About this file
This is a Past Performance Questionnaire template designed to evaluate contractor performance on federal contracts. The form is to be completed by government respondents (such as contracting officers or program managers) who have direct knowledge of a contractor's past performance and returned to Amanda McCarthy, Contract Specialist at the Naval Air Warfare Center Training Systems Division within one week of receipt. The questionnaire applies to the Navy's P-8A Aircrew Training Device (ATD) Operational Flight Trainer (OFT) projection system upgrade solicitation (N6134026R1010-1), which is planned as a Small Business Set-Aside Commercial Competition.
The questionnaire requires identification of the contractor, program, contract details, and the respondent's information, followed by an assessment of the contractor's performance across three primary evaluation criteria: Quality of Product or Service, Schedule Performance, and Program Management and Subcontract Management. Each criterion uses a five-point rating scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory) with substantiating examples required for each rating. The form concludes with a summary question asking whether the respondent would award the contract to the contractor if given the choice today. Responses must be signed (electronic or handwritten signatures are acceptable) to verify completion and agreement with the information provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACH L-7 Q_A - Government Responses.xlsx | XLSX spreadsheet | |
| Solicitation Attach - P8A OFT Projection DRAFT SOW_08APR2026.docx | DOCX document | |
| Solicitation Attach - P8-A OFT Upgrade DRAFT Spec_26MAR2026.docx | DOCX document | |
| Solicitation Attachment - Data Item Transmittal (DIT) Form.pdf | ||
| ATTACH L-5 RIPP.xlsx | XLSX spreadsheet | |
| Solicitation Exh A-E -OFT Projection DRAFT CDRL_23MAR2026.docx | DOCX document | |
| DRAFT P-8A OFT Projection System Upgrade Sec L_and_M.docx | DOCX document | |
| ATTACH L-2 OST.docx | DOCX document | |
| Industry Day Attach 2 - OFT Projection_Contractor_Question_Form.docx | DOCX document | |
| ATTACH L-4 PPCS.docx | DOCX document | |
| ATTACH L-6 Price_Section-B.xlsx | XLSX spreadsheet | |
| ATTACH L-7 Q_A.xlsx | XLSX spreadsheet | |
| Industry Day Notice_OFT Projection System Upgrade_FINAL.pdf | ||
| Industry Day Attach 1 - Conference Attendance N6134026R1010.xlsx | XLSX spreadsheet | |
| DRAFT Solicitation - N6134026R1010.pdf | ||
| ATTACH L-1_CRM.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION L – VOLUME 2
ATTACHMENT L-3: PAST PERFORMANCE QUESTIONNAIRE
Within 1 week from receipt of this questionnaire return this form to Amanda McCarthy, Contract Specialist via email: amanda.m.mccarthy.civ@us.navy.mil
Completion Instructions – The contractor shall complete Section 1. The respondent shall complete all other sections.
1. CONTRACTOR IDENTIFICATION
a. Contractor:
b. Program Title:
c. Contract Number / Delivery Order Number:
d. Type of Contract: Percent Complete:
e. Period of Performance being assessed: _________________________________________________
f. Offeror Role in Past Performance Contract (Prime Contractor / Subcontractor / JV Team Member): __________________________________________________________________________________
g. Offeror proposed role for Solicitation (Prime Contractor / Subcontractor / JV Team Member): __________________________________________________________________________________
h. CAGE Code: _____________________________________________________________________
i. UEI Code: ________________________________________________________________________
2. RESPONDENT IDENTIFICATION
a. Name:
b. Agency:
c. Position:
d. Relation to Program:
e. Phone:
f. Email Address:
g. Date Questionnaire Completed:
3. PROGRAM CHARACTERISTICS
a. Please provide a short description of the subject contract.
4. PERFORMANCE LEVELS
4.1 PERFORMANCE GRADES (Use these grades to provide the overall rating where requested below).
Exceptional - Performance meets contractual requirements and exceeds many to the Government’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the government's benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions
Unsatisfactory - Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor's corrective actions appear or were ineffective.
4.2 QUESTIONS
4.2.1. Quality of Product or Service
Quality: (How would you rate the Offeror’s past performance in the delivery of quality supplies and services, which includes meeting technical requirements?)
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
N/A
Provide examples that substantiate rating:
4.2.2. Schedule
Schedule: (How would you rate the Offeror’s past performance in meeting schedule requirements, to include on-time or late deliveries, modifications of original schedules?)
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
N/A
4.2.3 Program Management and Subcontract Management
Program Management and Subcontract Management: (How would you rate the Offeror’s past performance in managing the contracted effort, to include program management, subcontract management, and cooperation with the customer?)
Exceptional
Very Good
Satisfactory
Marginal
Unsatisfactory
N/A
4.3 SUMMARY: Given what I know today about the contractor's ability to execute the contract requirements, I WOULD or WOULD NOT award to the contractor today given that I had a choice.
Signature _____________________________________________ Date _____________