This document contains a bid schedule and description for the construction of a new fish hatchery located in Klamath Falls, Oregon. The U.S. Fish and Wildlife Service is soliciting bids for the construction of a new fish sucker fish hatchery to include an influent retention pond, up to ten aquaculture ponds, access roads, a geothermal supply pipeline, pond drain pipeline, and pre-engineered metal building. Bids will be received on a firm-fixed-price basis for the base bid and five bid options, including additional aquaculture ponds, pipelines, and structures. The estimated value is between $4-6 million. The contract is set aside for small businesses. The bid schedule outlines the base bid and options for quantities and unit pricing. The description provides details on the site conditions, scope of work, and requirements for the influent pond, aquaculture ponds, pipelines, access roads, and metal building. The closing date for bids is in February 2022 with an anticipated period of performance from May 2022 to August 2023.
View the file
Other files
Show all 47
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
for
New Hatchery Phase 1 at the
Klamath Falls National Fish Hatchery
| Item # |
| Description |
| Estimated Quantity |
| Unit |
| Unit Price |
| Total Cost |
| 1 |
| Base Bid – includes but is not limited to construction of 1.08 acre, lined Influent Retention Pond (IRP) water storage pond, pond overflow structure and two water supply intake structures and associated excavation, embankment, grading, seeding; construction of approximately 2,250 lf of gravel surfaced and asphalt concrete surfaced access road varying in width from 12 to 48 feet, ditches and associated excavation, embankment, grading and seeding; construction of 2,990 feet of 8-inch diameter geothermal supply pipeline, stubs for supply to future ponds along the pipeline alignment, discharge laterals for supply to the IRP, associated trenching, bedding and backfill; construction and maintenance of temporary erosion and sedimentation control measures on the project site; and all other work necessary for the completion of the work as indicated on the Drawings and not specifically identified within the description of another bid item |
| 1 |
| LS |
| 2 |
| Bid Option No. 1 - includes but is not limited to construction of approximately 1,035 feet of 24-inch diameter pond drain pipeline, including five catch basin structures |
| 1 |
| LS |
| 4 |
| Bid Option No. 3 - includes but is not limited to construction of four 1/8-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage |
| 1 |
| LS |
| 5 |
| Bid Option No. 4 - includes but is not limited to construction two 1/4-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage. |
| 1 |
| LS |
| 6 |
| Bid Option No. 5 – includes but is not limited to construction of four 1/4-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage |
| 1 |
| LS |
TOTAL PROPOSAL COST: $_________
NOTE - Task 3, bid option 2 was left off of the bid schedule on purpose as this task is already completed. Refer to question 6 of attachment 3, clarifications and requests for information.
Incomplete Bids will not be considered.