Amend_4_-_Attach_1_-_Klamath_Falls_BLANK_Bid_Form_v4_April_6_0004.doc

DOC document 97 KB Posted

Attached to
OR-KLAMATH FALLS NFH CONSTRUCTION OF PHASE 1
Solicitation number
140F0322B0001
Issued by

About this file

This solicitation is for the construction of a new fish sucker fish hatchery located in Klamath Falls, Oregon. The U.S. Fish and Wildlife Service is seeking a firm-fixed-price contract for excavation, grading, pond construction, road construction, pipeline installation, and other work to build the hatchery facilities. The performance period is anticipated to be from May 2022 to August 2023.

The project includes construction of a 1.08 acre water storage pond, over 2,000 feet of access roads, 2,990 feet of geothermal supply pipeline, and up to ten aquaculture ponds ranging from 1/8 to 1/4 acres. Optional bid items provide for additional pond construction, a 1,035 foot drainage pipeline and catch basins, and import fill material. The solicitation is set aside for small businesses with a size standard of $39.5 million. The contract is to be awarded to the responsive, responsible bidder providing the lowest total price. Interested parties must register in the System for Award Management to participate.

View the file

Other files

File Type Posted
Amend_8_-_Attach_1_-_anwsers_to_updated_questions_V14_0008.pdf PDF
Sol_140F0322B0001_Amd_0008.pdf PDF
Amend_7_-_Attach_1_-_updated_answers_to_questions_V12_0007.pdf PDF
Sol_140F0322B0001_Amd_0007.pdf PDF
Sol_140F0322B0001_Amd_0006.pdf PDF
Amend_6_-_Attach_1_-_Updated_Answers_to_Questions_V11_0006.docx DOCX document
Amend_5_-_Attach_4_-_33_10_00_Water_Utilities_0005.pdf PDF
Amend_5_-_Attach_3_-_03_30_00_Cast-in-place_Concrete_0005.pdf PDF
Amend_5_-_Attach_1_-_Klamath_Falls_BLANK_ADD_5_April_20_0005.doc DOC document
Sol_140F0322B0001_Amd_0005.pdf PDF
Amend_5_-_Attach_5-_Answers_to__Questions_V9_0005.pdf PDF
Amend_5_-_Attach_2_-_01_71_23_Field_Engineering_0005.pdf PDF
Amend_4_-_Attach_2_-_Replacement_spec_31_00_00_Earthwork_0004.pdf PDF
Amend_4_-_Attach_3_-_answers_to_Questions_V9_0004.pdf PDF
Sol_140F0322B0001_Amd_0004.pdf PDF
Sol_140F0322B0001_Amd_0003.pdf PDF
Amend_2_-_Attach_3_-_40_71_13_Magnetic_Flow_Meters_0002.pdf PDF
Amend_2_-_Attach_1_-_KF_New_Hatchery_Bid_Form_v3_12-20_0002.pdf PDF
Amend_2_-_Attach_11_-_KFH_Phase_1A_Addendum_0002.pdf PDF
Amend_2_-_Attach_6_-_31_00_00_Earthwork_0002.pdf PDF
Amend_2_-_Attach_10_-_01_71_23_Field_Engineering_0002.pdf PDF
Amend_2_-_Attach_14_-_X-GRADING_0002.zip ZIP file
Amend_2_-_Attach_13_-_KF_NFH_Electrical_Addendum_0002.pdf PDF
Sol_140F0322B0001_Amd_0002.pdf PDF
Amend_2_-_Attach_7_-_05_50_00_Metal_Fabrications_0002.pdf PDF
Amend_2_-_Attach_9_-_01_57_13_Erosion_Sedimentation_Control_0002.pdf PDF
Amend_2_-_Attach_5_-_33_40_00_Drainage_Systems_0002.pdf PDF
Amend_2_-_Attach_12_-_KFH_-_Phase_1B_Addendum_0002.pdf PDF
Amend_2_-_Attach_4_-_33_10_00_Water_Utilities_0002.pdf PDF
Amend_2_-_Attach_2_-_Answers_to_Questions_V8_0002.pdf PDF
Amend_2_-_Attach_8_-_03_30_00_Cast-in-place_Concrete_0002.pdf PDF
Amend_0001_-_Attach_1_-_Attendee_List_140F0322B0001_0001.pdf PDF
Sol_140F0322B0001_Amd_0001.pdf PDF
Attach_6_-_20211221_Phase_1_Bid_optimized_x.pdf PDF
Attach_10_-_USFWS-Klamath-Falls-NFH-Final-EA.pdf PDF
Attach_1_-_140F0322B0001_clauses_and_provisions.pdf PDF
Attach_7_-_Klamath_Falls_NFH-Geotech_Report.pdf PDF
Attach_11-_Klamath_Falls_NFH_Final_FONSI_10-29-2020_signed.pdf PDF
Sol_140F0322B0001.pdf PDF
Attach_3_-_Klamath_Falls_New_Hatchery_Scope_Narrative_v2.pdf PDF
Attach_5_-_Klamath_Falls_NFH_Compiled_Specs_201213.pdf PDF
Attach_9_-_Recorded_Lease_Legal_Descriptions___Map.pdf PDF
Attach_13_-__Cover_letter_for_140F0322B0001.pdf PDF
Attach_2_-Klamath_Falls_New_Hatchery_Bid_Form_v3_12-2021_xx.doc DOC document
Attach_12_-_Wage_Dec_OR20220071_dated_010722.pdf PDF
Attach_8_-_Klamath_Falls_Site_Photos.pdf PDF
Attach_4_-_Clarifications_and_RFIs_V5.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

for

New Hatchery Phase 1A and 1B at the

Klamath Falls National Fish Hatchery April 14, 2022

Amendment 0004 to IFB No. 140F0322B0001

Ite #
Description
Estimated Quantity
Unit
Unit Price
Total Cost
1
Base Bid – includes but is not limited to construction of 1.08 acre, lined Influent Retention Pond (IRP) water storage pond, pond overflow structure and two water supply intake structures and associated excavation, embankment, grading, seeding; construction of approximately 2,250 lf of gravel surfaced and asphalt concrete surfaced access road varying in width from 12 to 48 feet, ditches and associated excavation, embankment, grading and seeding; construction of 2,990 feet of 8-inch diameter geothermal supply pipeline, stubs for supply to future ponds along the pipeline alignment, discharge laterals for supply to the IRP, associated trenching, bedding and backfill; construction and maintenance of temporary erosion and sedimentation control measures on the project site; and all other work necessary for the completion of the work as indicated on the Drawings and not specifically identified within the description of another bid item
1
LS
2
Bid Option No. 1 - includes but is not limited to construction of approximately 1,035 feet of 24-inch diameter pond drain pipeline, including five catch basin structures
1
LS
4
Bid Option No. 3 - includes but is not limited to construction of four 1/8-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage
1
LS
5
Bid Option No. 4 - includes but is not limited to construction two 1/4-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage.
1
LS
6
Bid Option No. 5 – includes but is not limited to construction of four 1/4-acre, lined, earthen berm aquaculture ponds and associated access roads, crushed stone road surfacing, water supply, cast-in-place concrete pond kettles, and pond drainage
1
LS
6.1
Bid Option No. 6 – includes furnishing, transporting, placing, compacting and grading Imported Select Structural Fill for use as fill and backfill as directed by the Engineer in the event that a sufficient volume of on-site soils suitable for use as fill and backfill is not encountered during excavation and, in the opinion of the Engineer, a sufficient quantity of on-site materials cannot be conditioned or mixed to produce suitable material to accomplish fill and backfill requirements.
15000
CY

TOTAL BID COSTS:

Incomplete Bids will not be considered.

Name of Bidder and Company:

Address (Include Zip Code):

Klamath Falls National Fish Hatchery Phase 1 Klamath Falls, Oregon

File details come from the government source that posted it. Updated .