Attach 5 - Drawings 3 of 7 Structural.pdf

PDF 7 MB Posted

Attached to
Buffalo Creek Work Center Office & Engine Storage Additions Federal contract opportunity
Solicitation number
1282B125R0021
Issued by
Department of Agriculture Forest Service

About this file

These are structural engineering drawings for the Buffalo Creek Work Center Office & Engine Storage Additions project, depicting detailed technical specifications for wood framing, connections, and structural elements. The drawings include comprehensive diagrams showing roof framing plans, wall details, foundation connections, truss designs, and various structural connection types across multiple sheets. The drawings use standard architectural notation with grid lines, section markers, and detailed technical annotations, providing precise instructions for construction of new office and engine storage spaces as part of a renovation project for the U.S. Forest Service facility in Buffalo Creek, Colorado.

The drawings cover multiple aspects of structural design including typical wood framing techniques, special structural connections, roof snow load considerations, timber-to-steel connections, and foundation interface details. Each sheet is labeled with project identification, drawing numbers, and includes specific technical notes and reference information to guide construction. The drawings appear to be part of a comprehensive set of construction documents for a federal government project at the Pike-San Isabel National Forests South Platte Ranger District work center, focusing on expanding and improving existing facility infrastructure.

View the file

Other files for this federal contract opportunity

Other files attached to Buffalo Creek Work Center Office & Engine Storage Additions, newest first.
File Type Posted
A0003_BCWC.pdf PDF
A0002_SUMMARY OF CHANGES.pdf PDF
A0002_BCWC.pdf PDF
Attach 10-Specifications Project Manual 06.24.25.pdf PDF
Attach 03 - Updated Drawings_06.24.2025.pdf PDF
2024-01-01_R2 - CO_PKSI - BCWC_CORE Electric Builder Developer Service Requirements.pdf PDF
2022-10-12_R2 - CO_PKSI - BCWC_Existing Fence.jpg JPG image
2023-06-05_R2 - CO_PKSI - BCWC_Water Wastewater Memo.pdf PDF
2024-10-10_R2 - CO_PKSI - BCWC_CORE Electric Construction Install.pdf PDF
2022-12-29_R2 - CO_PKSI - BCWC_MEP Summary.pdf PDF
2024-10-10_R2 - CO_PKSI - BCWC_CORE Electric Construction Removal.pdf PDF
A0001_BCWC.pdf PDF
Reduced_Attach 7a - Drawings 5 of 7 Elec.pdf PDF
Reduced _Attach 12 - A and E Report BCWC.pdf PDF
Reduced_Attach 7b - Drawings 5 of 7 Elec.pdf PDF
Attach 2_Schedule of Items.xlsx XLSX spreadsheet
Attach 6 - Drawings 4 of 7 Mech_Plumb.pdf PDF
Attach 9 - Drawings 7 of 7 Tech.pdf PDF
Attach 10 b_Parts 11-15 Specifications BCWC.pdf PDF
Attach 10 e_Parts 27 -35 Specifications BCWC.pdf PDF
Attach 10 f_Parts 36 -43 Specifications BCWC.pdf PDF
Attach 10 g_Parts 44 -49 Specifications BCWC.pdf PDF
Attach 10 h_Parts 50 -56 Specifications BCWC.pdf PDF
Attach 15 - Materials Board.pdf PDF
Attach 8 - Drawings 6 of 7 Fire.pdf PDF
Attach 10 c_Parts 16 -22 Specifications BCWC.pdf PDF
Attach 11 - Geotechnical Report.pdf PDF
Attach 12 - A and E Report BCWC.pdf PDF
Attach 16 - Survey.pdf PDF
Attach 18_Buffalo Creek HazMat Report 032825.pdf PDF
1282B125R0021_BCWC.pdf PDF
Attach 1 SOW - Statement of Work.pdf PDF
Attach 3 - Drawings 1 of 7 Arch.pdf PDF
Attach 10 a_Parts 1-10 Specifications BCWC.pdf PDF
Attach 10 i_Parts 57-64 Specifications BCWC.pdf PDF
Attach 13 - Commissioning Plan.pdf PDF
Attach 14 - Guiding Principles.pdf PDF
Attach 17 - WD_CO20250023 dated 05.16.2025.pdf PDF
Attach 4- Drawings 2 of 7 Civil.pdf PDF
Attach 7 - Drawings 5 of 7 Elec.pdf PDF
Attach 10 d_Parts 23 -26 Specifications BCWC.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .