Attach_09_AfdStp_ Submittal_Register_20240516.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Re-Stripe Airfield Parking Pavements Federal contract opportunity
Solicitation number
W50S8F-24-R-A010
Issued by
Department of the Army National Guard

About this file

This document is a Submittal Register for the "Re-Stripe Airfield Parking Pavements" federal contract opportunity. The Submittal Register outlines the various submittals required from the contractor, including a Job Specific Safety Plan, Quality Control Plan, Project Schedule, Progress Reports, Material Safety Data Sheets, and various paint specifications and samples.

The related federal contract opportunity is a Request for Proposal (RFP) for the re-striping of the Main Aircraft Parking Apron at the 177th Fighter Wing in Egg Harbor Township, NJ. The solicitation is a 100% small business set-aside with a NAICS code of 237310 and a magnitude of construction between $100,000 and $250,000. Bid Guarantee, Payment, and Performance Bonds are required for all offers greater than $150,000. A pre-bid conference and site visit will be conducted by the Government.

View the file

Other files for this federal contract opportunity

Other files attached to Re-Stripe Airfield Parking Pavements, newest first.
File Type Posted
24-R-A010_SF30_AfdStp_Solicitation_AMEND_02_20240613.pdf PDF
W50S8F-24-R-A010_SF30_AfdStp_Solicitation_AMEND_02_20240613.pdf PDF
24-R-A010_AMEND_02_AfdStp_Final_QA_20240613.pdf PDF
24-R-A010_AMEND_01_AfdStp_Pre-Bid_Conf_PPT_20240604.pdf PDF
Attach_06_AMEND_01_AfdStp_AQRC242002_Restripe_Main_Apron_SOW_REV_01_20240605.pdf PDF
24-R-A010_AMEND_01_AfdStp_Pre-Bid_Conf_SIGN-IN_20240604.pdf PDF
W50S8F-24-R-A010_SF30_AfdStp_Solicitation_AMEND_01_20240605.pdf PDF
W50S8F-24-R-A010_SF1442_AfdStp_Solicitation_Released_20240517.pdf PDF
Attach_10_AfdStp_DOL_Wage_20240001_Mod_02_20240308.pdf PDF
Attach_13_AfdStp_EMS_Commitment_Statement.pdf PDF
Attach_12_AfdStp_Insurance_Requirements.pdf PDF
Attach_11AfdStp_Project_Mng_Software_Pricing_2024.pdf PDF
Attach_04_AfdStp_Evaluation_Factors.pdf PDF
AfdStp_List_of_Attachments.xlsx XLSX spreadsheet
Attach_08_AfdStp_Project_Drawings_20240119.pdf PDF
Attach_15_AfdStp_177FW_Vicinity_Maps.pdf PDF
Attach_06_AfdStp_AQRC242002_Restripe_Main_Apron_SOW_20240423.pdf PDF
Attach_03_AfdStp_Section_00-21-00_Instructions_to_Offerors.pdf PDF
Attach_07_AfdStp_Project_Specifications_20240122.pdf PDF
Attach_14_AfdStp_OPSEC_Letter.pdf PDF
Attach_02_AfdStp_Sect_Notes.pdf PDF
Attach_01_AfdStp_Break_Out.pdf PDF
Attach_05_Exhibit_A_Past_Performance_Questionaire.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSRestripe Main ApronAQRC242002AQRC242002
TO BE COMPLETED BY PROJECT ENGINEERContractorTO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIREDDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
SUBMITTAL NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMFGR'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATION INSTRUCTIONPERFORMANCE TEST REPORTOTHERSUBMISSION DATEDATE CONTRACTOR NOTIFIED
ALL SUBMITTALS SHALL BE SUBMITTED THROUGH PROJECT MANAGEMENT SOFTWARE PER THE SOWAPPROVEDDISAPPROVED
1Job Specific Safety PlanxPrior to NTP1
2Job Specific Quality Control PlanxPrior to NTP2
3Project SchedulexPrior to NTP3
4AF 3065 – Progress Report -DRAFTxPrior to NTP4
5Key Personnel LetterxPrior to NTP5
6MSDS Sheets as requiredxPrior to NTP6
7Type of paint and quantity of beads requiredxxxxxPrior to NTP7
8Yellow Reflective paintxxxxxPrior to NTP8
9Yellow Non- reflective paintxxxxxPrior to NTP9
10Blue Reflective paintxxxxxPrior to NTP10
11Black paintxxxxxPrior to NTP11
12White paintxxxxxPrior to NTP12
13Red paintxxxxxPrior to NTP13
14Other submittals as required by Specifications or Drawingsxxxxx14
15Field Test ReportsxNLT 5 Days from date of test15
16Close-out Documents - Electronic copies onlyPrior to Final Payment16
17Contractor Warranties3Prior to Final Payment17
18Record Drawings3Prior to Final Payment18
19O&M Manual (if applicable)3333Prior to Final Payment19
20Maintenance Summary Forms3Prior to Final Payment20
21DD 1354 Worksheet1Prior to Final Payment21