1 | P a g e

U.S. General Services Administration

Region 10

Public Buildings Service www.gsa.gov

Addendum 1 - Statement of Work

For FTA TI – Office Build-Out

Construction Contract

PROJECT IDENTIFICATION

Project Title: FTA TI – Office Build-Out

Building: Jackson FB

Building ID #: WA0101ZZ

Building Location: 915 SECOND AVE, SEATTLE

2 | P a g e

1. Scope of Work

After conducting the Destructive inspection, the report came back with presence of asbestos in the vinyl flooring at the storage area. The floor area is approx. 32sf and vinyl tile and adhesive shall be removed.

Shell – Asbestos Removal

1.1 Contractor shall supply all supervision, equipment, labor and materials necessary to complete asbestos removal to include but not limited to Demolition and Clearing of existing vinyl floor at storage. See Exhibit 9 - Asbestos Removal Storage Area.

1.2 Contractor is required to eliminate asbestos containing materials noted in Exhibit 8 - JFB Floor 31 Supplemental Pre Renovation Asbestos Survey Report 091020.

1.3 Submit Asbestos Work Plan.

1.4 Secure building work access, send HVAC lockout request and other necessary documentations necessary to conduct and complete this work.

2. Attachments

2.1. Exhibit 8 - JFB Floor 31 Supplemental Pre Renovation Asbestos Survey Report 091020.

2.2. Exhibit 9 - Asbestos Removal Storage Area.