Attachment 0006 - Request for Use of Prohibited Material.docx
DOCX document 33 KB Posted
- Attached to
- Request for Proposal (RFP) for Army Watercraft Systems (AWS) Systems Technical Support (STS)
- Solicitation number
- W56HZV22R0062
About this file
This document contains a template for requesting a waiver to use prohibited materials under an Army contract. The template requests information on the prohibited materials, explanation of use, health hazards, analysis of alternatives considered, technical justification for use, program risks of denial, and a get well plan. The contractor would provide sections 1 through 7, while the government would fill in sections 8 through 10 regarding evaluation, concurrence from the chief engineer and product manager, and final approval from the project manager. It does not specify any products or services required under a contract opportunity.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Attachment [xx] – Request for Use of Prohibited Material
Attachment [0006]
Request for Use of Prohibited Material
Distribution Statement A – Approved for Public Release; distribution unlimited
(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)
1. General Information
Requesting Company
Date of Request
Point of Contact
Prohibited material for which waiver is requested
2. Explanation of Use
Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon system delivery including quantities of these parts. Indicate the specific variant and/or vessels the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vessel rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.
3. Health Hazard
Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).
4. Analysis of Alternatives
Instructions: Identify all alternative which were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for.
5. Technical Justification
Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated. Note cost, schedule, and use of non-developmental items (NDI) are not technical justifications.
6. Program Risk
Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.
7. Get Well Plan
Instructions: Identify which parts where an alternative may be integrated at a later date. Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.
The following Sections will be filled in by the Government
8. Environmental Safety and Occupational Health Representative Evaluation/ Recommendation
Instructions: Government ESOH Representative to provide evaluation of the above information and a recommendation to the Product Manager/Project Manager regarding approval/disapproval of the prohibited material request.
ESOH Representative Date
9. Concurrence
I concur that use of {prohibited material} as described in this form under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:
Chief/Lead Engineer
Product Manager
10. Approval
Upon the basis of the findings above, I hereby determine that use of {prohibited material} as identified in Section 2 of this form for the {Contractor Name} Contract {Contract Number} is acceptable and justified.
Project Manager
UNCLASSIFIED
File details come from the government source that posted it. Updated .