Attach K - Technical Proposal Datasheets.docx

DOCX document 20 KB Posted

Attached to
Operation and Maintenance of Maritime Prepositioning Force (MPF) Vessels
Solicitation number
N32205-21-R-4117
Issued by

About this file

This document contains technical proposal datasheets and exhibits for solicitation number N32205-21-R-4117 from the Department of the Navy Military Sealift Command for the operation and maintenance of six Maritime Prepositioning Force vessels. Offerors are required to provide details on ship operating experience including vessel names, types, ownership relationships, dates operated, dimensions and power specifications. Additional tables require information on relevant dry dock repair experience as well as resumes and dedicated percentages for proposed key shore side personnel including a port engineer and assistant operations manager.

View the file

Other files

File Type Posted
N32205-21-R-4117-0007.pdf PDF
N32205-21-R-4117 conformed through Amend 0007.pdf PDF
N32205-21-R-4117 conformed through Amend 0006.pdf PDF
Attach V - Communications Suite Technical Exhibits (TE) 1-4 - Amend 6.pdf PDF
N32205-21-R-4117-0006.pdf PDF
Attach P - Pricing Forms A-C - Amend 5.xlsx XLSX spreadsheet
N32205-21-R-4117 conformed through Amend 0005.pdf PDF
N32205-21-R-4117-0005.pdf PDF
N32205-21-R-4117-0004.pdf PDF
N32205-21-R-4117 conformed through Amend 0003.pdf PDF
N32205-21-R-4117-0003.pdf PDF
Attach C - DD254 - Amend 3.pdf PDF
Attach G - SF LLL - Amend 3.pdf PDF
Attach L - Total Evaluated Price Form - Amend 3.xlsx XLSX spreadsheet
Attach L - Total Evaluated Price Form - Amend 2.xlsx XLSX spreadsheet
Attach W - ALMSC Naval Message 251231ZJAN18 - Amend 2.pdf PDF
Attach V - Communications Suite Technical Exhibits (TE) 1-4 - Amend 2.PDF PDF
N32205-21-R-4117-0002.pdf PDF
Attach P - Pricing Forms A-C - Amend 2.xlsx XLSX spreadsheet
N32205-21-R-4117 conformed through Amend 0002.pdf PDF
N32205-21-R-4117-0001.pdf PDF
Attach B - CBA-2019-12516-1 and CBA-2019-12518-1 r1.pdf PDF
Attach F - Request for Clarification or Question.docx DOCX document
N32205-21-R-4117.pdf PDF
Attach L - Total Evaluated Price Form.xlsx XLSX spreadsheet
Attach Q - GFP lists.zip ZIP file
Attach J - MECSP Worksheet.pdf PDF
Attach B - CBA-2019-12516-1 and CBA-2019-12518-1.pdf PDF
Attach O - Oversight and Metrics.pdf PDF
Attach N - Contract Deliverables.xlsx XLSX spreadsheet
Attach N - CDRL.pdf PDF
Attach E - American Institute Hull Clauses.pdf PDF
Attach U-Training Information.pdf PDF
Attach I - Past Perf Narrative.doc DOC document
Attach G - SF LLL.pdf PDF
Attach B - CBA-2019-12514-2.pdf PDF
Attach C - DD254.pdf PDF
Attach M - Award Fee Plan.pdf PDF
Attach P - Pricing Forms A-C.xlsx XLSX spreadsheet
Attach H - Invoice Requirements.pdf PDF
Attach T - Reimbursable Expenses.docx DOCX document
Attach B - CBA-2019-12515-1.pdf PDF
Attach D - P and I Guidelines.pdf PDF
Attach R - Monthly Budget Status Report.xlsx XLSX spreadsheet
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT K-1

Exhibit (1) Ship Operating Experience – The offeror shall complete this table per L-7.B.1.a.ii. Insert additional rows as applicable. Sample data has been provided as guidance.

Ship Name
Ship Type
Ship Owner
Relationship of Contractor to Ship
Dates Operated (MM/YYYY)
Gross Tonnage
Propulsion Type
Propulsion HP
LOA
Beam
M/V Noah Zark
Container
Theolmyti Inc.
Operator
06/1999-01/2002; 02/2005-10/2012
15,000
Slow Speed Diesel
25,000
650’
85’
M/V Kent Goh Strait
Oil Tanker
Dinoco
Maintenance Manager
04/2002-09/2003
30,000
Slow Speed Diesel
28,500
705’
125’

ATTACHMENT K-2

Exhibit (2) – Dry Dock Repair Experience: The offeror shall complete this table per L-7.B.1.b.iii. Insert additional rows as applicable. Sample data has been provided as guidance.

Ship Name
Year Dry Docked
Dry Dock Location
Final Cost
Final Duration
Reason for Dry Docking the Ship
M/V Noah Zark
2000
Dubai
$6.6M
45 days
Regulatory Surveys Due
M/V Noah Zark
2005
Singapore
$4.2M
40 days
Regulatory Surveys Due
M/V Kent Goa Strait
2003
Portugal
$5.2M
27 days
Repair U/W hull plating damaged by grounding.
Proposed Individual (First and Last Name)
Current Job Title
Current Employee?
Proposed Percent Dedication to this Contract
Proposed Total Percent Dedication to Other Duties
Minimum Key Billet Requirements
KEY PERSONNEL TO BE CONSIDERED FOR TECHNICAL TRADE-OFF FACTOR L-14.B.II.A.1 -Key Personnel Qualifications exceed requirements or number of Key Personnel proposed exceed requirements
Port Engineer (Example)
Jim Nasium
Engineering Superintendent
Yes
100%
0%
X
Assistant Operations Manager/POC for Operations (Example)
Rick O’Shay
Scheduler
Yes
40%
60%

X

ATTACHMENT K-3

Exhibit (3) – Technical Approach, Key Shore Side Personnel: The offeror shall complete this table for individuals proposed as Key Shore Side Personnel as part of L-7.B.1.a.iii. Insert additional rows as applicable. Sample data has been provided as guidance.

N32205-21-R-4117 MPF O&M Attachment K – Technical Proposal Data Sheets

File details come from the government source that posted it. Updated .