Attach_2_-Klamath_Falls_New_Hatchery_Bid_Form_v3_12-2021_xx.doc

DOC document 93 KB Posted

Attached to
OR-KLAMATH FALLS NFH CONSTRUCTION OF PHASE 1
Solicitation number
140F0322B0001
Issued by

About this file

This document contains a bid schedule and description for the construction of a new fish hatchery located in Klamath Falls, Oregon. The U.S. Fish and Wildlife Service is soliciting bids for the construction of a new fish sucker fish hatchery to include an influent retention pond, up to ten aquaculture ponds, access roads, a geothermal supply pipeline, pond drain pipeline, and pre-engineered metal building. Bids will be received on a firm-fixed-price basis for the base bid and five bid options, including additional aquaculture ponds, pipelines, and structures. The estimated value is between $4-6 million. The contract is set aside for small businesses. The bid schedule outlines the base bid and options for quantities and unit pricing. The description provides details on the site conditions, scope of work, and requirements for the influent pond, aquaculture ponds, pipelines, access roads, and metal building. The closing date for bids is in February 2022 with an anticipated period of performance from May 2022 to August 2023.

View the file

Other files

File Type Posted
Amend_8_-_Attach_1_-_anwsers_to_updated_questions_V14_0008.pdf PDF
Sol_140F0322B0001_Amd_0008.pdf PDF
Amend_7_-_Attach_1_-_updated_answers_to_questions_V12_0007.pdf PDF
Sol_140F0322B0001_Amd_0007.pdf PDF
Sol_140F0322B0001_Amd_0006.pdf PDF
Amend_6_-_Attach_1_-_Updated_Answers_to_Questions_V11_0006.docx DOCX document
Amend_5_-_Attach_4_-_33_10_00_Water_Utilities_0005.pdf PDF
Amend_5_-_Attach_3_-_03_30_00_Cast-in-place_Concrete_0005.pdf PDF
Amend_5_-_Attach_1_-_Klamath_Falls_BLANK_ADD_5_April_20_0005.doc DOC document
Sol_140F0322B0001_Amd_0005.pdf PDF
Amend_5_-_Attach_5-_Answers_to__Questions_V9_0005.pdf PDF
Amend_5_-_Attach_2_-_01_71_23_Field_Engineering_0005.pdf PDF
Amend_4_-_Attach_1_-_Klamath_Falls_BLANK_Bid_Form_v4_April_6_0004.doc DOC document
Amend_4_-_Attach_2_-_Replacement_spec_31_00_00_Earthwork_0004.pdf PDF
Amend_4_-_Attach_3_-_answers_to_Questions_V9_0004.pdf PDF
Sol_140F0322B0001_Amd_0004.pdf PDF
Sol_140F0322B0001_Amd_0003.pdf PDF
Amend_2_-_Attach_3_-_40_71_13_Magnetic_Flow_Meters_0002.pdf PDF
Amend_2_-_Attach_1_-_KF_New_Hatchery_Bid_Form_v3_12-20_0002.pdf PDF
Amend_2_-_Attach_11_-_KFH_Phase_1A_Addendum_0002.pdf PDF
Amend_2_-_Attach_6_-_31_00_00_Earthwork_0002.pdf PDF
Amend_2_-_Attach_10_-_01_71_23_Field_Engineering_0002.pdf PDF
Amend_2_-_Attach_14_-_X-GRADING_0002.zip ZIP file
Amend_2_-_Attach_13_-_KF_NFH_Electrical_Addendum_0002.pdf PDF
Sol_140F0322B0001_Amd_0002.pdf PDF
Amend_2_-_Attach_7_-_05_50_00_Metal_Fabrications_0002.pdf PDF
Amend_2_-_Attach_9_-_01_57_13_Erosion_Sedimentation_Control_0002.pdf PDF
Amend_2_-_Attach_5_-_33_40_00_Drainage_Systems_0002.pdf PDF
Amend_2_-_Attach_12_-_KFH_-_Phase_1B_Addendum_0002.pdf PDF
Amend_2_-_Attach_4_-_33_10_00_Water_Utilities_0002.pdf PDF
Amend_2_-_Attach_2_-_Answers_to_Questions_V8_0002.pdf PDF
Amend_2_-_Attach_8_-_03_30_00_Cast-in-place_Concrete_0002.pdf PDF
Amend_0001_-_Attach_1_-_Attendee_List_140F0322B0001_0001.pdf PDF
Sol_140F0322B0001_Amd_0001.pdf PDF
Attach_6_-_20211221_Phase_1_Bid_optimized_x.pdf PDF
Attach_10_-_USFWS-Klamath-Falls-NFH-Final-EA.pdf PDF
Attach_1_-_140F0322B0001_clauses_and_provisions.pdf PDF
Attach_7_-_Klamath_Falls_NFH-Geotech_Report.pdf PDF
Attach_11-_Klamath_Falls_NFH_Final_FONSI_10-29-2020_signed.pdf PDF
Sol_140F0322B0001.pdf PDF
Attach_3_-_Klamath_Falls_New_Hatchery_Scope_Narrative_v2.pdf PDF
Attach_5_-_Klamath_Falls_NFH_Compiled_Specs_201213.pdf PDF
Attach_9_-_Recorded_Lease_Legal_Descriptions___Map.pdf PDF
Attach_13_-__Cover_letter_for_140F0322B0001.pdf PDF
Attach_12_-_Wage_Dec_OR20220071_dated_010722.pdf PDF
Attach_8_-_Klamath_Falls_Site_Photos.pdf PDF
Attach_4_-_Clarifications_and_RFIs_V5.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

for

New Hatchery Phase 1 at the

Klamath Falls National Fish Hatchery

Item #
Description
Estimated Quantity
Unit
Unit Price
Total Cost
1
Base Bid – includes but is not limited to construction of 1.08 acre, lined Influent Retention Pond (IRP) water storage pond, pond overflow structure and two water supply intake structures and associated excavation, embankment, grading, seeding; construction of approximately 2,250 lf of gravel surfaced and asphalt concrete surfaced access road varying in width from 12 to 48 feet, ditches and associated excavation, embankment, grading and seeding; construction of 2,990 feet of 8-inch diameter geothermal supply pipeline, stubs for supply to future ponds along the pipeline alignment, discharge laterals for supply to the IRP, associated trenching, bedding and backfill; construction and maintenance of temporary erosion and sedimentation control measures on the project site; and all other work necessary for the completion of the work as indicated on the Drawings and not specifically identified within the description of another bid item
1
LS
2
Bid Option No. 1 - includes but is not limited to construction of approximately 1,035 feet of 24-inch diameter pond drain pipeline, including five catch basin structures
1
LS
4
Bid Option No. 3 - includes but is not limited to construction of four 1/8-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage
1
LS
5
Bid Option No. 4 - includes but is not limited to construction two 1/4-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage.
1
LS
6
Bid Option No. 5 – includes but is not limited to construction of four 1/4-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage
1
LS

TOTAL PROPOSAL COST: $_________

NOTE - Task 3, bid option 2 was left off of the bid schedule on purpose as this task is already completed. Refer to question 6 of attachment 3, clarifications and requests for information.

Incomplete Bids will not be considered.

Name of Bidder and Company:

Address (Include Zip Code):

Klamath Falls National Fish Hatchery Phase 1 Klamath Falls, Oregon

File details come from the government source that posted it. Updated .