SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f) expectations and to evaluate in detail what the client needs
Contractor shall include to conduct a Destructive Inspection documents may be electronically signed. Work include but requirements. 2.1.8.Contractor shall develop a verify existing conditions, and coordinate with the PM/COR, reference regarding asbestos containing materials.
agendas and minutes and project planning. 2.1.10.2.Phased requirements: Demolition, Architectural systems, Electrical signed construction documents, with fully developed facilitate meetings with the client to understand client latest versions of GSAs PBS P-100 and PBS P-120. Final the client on their Voice/Data and other IT Cabling
2.1.5.Contractor shall gather required information, field
2.1.10.1.Chairing design charrettes, providing meetings requirements and client intent. 2.1.4.Contractor shall set drawings shall reflect at a minimum, the following
2.1Design Develop a full set of engineered, sealed and
Exhibit 3 - FTA Final Test Fit to assess minimum spatial
Exhibit 2 - JFB Asbestos Re-inspection Report 2013 as and specifications shall be based upon and guided by the design development. 2.1.7.Contractor shall coordinate with concerns during the design development process.
integral to the design, to include but not limited to:
within the estimated construction cost. 2.1.9.Construction in the design development. 2.1.2.Contractor shall review
Design Services required actual measurements and the extent of work prior to required to build-out the new office spaces. The A/Es design held if necessary to address and resolve client comments or inspection is the drywall. 2.1.3.Contractor shall review
2.1.10.Architectural services and project specific elements the benefit of the client and the federal government and development. 2.1.6.Contractor shall field verify all as recommended on page 6. GSA priority area to focus
Plumbing systems, HVAC systems, and Voice/Data systems.
services addressing the demolitions, repairs and alterations
LS
JFB Building Information and include the noted requirements prior to design development. Subsequent meetings shall be not limited to: 2.1.1.Contractor shall review Exhibit 1 -cost-efficient design and use cost-efficient materials for
Client, Furniture Design contractor during design architectural designs, plans, sections, elevations, details systems, Fire alarm systems, Fire protection systems, specifications in CSI Masterformat, for the construction
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f) approved equal. 2.1.14.Estimate: 2.1.14.1.Costs shall be
Engineering calculations and signed and sealed documents shall be derived from GSA, O&M and Client Agency interviews the supporting data of the estimate. 2.1.14.4.Lump sum development of the estimate. 2.1.14.3.GSA requires work line sections, elevations and details, as applicable 2.1.11.5.
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
submitted in accordance with GSA P-120 Reference Table 3.1 options. 2.1.10.5.Design phase estimates.
in the construction drawings in CSI Masterformat or COR
(minimum) and PDF documents. 2.1.11.The design services for these unit costs must be well documented and included in estimate summary shall include all assumptions made in the
Deliverable supporting the construction, to include the areas addressed estimated cost. 2.1.14.6.All estimates will be developed and coordination. 2.1.10.4.Design phase submittals with product well as GSA Green Construction Policy. 2.1.13.Specifications assembly deconstruction and repair 2.1.11.4. MEP plans, Attachment E). 2.1.10.7.Design deliverables in AutoCAD_2019 and equipment for each individual task of work. The basis
Policy. 2.1.14.2.Basis of Estimate and Rationale: The funding source and segregated by work breakdown/division.
together shall not equate to more than 10% of the total
Selective demolition and repair 2.1.11.3. System and and schedules. 2.1.10.3.Engineering and Consultant adding up the direct costs of materials and supplies, labor, Life Safety Design, Installation and Testing Policy (see SOW and Hazardous Abatement costs as defined by the GSA Pricing and local environmental laws, regulations, and standards, as
2.1.14.7.The construction estimate shall be from one (1) quantification. 2.1.14.5.Lump sum pricing components summed
Work line item unit price cost estimates are developed by
2.1.12.The project work shall comply with all federal, state and summary sheets (GSA Form 3473) as provided by GSA.
Divisions 01-27, as applicable. 2.1.10.6.2.GSA Fire and
Planning charrettes and study reviews with GSA 2.1.11.2.
broken down by Shell, Tenant Improvements, Security Upgrades and on site reviews to include but not limited to: 2.1.11.1.
pricing is not acceptable without description and items use unit price cost estimates unless otherwise stated.
Contract Type: Firm Fixed Price
Project Estimating Requirements. Estimates shall use markups
2.1.10.6.Specifications. 2.1.10.6.1.Facility Specifications, OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 documentations necessary to conduct and complete this work.
existing vinyl floor at storage. See Exhibit 9 - Asbestos items/furniture to allow construction work. 2.2.2.2. New related works per approved construction drawings to include work access, send HVAC lockout request and other necessary
Contract Type: Firm Fixed Price perimeter walls shall be assessed and will stay as-is if
PoP: 11/30/2020 - 01/10/2022
LS
include but not limited to Demolition and Clearing of shall clear spaces including disposal of unnecessary equipment, labor and materials necessary to complete shell
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
Contract Type: Firm Fixed Price separation as required in the approved drawings. Existing
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
LS
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
091020. 1.3Submit Asbestos Work Plan. 1.4Secure building and materials necessary to complete asbestos removal to including attached electrical rough-ins/wirings. Contractor
2.2.2.Shell - Contractor shall supply all supervision, Deliverable shall establish new perimeter walls to allow new space
31 Supplemental Pre Renovation Asbestos Survey Report
PoP: 11/30/2020 - 01/10/2022 be part of the new space lay-out per approved drawings
1.1Contractor shall supply all supervision, equipment, labor
Shell - Demo / Perimeter Wall
Deliverable per new space requirements.
in this project and unless a wall already exists, Contractor
Contractor shall demo existing partition walls that will not
Note: This scope includes environmental work.
shall be installed in areas where doors are to be removed
Addendum 1 - 1.Scope of Work Shell Asbestos Removal asbestos containing materials noted in Exhibit 8 - JFB Floor
Removal Storage Area. 1.2Contractor is required to eliminate
Perimeter Walls In areas adjoining other spaces not included but not limited to: 2.2.2.1. Demolition and Clearing
PoP: 11/30/2020 - 01/10/2022 there are no damages and are fully functional. Wall in-fill
Shell - Asbestos Removal
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 door, hardware, locksets, and other materials required under throughout the construction process.
Acoustical Ceilings
Deliverable
2.2.3.2.Openings – Contractor shall provide and install
Floor Finishes
Deliverable
Tenant Improvement (Above Allowance)
10004AC
PoP: 11/30/2020 - 01/10/2022
LS
furniture manufacturer/installer and consultant is required install new partition walls per approved drawings.
Contract Type: Firm Fixed Price drawings.
0004AD
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
Openings construction drawings. In addition, coordination with the
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
LS
2.2.3.3.GWB Assemblies – Contractor shall provide and
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 necessary to accommodate new space lay-out per approved
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
PoP: 11/30/2020 - 01/10/2022 complete tenant improvement requirements per approved
0004AA
GWB Assemblies
Deliverable
PoP: 11/30/2020 - 01/10/2022 remove/reinstall and/or provide acoustical ceilings if
Contract Type: Firm Fixed Price this division per approved drawings.
Contract Type: Firm Fixed Price supervision, equipment, labor and materials necessary to
LS
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
LS
0004AB
Informational
2.2.3.4.Acoustical Ceilings – Contractor shall
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
2.2.3.5.Floor Finishes - Contractor shall provide and
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
Tenant Improvement - Contractor shall supply all
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f) per approved drawings.
0004AH
PoP: 11/30/2020 - 01/10/2022
LS
Painting
Deliverable
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
Contract Type: Firm Fixed Price
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
Deliverable signage to accommodate client requirements on the new space, space, per approved drawings.
PoP: 11/30/2020 - 01/10/2022
LS
Deliverable
2.2.3.7.Signage - Contractor shall provide and install new
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 accommodate new space lay-out per approved drawings.
Signage
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 necessary to accommodate client requirements on the new
Contract Type: Firm Fixed Price on the new space, per approved drawings.
PoP: 11/30/2020 - 01/10/2022
Deliverable install new carpet and/or resilient flooring and base to
2.2.3.8.Lockers - Contractor shall provide lockers if
PoP: 11/30/2020 - 01/10/2022
0004AE
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
LS
treatments if necessary, to accommodate client requirements
Contract Type: Firm Fixed Price
Lockers
0004AF
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
2.2.3.9.Window Treatments - Contractor shall provide window
Contract Type: Firm Fixed Price per approved drawings.
Deliverable
2.2.3.6.Painting - Contractor shall paint new space lay-out
LS
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
Contract Type: Firm Fixed Price
Window Treatments
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
0004AG
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Contract Type: Firm Fixed Price
2.2.3.11.Fire Suppression - Contractor shall conduct fire
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
PoP: 11/30/2020 - 01/10/2022
2.2.3.12.Plumbing - Contractor shall conduct plumbing
Fire Suppression
PoP: 11/30/2020 - 01/10/2022 assessment and install a complete system necessary to
LS
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
0004AL
Deliverable
Contract Type: Firm Fixed Price
Plumbing
LS
Contract Type: Firm Fixed Price
Deliverable
2.2.3.14.Electrical - Contractor shall conduct electrical
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
LS
per approved drawings.
LS
on the new space, per approved drawings.
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
0004AK
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
Electrical
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
PoP: 11/30/2020 - 01/10/2022
Deliverable other related caseworks to accommodate client requirements
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 accommodate client requirements on the new space lay-out, Deliverable
0004AJ
requirements on the new space lay-out, per approved drawings.
10004AM
sprinkler assessment and revisions if necessary, to per approved drawings.
2.2.3.10.Casework - Contractor shall provide cabinets and
PoP: 11/30/2020 - 01/10/2022
PoP: 11/30/2020 - 01/10/2022
Contract Type: Firm Fixed Price
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 assessment and install complete system to accommodate client
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 accommodate client requirements on the new space lay-out, Casework
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
PoP: 11/30/2020 - 01/10/2022 that is not under any of the divisions listed. Contractor
Contract Type: Firm Fixed Price
Informational
Improvement - Contractor shall supply all supervision, Miscellaneous – This scope allows contractor to specify work
HVAC
Deliverable
2.2.3.15.Communications - Contractor shall conduct
Contract Type: Firm Fixed Price
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
the construction process.
Divisions Charged to Client's TI Allowance. Tenant
0004AN
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
for compliance of Section 6 as part of this division.
Communications
0005AB
Deliverable
Miscellaneous
Deliverable manufacturer/installer and consultant is required throughout
LS
Tenant Improvement Allowance
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
2.2.3.1.General Requirements – Contractor shall review SOW
In addition, coordination with the furniture space lay-out, per approved drawings.
0004AP
construction project under this scope.
PoP: 11/30/2020 - 01/10/2022
General Requirements improvement requirements per approved construction drawings.
LS
LS
shall specify all other works required to complete the
Contract Type: Firm Fixed Price necessary to accommodate client requirements on the new
0005AA
LS
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
PoP: 11/30/2020 - 01/10/2022 equipment, labor and materials necessary to complete tenant
2.2.3.13.HVAC - Contractor shall conduct HVAC assessment and
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
communication assessment and install a complete system
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f) the project.
of all costs per replacement grill, with the quantity of up
Alternate: Replacement broken radiator grills associated costs for replacement unmatched acoustical
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 of the solicitation. Unit level pricing is to be inclusive
Deliverable tiles, with the quantity of up to 10 tiles. Quantities may
Deliverable unilaterally by the Contracting Officer at the completion of not match in color. Includes all labor, materials and
PoP: 11/30/2020 - 01/10/2022
EA
the project.
allowance adjusted. Excess funds may be deobligated to be inclusive of all costs per replacement replacing the on the new space lay-out, per approved drawings.
appropriate based unit level price, with the overall
FTA Spaces on the 31rst floor as discussed in Amendment A001
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009 ceiling tiles in the IT Area, FTA, Common hallway) that do
Contract Type: Firm Fixed Price unitaterally by the Contracting Officer at the completion of in Amendment A001 of the solicitation. Unit level pricing is throughout the spaces shown in the the test fit for the new revisions if necessary, to accommodate client requirements
Alternate: Tenant Improvement Allowance for replacement of
PoP: 11/30/2020 - 01/10/2022
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
EA
by the Contracting Officer unilaterally as deemed overall allowance adjusted. Excess funds may be deobligated fit for the new FTA Spaces on the 31rst floor as discussed
Alternate: Ceiling Tile Replacement to 10 grills. Quantities may be adjusted upward or downward deemed appropriate based upon the unit level price, with the
Contract Type: Firm Fixed Price associated costs for replacement of broken radiator grills
Deliverable
Alternate Allowance: Includes all labor, materials and ceiling tiles throughout the spaces shown in the the test
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
be adjusted upward or downward by the Contracting Officer as
PSC: Z2AA -- REPAIR OR ALTERATION OF OFFICE BUILDINGS
OF
ITEM NO.
(a)
SUPPLIES OR SERVICES
(b)
QUANTITY
ORDERED
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Place of Performance: 915 SECOND AVE SEATTLE, WA 98174-1009
PoP: 11/30/2020 - 01/10/2022
Contract Type: Firm Fixed Price
| topmostSubform[0]: |
| Page2[0]: |
| USC10[0]: |
| TelephoneNo\: |
| [0]: |
| Date31c[0]: |
| CheckBox29[0]: Off |
| AmendmentNo4[0]: |
| AdministeredBy[0]: Acquisition Management Division |
Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA
| FacilityCode[0]: |
| AmendmentDate4[0]: |
| AmendmentNo7[0]: |
| AuthorizedSignature[0]: |
| Date30c[0]: |
| Amounts[0]: |
| AmendmentNo5[0]: |
| AmendmentDate8[0]: |
| AmendmentNo1[0]: |
| AccountingData[0]: |
| AmendmentDate3[0]: |
| Amount[0]: |
| AmendmentNo10[0]: |
| AmendmentDate7[0]: |
| PaymentMadeBy[0]: PBS PAYMENTS BRANCH -https://finance.ocfo.gsa.gov/ |
P.O. BOX 17181
https://finance.ocfo.gsa.gov/
FORT WORTH, TX 76102-0181 USA
| AmendmentNo8[0]: |
| NameofOfferor[0]: |
| NameContractingOfficer[0]: Keith Goodsell |
| Copies28[0]: |
| NameTitleSign[0]: |
| NameandTitle[0]: |
| OfferDate[0]: |
| Signature30b[0]: |
| AmendmentDate9[0]: |
| AmendmentNo6[0]: |
| ItemsAccepted[0]: |
| AmendmentDate2[0]: |
| AmendmentNo2[0]: |
| AmendmentDate6[0]: |
| RemittanceAddress[0]: |
| USC41[0]: |
| CalendarDays2[0]: |
| AmendmentNo9[0]: |
| CheckBox1[0]: Off |
| AmendmentDate10[0]: |
| CodeField[0]: |
| AmendmentNo3[0]: |
| AdministeredByCode[0]: 10PQCB2 |
| CheckBox28[0]: Off |
| Item[0]: 27 |
| AmendmentDate1[0]: |
| AmendmentDate5[0]: |
| CheckBox2[0]: Off |
| Signature31b[0]: |
| Page1[0]: |
| Code[0]: 10PQCB2 |
| Sealed[0]: Off |
| PurchaseRequestNo[0]: EQ10PCPB-20-0017 |
| Mandatory[0]: Off |
| AddressOfferTo[0]: 10PQCB2 |
Acquisition Management Division Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA
| Is[0]: 1 |
| Yes[0]: 1 |
| NumberofCopies[0]: 1 |
| Award[0]: 1 |
| Pages[0]: 11 |
| WorkDescribed[0]: GSA Public Buildings Service, Northwest/Arctic Region, Project Name: Project Name: FTA D-B Tenant Improvements 31st Floor JFB |
Task Order Agreement:__________________________ Solicitation Number: 47PL0120R0064
| PhoneNo[0]: (253) 931-7775 |
| Hour[0]: 3:00 PM (PST) |
| Proceed[0]: Off |
| See[0]: Task Order Agreement |
| SolicitationNo[0]: 47PL0120R0064 |
| CalendarDays[0]: 10 |
| CalendarDaysComplete[0]: 312 |
| Name9a[0]: Keith Goodsell |
| Page[0]: 1 |
| Negotiated[0]: 1 |
| By[0]: |
| Negotiable[0]: 1 |
| IsNot[0]: Off |
| ProjectNo[0]: |
| DateDue[0]: 11/9/2020 |
| IssuedBy[0]: Acquisition Management Division |
Construction Branch Team B 400 - 15th Street SW Auburn, WA 98001-6599 USA