Att L-7 Workload Analysis Instructions.pdf

PDF 151 KB Posted

Attached to
SOLICITATION -- MULTI-ENGINE TRAINING SYSTEM (METS) AIRCRAFT PROCUREMENT Federal contract opportunity
Solicitation number
N00019-21-R-0077
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document provides instructions for completing a workload analysis form in response to a solicitation for the procurement of Multi-Engine Training System aircraft. The Naval Air Systems Command solicitation seeks a single firm fixed price contract to replace the T-44C aircraft currently used for naval aviator training. Offerors must analyze inspection and maintenance requirements for a 30-year aircraft service life based on usage metrics of 600 annual flight hours, 660 annual engine operating hours, and 1,500 annual landings. The workload analysis form requires offerors to list scheduled inspection types including flight hour, calendar, cycle, equipment, flightline, conditional, and depot inspections. For each inspection type, offerors must provide the total occurrences, elapsed maintenance time, and maintenance man-hours over a 30-year period for a single aircraft. In addition, offerors must specify the fuel consumption per hour for the mission profiles in the performance specification. Proposals are due by March 16, 2022 with contract award anticipated in the first quarter of fiscal year 2023.

View the file

Other files for this federal contract opportunity

Other files attached to SOLICITATION -- MULTI-ENGINE TRAINING SYSTEM (METS) AIRCRAFT PROCUREMENT, newest first.
File Type Posted
N0001921R0077 METS RFP Amend 0002.pdf PDF
220202 METS_QA_Sheet Responses Batch VII.pdf PDF
Conformed copy through Amend 0002.pdf PDF
N0001921R0077 METS RFP_Amend 0001.pdf PDF
Att L-13 Corporate Experience Amend 0002.xlsx XLSX spreadsheet
N0001921R0077 METS RFP Amend 0001.pdf PDF
Att L-1 Verification Matrix Amend 0001.xlsx XLSX spreadsheet
Conformed copy through Amend 0001.pdf PDF
Att-2 METS Airplane Specification Rev2 13Dec2021 Amend 0001.pdf PDF
Att L-2 SPD Amend 0001.pdf PDF
Att-1 METS Airplane PWS_112921.pdf PDF
Att-1 METS CLS PWS Appendix B_112921.pdf PDF
Att-12 Real Property.pdf PDF
Att L-3 SPD Team Experience.docx DOCX document
Att L-6 Access Agreement.docx DOCX document
Att L-16_PSE_List_with_Price.xlsx XLSX spreadsheet
METS QA Sheet.xlsx XLSX spreadsheet
Att-11 CDRL Disposition Letter Template.pdf PDF
Exhibit T METS OT DIDs.pdf PDF
Att L-14_Unit_Pricing_Matrix.xlsx XLSX spreadsheet
Att L-15_SPL_with_Price.xlsx XLSX spreadsheet
Competition Library.zip ZIP file
Att-2 METS Airplane Specification Rev2 13Dec2021.pdf PDF
Exhibit A METS CDRLs.pdf PDF
Att L-8 Workload Analysis Form.xlsx XLSX spreadsheet
Att L-11 Flyaway Kits List.docx DOCX document
N0001921R0077 METS RFP.pdf PDF
Att-1 METS Airplane PWS Appendix A--Cyber Security Plan.pdf PDF
Att-6 Source of Repair Instructions.pdf PDF
Att-8 GFP.xlsx XLSX spreadsheet
Att L-1 Verification Matrix.xlsx XLSX spreadsheet
Att L-2 SPD.pdf PDF
Att L-4 Sustainment Features Matrix.xlsx XLSX spreadsheet
Att L-5 Special License Agreement.docx DOCX document
Att L-13 Corporate Experience.xlsx XLSX spreadsheet
Att L-17 Rights in Data.xlsx XLSX spreadsheet
METS RFP Changes.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0001921R0077

L-7 Workload Analysis Instructions

The following instructions provide the Offerors with the information to populate Attachment L-8

(Workload Analysis Form). The Offeror shall provide scheduled maintenance inspection and life-limited component replacement requirements for a 30-year service life. These maintenance activities will be in accordance with the Original Equipment Manufacturer (OEM) documents and by Federal Aviation Administration (FAA) type certification requirements. The Offeror shall perform an analysis of any workload or inspection impacts to the Offeror’s cycle based on the usage profiles within the performance based specification Appendix B (Mission Profiles) and the following usage metrics:

Individual aircraft annual flight-hours: 600/year

Individual engine annual operating time: 660/year

Individual aircraft landings per year: 1,500

There are four (4) columns (left to right), in Attachment L-8 (Workload Analysis Form). A detailed description of each data element can be found in paragraph 2.

(1) Scheduled Inspection Type

(2) Total Occurrences

(3) Total Elapsed Maintenance Time

(4) Total Maintenance Man-Hours

2.1 Scheduled Inspection Type

The Offeror shall enter the type of inspections that will be conducted on one aircraft for the

30-year service life.

2.1.1 Flight-Hour Inspections

The Offeror shall enter their unique flight-hour inspections on one aircraft using the following examples; 10-hour, 25-hour, 75-hour, 100-hour, 2000-hour, 3000-hour, Phase A, Phase B, Phase

C, and Phase D. The Offeror shall identify each inspection type on separate lines in Attachment 8

(Workload Analysis) form.

2.1.2 Calendar Inspections

The Offeror shall list their unique calendar inspections on one aircraft using the following examples; 7-day, 14-day, 28-day, 1-year annual, and 24-month. The Offeror shall identify each inspection type on separate lines in Attachment 8 (Workload Analysis) form.

2.1.3 Cycle Inspections

The Offeror shall list their unique cycle inspections on one aircraft using the following examples;

1,000-landings, 16,000-cycles, 5,000-hours, 4,000-refills, etc. The Offeror shall identify the each component and inspection on separate lines in Attachment 8 (Workload Analysis) form.

1 Overview

2 Data Element Description

N0001921R0077

L-7 Workload Analysis Instructions

2.1.4 Aviation Life Support Equipment (ALSE) Inspections

The Offeror shall list their unique ALSE inspections on one aircraft using the following examples; 1-year annual first aid kit, 30-day life raft, 30-day life vests, and 180-day fire extinguisher. The Offeror shall identify each inspection type on separate lines in Attachment 8

(Workload Analysis) form.

2.1.5 Flightline Inspections

The Offeror shall list their unique flightline inspections on one aircraft using the following examples; daily and turnaround. The Offeror shall identify each inspection type on separate lines in Attachment 8 (Workload Analysis) form.

2.1.6 Conditional Inspections

The Offeror shall list their unique flightline inspections on one aircraft using the following examples; bird strike, lighting strike, and over-weight landing. The Offeror shall identify each inspection type on separate lines in Attachment 8 (Workload Analysis) form.

2.1.7 Depot and Overhaul

The Offeror shall list their unique Depot and overhaul requirements for both aircraft, components and engines and annotate the time requirement for each. The Offeror shall identify the component or structure overhauled or replaced on separate lines, for each occurrence, in

Attachment 8 (Workload Analysis) form.

2.2 Total Occurrences

The Offeror shall enter the total number of occurrences of each scheduled inspection type that will occur on one aircraft for the 30-year service life.

2.3 Total Elapsed Maintenance Time

The Offeror shall enter the total elapsed maintenance time required to complete the total occurrences of scheduled inspection type on one aircraft for the 30-year service life.

2.4 Total Maintenance Man-Hours

The Offeror shall enter the total maintenance man-hours required to complete the total occurrences of scheduled inspection type on one aircraft for the 30-year service life.

2.5 Fuel Usage

The Offeror shall enter the fuel consumption per hour in gallons required to execute both mission profile A and profile B in the performance based specification in the Fuel Usage tab.

File details come from the government source that posted it. Updated .