SOLICITATION # 36C77625R0063
PROJECT NAME: 636-502 Construct Sterile Processing Service – Omaha NE
TECHNICAL QUESTIONS AND VA RESPONSE TRACKING SHEET
| Item No. |
| QUESTION |
| GOVERNMENT RESPONSE |
| 1 |
| Are there any special and site-specific considerations or requirements we should be aware of when performing construction work near the MRI? |
| site specific considerations - no overhead lifts over occupied space. |
| 2 |
| Are there any restrictions on the hours we are allowed to work near the MRI, or should we assume standard construction hours? |
| Please see note in #3. No overhead crane lifts during business hours or when the space is occupied |
| 3 |
| Do we need to be aware of any vibration-related restrictions or limitations for work near the MRI? |
| Noise levels during patient care and the potential for anything heavy/unsecure coming through the ceiling are concerns for the entire area (Nuc Med, MRI, Ultrasound, office spaces). Considerations for Nuc Med SPECT and PET: |
• The cameras have crystals that need to remain stable, but it would take fairly significant vibration to cause artifacts on the images.
• The MRI is Very susceptible to vibrations, drilling/jackhammering on the grounds around, or on the roof above have potential to cause issues with images and disrupt the magnetic field and frequencies, which may cause issues with the machines
| 4 |
| On some projects submittal exchange is provided for the project by The VA. It does not appear to specify if we will be required to use Submittal Exchange on this project. Can the VA verify if we are required to use Submittal Exchange or if the VA is providing any online submittal platform for this project? |
| The VA will make sure a document exchange service is available once the project is awarded |
| 5 |
| Specification section 01 35 26 requires the Prime Contractor to provide an SSHO for the project and that individual is to be on site any time construction activities are occurring. It is unclear from the specifications if the SSHO may be a dual hat employee that also serves as the Superintendent for the project. Can the VA please clarify if they are requiring separate individuals to perform the role of SSHO and the role of Superintendent? |
| No, they need to be separate. A sperate SSHO, QAQC and Superintendence. |
| 6 |
| Please clarify if a separate individual is required to perform the role of Construction Quality Control or can that be performed by the superintendent? |
| No, they need to be separate. A separate SSHO, QAQC and Superintendent. |
| 7 |
| Paragraph 3.4.B of 01 45 00 Quality control also states that the CQCSM can also have duties as the project superintendent. Can the VA please clarify that one individual can perform both duties on this project? |
| No, they need to be separate. A sperate SSHO, QAQC and Superintendent. |
| 8 |
| Can you state the specific roles, Superintendent, SSHO, and CQC/QCM that need to be separate individuals? |
| No, they need to be separate. A separate SSHO, QAQC and Superintendent. |
| 9 |
| Will the VA be issuing state of Nebraska sales tax exempt forms on this project? |
| No. Please refer to section 4.13 Special Notes Regarding FAR 52.229-3: Federal, State and Local Taxes. |
| 10 |
| Is there an existing roof warranty? If so, please provide the roofing manufacturer’s information? |
| No existing roof warranty |