Attach 2_Schedule of Items.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Buffalo Creek Work Center Office & Engine Storage Additions Federal contract opportunity
Solicitation number
1282B125R0021
Issued by
Department of Agriculture Forest Service

About this file

The attached file is a Schedule of Items for the Buffalo Creek Work Center Office and Engine Storage Additions project for the USDA Forest Service Rocky Mountain Region. The document outlines base items and optional items for construction work, with four base item categories covering general requirements, existing conditions, building systems, and site work. Optional items include refinishing existing siding, adding equipment storage lockers, concrete paving, office demolition, heater replacement, engine bay addition, sewer line replacement, and window grilles. The project involves upgrading a historical work center built in 1938, located at 18046 County Road 126 in Buffalo Creek, Colorado, with the goal of improving energy efficiency and space utilization through new office and engine storage additions. The solicitation number is 1282B125R0021, and the project scope includes site utilities, foundation work, building construction, and mechanical/electrical/plumbing system installations.

View the file

Other files for this federal contract opportunity

Other files attached to Buffalo Creek Work Center Office & Engine Storage Additions, newest first.
File Type Posted
A0003_BCWC.pdf PDF
A0002_SUMMARY OF CHANGES.pdf PDF
2023-06-05_R2 - CO_PKSI - BCWC_Water Wastewater Memo.pdf PDF
2024-10-10_R2 - CO_PKSI - BCWC_CORE Electric Construction Install.pdf PDF
2022-12-29_R2 - CO_PKSI - BCWC_MEP Summary.pdf PDF
2022-10-12_R2 - CO_PKSI - BCWC_Existing Fence.jpg JPG image
A0002_BCWC.pdf PDF
Attach 10-Specifications Project Manual 06.24.25.pdf PDF
Attach 03 - Updated Drawings_06.24.2025.pdf PDF
2024-01-01_R2 - CO_PKSI - BCWC_CORE Electric Builder Developer Service Requirements.pdf PDF
2024-10-10_R2 - CO_PKSI - BCWC_CORE Electric Construction Removal.pdf PDF
A0001_BCWC.pdf PDF
Reduced_Attach 7a - Drawings 5 of 7 Elec.pdf PDF
Reduced _Attach 12 - A and E Report BCWC.pdf PDF
Reduced_Attach 7b - Drawings 5 of 7 Elec.pdf PDF
1282B125R0021_BCWC.pdf PDF
Attach 1 SOW - Statement of Work.pdf PDF
Attach 3 - Drawings 1 of 7 Arch.pdf PDF
Attach 10 a_Parts 1-10 Specifications BCWC.pdf PDF
Attach 10 i_Parts 57-64 Specifications BCWC.pdf PDF
Attach 13 - Commissioning Plan.pdf PDF
Attach 14 - Guiding Principles.pdf PDF
Attach 17 - WD_CO20250023 dated 05.16.2025.pdf PDF
Attach 8 - Drawings 6 of 7 Fire.pdf PDF
Attach 10 c_Parts 16 -22 Specifications BCWC.pdf PDF
Attach 11 - Geotechnical Report.pdf PDF
Attach 12 - A and E Report BCWC.pdf PDF
Attach 16 - Survey.pdf PDF
Attach 18_Buffalo Creek HazMat Report 032825.pdf PDF
Attach 5 - Drawings 3 of 7 Structural.pdf PDF
Attach 6 - Drawings 4 of 7 Mech_Plumb.pdf PDF
Attach 9 - Drawings 7 of 7 Tech.pdf PDF
Attach 10 b_Parts 11-15 Specifications BCWC.pdf PDF
Attach 10 e_Parts 27 -35 Specifications BCWC.pdf PDF
Attach 10 f_Parts 36 -43 Specifications BCWC.pdf PDF
Attach 10 g_Parts 44 -49 Specifications BCWC.pdf PDF
Attach 10 h_Parts 50 -56 Specifications BCWC.pdf PDF
Attach 15 - Materials Board.pdf PDF
Attach 4- Drawings 2 of 7 Civil.pdf PDF
Attach 7 - Drawings 5 of 7 Elec.pdf PDF
Attach 10 d_Parts 23 -26 Specifications BCWC.pdf PDF
Show all 41

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items

Schedule of Items
USDA Forest Service | Rocky Mountain Region 2
Pike & San Isabel National Forests

Buffalo Creek Work Center Office and Engine Storage Additions

Base ItemDivisionDescriptionUnitQuantityUnit PriceTotal
BI-0101General Requirements - Mobilization, Bonding, InsuranceLS1
BI-0202-19Existing Conditions

Concrete Masonry Metals Woods and Plastics Thermal and Moisture Protection Doors and Windows Finishes Specialties

FurnishingsLS1
BI-0320-29Plumbing

Heating Ventilating and Air Conditoning Electrical Communications

Electronic Safety and SecurityLS1
BI-0430-39Earthwork

Exterior Improvements

UtilitiesLS1
TOTAL BASE ITEMS$0.00
Optional ItemDivisionDescriptionUnitQuantityUnit PriceTotal
OI-1001-ADD - Refinish Existing Siding to Match NewLS1
OI-1002-ADD - Two Tier Cage Style Equipment Storage Locker SystemLS1
OI-1003-ADD - Heavy Duty Concrete Paving ApronLS1
OI-1004-ADD - Existing Office DemolitionLS1
OI-1005-ADD - Replace Existing Radiant HeatersLS1
OI-1006-ADD - Engine Bay AdditionLS1
OI-1007-ADD - Sewer Line Replacement with New PVC Piping & CappingLS1
OI-1008-ADD - Window GrillesLS1
TOTAL OPTIONAL ITEMS$0.00
TOTAL BASE + OPTIONAL ITEMS$0.00

COLUMBINE RANGER DISTRICT/FIELD OFFICE &P SCHEDULE OF ITEMS

File details come from the government source that posted it. Updated .