This document is a Technical Questions and VA Response Tracking Sheet for Solicitation #36C77625R0063, a VA project to Construct Sterile Processing Service in Omaha, NE. The document addresses technical clarifications for a construction project, focusing on specific technical details such as duct materials, cabling requirements, and equipment specifications. Key responses include removing bid alternates, confirming stainless steel duct requirements for wet areas and equipment exhaust, verifying steam and condensate piping details, and specifying network cabling standards (Cat 6A for horizontal cabling and 24-strand OM4 multimode fiber for backbone infrastructure). The project is being managed by the Department of Veterans Affairs Technology Acquisition Center in Austin, with the solicitation number 36C77625R0063 for the VISN 23 region.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION # 36C77625R0063
PROJECT NAME: 636-502 Construct Sterile Processing Service – Omaha NE
TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET
| Item No. |
| QUESTION |
| GOVERNMENT RESPONSE |
| 11 |
| We see notes on M6.01 under the VAV schedule for a deductive and additive Alternate #3. The removal of VAVs 20-23 and the addition of a single VAV 24. There appears to be a piping layout for the changes within this deduct and add but there appears to be no duct change drawings indicating what they want to happen. Will there be additional drawings coming out to indicate the needed duct changes? |
| 1. Bid alternates have been removed from the project. Any reference to Bid Alternate #3 is no longer to be considered, VAV-24 in the schedule on M6.01 is no longer to be considered for this project. The references to Bid alternate #3 on sheets M6.07 and M6.08 (using the existing chilled water system in lieu of the new cooling towers) are also no longer to be considered for this project. |
2. Specifications will supersede drawing notes, wet area and equipment duct to be stainless. Any lab hoods or biosafety cabinets would need stainless steel exhaust.
3. Drawing sheet M 2.05 shows steam and condensate piping to equipment.
| 12 |
| We do not see a duct material schedule. There is a note on M0.00 that says all duct to be galvanized. However, the specs indicate they want stainless steel for wet area duct and wet equipment exhaust which contradicts the note on M0.00. Also is all the other duct galvanized or do specific areas with exhaust being feed from the venturi valves need to be stainless steel? |
| Specifications will supersede drawing notes, wet area and equipment duct to be stainless. Any lab hoods or biosafety cabinets would need stainless steel exhaust. |
| 13 |
| The steam and condensate drawings for sterilization equipment needed as we do not see these systems and components shown or listed in these lines. |
| Drawing sheet M 2.05 shows steam and condensate piping to equipment. |
| 14 |
| Asking for some clarity on what is require Cat6 or Cat6A for the horizontal cabling. It shows Cat6 on many of the diagrams on E-005. But I believe many VA projects have been Cat6A historically |
| Use Cat 6A |
| 15 |
| As far as the backbone cabling. Is a riser sheet that shows more of what is needed as far as copper and/or fiber cable size and type |
| We do not have a riser sheet for this because we aren't doing the infrastructure of multiple tr's. It is just the one and we show on plans the pathway for the fiber backbone. It will need to be a multimode fiber. 24 strand OM4 |