Attach D2_Addendum 1 - SOW 20200923 Removal of ACM.pdf
PDF 124 KB Posted
- Attached to
- FTA D-B Tenant Improvements 31st Floor JFB
- Solicitation number
- 47PL0120R0064
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
U.S. General Services Administration
Region 10
Public Buildings Service www.gsa.gov
Addendum 1 - Statement of Work
For FTA TI – Office Build-Out
Construction Contract
PROJECT IDENTIFICATION
Project Title: FTA TI – Office Build-Out
Building: Jackson FB
Building ID #: WA0101ZZ
Building Location: 915 SECOND AVE, SEATTLE
2 | P a g e
1. Scope of Work
After conducting the Destructive inspection, the report came back with presence of asbestos in the vinyl flooring at the storage area. The floor area is approx. 32sf and vinyl tile and adhesive shall be removed.
Shell – Asbestos Removal
1.1 Contractor shall supply all supervision, equipment, labor and materials necessary to complete asbestos removal to include but not limited to Demolition and Clearing of existing vinyl floor at storage. See Exhibit 9 - Asbestos Removal Storage Area.
1.2 Contractor is required to eliminate asbestos containing materials noted in Exhibit 8 - JFB Floor 31 Supplemental Pre Renovation Asbestos Survey Report 091020.
1.3 Submit Asbestos Work Plan.
1.4 Secure building work access, send HVAC lockout request and other necessary documentations necessary to conduct and complete this work.
2. Attachments
2.1. Exhibit 8 - JFB Floor 31 Supplemental Pre Renovation Asbestos Survey Report 091020.