Attach_6_Contract_Price_Schedule_Blank_OLYM_PMIS_306966-307067_100__Final.pdf

PDF 47 KB Posted

Attached to
Olympic National Park REHAB HURRICANE RIDGE WATER
Solicitation number
140P8326R0002
Issued by

About this file

This is a Contract Price Schedule Template for the National Park Service (NPS) Denver Service Center for the Rehabilitate Hurricane Ridge Water System project at Olympic National Park. The solicitation numbers are OLYM-306966 and 307067 in the Project Management Information System (PMIS).

The pricing template requires offerors to submit pricing for three base contract line items: (1) Water Distribution System Replacement, (2) Water System Controls, and (3) Water Storage Tank Rehabilitation, all valued on a lump-sum basis. Additionally, offerors must price two optional line items: (4) OPTION A for Demolition work and (5) OPTION B for Remote Monitoring capabilities, also on a lump-sum basis. Offerors are instructed to provide total prices only for lump-sum items and to calculate extended prices for unit-priced items, with unit prices governing in case of calculation errors and totals governing in case of summation errors. All prices must be rounded to whole dollars. Measurement and payment information is specified in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. The template requires offerors to submit pricing for all base line items and option line items to ensure proposal acceptability.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Price Schedule Template National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18

Solicitation Number:

PARK - PMIS: OLYM - 306966 & 307067

(Project Management Information System)

Developed Area: Olympic National Park

Project Title: Rehabilitate Hurricane Ridge Water System

Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.

Contract Line

Item Number

(CLIN)

Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price

1 Water Distribution System Replacement 1 Lump Sum

2 Water System Controls 1 Lump Sum

3 Water Storage Tank Rehabilitation 1 Lump Sum

TOTAL BASE PRICE (Contract Line Item Number 1 through 3) ---------------------------------------------------------------------------------

4 OPTION A, (Demolition) 1 Lump Sum

5 OPTION B, (Remote Monitoring) 1 Lump Sum

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 4 through 5) -----------------------------------------------------------

TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 5) --------------------------

All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

File details come from the government source that posted it. Updated .