About this file
This document is a project manual for the restriping of the air field apron at the 177th Fighter Wing Air National Guard facility in Egg Harbor, New Jersey. The key details are:
The project involves paint removal and repainting of the airfield apron pavements. The pavement surface is asphalt mixture. Requirements include removing 95% of existing paint, using environmentally-acceptable chemical or mechanical paint removal methods, and repainting the surfaces with reflectorized waterborne or methacrylate paint in accordance with specified application rates and retroreflectivity standards. The contractor must adhere to strict environmental and airfield operational requirements, submit various plans and test results for approval, and repair any damage caused during the work.
The related federal contract opportunity is a solicitation for the restriping of the Main Aircraft Parking Apron at the 177th Fighter Wing in Egg Harbor Township, NJ. It is a total small business set-aside with an estimated magnitude of construction between $100,000 and $250,000. The solicitation requires bid bonds, payment bonds, and performance bonds for contracts over $150,000.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual For Restripe Air Field Apron
AQRC242002
Prepared for:
177th Fighter Wing
Air National Guard
Egg Harbor, New Jersey
Prepared by:
177th Civil Engineering Squadron
Prepared date:
January. 22th 2024
SECTION TABLE OF CONTENTS
DIVISION 32 - EXTERIOR
IMPROVEMENTS
PART 1
SECTION 32 01 11.51
PAINT REMOVAL FROM AIRFIELD PAVEMENTS
1. General
2. Products
3. Execution
PART 2
SECTION 32 17 23
PAVEMENT MARKINGS
1. General
2. Products
3. Execution
PART 3
SECTION
Section 32.01.11.51
PAINT REMOVAL FROM AIRFIELD PAVEMENTS
Part 1. GENERAL
1.1 UNIT PRICES
1.1.1 Measurement
Paint removal is measured by the number of square feet of paint to be removed.
1.1.2 Payment
Paint removal is paid for at the contract as a lump sum line item and must include the cost of the Paint to be removed.
1.2 ADMINISTRATIVE REQUIREMENTS
Submit a schedule of work to the Contracting Officer. Describe the work to be accomplished; noting the location of work, distances from the ends of runways, taxiways, buildings, and other structures; and indicating dates and hours during which the work will be accomplished.
Schedule the work to conform to aircraft operating schedules. The Government will try to schedule aircraft operations so as to permit the maximum amount of time for the Contractor's work. However, in the event of any emergency, intense operational demands, adverse wind conditions, and other unforeseen difficulties, discontinue all work at locations in the aircraft operational area. Keep the approved schedule of work current and notify the Contracting Officer of any changes prior to beginning each day's work.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are [for Contractor Quality Control approval.][for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REQUIREMENTS. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Paint Removal Process Plan; G
Waste Collection, Identification and Disposal
Plan; G
SD-03 Product Data
Mechanical Paint removal equipment
Chemical Paint removal equipment
Paint Removal Detergents or Chemicals; G
SD-06 Test Reports
Test Section Results
1.4 MECHANICAL REMOVAL EQUIPMENT
Submit product data for mechanical Paint removal equipment including area of coverage per pass, range of water pressures, and water tank capacity.
A. Mechanical removal equipment includes waterblasting, grinding or scarifying, or other approved non-chemical systems. Control the equipment used on asphalt or tar concrete to remove Paint accumulations while minimizing disturbances to asphalt or tar mixtures. Basic hand tools and the following major types of mechanical equipment are considered acceptable for this project:
Waterblasting Equipment.
1.4.1 Waterblasting Equipment
Provide mobile waterblasting equipment capable of producing a pressurized stream of water that effectively removes Paint from the pavement surface without significantly damaging the pavement.
Provide equipment, tools, and machinery which are safe and in good working order at all times. Provide equipment interlocks to prohibit high pressure water discharge when the vehicle or cleaning head is stationary (not moving forward or side to side).
1.5 TEST SECTION
Prior to the start of work, remove Paint on designated test areas not less than 15 m 50 feet in length. Use procedures, water pressures, nozzle height, nozzle spacings, nozzle angle, and equipment movement rate to achieve the required degree of Paint removal in accordance with Paragraph Paint REMOVAL. Methods included in paragraph COMPLIANCE TESTING will be used to determine if the Paint was successfully removed from the test section. The test will examine two random locations within the test section. Submit the test section results before conducting any further removal work. Provide photos of two random locations within the test area taken before and after the removal.
Provide photos of one random location at joint seals within the test area taken before and after removal.
1.6 DELIVERY, STORAGE, AND HANDLING
Deliver required materials in original manufacturer's containers labeled with appropriate Environmental Protection Agency (EPA), Occupational safety and Health Administration (OSHA), or other agency warnings, if applicable, and Safety Data Sheets. Protect materials from degrading until their use is required during execution of the work.
1.7 DELIVERY, STORAGE, AND HANDLING
Deliver required materials in original manufacturer's containers labeled with appropriate Environmental Protection Agency (EPA), Occupational safety and Health Administration (OSHA), or other agency warnings, if applicable, and Safety Data Sheets. Protect materials from degrading until their use is required during execution of the work.
1.9 PROJECT/SITE CONDITIONS
1.9.1 Environmental Requirements
Ensure pavement surface is free of snow, ice or slush. Ensure surface temperature is at least 5 degrees C 40 degrees F and rising at the beginning of operations. Cease operation during thunder and lightning storms. Cease operation during rainfall except for waterblasting and removal of previously applied chemicals. Cease waterblasting where surface water accumulation alters the effectiveness of material removal.
1.9.2 Airfield Traffic Control
Coordinate performance of all work in the controlled zones of the airfield with the Contracting Officer.
1.9.3 Emergency Landing and Takeoff
Emergencies take precedence over all operations. Upon notification from the Control Tower of an emergency landing or imminent takeoff, stop all operations immediately and evacuate all personnel and equipment to an area not utilized for aircraft traffic which is at least 76 m 250 feet measured perpendicular to and away from the near edge of the runway unless otherwise authorized by the Contracting Officer or the Contracting Officer's Representative. Equipment and chemicals or detergents as well as excess water must be able to clear the work area within 3 minutes.
1.9.4 Airfield Lighting
When night operations are necessary, provide all necessary lighting and equipment. Direct or shade lighting to prevent interference with aircraft, the air traffic control tower, and other base operations. Provide lighting and related equipment capable of being removed from the runway within 15 minutes of notification of an emergency. Night work must be coordinated with the Flight Operations Manager or Airfield Manager and approved in advance by the Contracting Officer or authorized representative.
1.9.5 Water
Water can be provided by the Government by a dedicated fire hydrant. The contractor shall be responsible on providing their own backflow preventer valve. The Government will not provide the equipment such a water truck.
1.10 SAFETY
Comply with OSHA 29 CFR 1910.
PART 2 PRODUCTS
2.1 PAINT REMOVAL DETERGENTS OR CHEMICALS
The use of environmentally acceptable detergents or chemical agents must be considered on a case-by-case basis. Submit the Safety Data Sheet (SDS) for detergents or chemicals in the Paint removal process. Use of any detergents or chemicals in the Paint removal process must be approved in advance by the Contracting Officer. The Government specifically reserves the right to reject the use of any process which the Contracting Officer determines may pose unnecessary risks to human health, the environment, the pavement, aircraft or NAVAIDS due to corrosion or foreign object damage (FOD) potential as a result of its use, storage, or disposal.
PART 3 EXECUTION
3.1 Paint REMOVAL
Prior to any work being completed, submit a Paint Removal Process
Plan for approval by the Contracting Officer.
a. The pavement surface type is asphalt mixture.
b. Remove 95 percent of paint on asphaltic concrete pavement.
Remove all paint that is loose, flaking, chalky, or not to be re-marked or does not comply with size or pattern standards.
c. Chemical methods used, if permitted, must be compatible with pavement materials, the environment and working personnel.
d. Exercise close control of water pressure and blasting time/duration to prevent damage to joints, existing markings that are not intended for removal, or the wearing surface.
e. Compliance testing for the amount of paint to be removed must conform to the requirements in paragraph
COMPLIANCE TESTING.
3.2 RATE OF REMOVAL
Rate of removal will be directed by the contractor. Do not permit high-pressure water application to remove the existing pavement surface, joint seals or crack seals.
3.3 WATER PRESSURE
Provide water pressure impact upon the indicated pavement areas sufficient to remove the designated Paint to the required degree of removal without damaging the existing pavement, joint sealant, or other airfield appurtenances. The Contractor is responsible for repairing any damage caused by the removal work.
3.4 CLEANUP AND WASTE DISPOSAL
Keep the worksite clean of by-products, debris and waste from Paint removal operations. Perform cleanup operations continuously. Remove all residue from the pavement. Obtain the approval of residue removal and disposal method from the Contracting Officer prior to beginning work. Submit a Waste Collection, Identification and Disposal Plan describing proposed actions regarding waste collection, control, identification, and disposal to the Contracting Officer's Representative for approval prior to the start of work. The plan will address disposal methods and requirements for hazardous and non-hazardous wastes.
3.5 COMPLIANCE TESTING
a. Compliance with the Paint removal requirements must be determined by direct testing within the designated work area.
b. Use a 0.1 square meter one square foot section of transparent material inscribed with a grid of 100 equal squares as a tool for quantitative measure of the percent removal. Place the grid pattern on the pavement surface at random locations. Then count the squares which contain paint deposits. The number of squares containing paint deposits must not exceed the allowed percentage in each of the randomly selected locations.
c. Divide each work area designated for Paint removal into at least four equal zones for the purpose of compliance testing.
The layout of each zone must be approved by the Contracting Officer. Within each zone, a minimum of seven random locations must be evaluated. The amount of Paint removed at each of the randomly selected test locations within each zone must meet the requirement described in paragraph Paint REMOVAL. Evaluate each zone independently. A zone not meeting the required percentage must be recleaned by the Contractor at the Contractor's expense.
d. Deposits of paint are defined as any surface deposit that can be removed by scratching the deposit with a flat sharp object (such as a pocket knife) without damaging the pavement surface.
Stains are defined as materials in the pavement surface microtexture that cannot be removed without damaging the pavement surface. Stain is generally embedded in the surface of the pavement below the horizontal plane of the surface texture.
The Contractor is not responsible for stain removal.
3.6 DAMAGE REPAIR
Repair any damage to the pavement surface, joint, joint and crack seals, or other Government property caused during the performance of the work at the Contractor's expense. Submit a repair plan to include methods and material to the Contracting Officer's Representative for approval prior to performance of the repairs. Complete the repairs within the performance period of the Contract.
Section 32.17.23
PAVEMENT MARKINGS
Part 1. GENERAL
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION
OFFICIALS (AASHTO)
AASHTO M 247 (2013) Standard Specification for
Glass Beads Used in Pavement Markings
AASHTO M 248 (1991; R 2012) Standard Specification for Ready-Mixed White and Yellow Traffic Paints
AASHTO M 249 (2012; R2016) Standard Specification for White and Yellow Reflective Thermoplastic Striping Material (Solid Form)
ASTM INTERNATIONAL (ASTM)
ASTM D1652 (2011; E 2012) Standard Test Method for Epoxy Content of Epoxy Resins
ASTM D2074 (2007; R2013) Standard Test Methods for Total, Primary, Secondary, and Tertiary Amine Values of Fatty Amines by Alternative Indicator Method
ASTM D2240 (2015) Standard Test Method for
Rubber Property - Durometer Hardness
ASTM D2621 (1987; R 2016) Standard Test Method for Infrared Identification of Vehicle Solids from Solvent-Reducible Paints
ASTM D2697 (2003; R 2014) Volume Nonvolatile
Matter in Clear or Pigmented Coatings
ASTM D3335 (1985a; R 2014) Low Concentrations of Lead, Cadmium, and Cobalt in Paint by Atomic Absorption Spectroscopy
ASTM D3718 (1985a; R 2015) Low Concentrations of Chromium in Paint by Atomic Absorption Spectroscopy
ASTM D3924 (2016) Standard Specification for
Environment for Conditioning and Testing Paint, Varnish, Lacquer, and Related Materials
ASTM D3960 (2005; R 2013) Determining Volatile
Organic Compound (VOC) Content of Paints and Related Coatings
ASTM D4060 (2014) Abrasion Resistance of
Organic Coatings by the Taber Abrader
ASTM D4061 (2013) Standard Test Method for Retro reflectance of Horizontal Coatings
ASTM D4280 (2012) Extended Life Type, Non-plowable, Raised, Retroreflective Pavement Markers
ASTM D4383 (2012) Standard Specification for
Plowable, Raised Retroreflective Pavement Markers
ASTM D4505 (2012; R 2017) Standard Specification for Preformed Retro reflective Pavement Marking Tape for Extended Service Life
ASTM D4541 (2017) Standard Test Method for Pull- Off Strength of Coatings Using Portable Adhesion Testers
ASTM D471 (2016a) Standard Test Method for
Rubber Property - Effect of Liquids
ASTM D476 (2015) Dry Pigmentary Titanium
Dioxide Pigments
ASTM D522/D522M (2014) Mandrel Bend Test of
Attached Organic Coatings
ASTM D638 (2014) Standard Test Method for
Tensile Properties of Plastics
ASTM D6628 (2003; R 2015) Standard Specification for Color of Pavement Marking Materials
ASTM D695 (2010) Standard Test Method for
Compressive Properties of Rigid Plastics
ASTM D711 (2010; R 2015) No-Pick-Up Time of
Traffic Paint
ASTM D7234 (2012) Standard Test Method for Pull-Off
Adhesion Strength of Coatings on Concrete Using Portable Pull-Off Adhesion Testers
ASTM D823 (1995; E 2012; R 2012) Producing Films of Uniform Thickness of Paint, Varnish, and Related Products on Test Panels.
ASTM E1347 (2006; R 2011) Color and Color Difference Measurement by Tristimulus (Filter) Colorimetry
ASTM E1710 (2011) Standard Test Method for
Measurement of Retroreflective Pavement Marking Materials with CEN- Prescribed Geometry Using a Portable Retro reflectometer
ASTM E2177 (2011) Standard Test Method for
Measuring the Coefficient of Retroreflected Luminance (RL) of Pavement Markings in a Standard Condition of Wetness
ASTM E2302 (2003; R 2016) Standard Test Method for
Measurement of the Luminance Coefficient Under Diffuse Illumination of Pavement Marking Materials Using a Portable Reflectometer
ASTM G154 (2016) Standard Practice for
Operating Fluorescent Light Apparatus for UV Exposure of Nonmetallic Materials
INTERNATIONAL CONCRETE REPAIR INSTITUTE (ICRI)
ICRI 03732 (1997) Selecting and Specifying Concrete Surface Preparation for Sealers, Coatings, and Polymer Overlays
MASTER PAINTERS INSTITUTE (MPI)
MPI 32 (2012) Traffic Marking Paint, S.B.
MPI 97 (2012) Traffic Marking Paint, Latex
U.S. FEDERAL AVIATION ADMINISTRATION (FAA)
FAA AC 150/5370-10 (2014; Rev G; Errata 1 2015; Errata 2
2016) Standards for Specifying Construction of Airports
U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)
MUTCD (2015) Manual on Uniform Traffic
Control Devices
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-595 (Rev C; Notice 1) Colors Used in Government Procurement
FS TT-B-1325 (Rev D; Notice 1; Notice 2 2017)
Beads (Glass Spheres) Retro- Reflective (Metric)
FS TT-P-1952 (2015; Rev F) Paint, Traffic and
Airfield Markings, Waterborne
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only or as otherwise designated. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES: SD-03 Product Data
Surface Preparation Equipment List; G
Application Equipment List; G
Reflective media for airfields; Waterborne Paint;
G
SD-06 Test Reports
Reflective Media for Airfields; G
Waterborne Paint; G
1.3 QUALITY ASSURANCE
1.3.1 Regulatory Requirements
Submit certificate stating that the proposed pavement marking paint meets the Volatile Organic Compound, (VOC) regulations of the local Air Pollution Control District having jurisdiction over the geographical area in which the project is located.
Submit Safety Data Sheets for each product.
1.3.2 Qualifications
Submit documentation certifying that pertinent personnel are qualified for equipment operation and handling of applicable chemicals. The documentation should include experience on five projects of similar size and scope with references for all personnel.
1.3.3 Qualifications for Airfield Marking Personnel
Submit documentation of qualifications in resume format a minimum of 14 working days before pavement marking work is to be performed showing personnel who will be performing the work have experience working on airfields, operating mobile self-powered marking, cleaning, and paint removal equipment and performing these tasks. Include with resume a list of references complete with points of contact and telephone numbers.
Provide certification for pavement marking machine operator and Foreman demonstrating experience successfully completing a minimum of two airfield pavement marking projects of similar size and scope. Provide documentation demonstrating personnel have a minimum of four years of experience operating similar equipment and performing the same or similar work in similar environments, similar in size and scope of the planned project.
The Contracting Officer reserves the right to require additional proof of competency or to reject proposed personnel.
1.4 DELIVERY AND STORAGE
Deliver paint materials, thermoplastic compound materials, and reflective media in original sealed containers that plainly show the designated name, specification number, batch number, color, date of manufacture, manufacturer's directions, and name of manufacturer.
Provide storage facilities at the job site, only in areas approved by the Contracting Officer, for maintaining materials at temperatures recommended by the manufacturer.
1.5 PROJECT/SITE CONDITIONS
1.5.1 Environmental Requirements
1.5.1.1 Weather Limitations for Application
Apply pavement markings to clean, dry surfaces, and unless otherwise approved, only when the air and pavement surface temperature is at least 3 degrees C 5 degrees F above the dew point and the air and pavement temperatures are within the limits recommended by the pavement marking manufacturer. Allow pavement surfaces to dry after water has been used for cleaning or rainfall has occurred prior to striping or marking. Test the pavement surface for moisture before beginning work each day and after cleaning. Do not commence marking until the pavement is sufficiently dry and the pavement condition has been approved by the Contracting Officer. Employ the "plastic wrap method" to test the pavement for moisture as specified in paragraph TESTING
FOR MOISTURE.
1.5.1.2 Weather Limitations for Removal of Pavement Markings on Roads and Parking Areas Pavement surface must be free of snow, ice, or slush; with a surface temperature of at least 4 degrees C 40 degrees F and rising at the beginning of operations, except those involving shot or sand blasting or grinding. Cease operation during thunderstorms, or during rainfall, except for water blasting and removal of previously applied chemicals. Cease water blasting where surface water accumulation alters the effectiveness of material removal.
1.5.2 Traffic Control
Place warning signs conforming to MUTCD near the beginning of the worksite and well ahead of the worksite for alerting approaching traffic from both directions. Place small markers along newly painted lines or freshly placed raised markers to control traffic and prevent damage to newly painted surfaces or displacement of raised pavement markers. Mark painting equipment with large warning signs indicating slow-moving painting equipment in operation.
When traffic must be rerouted or controlled to accomplish the work, provide necessary warning signs, flag persons, and related equipment for the safe passage of vehicles.
1.5.3 Airfield Traffic Control
Coordinate performance of all work in the controlled zones of the airfield with the Contracting Officer and with the Flight Operations Officer or Airfield Manager. Neither equipment nor personnel can use any portion of the airfield without permission of these officers.
1.5.4 Airfield Emergency Landing and Takeoff
Emergencies take precedence over all operations. Upon notification from the control tower of an emergency landing or imminent takeoff, stop all operations immediately and evacuate all personnel and equipment to an area not utilized for aircraft traffic which is at least 75 m 250 feet measured perpendicular to and away from the near edge of the runway unless otherwise authorized by the Contracting Officer. Equipment and chemicals or detergents as well as excess water must be able to clear the work area within 3 minutes.
1.5.5 Lighting
When night operations are necessary, provide all necessary lighting and equipment. Direct or shade lighting to prevent interference with aircraft, the air traffic control tower, and other base operations. Provide lighting and related equipment capable of being removed from the runway within 15 minutes of notification of an emergency. Night work must be coordinated with the Flight Operations Manager or Airfield Manager and approved in advance by the Contracting Officer. The Government reserves the right to accept or reject night work on the day following night activities by the Contractor.
Part 2. PRODUCTS
2.1 EQUIPMENT
2.1.1 Application Equipment
Submit application equipment list appropriate for the material(s) to be used. Include manufacturer's descriptive data and certification for the planned use that indicates area of coverage per pass, pressure adjustment range, tank and flow capacities, and all safety precautions required for operating and maintaining the equipment. Provide and maintain machines, tools, and equipment used in the performance of the work in satisfactory operating condition, or remove them from the work site. Provide mobile and maneuverable application equipment to the extent that straight lines can be followed and normal curves can be made in a true arc.
2.1.1.1 Paint Application Equipment
2.1.1.1.1 Airfield Marking
Provide self-propelled or mobile-drawn spraying machine for applying the paint for airfield pavements with an arrangement of atomizing nozzles capable of applying the specified line width in a single pass. Provide paint applicator with paint reservoirs or tanks of sufficient capacity and suitable gages to apply paint in accordance with requirements specified. Equip tanks with suitable mechanical agitators. Equip spray mechanism with quick-action valves conveniently located, and include necessary pressure regulators and gages in full view and reach of the operator. Install paint strainers in paint supply lines to ensure freedom from residue and foreign matter that may cause malfunction of the spray guns. The paint applicator must be readily adaptable for attachment of a dispenser for the reflective media approved for use.
2.1.1.1.2 Hand Application
Provide spray guns for hand application of paint in areas where the mobile paint applicator cannot be used.
2.1.2 Reflective Media Dispenser
Attach the dispenser for applying the reflective media to the paint dispenser and designed to operate automatically and simultaneously with the applicator through the same control mechanism. The bead applicator must be capable of adjustment and designed to provide uniform flow of reflective media over the full length and width of the stripe at the rate of coverage specified in paragraph APPLICATION.
2.2 MATERIALS
Use reflectorized waterborne or methacrylate paint for airfield markings. The maximum allowable VOC content of pavement markings is 150 grams per liter. Color of markings are indicated on the drawings and must conform to FED-STD-595 for airfields. Provide materials conforming to the requirements specified herein.
2.2.1 Waterborne
Paint FS TT-P-1952, Type III
2.2.6 Reflective Media
2.2.6.1 Reflective Media for
Airfields FS TT-B-1325, Type I, Gradation A
Part 3. EXECUTION
3.1 EXAMINATION
3.1.1 Testing for Moisture
Test the pavement surface for moisture before beginning pavement marking after each period of rainfall, fog, high humidity, or cleaning, or when the ambient temperature has fallen below the dew point. Do not commence marking until the pavement is sufficiently dry and the pavement condition has been approved by the Contracting Officer or authorized representative.
Employ the "plastic wrap method" to test the pavement for moisture as follows: Cover the pavement with a 300 mm by 300 mm 12 inch by 12inch section of clear plastic wrap and seal the edges with tape. After 15 minutes, examine the plastic wrap for any visible moisture accumulation inside the plastic. Do not begin marking operations until the test can be performed with no visible moisture accumulation inside the plastic wrap.
Re-test surfaces when work has been stopped due to rain.
3.1.2 Surface Preparation demonstration
Prior to surface preparation, demonstrate the proposed procedures and equipment. Prepare areas large enough to determine [cleanliness][, adhesion of remaining coating] and rate of cleaning. [Perform a demonstration removal of pavement marking in an area designated by the Contracting Officer.] [Approved demonstration area establishes the standard for the remainder of the work.]
3.1.3 Test Stripe demonstration
Prior to paint application, demonstrate test stripe application within the work area using the proposed materials and equipment.
Apply separate test stripes in each of the line widths and configurations required herein using the proposed equipment.
Make the test stripes long enough to determine the proper speed and operating pressures for the vehicle(s) and machinery, but not less than 15 m 50 feet long.
3.1.4 Application rate Demonstration
During the Test Stripe Demonstration, demonstrate compliance with the application rates specified herein. Document the equipment speed and operating pressures required to meet the specified rates in each configuration of the equipment and provide a copy of the documentation to the Contracting Officer prior to proceeding with the work.
3.1.5 Retroreflective Value demonstration
After the test stripes have cured to a "no-track" condition, demonstrate compliance with the average retroreflective values specified herein. Take a minimum of ten readings on each test stripe with a Retro reflectometer with a direct readout in millicandelas per square meter per lux (mcd/m2/lx). Conform testing per ASTM D4061, ASTM E1710, ASTM E2177, and ASTM E2302.
3.1.6 Level of Performance Demonstration
The Contracting Officer will be present at the application demonstrations to observe the results obtained and to validate the operating parameters of the vehicle(s) and equipment. If accepted by the Contracting Officer, the test stripe is the measure of performance required for this project. Do not proceed with the work until the demonstration results are satisfactory to the Contracting Officer.
3.2 EXTERIOR SURFACE PREPARATION
Thoroughly clean surfaces to be marked before application of the paint. Remove dust, dirt, and other granular surface deposits by sweeping, blowing with compressed air, rinsing with water, or a combination of these methods as required.
Do not use shot blasting on airfield pavements due to the potential of Foreign Object Damage (FOD) to aircraft. Scrub affected areas, where oil or grease is present on old pavements to be marked, with several applications of trisodium phosphate solution or other approved detergent or degreaser and rinse thoroughly after each application.
After cleaning oil-soaked areas, seal with shellac or primer recommended by the manufacturer to prevent bleeding through the new paint. Do not commence painting in any area until pavement surfaces are dry and clean.
3.2.1 Early Painting of Asphalt Pavements
For asphalt pavement systems requiring painting application at less than 30 days, apply the paint and beads at half the normal application rate, followed by a second application at the normal rate after 30 days.
3.3 APPLICATION
Apply pavement markings to dry pavements only.
3.3.1 Paint
Apply paint pneumatically with approved equipment at rate of coverage specified herein. Provide guidelines and templates as necessary to control paint application. Take special precautions in marking numbers, letters, and symbols. Manually paint numbers, letters, and symbols. Sharply outline all edges of markings. The maximum drying time requirements of the paint specifications will be strictly enforced, to prevent undue softening of bitumen, and pickup, displacement, or discoloration by tires of traffic. If there is a deficiency in drying of the markings, painting operations must cease until the cause of the slow drying is determined and corrected.
3.3.1.1 Waterborne Paint
3.3.1.1.1 Airfields
For reflectorized and non-reflectorized markings, apply paint conforming to Type III at a rate of 2.7 plus or minus 0.20 square meter per liter 108 plus or minus 8 square feet per gallon For reflectorized markings, apply paint and glass spheres at the following rates:
Bead Type Paint Type Paint Application Rate Bead Application Rate
Type I (Gradation A)
Type I, II, III 121 plus or minus 6 Sq Ft/Gallon
8 plus or minus 1 lb/gallon
3.4 FILED QUALITY CONTROL
3.4.1 Sampling and Testing
As soon as the paint materials and reflective media are available for sampling, obtain by random selection from the sealed containers, four-quart samples of each batch in the presence of the Contracting Officer. Two quarts will be for sampling and testing by the Contractor and two quarts will be for retention by the Government. Accomplish adequate mixing prior to sampling to ensure a uniform, representative sample. A batch is defined as that quantity of material processed by the manufacturer at one time and identified by number on the label. Clearly identify samples by designated name, specification number, batch number, project contract number, intended use, and quantity involved.
Test samples by an approved laboratory. If a sample fails to meet specification, replace the material in the area represented by the samples and retest the replacement material as specified above. Submit certified copies of the test reports, prior to the use of the materials at the jobsite. Include in the report of test results a listing of any specification requirements not verified by the test laboratory. At the discretion of the Contracting Officer, samples provided may be tested by the Government for verification.
3.4.2 Material Inspection
Examine material at the job site to determine that it is the material referenced in the report of test results or certificate of compliance. A certificate of compliance shall be accompanied by test results substantiating conformance to the specified requirements.
3.4.3 Dimensional Tolerance
Apply all markings in the standard dimensions provide in the drawings. New markings may deviate a maximum of 10 percent larger than the standard dimension. The maximum deviation allowed when painting over an old marking is up to 20 percent larger than the standard dimensions.
3.4.4 Bond Failure Verification
Inspect newly applied markings for signs of bond failure based on visual inspection and comparison to results from Test Stripe Demonstration paragraph.
3.4.5 Reflective Media and coating Application Verification
Use a wet film thickness gauge to measure the application of wet paint. Use a microscope or magnifying glass to evaluate the embedment of glass beads in the paint. Verify the glass bead embedment with approximately 50 percent of the individual bead spheres embedded and 50 percent of the individual bead spheres exposed.
3.4.6 Retroreflective Markings
Collect and record readings for white and yellow retroreflective markings at the rate of one reading per 305 linear m 1000 linear feet. The minimum acceptable average for white markings is 200 millicandelas per square meter per lux (mcd/m2/lx) (measured with Retroreflectometer). The minimum acceptable average for yellow markings is 175 millicandelas per square meter per lux (mcd/m2/lx). Compute readings by averaging a minimum of 10 readings taken within the area at random locations. Re-mark areas not meeting the retroreflective requirements stated above.
3.4.7 Material Bond Verification and Operations Area Cleanup for Airfields
Vacuum sweep the aircraft operating area before it is opened for aircraft operations to preclude potential foreign object damaged to aircraft engines. Visually inspect the pavement markings and the material captured by the vacuum. Verify that no significant loss of reflective media has occurred to the pavement marking due to the vacuum cleaning.
Part 3. GENERAL
3.1 Traffic Control and Protection
Place warning signs near the beginning of the work site and well ahead of the work site for alerting approaching traffic from both directions. Place small markers along newly painted lines to control traffic and prevent damage to newly painted surfaces.
Mark painting equipment with large warning signs indicating slow-moving painting equipment in operation.
3.2 Weather Limitation
Apply paint to clean, dry surfaces, and, unless otherwise approved, only when air and pavement temperatures are above 40 degrees F (5 degrees C) and less than 95 degrees F (35 degrees C) for oil-based materials; above 50 degrees F (10 degrees C) and less than 110 degrees F (43 degrees C) for water based materials. Maintain paint temperature within these same limits.