This file is a site plan and electrical control drawing for the Olympic National Park Hurricane Ridge Water Rehabilitation project, dated December 24, 2024, with project numbers 306966 and 307067. The drawing was designed by R. Streed, reviewed by C. Irvine and M. Nelson, and covers approximately 177,850 square feet across 149 sheets.

The electrical control plan specifies furnish and install (F&I) requirements for underground electrical infrastructure serving the park's water system. Key components include: installation of minimum 12" x 12" underground junction boxes with AASHTO H-20 rating for vehicular traffic spaced every 300-500 feet; 1-1/4" and 2" conduit runs totaling approximately 1,800 feet between the existing well building, underground reservoir, and multiple underground boxes (UGB1-UGB9); F&I of float switches (LSL102 and LSH102) in the south reservoir compartment; and junction boxes within the reservoir valve vault. Critical construction requirements mandate that the contractor maintain continuous well operation to provide potable water service to temporary office and restroom trailers throughout construction, and that all electrical lines be installed as open trench replacements along existing alignments with direct point-to-point conductor installation and no splicing. The contractor must field verify all existing equipment locations and coordinate proposed conduit installation with water line placement per civil plans before final installation.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

U E

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

U E

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UE

UEUE

UE

UE

E02 306966 & 307067

OLYMPIC NATIONAL PARK

HURRICANE RIDGE

12/24/2024

R. STREED

C. IRVINE

M. NELSON

177,850

SITE PLAN

ELECTRICAL CONTROL

SCALE IN FEET

100 200

EXISTING WELL BUILDING

DEMOLISHED VISITOR CENTER

EXISTING UNDERGROUND RESERVOIR

SHEET NOTES:

A) ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND

FIELD OBSERVATION OF THE EXISTING FACILITY.

B) "X" INDICATES EXISTING DEVICE TO REMAIN.

C) COORDINATE WORK WITH OTHER TRADES.

D) CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL EXISTING EQUIPMENT.

E) LOOP CONDUCTORS IN EACH UNDERGROUND BOX.

F) ALL CONDUCTORS SHALL BE INSTALLED POINT TO POINT WITH NO SPLICING.

G) PROPOSED UNDERGROUND BOX LOCATIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY FINAL LOCATION WITH OWNER

BEFORE INSTALLING AND MAKE ADJUSTMENTS AS DIRECTED.

H) F&I PROPOSED UNDERGROUND CONDUITS IN SAME TRENCH AS PROPOSED WATER LINE, REFER TO CIVIL PLANS FOR WATER LINE

LOCATION AND SEPARATION REQUIREMENTS FROM WATER LINE. PROPOSED UNDERGROUND PATHS SHOWN FOR CLARITY ONLY.

SINGLE CONDUIT PATH IS EXPECTED BETWEEN EQUIPMENT.

CONSTRUCTION NOTES:

A) CONTRACTOR TO ENSURE CONTINUED WELL OPERATION TO MAINTAIN POTABLE WATER SERVICE FOR THE TEMPORARY OFFICE

TRAILER AND TEMPORARY RESTROOM TRAILER THROUGHOUT THE CONSTRUCTION PERIOD.

B) PROPOSED ELECTRICAL LINES TO BE OPEN TRENCH REPLACEMENT WITH DIRECT REPLACEMENT ALONG SAME ALIGNMENT (ONLY

WHERE PROPOSED WORK ALIGNS WITH EXISTING).

PLAN NOTES:

1) FURNISH AND INSTALL (F&I) MINIMUM 12" X 12" UNDERGROUND BOX. UPSIZE AS REQUIRED BASED ON CONDUITS TERMINATING IN BOX. UNDERGROUND BOX SHALL HAVE MINIMUM AASHTO H-20 RATING FOR DELIBERATE VEHICULAR TRAFFIC.

2) UNDERGROUND PATH FROM EXISTING RESERVOIR MANHOLE TO EXISTING WELL BUILDING. UTILIZE EXISTING CONDUIT BETWEEN EXISTING WELL BUILDING AND X-UGB. F&I 1-1/4" CONDUIT FROM X-UGB TO EXISTING RESERVOIR.

3) UNDERGROUND PATH FROM EXISTING WELL BUILDING TO UNDERGROUND BOX UGB9, REFER TO ONE LINE. UTILIZE EXISTING

CONDUIT BETWEEN EXISTING WELL BUILDING AND X-UGB.

4) EXISTING 1-1/4" CONDUIT BETWEEN EXISTING WELL BUILDING AND EXISTING UNDERGROUND BOX (X-UGB). ESTIMATED DISTANCE OF

EXISTING CONDUIT RUN IS 1800 FEET.

5) F&I UNDERGROUND JUNCTION BOXES EVERY 300-500 FEET AS REQUIRED TO INSTALL NEW CONDUCTORS. MINIMUM 12" X 12" UNDERGROUND BOX SIZE, UPSIZE AS REQUIRED. UNDERGROUND BOX SHALL HAVE MINIMUM AASHTO H-20 RATING FOR DELIBERATE

VEHICULAR TRAFFIC.

6) F&I 2" CONDUIT FROM UGB3 TO EXISTING UNDERGROUND JUNCTION BOX (X-UGB2). CONDUIT IS FOR FUTURE USE.

NOTE 4

NOTE 1

LSL102

LSH102

PIT101

NOTE 2

EXISTING UNDERGROUND BOX

X-VFD

X-FIT

CP1

WIT103

UGB1

NOTE 1

UGB6

NOTE 1

UGB7

X-UGB

E03

E04

RESERVOIR VALVE VAULT #1

E05

NOTE 3

NOTE 4 & 5

UGB9

UGB5

NOTE 1

TEMPORARY UTILITY BUILDING

UGB2 NOTE 1

NOTE 1

UGB4

NOTE 1

UGB3

NOTE 1

NOTE 1

UGB8

X-UGB2

NOTE 6

12/27/2024

AutoCAD SHX Text P

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

UE

UE

UE

UE

UE

UE

UE UE

UE

UE

E05 306966 & 307067

OLYMPIC NATIONAL PARK

HURRICANE RIDGE

12/24/2024

R. STREED

C. IRVINE

M. NELSON

177,850

SITE PLAN - RESERVOIR

ENLARGED ELECTRICAL CONTROL

SCALE IN FEET

20 40

SHEET NOTES:

A) ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS ARE BASED ON INFORMATION FROM

CONSTRUCTION DOCUMENTS AND FIELD OBSERVATION OF THE EXISTING FACILITY.

B) "X" INDICATES EXISTING DEVICE TO REMAIN.

C) COORDINATE WORK WITH OTHER TRADES.

D) CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL EQUIPMENT.

E) ALL CONDUCTORS SHALL BE INSTALLED POINT TO POINT WITH NO SPLICING.

CONSTRUCTION NOTES:

A) CONTRACTOR TO ENSURE CONTINUED WELL OPERATION TO MAINTAIN POTABLE WATER SERVICE

FOR THE TEMPORARY OFFICE TRAILER AND TEMPORARY RESTROOM TRAILER THROUGHOUT THE

CONSTRUCTION PERIOD.

B) PROPOSED ELECTRICAL LINES TO BE OPEN TRENCH REPLACEMENT WITH DIRECT REPLACEMENT

ALONG SAME ALIGNMENT (ONLY WHERE PROPOSED WORK ALIGNS WITH EXISTING).

PLAN NOTES:

1) 1-1/4" CONDUIT FROM UGB8 SHALL ENTER RESERVOIR VALVE VAULT #1. F&I JUNCTION BOX IN

VALVE VAULT.

2) F&I LSL102 AND LSH102 FLOAT SWITCHES IN SOUTH RESERVOIR COMPARTMENT. F&I CONDUIT

BETWEEN FLOAT SWITCHES AND JUNCTION BOX IN RESERVOIR VALVE VAULT #1. REFER TO

CONTROL SCHEDULE FOR CONDUCTOR REQUIREMENTS.

3) F&I CONDUIT AND CONDUCTOR FROM JUNCTION BOX TO PIT101, REFER TO CONTROL SCHEDULE.

4) INTERIOR OF RESERVOIR COMPARTMENT AND VALVE VAULT ARE CONSIDERED WET LOCATIONS.

LSL102

LSH102

PIT101

NOTE 1, 3, & 4

EXISTING UNDERGROUND RESERVOIR

UGB8

12/27/2024

RESERVOIR VALVE VAULT #1

NOTE 2

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

File details come from the government source that posted it. Updated .