Amend_0001_-_Attach_1_-_Attendee_List_140F0322B0001_0001.pdf

PDF 2 MB Posted

Attached to
OR-KLAMATH FALLS NFH CONSTRUCTION OF PHASE 1
Solicitation number
140F0322B0001
Issued by

About this file

This document provides details for a federal solicitation seeking construction services for a new fish hatchery in Klamath Falls, Oregon. The U.S. Fish and Wildlife Service is soliciting bids for the construction of a new fish sucker fish hatchery to include an influent retention pond, up to ten aquaculture ponds, access roads, a geothermal supply pipeline, and a pond drain pipeline. Optional bid items include additional aquaculture ponds and a pre-engineered metal building. The base bid and five bid options include excavation, lining, road construction, pipeline installation, and concrete structures. The period of performance is from spring 2022 to fall 2023. The total project value is estimated between $4-6 million. This procurement is set aside for small businesses with a size standard of $39.5 million or less annually. Bids are due in February 2022 with award anticipated by May 2022. The contracting officer is Karl Lautzenheiser and all inquiries must be submitted in writing to the provided email.

View the file

Other files

File Type Posted
Amend_8_-_Attach_1_-_anwsers_to_updated_questions_V14_0008.pdf PDF
Sol_140F0322B0001_Amd_0008.pdf PDF
Amend_7_-_Attach_1_-_updated_answers_to_questions_V12_0007.pdf PDF
Sol_140F0322B0001_Amd_0007.pdf PDF
Sol_140F0322B0001_Amd_0006.pdf PDF
Amend_6_-_Attach_1_-_Updated_Answers_to_Questions_V11_0006.docx DOCX document
Amend_5_-_Attach_4_-_33_10_00_Water_Utilities_0005.pdf PDF
Amend_5_-_Attach_3_-_03_30_00_Cast-in-place_Concrete_0005.pdf PDF
Amend_5_-_Attach_1_-_Klamath_Falls_BLANK_ADD_5_April_20_0005.doc DOC document
Sol_140F0322B0001_Amd_0005.pdf PDF
Amend_5_-_Attach_5-_Answers_to__Questions_V9_0005.pdf PDF
Amend_5_-_Attach_2_-_01_71_23_Field_Engineering_0005.pdf PDF
Amend_4_-_Attach_1_-_Klamath_Falls_BLANK_Bid_Form_v4_April_6_0004.doc DOC document
Amend_4_-_Attach_2_-_Replacement_spec_31_00_00_Earthwork_0004.pdf PDF
Amend_4_-_Attach_3_-_answers_to_Questions_V9_0004.pdf PDF
Sol_140F0322B0001_Amd_0004.pdf PDF
Sol_140F0322B0001_Amd_0003.pdf PDF
Amend_2_-_Attach_3_-_40_71_13_Magnetic_Flow_Meters_0002.pdf PDF
Amend_2_-_Attach_1_-_KF_New_Hatchery_Bid_Form_v3_12-20_0002.pdf PDF
Amend_2_-_Attach_11_-_KFH_Phase_1A_Addendum_0002.pdf PDF
Amend_2_-_Attach_6_-_31_00_00_Earthwork_0002.pdf PDF
Amend_2_-_Attach_10_-_01_71_23_Field_Engineering_0002.pdf PDF
Amend_2_-_Attach_14_-_X-GRADING_0002.zip ZIP file
Amend_2_-_Attach_13_-_KF_NFH_Electrical_Addendum_0002.pdf PDF
Sol_140F0322B0001_Amd_0002.pdf PDF
Amend_2_-_Attach_7_-_05_50_00_Metal_Fabrications_0002.pdf PDF
Amend_2_-_Attach_9_-_01_57_13_Erosion_Sedimentation_Control_0002.pdf PDF
Amend_2_-_Attach_5_-_33_40_00_Drainage_Systems_0002.pdf PDF
Amend_2_-_Attach_12_-_KFH_-_Phase_1B_Addendum_0002.pdf PDF
Amend_2_-_Attach_4_-_33_10_00_Water_Utilities_0002.pdf PDF
Amend_2_-_Attach_2_-_Answers_to_Questions_V8_0002.pdf PDF
Amend_2_-_Attach_8_-_03_30_00_Cast-in-place_Concrete_0002.pdf PDF
Sol_140F0322B0001_Amd_0001.pdf PDF
Attach_6_-_20211221_Phase_1_Bid_optimized_x.pdf PDF
Attach_10_-_USFWS-Klamath-Falls-NFH-Final-EA.pdf PDF
Attach_1_-_140F0322B0001_clauses_and_provisions.pdf PDF
Attach_7_-_Klamath_Falls_NFH-Geotech_Report.pdf PDF
Attach_11-_Klamath_Falls_NFH_Final_FONSI_10-29-2020_signed.pdf PDF
Sol_140F0322B0001.pdf PDF
Attach_3_-_Klamath_Falls_New_Hatchery_Scope_Narrative_v2.pdf PDF
Attach_5_-_Klamath_Falls_NFH_Compiled_Specs_201213.pdf PDF
Attach_9_-_Recorded_Lease_Legal_Descriptions___Map.pdf PDF
Attach_13_-__Cover_letter_for_140F0322B0001.pdf PDF
Attach_2_-Klamath_Falls_New_Hatchery_Bid_Form_v3_12-2021_xx.doc DOC document
Attach_12_-_Wage_Dec_OR20220071_dated_010722.pdf PDF
Attach_8_-_Klamath_Falls_Site_Photos.pdf PDF
Attach_4_-_Clarifications_and_RFIs_V5.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

img20220302_08044156

img20220302_08260388
img20220302_08214192

File details come from the government source that posted it. Updated .