 Tech Questions - dated 8-7-25.docx DOCX document
Attachment 2 - Attachment 22 - WD - NEW20250057 Rev 7 - 8-1-25.pdf PDF
36C77625R0063 0005.docx DOCX document
36C77625R0063 0004.docx DOCX document
Addendum 001 Division 27 - Communications - dated 7-31-25.pdf PDF
Attachment 1 - RFP 36C77625R0063 Tech Questions - dated 7-31-25.docx DOCX document
36C77625R0063 0003.docx DOCX document
Attachment 1 _ RFP 36C77625R0063 Tech Questions _ dated 7-17-25.docx DOCX document
36C77625R0063 0002.docx DOCX document
Attachment 1 - Sign-In Sheet - 636-502 Construct SPS - Omaha 7-7-25.pdf PDF
36C77625R0063 0001.docx DOCX document
Attachment 04 - Set 2_Civil.pdf PDF
Attachment 07 - Set 5_Arch3.pdf PDF
Attachment 09 - Set 7_Equipment.pdf PDF
Attachment 13 - Set 11_Plumbing.pdf PDF
Attachment 01 - Vol 1 Combined Specs - FINAL.pdf PDF
Attachment 03 - Set 1_G Series_Part1.pdf PDF
Attachment 05 - Set 3_Arch1.pdf PDF
Attachment 06 - Set 4_Arch2.pdf PDF
Attachment 03 - Set 1_G Series_Part2.pdf PDF
Attachment 08 - Set 6_Arch4.pdf PDF
Attachment 12 - Set 10_Mech2.pdf PDF
Attachment 15 - Set 13_Fire Protect.pdf PDF
Attachment 03 - Set 1_G Series_Part3.pdf PDF
Attachment 03 - Set 1_G Series_Part4.pdf PDF
Attachment 10 - Set 8_Structure.pdf PDF
Attachment 11 - Set 9_Mech1.pdf PDF
Attachment 14 - Set 12_Electrical.pdf PDF
Attachment 16 - VHA ICRA - 6-25-25.pdf PDF
36C77625R0063.docx DOCX document
Attachment 17 - Project Information Sheet for Contractors.docx DOCX document
Attachment 21 - Site Visit Instructions - Construct SPS - Omaha.docx DOCX document
Attachment 20 - Limitations on Subcontracting - Construction.docx DOCX document
Attachment 18 - PPQ.docx DOCX document
Attachment 19 - Subcontractor Information and Consent Form.docx DOCX document
Attachment 22 - WD - NE20250057 Rev 4 - 5-16-25.pdf PDF
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMAHA VAMC

NEW SPS ADDITION

Volume 2 -Construction Document Specifications

PROJE CT NO. : 636 - 5 0 2

November 23, 2020

U.S. DEPARTMENT OF VETERANS AFFAIRS

Compliancy Review Included 2/23/2024

VA NEBRASKA WESTERN IOWA HEALTH CARE SYSTEM

DEPARTMENT OF VETERANS AFFAIRS

Omaha NE

DESIGN STERILE PROCESSING CENTER

OMAHA VAMC

November 23, 2020

ARCHITECT

FourFront Design, Inc.

517 Seventh Street

Rapid City, SD 57701

MECHANICAL ENGINEER

ELECTRICAL ENGINEER

STRUCTURAL ENGINEER

Albertson Engineering, Inc 3202 West Main, Suite C Rapid City, SD 57702

CIVIL ENGINEERING

TerraSite Design, Inc.

1635 Deadwood Ave

Rapid City, SD 57702

11/23/20

FIRE PROTECTION ENGINEER

Farris Engineering 12700 West Dodge Road

Omaha, NE 68154

11-01-20

Omaha VAMC New SPS Addition VA Contract# 101F-17-D-2907

Project No. 636-502 00 01 10 - 1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION NO. DIVISION AND SECTION TITLES DATE

VOLUME 1

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 05-20

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 03-20

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 07-20

01 42 19 Reference Standards 11-20

01 45 00 Quality Control 03-19

01 45 29 Testing Laboratory Services 11-18

01 57 19 Temporary Environmental Controls 01-11

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 09-13

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 07-19

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 21 00 Steel Joist Framing 11-18

05 31 00 Steel Decking 02-16

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

05 51 00 Metal Stairs 10-15

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

Project No. 636-502 00 01 10 - 2

06 10 00 Rough Carpentry 10-17

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 00 Sheet Waterproofing 04-13

07 21 13 Thermal Insulation 10-17

07 22 00 Roof and Deck Insulation 02-16

07 72 00 Roof Accessories 10-15

07 24 00 Exterior Insulation Finish System 01-21

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 31 13 Access Doors and Frames 02-16

08 34 53 Security Doors and Frames 05-15

08 56 19 Pass Windows 02-16

08 56 53 Blast Resistant Windows 02-16

08 71 00 Door Hardware 04-20

08 71 13.11 Low Energy Power Assist Door Operators 08-16

08 80 00 Glazing 10-15

08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 04-20

09 30 13 Ceramic/Porcelain Tiling 09-15

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 02-16

09 65 19 Resilient Tile Flooring 05-18

09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring

(RES-3)

07-14

09 68 00 Carpeting 10-15

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 14 00 Signage 10-15

10 21 23 Cubicle Curtain Tracks 05-15

10 22 26.13 Operable Paired Partitions 04-19

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 11 – EQUIPMENT

Project No. 636-502 00 01 10 - 3

11 71 01 Medical Washing and Sterilizing Equipment 02-11

DIVISION 12 – FURNISHINGS

12 31 00 Metal Mobile Storage Shelving Units 05-15

12 32 00 Manufactured Wood Casework 09-15

12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

DIVISION 14– CONVEYING EQUIPEMENT

VOLUME 2

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 09-20

22 05 12 General Motor Requirements for Plumbing Equipment 09-20

22 05 19 Meters and Gages for Plumbing Piping 09-20

22 05 23 General-Duty Valves for Plumbing Piping 09-20

22 05 33 Heat Tracing for Plumbing Piping 09-20

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 11-19

22 11 23 Domestic Water Pumps 09-15

22 13 00 Facility Sanitary and Vent Piping 09-20

22 14 00 Facility Storm Drainage 09-15

22 15 00 General Service Compressed-Air Systems 09-20

22 31 11 Water Softeners 09-15

22 35 00 Domestic Water Heat Exchangers 09-20

22 40 00 Plumbing Fixtures 09-15

22 67 19.16 Reverse-Osmosis Water Equipment 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-20

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-20

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 02-20

23 09 23 Direct-Digital Control System for HVAC 09-11

Project No. 636-502 00 01 10 - 4

SECTION NO. DIVISION AND SECTION TITLES DATE

23 21 13 Hydronic Piping 02-20 23 21 23 Hydronic Pumps 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 22 23 Steam Condensate Pumps 04-20 23 25 00 HVAC Water Treatment 02-20

23 31 00 HVAC Ducts and Casings 02-20

23 34 00 HVAC Fans 02-20

23 36 00 Air Terminal Units 02-20

23 37 00 Air Outlets and Inlets 02-20

23 40 00 HVAC Air Cleaning Devices 03-20

23 64 00 Packaged Water Chillers 03-23

23 65 00 Cooling Towers 03-23

23 72 00 Air-to-Air Energy Recovery Equipment 03-20

23 73 00 Indoor Central-Station Air-Handling Units 03-20

23 82 00 Convection Heating and Cooling Units 03-20

DIVISION 25 – INTEGRATED AUTOMATION

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 13 Medium-Voltage Cables 01-17

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 39 Underfloor Raceways for Electrical Systems 01-18

26 05 41 Underground Electrical Construction 01-17

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 12 19 Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers 01-18

26 13 16 Medium-Voltage Fusible Interrupter Switches 01-17

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 29 11 Motor Controllers 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 33 53 Static Uninterruptible Power Supply 01-17

26 41 00 Facility Lightning Protection 01-17

26 51 00 Interior Lighting 01-18

26 56 00 Exterior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

Project No. 636-502 00 01 10 - 5

SECTION NO. DIVISION AND SECTION TITLES DATE

27 31 00 Voice Communications Switching and Routing Equipment 06-15

27 32 41 Two-Way Radio Equipment and Systems 10-18

27 41 31 Master Antenna Television Equipment and Systems 06-15

27 51 16 Public Address and Mass Notification Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 13 16 Physical Access Control System and Database Management 09-11

28 23 00 Video Surveillance 09-11

28 26 00 Electronic Personal Protection System 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

31 23 19 Dewatering 10-12

31 23 23.33 Flowable Fill 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 12 16 Asphalt Paving 09-15

32 17 23 Pavement Markings 08-16

32 90 00 Planting 08-16

DIVISION 33 – UTILITIES

33 30 00 Sanitary Sewer Utilities 06-13

DIVISION 34 – TRANSPORTATION

DIVISION 48 – Electrical Power Generation

07-01-15

Project No. 636-502 00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

G-000 COVER SHEET

G-001 LOCATION MAP

G-002 PROJECT DIRECTORY, DRAWING INDEX AND GENERAL

NOTES

G-003 ABBREVIATIONS, LEGENDS AND SYMBOLS

G-004 INFECTION CONTROL RISK ASSESMENT/PHASING PLANS

G-005 PHASING PLAN LEVEL 1, 2 AND 3

G-101 CODE PLAN

G-200 LIFE SAFETY PLAN – 2ND LEVEL

G-201 LIFE SAFETY PLAN – 3RD LEVEL

CIVIL

V100 CODE PLAN

C100 SITE GENERAL NOTES

CD100 DEMOLITION PLAN

CS100 SITE PLAN

CG100 GRADING AND STAKEOUT PLAN

CU100 SANITARY SEWER

CP100 JOINTING PLAN

CT100 TRAFFIC CONTROL PLAN

C-500 CIVIL DETAILS #1

C-501 CIVIL DETAILS #2

C-502 CIVIL DETAILS #3

ARCHITECTURAL

AD-100 DEMOLITION CEILING PLAN – FIRST LEVEL

AD-101 DEMOLITION 2ND LEVEL

AD-102 DEMOLITION CEILING PLAN- 2ND LEVEL

AD-103 DEMOLITION PLAN – 3RD LEVEL

AD-104 DEMOLITION – NORTH ELEVATION AND DETAILS

Project No. 636-502 00 01 15 - 2

A-000 WALL TYPES

A-001 PARTITION FRAMING DETAILS

A-010 HEAD OF WALL DETAILS

A-020 PLAN DETAILS

A-021 PLAN DETAILS

A-100 NEW FLOOR PLAN – 2ND LEVEL

A-101 NEW FLOOR PLAN – 3RD LEVEL

A-103 DIMENSION PLAN 3RD LEVEL

A-110 REFLECTED CEILING PLAN – 2ND LEVEL

A-111 REFLECTED CEILING PLAN – 3RD LEVEL

A-112 CEILING DETAILS

A-120 NEW ROOF PLAN

A-121 PLAN DETAILS

A-200 EXTERIOR ELEVATIONS

A-201 EXTERIOR ELEVATIONS

A-300 BUILDING SECTIONS

A-310 WALL SECTIONS

A-311 WALL SECTIONS

A-400 ENLARGED STAIR PLANS, SECTIONS AND DETAILS

A-401 SECTION DETAILS

A-402 SECTION DETAILS

A-403 CART WASH DETAILS

A-500 ROOM FINISH SCHEDULE

A-510 FLOOR FINISH PLAN – 2ND LEVEL

A-511 FLOOR FINISH PLAN – 3RD LEVEL AND FLOORING

TRANSITION DETAILS

A-512 WALL PROTECTION PLAN

A-513 WALL PROTECTION PLAN

A-530 SIGNAGE DETAILS

A-600 DOOR SCHEDULE, ELEVATIONS AND DETAILS

A-610 WINDOW ELEVATIONS AND DETAILS

EQUIPMENT

QH-100 SPS MEDICAL EQUIPMENT PLAN

QH-101 SPS MEDICAL EQUIPMENT SCHEDULE

Project No. 636-502 00 01 15 - 3

STRUCTURAL

S-001 STRUCTURAL GENERAL NOTES

S-002 IBC INSPECTION TABLES

S-003 SNOW DRIFT AND WIND UPLIFT PLAN

S-102 LEVEL 2 INTERSTITIAL FRAMING PLAN LEVEL

S-103 LEVEL 3 FLOOR FRAMING PLAN

S-104 LEVEL 4 ROOF FRAMING PLAN

S-401 LATERAL FRAMING ELEVATIONS

S-402 LATERAL FRAMING ELEVATIONS

S-403 LATERAL FRAMING DETAILS AND SCHEDULES

S-404 ENLARGED STAIR FRAMING PLANS

S-501 DETAILS

S-502 DETAILS

S-503 DETAILS

S-601 STANDARD DETAILS / SCHEDULES

MECHANICAL

M0.00 MECHANICAL SYMBOLS LEGEND AND GENERAL NOTES

M1.01 MECHANICAL ROOF DEMOLITION PLAN

M1.02 MECHANICAL FIRST FLOOR CEILING PLAN

M2.01 INTERSITIAL SPACE PIPING REMODEL PLAN

M2.02 LEVEL 3 MECHANICAL PIPING REMODEL PLAN

M2.03 INTERSITIAL SPACE HVAC DUCT REMODEL PLAN

M2.04 LEVEL 3 HVAC DUCT REMODEL PLAN

M2.05 STEAM PIPING REMODEL PLAN

M2.06 MECHANICAL ROOF PLAN

M3.01 MECHANICAL SECTIONS

M4.01 LARGE SCALE VIEWS

M5.00 MECHANICAL DETAILS – BUILDING 5 DRY SIDE 1

M5.01 MECHANICAL DETAILS – BUILDING 5 DRY SIDE 2

M5.10 MECHANICAL DETAILS – BUILDING 5 WET SIDE 1

M5.11 MECHANICAL DETAILS – BUILDING 5 WET SIDE 2

M5.12 MECHANICAL DETAILS – BUILDING 5 WET SIDE 3

M6.01 MECHANICAL SCHEDULES

M6.02 PIPING & INTRUMENTATION DIAGRAMS/SCHEMATIC(PID)

M6.03 ZONE/ROOM PRESSURE AND FLOWS DIAGRAM

M6.04 DDC CONTROLS

Project No. 636-502 00 01 15 - 4

M6.05 CONTROL DIAGRAMS

M6.06 CONTROL DIAGRAMS

M7.01 DUCTWORK ISOMETRIC VIEWS

M7.02 MECHANICAL PIPING ISOMETRIC VIEWS

PLUMBING

P0.00 PLUMBING SYMBOLS, LEGENDS AND ABBREVIATIONS

P1.00 EXISTING ROOF PLUMBING DEMOLITION PLAN

P1.01 FIRST FLOOR DRAIN, WASTE AND VENTILATION

P1.02 INTERSTITIAL SPACE WATER AND COMPRESSED AIR

PLAN

P1.03 INTERSTITIAL SPACE WASTE AND VENT PLAN

P1.04 LEVEL 3 SPS WATER AND COMPRESSED AIR PLAN

P1.05 LEVEL 3 DRAIN, WASTE AND VENT PLAN

P1.06 PLUMBING ROOF PLAN

P2.01 WATER AND COMPRESSED AIR ISOMETRIC VIEWS

P2.02 DRAIN, WASTE AND VENT ISOMETRIC VIEWS

P3.01 PLUMBING SECTIONS

P5.01 PLUMBING DETAILS

P5.02 PLUMBING DETAILS

P6.01 PLUMBING SCHEDULES

ELECTRICAL

E-000 ELECTRICAL LEGENDS AND ABBREVIATIONS

E-001 PANEL SCHEDULES

E-002 PANEL SCHEDULES

E-003 ELECTRICAL SCHEDULES

E-004 ELECTRICAL DETAILS

E-005 TELECOMMUNICATIONS DETAILS

E-006 ELECTRICAL SERVICE DETAILS

E-007 ELECTRICAL SITE PLANS

E-008 INTERSTITIAL SPACE FLOOR PLANS

ED-100 SECOND LEVEL ELECTRICAL DEMOLITION PLANS

ED-101 ICU CEILING DEMOLITION PLANS

E-100 SECOND LEVEL POWER PLAN

E-101 THIRD LEVEL POWER PLAN

E-102 ROOF LEVEL ELECTRICAL PLAN

E-200 SECOND LEVEL LIGHTING PLAN

E-201 THIRD LEVEL LIGHTING PLAN

Project No. 636-502 00 01 15 - 5

E-301 LEVEL THREE SPECIAL SYSTEMS PLAN

E-302 LEVEL 3 SPECIAL SYSTEMS ROUTING PLAN

FIRE PROTECTION

FA-000 FIRE ALARM GENERAL NOTES AND SYMBOLS

FA-100 FIRE ALARM PLAN – 2ND LEVEL

FA-101 FIRE ALARM PLAN – 3RD LEVEL

FX-000 FIRE SUPPRESSION GENERAL NOTES AND DETAILS

FX-100 FIRE SUPPRESSION PLAN – 2ND LEVEL

FX-101 FIRE SUPPRESSION PLAN – 3RD LEVEL

FX-400 FIRE SUPPRESSION LARGE SCALE PLANS AND SECTIONS

- - - END - - -

11-1-16

Project No.636-502 21 08 00 - 1

SECTION 21 08 00

COMMISSIONING OF FIRE SUPPRESSION SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The requirements of this Section apply to all sections of Division 21.

B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A

Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.

1.2 RELATED WORK

A. Section 01 00 00 GENERAL REQUIREMENTS.

B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.

C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

1.3 SUMMARY

A. This Section includes requirements for commissioning the Fire

Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 00

General Commissioning Requirements.

B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.

1.4 DEFINITIONS

A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.

1.5 COMMISSIONED SYSTEMS

A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 and of Division 21, is required in cooperation with the VA and the

Commissioning Agent.

B. The Fire Suppression systems commissioning will include the systems listed in Section 01 91 00 General Commissioning Requirements:

Project No.636-502 21 08 00 - 2

1.6 SUBMITTALS

A. The commissioning process requires review of selected Submittals. The

Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to

Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.

B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL

COMMISSIONING REQUIREMENTS.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 CONSTRUCTION INSPECTIONS

A. Commissioning of the building fire suppression systems will require inspection of individual elements of the fire suppression construction throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91 00 and the Commissioning plan to schedule inspections as required to support the Commissioning Process.

3.2 PRE-FUNCTIONAL CHECKLISTS

A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The

Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the

Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning

Agent will select a broader sample of checklists for review. If the

Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the type of equipment will be returned to the Contractor for correction and

Project No.636-502 21 08 00 - 3 resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING

REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.

3.3 CONTRACTORS TESTS

A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL

REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected

Contractor tests at the sole discretion of the Commissioning Agent.

Contractor tests shall be completed prior to scheduling Systems

Functional Performance Testing.

3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING

A. The Commissioning Process includes Systems Functional Performance

Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems

Functional Performance Test procedures for review and approval by the

COR. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing.

The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details.

3.5 TRAINING OF VA PERSONNEL

A. Training of the VA operation and maintenance personnel is required in cooperation with the COR and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00. The instruction shall be scheduled in coordination with the COR after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING

REQUIREMENTS and Division 21 Sections for additional Contractor training requirements.

Project No.636-502 21 08 00 - 4

----- END -----

06-01-15

Project No.636-502 21 13 13 - 1

SECTION 21 13 13

WET-PIPE SPRINKLER SYSTEMS

PART 1 - GENERAL

1.1 DESCRIPTION

A. Design, installation and testing shall be in accordance with NFPA 13.

B. The design and installation of a hydraulically calculated automatic wet-pipe system complete and ready for operation for all new areas of

Building 25 identified on plans.

C. Modification of the existing sprinkler system as indicated on the drawings and as further required by these specifications.

1.2 RELATED WORK

A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Section 33 10 00, WATER UTILITIES.

C. Section 07 84 00, FIRESTOPPING.

D. Section 09 91 00, PAINTING.

E. Not Used

F. Section 28 31 00, FIRE DETECTION AND ALARM.

G. Not Used

H. Not Used

1.3 DESIGN CRITERIA

A. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of NFPA 13.

1. Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section.

2. Sprinkler Protection: Sprinkler hazard classifications shall be in accordance with NFPA 13. The hazard classification examples of uses and conditions identified in the Annex of NFPA 13 shall be mandatory for areas not listed below. Request clarification from the

Government for any hazard classification not identified. To determining spacing and sizing, apply the following coverage classifications:

a. Light Hazard Occupancies: Offices, break rooms, locker rooms and customary access areas.

Project No.636-502 21 13 13 - 2

b. Ordinary Hazard Group 1 Occupancies: Laboratories, Interstitial space, Mechanical Equipment Rooms and IT rooms.

c. Ordinary Hazard Group 2 Occupancies: Storage rooms, trash rooms, clean and soiled linen rooms, HAC rooms, storage areas, file storage areas for the entire area of the space up to 140 square meters (1500 square feet) and Supply Processing and Distribution

(SPD).

3. Hydraulic Calculations: Calculated demand including hose stream requirements shall fall no less than 10 percent below the available water supply curve.

4. Water Supply: Base water supply on existing fire pump test data:

a. Location Basement. See most recent data at end of spec section.

b. Not Used

c. Not Used

d. Not Used

e. Not Used

f. Not Used

g. Not Used

5. Zoning:

a. For each sprinkler zone provide a control valve, flow switch, and a test and drain assembly with pressure gauge. For buildings greater than two stories, provide a check valve at each control valve.

b. Sprinkler zones shall conform to the smoke barrier zones shown on the drawings.

6. Not Used

1.4 SUBMITTALS

A. Submit as one package in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification

Project No.636-502 21 13 13 - 3 section. In addition to the hard copies, provide submittal items in

Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:

1. Qualifications:

a. Provide a copy of the installing contractors fire sprinkler and state contractor’s license.

b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a

Registered Professional Engineer licensed in the field of Fire

Protection Engineering.

c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.

2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA

13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.

3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.

4. Calculation Sheets:

a. Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and

Calculations chapter of NFPA 13.

b. Not Used

5. Valve Charts: Provide a valve chart that identifies the location of each newly installed control valve. Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and Location.

Project No.636-502 21 13 13 - 4

6. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in

Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:

a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.

1.) One full size (or size as directed by the COR) printed copy.

2.) One complete set in electronic pdf format.

3.) One complete set in AutoCAD format or a format as directed by the COR.

b. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA

13. Certificates shall be provided to document all parts of the installation.

c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address and telephone number, for each item of equipment.

d. One paper copy of the Material and Testing Certificates and the

Operations and Maintenance Manuals above shall be provided in a binder. In addition, these materials shall be provided in pdf format on a compact disc or as directed by the COR.

e. Provide one additional copy of the Operations and Maintenance

Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR.

Project No.636-502 21 13 13 - 5

1.5 QUALITY ASSURANCE

A. Installer Reliability: The installer shall possess a valid State of

Nebraska fire sprinkler contractor's license. The installer shall have been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.

B. Materials and Equipment: All equipment and devices shall be of a make and type listed by UL or approved by FM, or other nationally recognized testing laboratory for the specific purpose for which it is used. All materials, devices, and equipment shall be approved by the VA. All materials and equipment shall be free from defect. All materials and equipment shall be new unless specifically indicated otherwise on the contract drawings.

1.6 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. National Fire Protection Association (NFPA):

13-19...................Installation of Sprinkler Systems

25-20...................Inspection, Testing, and Maintenance of Water-

Based Fire Protection Systems

101-18..................Life Safety Code

170-18..................Fire Safety Symbols

C. Underwriters Laboratories, Inc. (UL):

Fire Protection Equipment Directory, continuously updated online.

D. Factory Mutual Engineering Corporation (FM):

Approval Guide

PART 2 - PRODUCTS

2.1 PIPING & FITTINGS

A. Not Used

B. Piping and fittings for sprinkler systems shall be in accordance with

NFPA 13.

1. Plain-end pipe fittings with locking lugs or shear bolts are not permitted.

2. Piping sizes 50 mm (2 inches) and smaller shall be black steel

Schedule 40 with threaded end connections.

3. Piping sizes 65 mm (2 ½ inches) and larger shall be black steel

Schedule 10 with grooved connections. Grooves in Schedule 10 piping shall be rolled grooved only.

Project No.636-502 21 13 13 - 6

4. Not Used

5. Plastic piping shall not be permitted except for drain piping.

6. Flexible sprinkler hose shall be FM Approved and limited to hose with threaded end fittings with a minimum inside diameter or 1-inch and a maximum length of 6-feet.

2.2 VALVES

A. General:

1. Valves shall be in accordance with NFPA 13.

2. Do not use quarter turn ball valves for 50 mm (2 inch) or larger drain valves.

B. Control Valve: The control valves shall be a listed indicating type.

Control valves shall be UL Listed or FM Approved for fire protection installations. System control valve shall be rated for normal system pressure but in no case less than 175 PSI.

C. Check Valve: Shall be of the swing type with a flanged cast iron body and flanged inspection plate.

D. Automatic Ball Drips: Cast brass 20 mm (3/4 inch) in-line automatic ball drip with both ends threaded with iron pipe threads.

E. Not Used

F. Not Used

2.3 FIRE DEPARTMENT SIAMESE CONNECTION – NOT USED

2.4 SPRINKLERS

A. All sprinklers shall be FM approved quick response. Provide FM approved quick response sprinklers in all areas, except where specifically noted otherwise.

B. Temperature Ratings: In accordance with NFPA 13.

C. Provide sprinkler guards in accordance with NFPA 13 and when the elevation of the sprinkler head is less than 7 feet 6 inches above finished floor. The sprinkler guard shall be UL listed or FM approved for use with the corresponding sprinkler.

2.5 SPRINKLER CABINET

A. Provide sprinkler cabinet with the required number of sprinkler heads of all ratings and types installed, and a sprinkler wrench for each type of sprinkler in accordance with NFPA 13. Locate adjacent to the riser.

B. Provide a list of sprinklers installed in the property in the cabinet.

The list shall include the following:

Project No.636-502 21 13 13 - 7

1. Manufacturer, model, orifice, deflector type, thermal sensitivity, and pressure for each type of sprinkler in the cabinet.

2. General description of where each sprinkler is used.

3. Quantity of each type present in the cabinet.

4. Issue or revision date of list.

2.6 SPRINKLER SYSTEM SIGNAGE

Rigid plastic, steel or aluminum signs with white lettering on a red background with holes for easy attachment. Sprinkler system signage shall be attached to the valve or piping with chain.

2.7 SWITCHES:

A. OS&Y Valve Supervisory Switches shall be in a weatherproof die cast/red baked enamel, oil resistant, aluminum housing with tamper resistant screws, 13 mm (1/2 inch) conduit entrance and necessary facilities for attachment to the valves. Provide two SPDT switches rated at 2.5 amps at 24 VDC.

B. Water flow Alarm Switches: Mechanical, non-coded, non-accumulative retard and adjustable from 0 to 60 seconds minimum. Set flow switches at an initial setting between 20 and 30 seconds.

C. Not Used

D. Valve Supervisory Switches for Ball and Butterfly Valves: May be integral with the valve.

2.8 GAUGES

Provide gauges as required by NFPA 13. Provide gauges where the normal pressure of the system is at the midrange of the gauge.

2.9 PIPE HANGERS, SUPPORTS AND RESTRAINT OF SYSTEM PIPING

Pipe hangers, supports, and restraint of system piping shall be in accordance with NFPA 13.

2.10 WALL, FLOOR AND CEILING PLATES

Provide chrome plated steel escutcheon plates.

2.11 ANTIFREEZE SOLUTION – NOT USED

2.12 VALVE TAGS

Engraved black filled numbers and letters not less than 15 mm (1/2 inch) high for number designation, and not less than 8 mm (1/4 inch) for service designation on 19 gage, 40 mm (1-1/2 inches) round brass disc, attached with brass "S" hook, brass chain, or nylon twist tie.

Project No.636-502 21 13 13 - 8

PART 3 - EXECUTION

3.1 INSTALLATION

A. Installation shall be accomplished by the licensed contractor. Provide a qualified technician, experienced in the installation and operation of the type of system being installed, to supervise the installation and testing of the system.

B. Installation of Piping: Accurately cut pipe to measurements established by the installer and work into place without springing or forcing. In any situation where bending of the pipe is required, use a standard pipe-bending template. Concealed piping in spaces that have finished ceilings. Where ceiling mounted equipment exists, such as in operating and radiology rooms, install sprinklers so as not to obstruct the movement or operation of the equipment. Sidewall heads may need to be utilized. In stairways, locate piping as near to the ceiling as possible to prevent tampering by unauthorized personnel and to provide a minimum headroom clearance of 2250 mm (seven feet six inches). Piping shall not obstruct the minimum means of egress clearances required by

NFPA 101. Pipe hangers, supports, and restraint of system piping shall be installed accordance with NFPA 13.

C. Welding: Conform to the requirements and recommendations of NFPA 13.

D. Drains: Provide drips and drains, including low point drains, in accordance with NFPA 13. Pipe drains to discharge at safe points outside of the building or to sight cones attached to drains of adequate size to readily carry the full flow from each drain under maximum pressure. Do not provide a direct drain connection to sewer system or discharge into sinks. Install drips and drains where necessary and required by NFPA 13. The drain piping shall not be restricted or reduced and shall be of the same diameter as the drain collector.

E. Supervisory Switches: Provide supervisory switches for sprinkler control valves.

F. Waterflow Alarm Switches: Install waterflow alarm switches and valves in stairwells or other easily accessible locations.

G. Inspector's Test Connection: Install and supply in accordance with NFPA

13, locate in a secured area, and discharge to the exterior of the building.

H. Affix cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections to the

Project No.636-502 21 13 13 - 9 respective waterflow switch or pipe connection near to the pipe from where they were cut.

I. Provide escutcheon plates for exposed piping passing through walls, floors or ceilings.

J. Not Used

K. Sleeves: Provide for pipes passing through masonry or concrete. Provide space between the pipe and the sleeve in accordance with NFPA 13. Seal this space with a UL Listed through penetration fire stop material in accordance with Section 07 84 00, FIRESTOPPING. Where core drilling is used in lieu of sleeves, also seal space. Seal penetrations of walls, floors and ceilings of other types of construction, in accordance with

Section 07 84 00, FIRESTOPPING.

L. Not Used

M. Provide pressure gauges at each water flow alarm switch location.

N. Not Used

O. Firestopping shall be provided for all penetrations of fire resistance rated construction. Firestopping shall comply with Section 07 84 00, FIRESTOPPING.

P. Not Used

Q. Painting of Pipe: In finished areas where walls and ceilings have been painted, paint primed surfaces with two coats of paint to match adjacent surfaces, except paint valves and operating accessories with two coats of gloss red enamel. Exercise care to avoid painting sprinklers. Painting of sprinkler systems above suspended ceilings and in crawl spaces is not required. Painting shall comply with Section 09

91 00, PAINTING. Any painted sprinkler shall be replaced with a new sprinkler.

R. Sprinkler System Signage: Provide rigid sprinkler system signage in accordance with NFPA 13 and NFPA 25. Sprinkler system signage shall include, but not limited to, the following:

1. Identification Signs:

a. Provide signage for each control valve, drain valve, sprinkler cabinet, and inspector’s test.

b. Provide valve tags for each operable valve installed as part of this project. Coordinate nomenclature and identification of operable valves with COR. Where existing nomenclature does not exist, the Tag Identification shall include no less than the following: (FP-B-F/SZ-#) Fire Protection, Building Number, Floor

Project No.636-502 21 13 13 - 10

Number/Smoke Zone (if applicable), and Valve Number. (E.g., FP-

500-1E-001) Fire Protection, Building 500, First Floor East, Number 001.)

2. Instruction/Information Signs:

a. Provide signage for each control valve to indicate valve function and to indicate what system is being controlled.

b. Provide signage indicating the number and location of low point drains.

3. Hydraulic Placards:

a. Provide signage indicating hydraulic design information. The placard shall include location of the design area, discharge densities, required flow and residual pressure at the base of riser, occupancy classification, hose stream allowance, flow test information, and installing contractor. Locate hydraulic placard information signs at each zone control valve and at system riser.

S. Repairs: Repair damage to the building or equipment resulting from the installation of the sprinkler system by the installer at no additional expense to the Government.

T. Interruption of Service: There shall be no interruption of the existing sprinkler protection, water, electric, or fire alarm services without prior permission of the Contracting Officer. Contractor shall develop an interim fire protection program where interruptions involve occupied spaces. Request in writing at least one week prior to the planned interruption.

3.2 INSPECTION AND TEST

A. Preliminary Testing: Flush newly installed systems prior to performing hydrostatic tests in order to remove any debris which may have been left as well as ensuring piping is unobstructed. Hydrostatically test system, including the fire department connections, as specified in NFPA

13, in the presence of the Contracting Officers Representative (COR) or his designated representative. Test and flush underground water line prior to performing these hydrostatic tests.

B. Final Inspection and Testing: Subject system to tests in accordance with NFPA 13, and when all necessary corrections have been accomplished, advise COR to schedule a final inspection and test.

Connection to the fire alarm system shall have been in service for at least ten days prior to the final inspection, with adjustments made to prevent false alarms. Furnish all instruments, labor and materials

Project No.636-502 21 13 13 - 11 required for the tests and provide the services of the installation foreman or other competent representative of the installer to perform the tests. Correct deficiencies and retest system as necessary, prior to the final acceptance. Include the operation of all features of the systems under normal operations in test

3.3 INSTRUCTIONS

Furnish the services of a competent instructor for not less than two hours for instructing personnel in the operation and maintenance of the system, on the dates requested by the COR.

- - - E N D - - -

07-01-16

Project No.636-502 22 05 11 - 1

SECTION 22 05 11

COMMON WORK RESULTS FOR PLUMBING

PART 1 - GENERAL

1.1 DESCRIPTION

A. The requirements of this Section shall apply to all sections of

Division 22.

B. Definitions:

1. Exposed: Piping and equipment exposed to view in finished rooms.

C. Abbreviations/Acronyms:

1. ABS: Acrylonitrile Butadiene Styrene

2. AC: Alternating Current

3. ACR: Air Conditioning and Refrigeration

4. AI: Analog Input

5. AISI: American Iron and Steel Institute

6. AO: Analog Output

7. AWG: American Wire Gauge

8. BACnet: Building Automation and Control Network

9. BAg: Silver-Copper-Zinc Brazing Alloy

10. BAS: Building Automation System

11. BCuP: Silver-Copper-Phosphorus Brazing Alloy

12. BSG: Borosilicate Glass Pipe

13. CDA: Copper Development Association

14. C: Celsius

15. CLR: Color

16. CO: Carbon Monoxide

17. COR: Contracting Officer’s Representative

18. CPVC: Chlorinated Polyvinyl Chloride

19. CR: Chloroprene

20. CRS: Corrosion Resistant Steel

21. CWP: Cold Working Pressure

22. CxA: Commissioning Agent

23. db(A): Decibels (A weighted)

24. DDC: Direct Digital Control

25. DI: Digital Input

26. DISS: Diameter Index Safety System

27. DO: Digital Output

28. DVD: Digital Video Disc

Project No.636-502 22 05 11 - 2

29. DN: Diameter Nominal

30. DWV: Drainage, Waste and Vent

31. ECC: Engineering Control Center

32. EPDM: Ethylene Propylene Diene Monomer

33. EPT: Ethylene Propylene Terpolymer

34. ETO: Ethylene Oxide

35. F: Fahrenheit

36. FAR: Federal Acquisition Regulations

37. FD: Floor Drain

38. FED: Federal

39. FG: Fiberglass

40. FNPT: Female National Pipe Thread

41. FPM: Fluoroelastomer Polymer

42. GPM: Gallons Per Minute

43. HDPE: High Density Polyethylene

44. Hg: Mercury

45. HOA: Hands-Off-Automatic

46. HP: Horsepower

47. HVE: High Volume Evacuation

48. ID: Inside Diameter

49. IPS: Iron Pipe Size

50. Kg: Kilogram

51. kPa: Kilopascal

52. lb: Pound

53. L/s: Liters Per Second

54. L/min: Liters Per Minute

55. MAWP: Maximum Allowable Working Pressure

56. MAX: Maximum

57. MED: Medical

58. m: Meter

59. MFG: Manufacturer

60. mg: Milligram

61. mg/L: Milligrams per Liter

62. ml: Milliliter

63. mm: Millimeter

64. MIN: Minimum

65. NF: Oil Free Dry (Nitrogen)

Project No.636-502 22 05 11 - 3

66. NPTF: National Pipe Thread Female

67. NPS: Nominal Pipe Size

68. NPT: Nominal Pipe Thread

69. OD: Outside Diameter

70. OSD: Open Sight Drain

71. OS&Y: Outside Stem and Yoke

72. OXY: Oxygen

73. PBPU: Prefabricated Bedside Patient Units

74. PH: Power of Hydrogen

75. PLC: Programmable Logic Controllers

76. PP: Polypropylene

77. PPM: Parts per Million

78. PSIG: Pounds per Square Inch

79. PTFE: Polytetrafluoroethylene

80. PVC: Polyvinyl Chloride

81. PVDF: Polyvinylidene Fluoride

82. RAD: Radians

83. RO: Reverse Osmosis

84. RPM: Revolutions Per Minute

85. RTRP: Reinforced Thermosetting Resin Pipe

86. SCFM: Standard Cubic Feet Per Minute

87. SDI: Silt Density Index

88. SPEC: Specification

89. SPS: Sterile Processing Services

90. STD: Standard

91. SUS: Saybolt Universal Second

92. SWP: Steam Working Pressure

93. TEFC: Totally Enclosed Fan-Cooled

94. TFE: Tetrafluoroethylene

95. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire

96. THWN: Thermoplastic Heat & Water Resistant Nylon Coated Wire

97. T/P: Temperature and Pressure

98. USDA: U.S. Department of Agriculture

99. V: Volt

100. VAC: Vacuum

101. VA: Veterans Administration

102. VAMC: Veterans Administration Medical Center

Project No.636-502 22 05 11 - 4

103. VAC: Voltage in Alternating Current

104. WAGD: Waste Anesthesia Gas Disposal

105. WOG: Water, Oil, Gas

1.2 RELATED WORK

A. Section 01 00 00, GENERAL REQUIREMENTS.

B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

C. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.

D. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.

E. Section 03 30 00, CAST-IN-PLACE CONCRETE: Concrete and Grout.

F. Section 05 31 00, STEEL DECKING: Building Components for Attachment of

Hangers.

G. Section 05 50 00, METAL FABRICATIONS.

H. Section 07 60 00, FLASHING AND SHEET METAL: Flashing for Wall and Roof

Penetrations.

I. Section 07 84 00, FIRESTOPPING.

J. Section 07 92 00, JOINT SEALANTS.

K. Section 09 91 00, PAINTING.

L. Section 22 05 12, GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT.

M. Section 22 07 11, PLUMBING INSULATION.

N. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.

O. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.

P. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.

Q. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.

R. Section 26 29 11, MOTOR CONTROLLERS.

S. Section 31 20 00, EARTH MOVING: Excavation and Backfill.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American Society of Mechanical Engineers (ASME):

ASME Boiler and Pressure Vessel Code -

BPVC Section IX-2013....Welding, Brazing, and Fusing Qualifications

B31.1-2012..............Power Piping

C. American Society for Testing and Materials (ASTM):

A36/A36M-2012...........Standard Specification for Carbon Structural

Steel

Project No.636-502 22 05 11 - 5

A575-96(R2013)e1........Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades

E84-2013a...............Standard Test Method for Surface Burning

Characteristics of Building Materials

E119-2012a..............Standard Test Methods for Fire Tests of

Building Construction and Materials

F1760-01(R2011).........Standard Specification for Coextruded

Poly(Vinyl Chloride) (PVC) Non-Pressure Plastic

Pipe Having Reprocessed-Recycled Content

D. International Code Council, (ICC):

IBC-2012................International Building Code

IPC-2012................International Plumbing Code

E. Manufacturers Standardization Society (MSS) of the Valve and Fittings

Industry, Inc:

SP-58-2009..............Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application and

Installation

SP-69-2003..............Pipe Hangers and Supports - Selection and

Application

F. Military Specifications (MIL):

P-21035B................Paint High Zinc Dust Content, Galvanizing

Repair (Metric)

G. National Electrical Manufacturers Association (NEMA):

MG 1-2011...............Motors and Generators

H. National Fire Protection Association (NFPA):

51B-2014................Standard for Fire Prevention During Welding, Cutting and Other Hot Work

54-2012.................National Fuel Gas Code

70-2014.................National Electrical Code (NEC)

I. NSF International (NSF):

5-2012..................Water Heaters, Hot Water Supply Boilers, and

Heat Recovery Equipment

14-2012.................Plastic Piping System Components and Related

Materials

61-2012.................Drinking Water System Components – Health

Effects

372-2011................Drinking Water System Components – Lead Content

Project No.636-502 22 05 11 - 6

J. Department of Veterans Affairs (VA):

PG-18-10................Plumbing Design Manual

PG-18-13-2011...........Barrier Free Design Guide

1.4 SUBMITTALS

A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and

SAMPLES.

B. Information and material submitted under this section shall be marked

"SUBMITTED UNDER SECTION 22 05 11, COMMON WORK RESULTS FOR PLUMBING",

with applicable paragraph identification.

C. Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements and will fit the space available.

D. If equipment is submitted which differs in arrangement from that shown, provide drawings that show the rearrangement of all associated systems.

Approval will be given only if all features of the equipment and associated systems, including accessibility, are equivalent to that required by the contract.

E. Prior to submitting shop drawings for approval, contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.

F. Installing Contractor shall provide lists of previous installations for selected items of equipment. Contact persons who will serve as references, with telephone numbers and e-mail addresses shall be submitted with the references.

G. Manufacturer's Literature and Data: Manufacturer’s literature shall be submitted under the pertinent section rather than under this section.

1. Electric motor data and variable speed drive data shall be submitted with the driven equipment.

2. Equipment and materials identification.

3. Firestopping materials.

4. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.

5. Wall, floor, and ceiling plates.

Project No.636-502 22 05 11 - 7

H. Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together and complete in a group. Coordinate and properly integrate materials and equipment in each group to provide a completely compatible and efficient installation. Final review and approvals will be made only by groups.

I. Coordination Drawings: Complete consolidated and coordinated layout drawings shall be submitted for all new systems, and for existing systems that are in the same areas. The drawings shall include plan views, elevations and sections of all systems and shall be on a scale of not less than 1:32 (3/8 inch equal to one foot). Clearly identify and dimension the proposed locations of the principal items of equipment. The drawings shall clearly show the proposed location and adequate clearance for all equipment, controls, piping, pumps, valves and other items. All valves, trap primer valves, water hammer arrestors, strainers, and equipment requiring service shall be provided with an access door sized for the complete removal of plumbing device, component, or equipment.