Exhibit 10 - 10-26-20 Additional Details.pdf

PDF 2 MB Posted

Attached to
FTA D-B Tenant Improvements 31st Floor JFB
Solicitation number
47PL0120R0064
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Workstation Sizes:

Total Usable SF:

7,168 USF

NWilliams Snapshot

NWilliams line

NWilliams line

NWilliams line

NWilliams Arrow

NWilliams Text Box N

NWilliams Callout

1. Only needs provision for 1 Refrigerator.

2. Provide ABAAS Table/Counter Top and Storage Underneath.

3. Provide over the counter and floor cabinets.

4. Move sink at appropriate location.

5. See Sample Picture 1-4

NWilliams Rectangle

NWilliams Callout Demo all ACM Flooring. Replace with New Flooring.

NWilliams Callout

1. Demo PIV Wall to install New or Salvaged Door at this Location

2. Paint new PIV ROOM wall.

NWilliams Callout

AREA 1 :

East Wing Offices

NWilliams Callout

AREA 3 :

West Wing Offices

NWilliams Callout

AREA 2 :

Isolated Storage Area

NWilliams Callout Confirmed door location here.

NWilliams Callout Lockers will not be provided by Construction Contractor

NWilliams Snapshot

NWilliams Arrow

NWilliams Snapshot

NWilliams Callout Move door here

NWilliams Snapshot

NWilliams Snapshot

NWilliams Snapshot

NWilliams Callout Move door here. See Sample Picture 11 for typical door with Sidelight intent.

NWilliams Snapshot

NWilliams Callout Demo Existing Wall and Door

NWilliams Snapshot

NWilliams Callout Expand Storage Area

NWilliams Snapshot

NWilliams Snapshot

NWilliams Callout Extend wall here

NWilliams Callout Move door here

NWilliams line

NWilliams Callout Wall with Glass Panel on Top. See Sample Picture 5.

NWilliams line

NWilliams Callout Demo Existing Doors along this wall

NWilliams Callout AREA 4 : NHTSA Space

NWilliams Callout Extend wall here

NWilliams Callout

1. See 3/4 Tall Wall Sample Picture 6

NWilliams Callout Large Training Room shall have Automatic Window Blinds/shades.

NWilliams Callout Install new entry door.

NWilliams Text Box Exhibit 10 - 10-26-20 Additional Details

NWilliams Snapshot

NWilliams Snapshot

Image

NWilliams Image

NWilliams Image

NWilliams Image

NWilliams Text Box Sample Picture 1

NWilliams Text Box Sample Picture 2

NWilliams Text Box Sample Picture 3

NWilliams Text Box Sample Picture 4

NWilliams Text Box Sample Picture 5

NWilliams Text Box Sample Picture 6

NWilliams Image

NWilliams Text Box Sample Picture 7

NWilliams Image

NWilliams Image

NWilliams Text Box Sample Picture 8

NWilliams

Sample Picture 9

NWilliams Text Box Sample Picture 10

NWilliams Image

NWilliams

Sample Picture 11

NWilliams Image

NWilliams Image

NWilliams Image

NWilliams Image

NWilliams Image

NWilliams Text Box Sample Picture 12

NWilliams Text Box Sample Picture 13

NWilliams Text Box Sample Picture 14

NWilliams Text Box Sample Picture 15

NWilliams Text Box Sample Picture 16

NWilliams

Sample Picture 17

NWilliams Image

NWilliams Image

NWilliams Text Box Sample Picture 18

NWilliams Text Box Sample Picture 19

NWilliams

Sample Picture 20

File details come from the government source that posted it. Updated .