Attach_2_OLYM_PMIS_306966-307067_22x34_Signed_100__Final.pdf
PDF 30 MB Posted
- Solicitation number
- 140P8326R0002
About this file
This file is a site plan and electrical control drawing for the Olympic National Park Hurricane Ridge Water Rehabilitation project, dated December 24, 2024, with project numbers 306966 and 307067. The drawing was designed by R. Streed, reviewed by C. Irvine and M. Nelson, and covers approximately 177,850 square feet across 149 sheets.
The electrical control plan specifies furnish and install (F&I) requirements for underground electrical infrastructure serving the park's water system. Key components include: installation of minimum 12" x 12" underground junction boxes with AASHTO H-20 rating for vehicular traffic spaced every 300-500 feet; 1-1/4" and 2" conduit runs totaling approximately 1,800 feet between the existing well building, underground reservoir, and multiple underground boxes (UGB1-UGB9); F&I of float switches (LSL102 and LSH102) in the south reservoir compartment; and junction boxes within the reservoir valve vault. Critical construction requirements mandate that the contractor maintain continuous well operation to provide potable water service to temporary office and restroom trailers throughout construction, and that all electrical lines be installed as open trench replacements along existing alignments with direct point-to-point conductor installation and no splicing. The contractor must field verify all existing equipment locations and coordinate proposed conduit installation with water line placement per civil plans before final installation.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
U E
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UE
UEUE
UE
UE
E02 306966 & 307067
OLYMPIC NATIONAL PARK
HURRICANE RIDGE
12/24/2024
R. STREED
C. IRVINE
M. NELSON
177,850
SITE PLAN
ELECTRICAL CONTROL
SCALE IN FEET
100 200
EXISTING WELL BUILDING
DEMOLISHED VISITOR CENTER
EXISTING UNDERGROUND RESERVOIR
SHEET NOTES:
A) ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS ARE BASED ON INFORMATION FROM CONSTRUCTION DOCUMENTS AND
FIELD OBSERVATION OF THE EXISTING FACILITY.
B) "X" INDICATES EXISTING DEVICE TO REMAIN.
C) COORDINATE WORK WITH OTHER TRADES.
D) CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL EXISTING EQUIPMENT.
E) LOOP CONDUCTORS IN EACH UNDERGROUND BOX.
F) ALL CONDUCTORS SHALL BE INSTALLED POINT TO POINT WITH NO SPLICING.
G) PROPOSED UNDERGROUND BOX LOCATIONS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL VERIFY FINAL LOCATION WITH OWNER
BEFORE INSTALLING AND MAKE ADJUSTMENTS AS DIRECTED.
H) F&I PROPOSED UNDERGROUND CONDUITS IN SAME TRENCH AS PROPOSED WATER LINE, REFER TO CIVIL PLANS FOR WATER LINE
LOCATION AND SEPARATION REQUIREMENTS FROM WATER LINE. PROPOSED UNDERGROUND PATHS SHOWN FOR CLARITY ONLY.
SINGLE CONDUIT PATH IS EXPECTED BETWEEN EQUIPMENT.
CONSTRUCTION NOTES:
A) CONTRACTOR TO ENSURE CONTINUED WELL OPERATION TO MAINTAIN POTABLE WATER SERVICE FOR THE TEMPORARY OFFICE
TRAILER AND TEMPORARY RESTROOM TRAILER THROUGHOUT THE CONSTRUCTION PERIOD.
B) PROPOSED ELECTRICAL LINES TO BE OPEN TRENCH REPLACEMENT WITH DIRECT REPLACEMENT ALONG SAME ALIGNMENT (ONLY
WHERE PROPOSED WORK ALIGNS WITH EXISTING).
PLAN NOTES:
1) FURNISH AND INSTALL (F&I) MINIMUM 12" X 12" UNDERGROUND BOX. UPSIZE AS REQUIRED BASED ON CONDUITS TERMINATING IN BOX. UNDERGROUND BOX SHALL HAVE MINIMUM AASHTO H-20 RATING FOR DELIBERATE VEHICULAR TRAFFIC.
2) UNDERGROUND PATH FROM EXISTING RESERVOIR MANHOLE TO EXISTING WELL BUILDING. UTILIZE EXISTING CONDUIT BETWEEN EXISTING WELL BUILDING AND X-UGB. F&I 1-1/4" CONDUIT FROM X-UGB TO EXISTING RESERVOIR.
3) UNDERGROUND PATH FROM EXISTING WELL BUILDING TO UNDERGROUND BOX UGB9, REFER TO ONE LINE. UTILIZE EXISTING
CONDUIT BETWEEN EXISTING WELL BUILDING AND X-UGB.
4) EXISTING 1-1/4" CONDUIT BETWEEN EXISTING WELL BUILDING AND EXISTING UNDERGROUND BOX (X-UGB). ESTIMATED DISTANCE OF
EXISTING CONDUIT RUN IS 1800 FEET.
5) F&I UNDERGROUND JUNCTION BOXES EVERY 300-500 FEET AS REQUIRED TO INSTALL NEW CONDUCTORS. MINIMUM 12" X 12" UNDERGROUND BOX SIZE, UPSIZE AS REQUIRED. UNDERGROUND BOX SHALL HAVE MINIMUM AASHTO H-20 RATING FOR DELIBERATE
VEHICULAR TRAFFIC.
6) F&I 2" CONDUIT FROM UGB3 TO EXISTING UNDERGROUND JUNCTION BOX (X-UGB2). CONDUIT IS FOR FUTURE USE.
NOTE 4
NOTE 1
LSL102
LSH102
PIT101
NOTE 2
EXISTING UNDERGROUND BOX
X-VFD
X-FIT
CP1
WIT103
UGB1
NOTE 1
UGB6
NOTE 1
UGB7
X-UGB
E03
E04
RESERVOIR VALVE VAULT #1
E05
NOTE 3
NOTE 4 & 5
UGB9
UGB5
NOTE 1
TEMPORARY UTILITY BUILDING
UGB2 NOTE 1
NOTE 1
UGB4
NOTE 1
UGB3
NOTE 1
NOTE 1
UGB8
X-UGB2
NOTE 6
12/27/2024
AutoCAD SHX Text P
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
UE
UE
UE
UE
UE
UE
UE UE
UE
UE
E05 306966 & 307067
OLYMPIC NATIONAL PARK
HURRICANE RIDGE
12/24/2024
R. STREED
C. IRVINE
M. NELSON
177,850
SITE PLAN - RESERVOIR
ENLARGED ELECTRICAL CONTROL
SCALE IN FEET
20 40
SHEET NOTES:
A) ALL EXISTING ELECTRICAL EQUIPMENT INDICATED ON PLANS ARE BASED ON INFORMATION FROM
CONSTRUCTION DOCUMENTS AND FIELD OBSERVATION OF THE EXISTING FACILITY.
B) "X" INDICATES EXISTING DEVICE TO REMAIN.
C) COORDINATE WORK WITH OTHER TRADES.
D) CONTRACTOR SHALL FIELD VERIFY EXACT LOCATION OF ALL EQUIPMENT.
E) ALL CONDUCTORS SHALL BE INSTALLED POINT TO POINT WITH NO SPLICING.
CONSTRUCTION NOTES:
A) CONTRACTOR TO ENSURE CONTINUED WELL OPERATION TO MAINTAIN POTABLE WATER SERVICE
FOR THE TEMPORARY OFFICE TRAILER AND TEMPORARY RESTROOM TRAILER THROUGHOUT THE
CONSTRUCTION PERIOD.
B) PROPOSED ELECTRICAL LINES TO BE OPEN TRENCH REPLACEMENT WITH DIRECT REPLACEMENT
ALONG SAME ALIGNMENT (ONLY WHERE PROPOSED WORK ALIGNS WITH EXISTING).
PLAN NOTES:
1) 1-1/4" CONDUIT FROM UGB8 SHALL ENTER RESERVOIR VALVE VAULT #1. F&I JUNCTION BOX IN
VALVE VAULT.
2) F&I LSL102 AND LSH102 FLOAT SWITCHES IN SOUTH RESERVOIR COMPARTMENT. F&I CONDUIT
BETWEEN FLOAT SWITCHES AND JUNCTION BOX IN RESERVOIR VALVE VAULT #1. REFER TO
CONTROL SCHEDULE FOR CONDUCTOR REQUIREMENTS.
3) F&I CONDUIT AND CONDUCTOR FROM JUNCTION BOX TO PIT101, REFER TO CONTROL SCHEDULE.
4) INTERIOR OF RESERVOIR COMPARTMENT AND VALVE VAULT ARE CONSIDERED WET LOCATIONS.
LSL102
LSH102
PIT101
NOTE 1, 3, & 4
EXISTING UNDERGROUND RESERVOIR
UGB8
12/27/2024
RESERVOIR VALVE VAULT #1
NOTE 2
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
TITLE OF SHEET
File details come from the government source that posted it. Updated .