This document contains a template for requesting a waiver to use prohibited materials under an Army contract. The template requests information on the prohibited materials, explanation of use, health hazards, analysis of alternatives considered, technical justification for use, program risks of denial, and a get well plan. The contractor would provide sections 1 through 7, while the government would fill in sections 8 through 10 regarding evaluation, concurrence from the chief engineer and product manager, and final approval from the project manager. It does not specify any products or services required under a contract opportunity.

View the file

Other files

File Type Posted
W56HZV22R0062-0004.pdf PDF
Attachment 0012 - GFPM.xlsx XLSX spreadsheet
Systems Technical Support - QA Sheet 09JAN2023.xlsx XLSX spreadsheet
W56HZV-22-R-0062 - STS RFP Conformed to AMD 0003.pdf PDF
W56HZV22R0062-0003.pdf PDF
Systems Technical Support - QA Sheet 04JAN2023.xlsx XLSX spreadsheet
Systems Technical Support - QA Sheet 20DEC2022.xlsx XLSX spreadsheet
Attachment 0011 - Technical Experience Matrix (2).xlsx XLSX spreadsheet
Attachment 0012 - GFPM 12.14.22 (2).xlsx XLSX spreadsheet
W56HZV22R0062-0002.pdf PDF
Systems Technical Support - QA Sheet 06DEC2022.xlsx XLSX spreadsheet
W56HZV-22-R-0062 AMD 0001.pdf PDF
Attachment 0019 - Task Order 0001 Contract Data Requirements List (CDRLs).docx DOCX document
Attachment 0018 - Task Order 0001 Performance Work Statement (PWS).docx DOCX document
Attachment 0008 - Performance Requirement Summary.pdf PDF
W56HZV-22-R-0062 STS Solicitation.pdf PDF
Attachment 0012 - GFPM - 090122P.xlsx XLSX spreadsheet
Attachment 0004 - FMECA Requirements 30MAR2022.pdf PDF
Attachment 0017 - Summary Sheet for Task Order 0001 Against the AWS STS Contract.docx DOCX document
Attachment 0005 - NDA.docx DOCX document
Attachment 0016 - Pre-award Survey of Prospective Contractor Accounting System.pdf PDF
Attachment 0013 - Small Business Participation Workbook.xlsx XLSX spreadsheet
Attachment 0002 - TDP Requirements.pdf PDF
Attachment 0003 - HMMR Format.xlsx XLSX spreadsheet
Attachment 0010 - Copyright Release Letter Template.pdf PDF
Attachment 0007 - Prep for Shipment and Storage (ATPD 2232).pdf PDF
Attachment 0015 - Certification of SB Size and Socioeconomic Status for Proposed Subs not in SAM.docx DOCX document
Attachment 0009 - Acronym List.docx DOCX document
Attachment 0001 - Configuration Management.docx DOCX document
Attachment 0011 - Technical Experience Matrix.xlsx XLSX spreadsheet
Attachment 0014 - Small Business Participation Workbook Instructions.docx DOCX document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

Attachment [xx] – Request for Use of Prohibited Material

Attachment [0006]

Request for Use of Prohibited Material

Distribution Statement A – Approved for Public Release; distribution unlimited

(*Distribution Statement A only applies when form is not filled in. Once filled check the Security Class Guide for proper distribution statement/markings)

1. General Information

Requesting Company

Date of Request

Point of Contact

Prohibited material for which waiver is requested

2. Explanation of Use

Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon system delivery including quantities of these parts. Indicate the specific variant and/or vessels the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vessel rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.

3. Health Hazard

Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).

4. Analysis of Alternatives

Instructions: Identify all alternative which were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for.

5. Technical Justification

Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated. Note cost, schedule, and use of non-developmental items (NDI) are not technical justifications.

6. Program Risk

Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.

7. Get Well Plan

Instructions: Identify which parts where an alternative may be integrated at a later date. Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.

The following Sections will be filled in by the Government

8. Environmental Safety and Occupational Health Representative Evaluation/ Recommendation

Instructions: Government ESOH Representative to provide evaluation of the above information and a recommendation to the Product Manager/Project Manager regarding approval/disapproval of the prohibited material request.

ESOH Representative Date

9. Concurrence

I concur that use of {prohibited material} as described in this form under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:

Chief/Lead Engineer

Product Manager

10. Approval

Upon the basis of the findings above, I hereby determine that use of {prohibited material} as identified in Section 2 of this form for the {Contractor Name} Contract {Contract Number} is acceptable and justified.