About this file

This is a Cross Reference Matrix (CRM) attachment that serves as a proposal instructions document designed to map evaluation factors to corresponding sections of the Statement of Work (SOW) and offeror proposal volumes.

The CRM establishes four primary evaluation elements for the P-8A Aircrew Training Device projection system upgrade: Element 1 addresses Out-the-Window (OTW) Projectors, referencing SOW paragraphs 3.2.1.a, 3.2.2, 3.2.2.a, and 3.85; Element 2 covers Projection System Upgrade Integration per SOW paragraph 3.3.1; Element 3 addresses Installation on a Full Motion Device per SOW paragraph 3.2.3.d; and Element 4 covers the Automatic Alignment System and Calibration per SOW paragraphs 3.2.2.b and 3.7.1. Offerors are required to provide corresponding proposal references to Volume I - Technical documentation for each element, with appropriate page numbers cited. This template is intended to ensure comprehensive cross-referencing between proposal content and contractual requirements, facilitating organized evaluation of technical submissions for the Naval Air Warfare Center Training Systems Division's projection system modernization initiative for both U.S. Navy and Royal Australian Air Force training platforms.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment L1: Cross Reference Matrix (CRM)

Section L – Proposal Instructions Volume or Paragraph Numbers
Section L - Proposal Instructions Volume or Paragraph Factor/(Element) Title
Section M – Evaluation Factors / (Element)
SOW

Example: Para 3.1 Note: This column shall address all paragraphs in Sections xx and xy of the SOW the offeror is addressing with the element and sub-element Proposal Reference (Vol/Para) Provide reference to Offeror’s Proposal Volume I – Technical. Example: Refer to appropriate page number in Offeror’s written proposal

Element 1
Element 1: Out-the-Window (OTW) Projectors
Element 1
SOW paragraph: 3.2.1.a; 3.2.2, 3.2.2.a; 3.85
Element 2
Element 2: Projection System Upgrade Integration
Element 2
SOW paragraph: 3.3.1.
Element 3
Element 3: Installation On a Full Motion Device
Element 3
SOW paragraph: 3.2.3.d
Element 4
Element 4: Automatic Alignment System and Calibration
Element 4
SOW paragraph:

3.2.2.b; 3.7.1

File details come from the government source that posted it. Updated .