The file's text, extracted by GovTribe without its formatting.
INSTRUCTIONS
INSTRUCTIONS TO OFFERORS
| General | |
| 1 | The prime offeror shall complete all yellow-highlighted cells in all tabs of this Government Format Pricing Model (GFPM) (excluding the "Subcontractor Labor Build" Tab). Subcontractors shall complete the "Subcontractor Labor Build" tab and submit it as part of its proposal submission . |
| 2 | All proposed direct labor rates shall be in line with justifying data (historical/incurred costs, salary survey, BLS OES etc.) for each identified locality. |
| "Minimum Qualifications" Tab | |
| 1 | There are no inputs on this tab. |
| 2 | This tab provides the minimum qualifications for each labor category provided in the GFPM. |
| "OCONUS" Tab | |
| 1 | There are no inputs on this tab. |
| 2 | This tab provides the different OCONUS hours and locations for each labor category. |
| "DBA Insurance" Tab | |
| 1 | The prime offeror shall complete all yellow-highlighted cells in this Tab. The proposed DBA costs on this Tab will NOT be included in the Total Proposed Price or Total Evaluated Price. |
| "Totals" Tab | |
| 1 | Offerors shall input offeror name into cell D2. |
| 2 | The total proposed price is calculated in cell B49. |
| 3 | No other offeror input is necessary, all totals will auto-populate from the "Ordering Period 1", "Ordering Period Period 2", "Ordering Period 3", "Ordering Period 4", "Ordering Period 5" and "Task Order 0001" tabs. |
| "Ordering Period 1", "Ordering Period 2", "Ordering Period 3", "Ordering Period 4", and "Ordering Period 5" Tabs | |
| 1 | Offeror input is required in all applicable cells highlighted in yellow except for the Labor OH (see item 8 for specific directions) |
| 2 | The "Labor Categories & Required Hours" (columns A - E) contain all of the labor categories that the USG anticipates to be necessary for completion of this effort. The "Req. Hours (LOE)" column (Column C) contains the total number of hours to be proposed for each of the USG identified labor categories. The hours may be allocated to the prime contractor or a combination of both the prime and subcontractors. All Proposed (prime & subcontractor) labor hours must be equal to the total number of hours (per each labor category) identified in the "Req. Hours (LOE)" column. |
| 2a | If the Delta in the "Delta (Req. - Prop.)" column (Column E) has a fill color in red for any labor category, then the offeror may be ineligible for award since the sum of the Prime and Subcontractor labor hours do not equal the required hours. |
| 2b | In the "Prime Contractor CPFF Labor" table (columns G-T in the Ordering Period 1 tab and G-R in remaining ordering period tabs), offerors shall input the proposed number of hours that will be completed by the prime contractor for each of the USG identified labor categories. Offerors are required to submit fully burdened labor rates for each of the USG identified labor categories (Column Q in the Ordering Period 1 tab and Column O in the remaining ordering period tabs). Offerors shall insert all of the cost elements (direct labor, fringe benefit costs, labor overhead costs, general & administrative cost, fee etc.) that make up all of the fully burdened labor rates proposed for each of the USG identified labor categories (Columns I-P in the Ordering Period 1 tab and Column H-N in the remaining ordering period tabs). Fringe benefit costs, labor overhead costs, general & administrative costs, and fee for each labor category will be automatically calculated based on the rates input in row 2 (Contractor Proposed Indirect/Fee Rates). Columns R-T in the Ordering Period 1 tab and Columns P-R in the remaining ordering period tabs automatically calculate based on the offeror's inputs. |
| 2c | Offerors shall insert direct labor rates in the Ordering Period 1 tab for all labor categories (Column I). Note: Per section L, the proposed direct labor must meet or exceed the USG floor rates referenced in the Ordering Period 1 tab (Column H). |
| 2d | Offerors shall provide reconciliation between the Offeror Format Pricing Model (OFPM) and this GFPM. If reconciliation error(s) exist, the Government will rely on the data entered into this GFPM to make any price reasonableness and cost realism determinations. |
| 3 | Subcontractors shall submit a GFPM with the "Subcontractor Labor Build" tab completed only. Further, subcontractors shall submit an OFPM that includes a detailed cost build up in their own format for each proposed fully burdened labor rate. Subcontractors may choose to submit the cost build up data as part of the prime contractor's cost submission or as separate submission directly to the Government. If reconciliation error(s) exist between the prime contractor's pricing submission and the subcontractor cost build up spreadsheets, the Government will rely on the data entered into the prime contractor's GFPM to make any price reasonableness and cost realism determinations. |
| 3a | In the "Subcontractor Labor" table (columns V-AI in the Ordering Period 1 tab and T-AG in the remaining ordering period tabs), offerors shall input the proposed number of hours that will be completed by the subcontractor for each of the USG identified labor categories. If proposing subcontractor hours, Offerors are required to submit fully burdened labor rates for each of the USG identified labor categories (Column AC in the Ordering Period 1 tab and Column AA in the remaining ordering period tabs). Offerors shall insert all of the cost elements (subcontractor FBLR, prime fringe benefit costs, prime labor overhead costs, prime general & administrative cost, prime fee etc.) that make up all of the fully burdened labor rates proposed for each of the USG identified labor categories (Columns X-AB in the Ordering Period 1 tab and Column V-Z in the remaining ordering period tabs). Columns AD-AF in the Ordering Period 1 tab and Columns AB-AD in the remaining ordering period tabs automatically calculate based on the offeror's inputs. |
| 3b | In column AG in the Ordering Period 1 tab and AE in the remaining tabs, the prime offeror shall enter the name of the subcontractor(s) proposed to complete the hours associated with each labor category. If the prime offeror proposes more than one subcontractor for a single labor category, a single blended FBLR (inclusive of prime contractor indirect adders and fee) shall be proposed. The proposed FBLR (inclusive of prime contractor indirect adders and fee) shall be a blend of each subcontractor’s proposed FBLR. In column AH in the Ordering Period 1 tab and column AF in the remaining ordering period tabs the prime offeror shall indicate if the proposed subcontractor FBLR is a "blended" FBLR. For each labor category where more than one subcontractor is proposed, the prime offeror shall provide the number of sub hours that it allocated to each sub in developing the "blended" FBLR as part of its OFPM. In column AI in the Ordering Period 1 tab and Column AG in the remaining ordering period tabs the prime offeror shall enter the billing nomenclature for each of the subcontracted labor categories, all subcontracted labor categories shall be differentiated from prime labor categories. |
| 4 | Columns AK - AM in the Ordering Period 1 tab and AI - AK in the remaining ordering period tabs calculate a composite fully burdened labor rate (prime and subcontractor) for each of the USG identified labor categories. All values populate based on the offerors input in the "Prime Labor" and "Subcontractor Labor" tables. No offeror input is necessary. |
| 5 | The Travel / ODC and Material Plug Figures in cells E31 and E36 are pre-populated plug figures. |
| 5a | Offeror's may input an indirect rate (to include overhead, G&A, and FCCM) to apply to the USG provided Plug Travel / ODC Figure costs in cell D32 and USG provided plug Material costs in cell D37 in the ordering period tabs. The total Travel / ODC amount will be the sum of the USG plug figures and all proposed indirect costs. The total Material amount will be the sum of the USG plug figures and all proposed indirect costs. No fee shall be applied to the USG provided plug figures. |
| 6 | The Total Price for each performance period is equal to the sum of labor costs, travel/ODCs, and material costs. |
| 7 | Column F in the ordering period tabs are blank and hidden with no inputs, precedents, or dependents. |
| 8 | The Labor OH 1 column (Column L in the Ordering Period 1 and Column J in the remaining ordering periods) is unlocked and editable. The offeror can either input one overhead percentage in Row 2 to apply to all labor categories, or the offeror can leave Row 2 blank and directly input the labor overhead dollars per hour for each labor category. |
| "Escalation" Tab: | |
| 1 | This tab provides the data for the labor escalation rates which are used in all periods of performance tabs except for Ordering Period 1. |
| 2 | Per section L, for evaluation purposes only, this solicitation has set a minimum realistic escalation rate for each period of performance. Offerors may choose to increase this rate in column C of the escalation tab, but shall not propose an escalation rate which is below the USG minimum. |
| "Subcontractor Labor Build" Tab: | |
| 1 | Prime Offerors may leave this tab blank if it doesn't have access to the subcontractor labor build. Subcontractors shall complete and provide this tab to the Government. This tab shows the subcontractor's compliance with the floor rates and compliance with providing a full labor buildup, per labor category that is being proposed by the individual subcontractor. |
| 2 | The Labor OH 1 column (Column I) is unlocked and editable. The offeror can either input one overhead percentage in the top row for each period to apply to all labor categories, or the offeror can leave the top rows blank and directly input the labor overhead dollars per hour for each labor category. |
| "Task Order 0001" Tab | |
| 1 | The offeror must input the labor hours for STS services, travel/ODCs and material associated with Task Order 0001. Further instruction is included in the "Task Order 0001" tab. |
Minimum Qualifications
| ID | Labor Category | Minimum Qualifications |
| 001 | Engineering I | Bachelors' degree, 0-4 years of experience |
| 002 | Engineering II | Bachelors' degree, 5-9 years of experience |
| 003 | Engineering III | Bachelors' degree, 10+ years of experience |
| 004 | Logistics I | Bachelors' degree, 0-4 years of experience |
| 005 | Logistics II | Bachelors' degree, 5-9 years of experience |
| 006 | Logistics III | Bachelors' degree, 10+ years of experience |
| 007 | CONUS FSR | Bachelors' degree, 5+ years of experience |
| 008 | OCONUS FSR | Bachelors' degree, 5+ years of experience |
OCONUS Locations
| Hours | | | | |
| Location | Ordering Period 1 | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering period 5 |
| Yokohama North Dock, Japan | 1,933 | 1,933 | 1,933 | 1,933 | 1,933 |
| Okinawa, Japan | 1,933 | 1,933 | 1,933 | 1,933 | 1,933 |
| Pearl harbor, Hawaii | 1,933 | 1,933 | 1,933 | 1,933 | 1,933 |
| TOTAL | 5,800 | 5,800 | 5,800 | 5,800 | 5,800 |
DBA Insurance
| DBA Insurance | |
| Ordering Period 1 | $ - |
| Ordering Period 2 | $ - |
| Ordering Period 3 | $ - |
| Ordering Period 4 | $ - |
| Ordering Period 5 | $ - |
Totals
OFFEROR NAME:
Period Item Proposed Estimated Cost per Hour Proposed Fixed Fee per Hour Proposed Price per Hour Proposed Estimated Cost Total Proposed Fixed Fee Total Proposed Price Total
| Ordering Period 1 | Labor - Engineering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 1 | Labor - Logistics | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 1 | Labor - CONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 1 | Labor - OCONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 1 | Material/Travel/ODC | | | | $ 1,876,595.00 | | $ 1,876,595.00 |
| Total Ordering Period 1 | | | | | $ 1,876,595.00 | $ - 0 | $ 1,876,595.00 |
Period Item Proposed Estimated Cost per Hour Proposed Fixed Fee per Hour Proposed Price per Hour Proposed Estimated Cost Total Proposed Fixed Fee Total Proposed Price Total
| Ordering Period 2 | Labor - Engineering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 2 | Labor - Logistics | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 2 | Labor - CONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 2 | Labor - OCONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 2 | Material/Travel/ODC | | | | $ 1,914,127.00 | | $ 1,914,127.00 |
| Total Ordering Period 2 | | | | | $ 1,914,127.00 | $ - 0 | $ 1,914,127.00 |
Period Item Proposed Estimated Cost per Hour Proposed Fixed Fee per Hour Proposed Price per Hour Proposed Estimated Cost Total Proposed Fixed Fee Total Proposed Price Total
| Ordering Period 3 | Labor - Engineering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 3 | Labor - Logistics | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 3 | Labor - CONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 3 | Labor - OCONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 3 | Material/Travel/ODC | | | | $ 1,952,410.00 | | $ 1,952,410.00 |
| Total Ordering Period 3 | | | | | $ 1,952,410.00 | $ - 0 | $ 1,952,410.00 |
Period Item Proposed Estimated Cost per Hour Proposed Fixed Fee per Hour Proposed Price per Hour Proposed Estimated Cost Total Proposed Fixed Fee Total Proposed Price Total
| Ordering Period 4 | Labor - Engineering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 4 | Labor - Logistics | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 4 | Labor - CONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 4 | Labor - OCONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 4 | Material/Travel/ODC | | | | $ 1,991,458.00 | | $ 1,991,458.00 |
| Total Ordering Period 4 | | | | | $ 1,991,458.00 | $ - 0 | $ 1,991,458.00 |
Period Item Proposed Estimated Cost per Hour Proposed Fixed Fee per Hour Proposed Price per Hour Proposed Estimated Cost Total Proposed Fixed Fee Total Proposed Price Total
| Ordering Period 5 | Labor - Engineering | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 5 | Labor - Logistics | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 5 | Labor - CONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 5 | Labor - OCONUS FSR | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Ordering Period 5 | Material/Travel/ODC | | | | $ 2,031,287.00 | | $ 2,031,287.00 |
| Total Ordering Period 5 | | | | | $ 2,031,287.00 | $ - 0 | $ 2,031,287.00 |
Task Order 0001 Proposed Price $ - 0 $ - 0 $ - 0
Total Proposed Price $ 9,765,877.00
Ordering Period 1
| Ordering Period 1 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Contractor Proposed Indirect/Fee Rates | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| USG Site | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Categories & Required Hours | | | | | | Prime Contractor CPFF Labor | | | | | | | | | | | | | | | Subcontractor Labor | | | | | | | | | | Composite FBLR (Prime & Sub) | | |
| ID | Labor Category | Req. Hours (LOE) | Prop Hours. | Delta (Req. - Prop.) | | Prime Hours | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| (Floor Rate) | Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| (Proposed) | Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| (Calculation) | Fringe Benefit | Labor OH 1 | G&A | FCCOM | Cost | Fee | FBLR | Total Cost | Total Fee | Total Price | | Sub Hours | Sub FBLR | Prime OH 1 | Prime G&A | Prime FCCOM | Cost | Prime Fee | FBLR (Inclusive of All Prime Adders) | Total Cost | Total Fee | Total Price | Name of Subcontractor(s) | Blended Sub FBLR (Y/N) | Billing Nomenclature | Proposed | | | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Cost | Fee | Total |
| 001 | Engineering I | 14,473 | - 0 | 14,473 | | | $ 35.84 | | $ 35.84 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 35.84 | $ - 0 | $ 35.84 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 002 | Engineering II | 28,945 | - 0 | 28,945 | | | $ 43.34 | | $ 43.34 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 43.34 | $ - 0 | $ 43.34 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 003 | Engineering III | 14,473 | - 0 | 14,473 | | | $ 73.12 | | $ 73.12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 73.12 | $ - 0 | $ 73.12 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| | Engineering - Composite FBLR | 57,891 | - 0 | 57,891 | | | | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 004 | Logistics I | 10,150 | - 0 | 10,150 | $ 23.64 | $ 23.64 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 23.64 | $ - 0 | $ 23.64 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 005 | Logistics II | 20,301 | - 0 | 20,301 | $ 29.08 | $ 29.08 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 29.08 | $ - 0 | $ 29.08 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 006 | Logistics III | 10,150 | - 0 | 10,150 | $ 33.91 | $ 33.91 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 33.91 | $ - 0 | $ 33.91 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| Logistics - Composite FBLR | 40,601 | - 0 | 40,601 | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
007 CONUS FSR 11,600 - 0 11,600 $ 35.15 $ 35.15 $ - 0 $ - 0 $ - 0 $ - 0 $ 35.15 $ - 0 $ 35.15 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 008 | OCONUS FSR | 5,800 | - 0 | 5,800 | $ 35.15 | $ 35.15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 35.15 | $ - 0 | $ 35.15 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Required Hours | 115,892 | - 0 | 115,892 | | | | | | | | | | | | | | | | | | | | | | | |
| LABOR | Estimated Cost | Fixed Fee | Price |
| Engineering | $ - 0 | $ - 0 | $ - 0 |
| Logistics | $ - 0 | $ - 0 | $ - 0 |
| CONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| OCONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| TOTAL LABOR | $ - 0 | $ - 0 | $ - 0 |
| Travel / ODC | Rate | Est Cost |
| Travel / ODC | | $ 750,638.00 |
| Travel/ ODC Indirect Rate | | $ - 0 |
| Total Travel/ ODC | | $ 750,638.00 |
| Material | Rate | Est Cost |
| Material | | $ 1,125,957.00 |
| Material Indirect Rate | | $ - 0 |
| Total Material | | $ 1,125,957.00 |
TOTAL PRICE $ 1,876,595.00
Ordering Period 2
| Ordering Period 2 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Contractor Proposed Indirect/Fee Rates | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| USG Site | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Categories & Required Hours | | | | | | Prime Contractor CPFF Labor | | | | | | | | | | | | | Subcontractor Labor | | | | | | | | | | | Composite FBLR (Prime & Sub) | | |
| ID | Labor Category | Req. Hours (LOE) | Prop Hours. | Delta (Req. - Prop.) | | Prime Hours | Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | |
| (Calculation) | Fringe Benefit | Labor OH 1 | G&A | FCCOM | Cost | Fee | FBLR | Total Cost | Total Fee | Total Price | | Sub Hours | Sub FBLR | Prime OH 1 | Prime G&A | Prime FCCOM | Cost | Prime Fee | FBLR (Inclusive of All Prime Adders) | Total Cost | Total Fee | Total Price | Name of Subcontractor(s) | Blended Sub FBLR (Y/N) | Billing Nomenclature | | Proposed | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Cost | Fee | Total |
| 001 | Engineering I | 14,501 | - 0 | 14,501 | | | $ 37.09 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 37.09 | $ - 0 | $ 37.09 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 002 | Engineering II | 29,001 | - 0 | 29,001 | | | $ 44.85 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 44.85 | $ - 0 | $ 44.85 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 003 | Engineering III | 14,501 | - 0 | 14,501 | | | $ 75.67 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 75.67 | $ - 0 | $ 75.67 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| | Engineering - Composite FBLR | 58,003 | - 0 | 58,003 | | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 004 | Logistics I | 10,150 | - 0 | 10,150 | $ 24.47 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 24.47 | $ - 0 | $ 24.47 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 005 | Logistics II | 20,301 | - 0 | 20,301 | $ 30.09 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 30.09 | $ - 0 | $ 30.09 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 006 | Logistics III | 10,150 | - 0 | 10,150 | $ 35.09 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 35.09 | $ - 0 | $ 35.09 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| Logistics - Composite FBLR | 40,601 | - 0 | 40,601 | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
007 CONUS FSR 11,600 - 0 11,600 $ 36.38 $ - 0 $ - 0 $ - 0 $ - 0 $ 36.38 $ - 0 $ 36.38 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 008 | OCONUS FSR | 5,800 | - 0 | 5,800 | $ 36.38 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 36.38 | $ - 0 | $ 36.38 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Required Hours | 116,004 | - 0 | 116,004 | | | | | | | | | | | | | | | | | | | | | | |
| LABOR | Estimated Cost | Fixed Fee | Price |
| Engineering | $ - 0 | $ - 0 | $ - 0 |
| Logistics | $ - 0 | $ - 0 | $ - 0 |
| CONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| OCONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| TOTAL LABOR | $ - 0 | $ - 0 | $ - 0 |
| Travel / ODC | Rate | Est Cost |
| Travel / ODC | | $ 765,651.00 |
| Travel/ ODC Indirect Rate | | $ - 0 |
| Total Travel/ ODC | | $ 765,651.00 |
| Material | Rate | Est Cost |
| Material | | $ 1,148,476.00 |
| Material Indirect Rate | | $ - 0 |
| Total Material | | $ 1,148,476.00 |
TOTAL PRICE $ 1,914,127.00
Ordering Period 3
| Ordering Period 3 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Contractor Proposed Indirect/Fee Rates | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| USG Site | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Categories & Required Hours | | | | | | Prime Contractor CPFF Labor | | | | | | | | | | | | | Subcontractor Labor | | | | | | | | | | | Composite FBLR (Prime & Sub) | | |
| ID | Labor Category | Req. Hours (LOE) | Prop Hours. | Delta (Req. - Prop.) | | Prime Hours | Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | |
| (Calculation) | Fringe Benefit | Labor OH 1 | G&A | FCCOM | Cost | Fee | FBLR | Total Cost | Total Fee | Total Price | | Sub Hours | Sub FBLR | Prime OH 1 | Prime G&A | Prime FCCOM | Cost | Prime Fee | FBLR (Inclusive of All Prime Adders) | Total Cost | Total Fee | Total Price | Name of Subcontractor(s) | Blended Sub FBLR (Y/N) | Billing Nomenclature | | Proposed | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Cost | Fee | Total |
| 001 | Engineering I | 14,501 | - 0 | 14,501 | | | $ 38.17 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 38.17 | $ - 0 | $ 38.17 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 002 | Engineering II | 29,001 | - 0 | 29,001 | | | $ 46.16 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 46.16 | $ - 0 | $ 46.16 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 003 | Engineering III | 14,501 | - 0 | 14,501 | | | $ 77.88 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 77.88 | $ - 0 | $ 77.88 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| | Engineering - Composite FBLR | 58,003 | - 0 | 58,003 | | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 004 | Logistics I | 10,150 | - 0 | 10,150 | $ 25.18 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 25.18 | $ - 0 | $ 25.18 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 005 | Logistics II | 20,301 | - 0 | 20,301 | $ 30.97 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 30.97 | $ - 0 | $ 30.97 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 006 | Logistics III | 10,150 | - 0 | 10,150 | $ 36.12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 36.12 | $ - 0 | $ 36.12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| Logistics - Composite FBLR | 40,601 | - 0 | 40,601 | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
007 CONUS FSR 11,600 - 0 11,600 $ 37.44 $ - 0 $ - 0 $ - 0 $ - 0 $ 37.44 $ - 0 $ 37.44 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 008 | OCONUS FSR | 5,800 | - 0 | 5,800 | $ 37.44 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 37.44 | $ - 0 | $ 37.44 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Required Hours | 116,004 | - 0 | 116,004 | | | | | | | | | | | | | | | | | | | | | | |
| LABOR | Estimated Cost | Fixed Fee | Price |
| Engineering | $ - 0 | $ - 0 | $ - 0 |
| Logistics | $ - 0 | $ - 0 | $ - 0 |
| CONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| OCONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| TOTAL LABOR | $ - 0 | $ - 0 | $ - 0 |
| Travel / ODC | Rate | Est Cost |
| Travel / ODC | | $ 780,964.00 |
| Travel/ ODC Indirect Rate | | $ - 0 |
| Total Travel/ ODC | | $ 780,964.00 |
| Material | Rate | Est Cost |
| Material | | $ 1,171,446.00 |
| Material Indirect Rate | | $ - 0 |
| Total Material | | $ 1,171,446.00 |
TOTAL PRICE $ 1,952,410.00
Ordering Period 4
| Ordering Period 4 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Contractor Proposed Indirect/Fee Rates | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| USG Site | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Categories & Required Hours | | | | | | Prime Contractor CPFF Labor | | | | | | | | | | | | | Subcontractor Labor | | | | | | | | | | | Composite FBLR (Prime & Sub) | | |
| ID | Labor Category | Req. Hours (LOE) | Prop Hours. | Delta (Req. - Prop.) | | Prime Hours | Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | |
| (Calculation) | Fringe Benefit | Labor OH 1 | G&A | FCCOM | Cost | Fee | FBLR | Total Cost | Total Fee | Total Price | | Sub Hours | Sub FBLR | Prime OH 1 | Prime G&A | Prime FCCOM | Cost | Prime Fee | FBLR (Inclusive of All Prime Adders) | Total Cost | Total Fee | Total Price | Name of Subcontractor(s) | Blended Sub FBLR (Y/N) | Billing Nomenclature | | Proposed | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Cost | Fee | Total |
| 001 | Engineering I | 14,501 | - 0 | 14,501 | | | $ 39.24 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 39.24 | $ - 0 | $ 39.24 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 002 | Engineering II | 29,001 | - 0 | 29,001 | | | $ 47.45 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 47.45 | $ - 0 | $ 47.45 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 003 | Engineering III | 14,501 | - 0 | 14,501 | | | $ 80.05 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 80.05 | $ - 0 | $ 80.05 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| | Engineering - Composite FBLR | 58,003 | - 0 | 58,003 | | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 004 | Logistics I | 10,150 | - 0 | 10,150 | $ 25.88 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 25.88 | $ - 0 | $ 25.88 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 005 | Logistics II | 20,301 | - 0 | 20,301 | $ 31.83 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 31.83 | $ - 0 | $ 31.83 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 006 | Logistics III | 10,150 | - 0 | 10,150 | $ 37.12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 37.12 | $ - 0 | $ 37.12 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| Logistics - Composite FBLR | 40,601 | - 0 | 40,601 | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
007 CONUS FSR 11,600 - 0 11,600 $ 38.48 $ - 0 $ - 0 $ - 0 $ - 0 $ 38.48 $ - 0 $ 38.48 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 008 | OCONUS FSR | 5,800 | - 0 | 5,800 | $ 38.48 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 38.48 | $ - 0 | $ 38.48 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Required Hours | 116,004 | - 0 | 116,004 | | | | | | | | | | | | | | | | | | | | | | |
| LABOR | Estimated Cost | Fixed Fee | Price |
| Engineering | $ - 0 | $ - 0 | $ - 0 |
| Logistics | $ - 0 | $ - 0 | $ - 0 |
| CONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| OCONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| TOTAL LABOR | $ - 0 | $ - 0 | $ - 0 |
| Travel / ODC | Rate | Est Cost |
| Travel / ODC | | $ 796,583.00 |
| Travel/ ODC Indirect Rate | | $ - 0 |
| Total Travel/ ODC | | $ 796,583.00 |
| Material | Rate | Est Cost |
| Material | | $ 1,194,875.00 |
| Material Indirect Rate | | $ - 0 |
| Total Material | | $ 1,194,875.00 |
TOTAL PRICE $ 1,991,458.00
Ordering Period 5
| Ordering Period 5 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Contractor Proposed Indirect/Fee Rates | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| USG Site | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| Labor Categories & Required Hours | | | | | | Prime Contractor CPFF Labor | | | | | | | | | | | | | Subcontractor Labor | | | | | | | | | | | Composite FBLR (Prime & Sub) | | |
| ID | Labor Category | Req. Hours (LOE) | Prop Hours. | Delta (Req. - Prop.) | | Prime Hours | Direct Labor | | | | | | | | | | | | | | | | | | | | | | | | | |
| (Calculation) | Fringe Benefit | Labor OH 1 | G&A | FCCOM | Cost | Fee | FBLR | Total Cost | Total Fee | Total Price | | Sub Hours | Sub FBLR | Prime OH 1 | Prime G&A | Prime FCCOM | Cost | Prime Fee | FBLR (Inclusive of All Prime Adders) | Total Cost | Total Fee | Total Price | Name of Subcontractor(s) | Blended Sub FBLR (Y/N) | Billing Nomenclature | | Proposed | | | | | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | Cost | Fee | Total |
| 001 | Engineering I | 14,501 | - 0 | 14,501 | | | $ 40.35 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 40.35 | $ - 0 | $ 40.35 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 002 | Engineering II | 29,001 | - 0 | 29,001 | | | $ 48.80 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 48.80 | $ - 0 | $ 48.80 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 003 | Engineering III | 14,501 | - 0 | 14,501 | | | $ 82.33 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 82.33 | $ - 0 | $ 82.33 | $ - 0 | $ - 0 | $ - 0 | | | | $ - 0 | $ - 0 | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| | Engineering - Composite FBLR | 58,003 | - 0 | 58,003 | | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 004 | Logistics I | 10,150 | - 0 | 10,150 | $ 26.62 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 26.62 | $ - 0 | $ 26.62 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 005 | Logistics II | 20,301 | - 0 | 20,301 | $ 32.74 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 32.74 | $ - 0 | $ 32.74 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| 006 | Logistics III | 10,150 | - 0 | 10,150 | $ 38.18 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 38.18 | $ - 0 | $ 38.18 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | | | |
| Logistics - Composite FBLR | 40,601 | - 0 | 40,601 | | | | | | | | | $ - 0 | $ - 0 | $ - 0 | | | | | | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
007 CONUS FSR 11,600 - 0 11,600 $ 39.58 $ - 0 $ - 0 $ - 0 $ - 0 $ 39.58 $ - 0 $ 39.58 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0
| 008 | OCONUS FSR | 5,800 | - 0 | 5,800 | $ 39.58 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ 39.58 | $ - 0 | $ 39.58 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Required Hours | 116,004 | - 0 | 116,004 | | | | | | | | | | | | | | | | | | | | | | |
| LABOR | Estimated Cost | Fixed Fee | Price |
| Engineering | $ - 0 | $ - 0 | $ - 0 |
| Logistics | $ - 0 | $ - 0 | $ - 0 |
| CONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| OCONUS FSR | $ - 0 | $ - 0 | $ - 0 |
| TOTAL LABOR | $ - 0 | $ - 0 | $ - 0 |
| Travel / ODC | Rate | Est Cost |
| Travel / ODC | | $ 812,515.00 |
| Travel/ ODC Indirect Rate | | $ - 0 |
| Total Travel/ ODC | | $ 812,515.00 |
| Material | Rate | Est Cost |
| Material | | $ 1,218,772.00 |
| Material Indirect Rate | | $ - 0 |
| Total Material | | $ 1,218,772.00 |
TOTAL PRICE $ 2,031,287.00
Composite Labor Rates
| USG Site | | | | | | | | | | | | | | | | | | | | | | | | |
| ID | Labor Category | Level | Location | Ordering Period 1 | | | Ordering Period 2 | | | Ordering Period 3 | | | Ordering Period 4 | | | Ordering Period 5 | | | Option Year 1 | | | Option Year 2 | | |
| | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | |
| | | | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR |
| 001 | Engineering I | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 002 | Engineering II | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 003 | Engineering III | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 004 | 0 | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 005 | Logistics I | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 006 | Logistics II | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 007 | Logistics III | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 008 | 0 | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 009 | CONUS FSR | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 010 | 0 | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 011 | OCONUS FSR | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 012 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 013 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 014 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 015 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 016 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 017 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 018 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 019 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 020 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 021 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 022 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 023 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 024 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 025 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 026 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 027 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 028 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 029 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 030 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 031 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| Contractor Site | | | | | | | | | | | | | | | | | | | | | | | | |
| ID | Labor Category | Level | Location | Ordering Period 1 | | | Ordering Period 2 | | | Ordering Period 3 | | | Ordering Period 4 | | | Ordering Period 5 | | | Option Year 1 | | | Option Year 2 | | |
| | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | | CPFF FBLR | | |
| | | | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR | Cost | Fee | FBLR |
| 001 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 002 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 003 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 004 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 005 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 006 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 007 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 008 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 009 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 010 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 011 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 012 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 013 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 014 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 015 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 016 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 017 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 018 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 019 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 020 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 021 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 022 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 023 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 024 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 025 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 026 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 027 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 028 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 029 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 030 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 031 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
Escalation
| POP | Minimum |
| Escalation | Proposed | |
| Escalation | Calculated | |
Escalation
| Ordering Period 2 | 3.5% | 3.5% |
| Ordering Period 3 | 2.9% | 2.9% |
| Ordering Period 4 | 2.8% | 2.8% |
| Ordering Period 5 | 2.9% | 2.9% |
Prime Ceiling Rates
| USG Site | | | | Prime Contractor Labor Ceilings | | | | | | | | |
| ID | Labor Category | Level | Location | Ordering Period 1 | | | Ordering Period 2 | Ordering Period 3 | Ordering Period 4 | Ordering Period 5 | Option Year 1 | Option Year 2 |
| | | | | CPFF FBLR | | | CPFF FBLR | CPFF FBLR | CPFF FBLR | CPFF FBLR | CPFF FBLR | CPFF FBLR |
| | | | | Cost Ceiling | Fee | FBLR | | | | | | |
| Ceiling | | Cost Ceiling | Fee | FBLR | | | | | | | | | |
| Ceiling | | Cost Ceiling | Fee | FBLR | | | | | | | | | |
| Ceiling | | Cost Ceiling | Fee | FBLR | | | | | | | | | |
| Ceiling | | Cost Ceiling | Fee | FBLR | | | | | | | | | |
| Ceiling | | Cost Ceiling | Fee | FBLR | | | | | | | | | |
| Ceiling | | Cost Ceiling | Fee | FBLR | | | | | | | | | |
Ceiling
| 001 | Engineering I | ERROR:#REF! | ERROR:#REF! | $ 39.42 | $ - 0 | $ 39.42 | $ 40.80 | $ - 0 | $ 40.80 | $ 41.99 | $ - 0 | $ 41.99 | $ 43.16 | $ - 0 | $ 43.16 | $ 44.39 | $ - 0 | $ 44.39 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 002 | Engineering II | ERROR:#REF! | ERROR:#REF! | $ 47.67 | $ - 0 | $ 47.67 | $ 49.34 | $ - 0 | $ 49.34 | $ 50.78 | $ - 0 | $ 50.78 | $ 52.19 | $ - 0 | $ 52.19 | $ 53.68 | $ - 0 | $ 53.68 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 003 | Engineering III | ERROR:#REF! | ERROR:#REF! | $ 80.43 | $ - 0 | $ 80.43 | $ 83.24 | $ - 0 | $ 83.24 | $ 85.67 | $ - 0 | $ 85.67 | $ 88.05 | $ - 0 | $ 88.05 | $ 90.56 | $ - 0 | $ 90.56 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 004 | 0 | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 005 | Logistics I | ERROR:#REF! | ERROR:#REF! | $ 26.00 | $ - 0 | $ 26.00 | $ 26.91 | $ - 0 | $ 26.91 | $ 27.70 | $ - 0 | $ 27.70 | $ 28.47 | $ - 0 | $ 28.47 | $ 29.28 | $ - 0 | $ 29.28 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 006 | Logistics II | ERROR:#REF! | ERROR:#REF! | $ 31.99 | $ - 0 | $ 31.99 | $ 33.10 | $ - 0 | $ 33.10 | $ 34.07 | $ - 0 | $ 34.07 | $ 35.02 | $ - 0 | $ 35.02 | $ 36.02 | $ - 0 | $ 36.02 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 007 | Logistics III | ERROR:#REF! | ERROR:#REF! | $ 37.30 | $ - 0 | $ 37.30 | $ 38.60 | $ - 0 | $ 38.60 | $ 39.73 | $ - 0 | $ 39.73 | $ 40.83 | $ - 0 | $ 40.83 | $ 42.00 | $ - 0 | $ 42.00 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 008 | 0 | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 009 | CONUS FSR | ERROR:#REF! | ERROR:#REF! | $ 38.67 | $ - 0 | $ 38.67 | $ 40.01 | $ - 0 | $ 40.01 | $ 41.18 | $ - 0 | $ 41.18 | $ 42.33 | $ - 0 | $ 42.33 | $ 43.53 | $ - 0 | $ 43.53 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 010 | 0 | ERROR:#REF! | ERROR:#REF! | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 011 | OCONUS FSR | ERROR:#REF! | ERROR:#REF! | $ 38.67 | $ - 0 | $ 38.67 | $ 40.01 | $ - 0 | $ 40.01 | $ 41.18 | $ - 0 | $ 41.18 | $ 42.33 | $ - 0 | $ 42.33 | $ 43.53 | $ - 0 | $ 43.53 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 012 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 013 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
| 014 | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! | ERROR:#REF! |
This is the start of the file's text. The full file is on GovTribe.