Exhibit T METS OT DIDs.pdf
PDF 1 MB Posted
- Attached to
- SOLICITATION -- MULTI-ENGINE TRAINING SYSTEM (METS) AIRCRAFT PROCUREMENT Federal contract opportunity
- Solicitation number
- N00019-21-R-0077
About this file
This document is a solicitation announcement for the Multi-Engine Training System (METS) aircraft procurement to replace the T-44C aircraft currently used by the U.S. Navy for aviator and flight officer training. The Naval Air Systems Command (NAVAIR) seeks to award a single firm fixed price contract through full and open competition for the procurement of commercial aircraft through a base and options. The total procurement is for the METS aircraft. Proposals are due by 1630 Eastern Standard Time on March 16, 2022. NAVAIR anticipates contract award in the first quarter of fiscal year 2023. The solicitation number is N00019-21-R-0077 and supersedes all previously posted draft documents regarding the METS requirement. Offerors should only rely on the requirements in this solicitation and not previously posted drafts. Questions should be directed to the listed procuring contracting officer and contract specialist.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT T
CONTRACT DATA ITEM DELIVERABLES
Version 1.0
29 November
N00019-21-R-0077
Prepared by:
Program Executive Officer - Tactical Aircraft Programs (PEO(T))
Naval Undergraduate Flight Training Systems (PMA-273) 48187 Standley Road, Building 4010, Room 228
Patuxent River, MD 20670
DISTRIBUTION A. Approved for public release: distribution unlimited.
CHANGE SUMMARY PAGE
This change summary page is provided to maintain a record of changes to the Contract Data Requirements List. Upon receipt of a change or revision, the holder of the CDRL shall incorporate the change(s) and/or revision(s) into the CDRLs and make appropriate entries on the record of changes below.
Version No.
Brief Description of the Change Date Revised
DATA ITEM DESCRIPTION
Title: DAILY AIRCRAFT STATUS REPORT (DASR)
Number: OT-21-00052 AMSC Number: · DTIC Applicable:
Preparing Activity: AS/PMA273 Applicable Forms:
Approval Date: 20210914 ELH Limitation: N00019-21-RFPREQ-PMA-273-0368 GIDEP Applicable:
Project Number:
Use/relationship: This report provides a daily status report that depicts the operational status of fleet aircraft assigned to United States Navy Training Wings. The report will be utilized by the Chief of Naval Aviation Training Wing Commanders and the Contractor Logistics Support managers that provide maintenance and logistics services. The report identifies the status of fleet aircraft.
This Data Item Description (DID) contains the format, content, and intended use information for the data product resulting from the work task described in the contract Performance Work Statement (PWS).
This DID is for one-time use for PID # N00019-21-RFPREQ-PMA-273-0368.
Requirements:
1. Reference documents: The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
1.1 CNATRAINST 13011.11F - "Daily Aircraft Status Reporting"
2. Format: The data for each report shall be provided within a separate MS Excel file in accordance with the requirements of Paragraph 3. Each aircraft shall be reported. Additional information pertaining to the format of this report is contained in Paragraph 5.
3. Content. The report shall contain the following:
3.1. The cover page of the report shall include:
3.1.1. Contractor Name
3.1.2. Contractor Address
3.1.3. Contract Number
3.1.4. Contractor Email Address
3.1.5. CDRL Number
3.1.6. Date prepared
3.1.7 Distribution Statement
3.2. A Daily Status Report shall be produced for each Type/ Model /Series (T/M/S) of aircraft and a Daily Status Report shall be produced based upon the combined data of all T/M/S. The Daily Status report page of the report shall include:
3.2.1. The below data in the HEADER of the DASR report:
3.2.1.1 The applicable TRAINING AIRWING, followed by DAILY
AIRCRAFT REPORT
3.2.1.2 Contract Number
3.2.1.3 Contract Data Requirements List (CDRL) Number
3.2.1.4 Julian Date
3.2.1.5 Calendar Date
3.2.1.6 Compiled By
3.2.1.7 Submitted By
3.2.2 The below data is to be included in SECTION “A” – READINESS DATA, of the DASR report:
3.2.2.1. Number Assigned (Aircraft in Inventory) "AC Status":
3.2.2.2. Number NMCRS (Out Of Reporting) Section "C":
3.2.2.3. In Mission Capable Reporting Status (MCRS) "AC Status":
3.2.2.4. Number Not Mission Capable, Maintenance (NMCM) Section "D":
3.2.2.5. Aircraft Number In Planned Schedule Maintenance (PM) Section "E":
3.2.2.6. Number Not Mission Capable, Supply (NMCS) Section "F":
3.2.2.7. Number Partial Mission Capable (Awaiting FCF) Section "G":
3.2.2.8. Number Mission Capable (FMC/PMC Minus FCF):
3.2.2.9. Number Cross Country (XC /PREPOS) Section "H":
3.2.2.10. Number Of Ready For Production Aircraft at MOB
3.2.2.11. Number Of Aircraft In The Phase Window (< 100%) Section "I":
3.2.2.12. Number Of Aircraft In The Phase Window (> 100%) Section "I":
3.2.3 The below data is to be included in SECTION “B” – MATERIAL DATA, of the DASR report:
3.2.3.1 Total NMCS Requirements
3.2.3.2 Total National Stock Numbers (NSN)
3.2.3.3 Total Part Numbers
3.2.3.4 Cannibalization Actions
3.2.4 The below data is to be included in SECTION “C” – NOT MISSION CAPABLE SUPPLY, of the DASR report:
3.2.4.1 Aircraft
3.2.4.2 Buno
3.2.4.3 Work Center
3.2.4.4 Document Number
3.2.4.5 Project Code
3.2.4.6 Maintenance Action Form (MAF) Number,
3.2.4.7 Part Number
3.2.4.8 Supply Maintenance and Recoverability (SM&R) Code
3.2.4.9 Quantity
3.2.4.10 Nomenclature
3.2.4.11 Cost
3.2.4.12 Status of Requisition
3.2.5 The below data is to be included in SECTION “D” –PARTIAL MISSION CAPABLE SUPPLY REPORT, of the DASR report:
3.2.5.1 Aircraft
3.2.5.2 Buno
3.2.5.3 Work Center
3.2.5.4 Document Number
3.2.5.5 Project Code
3.2.5.6 Maintenance Action Form (MAF) Number,
3.2.5.7 Part Number
3.2.5.8 Supply Maintenance and Recoverability (SM&R) Code
3.2.5.9 Quantity
3.2.5.10 Nomenclature
3.2.5.11 Cost
3.2.5.12 Status of Requisition
3.2.6 The below data is to be included in SECTION “E” – FLIGHT DATA REPORT, of the DASR report:
3.2.6.1 Aircraft T/M/S Total
3.2.6.2 Cross Country (X-CTRY)
3.2.6.3 Cross Country Fiscal Year To Date (FYTD)
3.2.6.4 Sunday Fiscal Year To Date (FYTD)
3.2.6.5 Weekend Total
3.2.6.6 Weekend Fiscal Year To Date (FYTD)
3.2.6.7 Night Vision Goggle Requested
3.2.6.8 Night Vision Goggle Complete
3.2.6.9 Gate 1 (0700)
3.2.6.10 Gate 2 (1000)
3.2.6.11 Gate 3 (1300)
3.2.6.12 Gate 4 (1700)
3.2.6.13 Gate 5 (Add On)
3.2.6.14 Gate Total
3.2.6.15 Daily Total
3.2.6.16 Monthly Total
3.2.6.17 Quarterly Total
3.2.6.18 Fiscal Year To Date (FYTD)
3.2.6.19 Remarks
3.2.6.19.1 Remarks should include significant data such
as Flight Hour Corrections, including the affected squadron, aircraft and date
3.2.6.20 Production Supervisor Signature
4. Intended Use Information: This data will be used by Government and Contractor personnel to improve the usage of Government assets by monitoring operational efficiency, flight operations, contractor performance, aircraft availability, and identification of mission cancellations.
5. A sample report is provided for information.
Example of DASR Report
Example of NMCS Report
METS NMCS REPORT
Example of PMCS Report
End of OT-21-00052
TITLE: NOT MISSION CAPABLE SUPPLY (NMCS) I PARTIAL MISSION CAPABLE SUPPLY
(PMCS) REPORT
Number: OT-21-00053
Approval Date: 20210914 ELH
AMSC Number: Limitation: N00019-21-RFPREQ-PMA-273-0368 DTIC Applicable: No GIDEP Applicable: No Preparing Activity: AS Project Number: N/A Applicable Forms:
Use/relationship: This report will be utilized by the Chief of Naval Aviation Training, Training Wing Commanders and the Contractor Logistics Support managers that provide maintenance and logistics services to identify non mission/partial mission capable supply requisitions and estimated delivery associated with Non Mission/Partial Mission aircraft that are located at Contractor and Subcontractor facilities. Assisting in scheduling, identify tasks, allocated resources, and schedule and risks associated with the transition into a fully operational aircraft.
The DID contains the format, content, and intended use information for the data product resulting from the contract requirements and derived requirements.
This DID is for one-time use for N00019-21-RFPREQ-PMA-273-0368.
Requirements:
Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
1. CNAFINST4790.2D- "The Naval Aviation Maintenance Program (NAMP)
2. Format. Contractor format is acceptable and must address all requirements listed in section 3 of this DID. The report will be in Microsoft Excel 2016 file format and must be completely accessible (including formulas) to the Government. The report will be free of proprietary markings.
3. Content. The report will contain the following:
• Contractor Name
• Contract Number
• Contract Data Requirements List (CDRL) Number
• Report Date
• Distribution Statement
3.1 The report shall include. NMCS/PMCS Metrics, NMCS, and PMCS reporting information will be included in separate Tabs labeled NMCS/PMCS Metrics, NMCS, and PMCS Report Format:
Aircraft #, BUNO, Work Center, Document Number, Project Code, Maintenance Action Form (MAF) Number, Part Number, Supply Maintenance And Recoverability Code (SM&R), Quantity, Nomenclature, Cost, Status of Requisition, and Logistics Manager Comments. The Logistics comments section shall address Yellow and Red Flag Performance Metrics, Logistics Support Issues to include comments regarding any part with four or more outstanding requisitions and any assistance required by CNATRA Headquarters.
3.2. Report Preparer. Name of person(s) preparing report, email, and telephone number(s).
3.3. Appendices. Include appendices where applicable: tables, references, charts, or other descriptive material. Each appendix will be identified and referenced in the appropriate area of this plan.
END OF OT-21-00053
Title: PLANNING & ESTIMATE REPORT Number: OT-21-00054 Approval Date: 20210914 ELH AMSC Number: Limitation: N00019-21-RFPREQ-PMA-273-0368 DTIC Applicable: GIDEP Applicable:
Preparing Activity: AS/PMA273 Project Number:
Use/relationship: This report provides a status report of repair schedules and cost estimates of fleet aircraft component parts that are located at Contractor and Subcontractor facilities. The report will be utilized by the Chief of Naval Aviation Training, Training Wing Commanders and the Contractor Logistics Support managers that provide maintenance and logistics services.
This Data Item Description (DID) contains the format, content, and intended use information for the data product resulting from the work task described in the contract SOW.
This DID is for one-time use for solicitation N00019-21-RFPREQ-PMA-273-0368.
1. Reference documents: The applicable issue of the documents cited herein, including their specified in the contract.
1.1 CNAFINST 4790:2D -"The Naval Aviation Maintenance Program (NAMP)"
2. Format: The contractor's format is acceptable. The data for each aircraft type shall be reported within a separate MS Excel file with column headings identified in Paragraph 3.2.
Data also to include 0-Level, I-Level & D-Level repair. Data columns (A thru BC) shall be presented in one continuous row.
3. Content. The report shall contain the following:
3.1. The cover page of the report shall include:
3.1.1. Contractor Name
3.1.2. Contract Number
3.1.3. Contract Data Requirements List (CDRL) Number
3.1.4. Report Period
3.1.5. Distribution Statement
3.2. The report shall include:
3.2.1. Date of P&E report
3.2.2. Assigned P&E number
3.2.3. Aircraft program identification
3.2.4. BUNO number
3.2.5. Contract number
3.2.6. CLIN/ACRN
3.2.7. T/M/S
3.2.8. Site
3.2.9. National Stock Number (NSN), if applicable
3.2.10. Nomenclature (NOUN)
3.2.11. Serial number, if applicable
3.2.12. Part number
3.2.13. Items returned to the vendor(s) for repair or replacement
3.2.14. Qty.
3.2.15. Covered under warranty during this period
3.2.16. Contractor's name
3.2.17. Contractor's cage code
3.2.18. Contractor's DoDAAC.
3.2.19. Delivery date (date of dd250)
3.2.20. Projected shipping date (date item returned to vendor) destination
3.2.21. Projected in-service dates (date when item returned to field)
3.2.22. Gov't repair authorization date
3.2.23. Estimated work begin date
3.2.24. Estimated work end date
3.2.25. Total disassembly man-hours
3.2.26. Calculation of total estimated (man-hours x unit cost) cost
3.2.27. Calculation of total actual (man-hours x unit cost) cost
3.2.28. Estimated unit price
3.2.29. Estimated extended price
3.2.30. Estimated man-hours
3.2.31. Estimated duration in number of days necessary to effect repairs
3.2.32. Special requirements necessary (fixture required, etc.)
3.2.33. Level of maintenance required for repair (O-level, I-level & D-level)
3.2.34. Part(s) required
3.2.34.1. National Stock Number (NSN), if applicable
3.2.34.2. Nomenclature (noun)
3.2.34.3. Serial number, if applicable
3.2.34.4. Part number
3.2.34.5. Qty required
3.2.34.6. Sub-contractor's name
3.2.34.7. Sub-contractor's cage code
3.2.34.8. Sub-contractor's DoDAAC
3.2.34.9. Complete description of defect including size, severity, and criticality, major or minor.
3.2.34.9.1. Accurate location of the defect.
3.2.34.9.2. Description of corrective action taken.
3.2.34.9.3. ACI task number when defect
discovered.
3.2.34.9.4. Describe any special work requested by the service, any difficulties encountered while performing the work, and the number of man-hours to complete.
3.2.35. Required repair actions
3.2.36. Additionally, for corrosion, report type and severity defects discovered during
ACI include:
3.2.37. Extent of the repairs required, including major components to be repaired or replaced and structural repair required
3.2.38. Type of preservation requirements anticipated, if any
3.2.39. Parts and/or material required for by part number nomenclature and price
3.2.40. Estimated delivery date for material/parts
3.2.41. Actual unit price (at completion of repair)
3.2.42. Actual extended price (at completion of repair)
3.2.43. Total actual duration in number of days necessary to effect repairs
4. Intended Use Information: This data will be used by Government and Contractor personnel to improve the usage of Government assets by monitoring the Contractor's ability to complete repair work within the scheduled timeframe, and, to perform those repairs within budgetary constraints.
End of One-Time-DID OT-21-00054
Title: OVER AND ABOVE REQUESTS
Number: OT-21-00055 Approval Date: 20210914 ELH AMSC Number: Limitation: N00019-21-RFPREQ-PMA-273-0368 DTIC Applicable: GIDEP Applicable:
Preparing Activity: AS/PMA-273 Project Number:
Applicable Forms:
Use/relationship: This report provides data to Government Personnel to assess repair plan costs of over and above work, as defined in the Performance Work Statement (PWS). This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract PWS. This DID is for one-time use for Solicitation N00019-
21-RFPREQ-PMA-273-0368
Requirements:
1. Reference documents: The applicable issue of the documents cited herein, including their specified in the contract
2. Format: The Contractor's format is acceptable.
3.1. Cover page shall include:
3.1.1. Contract Number
3.1.2. Name of Contract
3.1.3. Contract Data Requirements List Number
3.1.4. Contract Data Requirements List Title
3.1.5. Delivery Date of Report
3.1.6. Distribution Statement
3.2. The report shall include the following data in columns:
3.2.1. Date of Submission
3.2.2. Site Location
3.2.3. CLIN Number
3.2.4. Type/Model/Series
3.2.5. WRA Component Number
3.2.6. Estimated Labor Hours
3.2.7. Estimated Labor Cost
3.2.8. Part Numbers for Material Required
3.2.9. Estimated Material cost
3.2.10. Estimated Repair Plan Cost
4. Intended Use Information: This data will be used by Government personnel to assess and approve/disapprove requests for over and above work.
End of OT-21-00055
Title: GOVERNMENT FURNISHED PROPERTY INVENTORY REPORT
Number: OT-21-00056 Approval Date: 20210914 ELH
DTIC Applicable: GIDEP Applicable:
Preparing Activity: AS/PMA-273 Project Number:
Use/relationship: The report provides data reports necessary for the management and inventory of Government furnished property.
This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract Performance Work Statement (PWS).
This DID is for one-time use for N00019-21-RFPREQ-PMA-273-0368.
1. Reference documents:
1.1. COMNAVAIRFORINST 4415.1 Series
1.2. NAVSUP P-485
1.3. DoDI 5000.64
2. Format. The Contractor’s format is acceptable.
3.1. For each report period:
3.1.1. Cover page which shall include:
3.1.1.1. Contract Number
3.1.1.2. Name of Contract
3.1.1.3. CDRL Number
3.1.1.4. CDRL Title
3.1.1.5. Site Location
3.1.1.6. Delivery Date of Report
3.1.1.7. Distribution Statement
3.1.2. A separate report shall be submitted for each site that includes separate worksheet tabs that include the following commodity types:
3.1.2.1. Special Test Equipment
3.1.2.2. Individual Material Readiness List
3.1.2.3. Government Furnished Property
3.1.2.4. Tools
3.1.2.5. Flight Gear
3.1.2.6. Government Furnished Material
3.1.2.7. Calibration Standards
3.1.3. The report shall include the following data in columns:
3.1.3.1. Month
3.1.3.2. Location
3.1.3.3. Date Scheduled
3.1.3.4. Date Completed
3.1.3.5. Number of Line Items inventoried
3.1.3.6. Number of inventory discrepancies
3.1.3.7. Inventory Accuracy Rate
3.1.3.8. Site
3.1.4. The report shall include the following inventory information reported in columns:
3.1.4.1. Contract line item
3.1.4.2. National Stock Number
3.1.4.3. Part Number
3.1.4.4. Actual replacement percentage
3.1.4.5. Quantity on hand
3.1.4.6. Unit Price
3.1.4.7. Authorized stock level
3.1.4.8. Quantity excess to authorized level
3.1.4.9. Provide narrative supporting for any GFP line item that is recommended to remain in an excess position
4. Intended Use Information: This data will be used by the Government to ensure annual inventories are conducted and to ensure strict accountability of GFP. The data will also be used by Defense Contractors to understand historical timelines for completing inventories by commodity.
End of OT-21-00056
TITLE: GOVERNMENT FURNISHED PROPERTY INVENTORY PLAN
Number: OT-21-00057
AMSC Number: Limitation: N00019-21-RFPREQ-PMA-273-
DTIC Applicable: No GIDEP Applicable: No Preparing Activity: AS/PMA273 Project Number: N/A
Use/relationship: This data will be used by the Government to ensure annual inventories are conducted and to ensure strict accountability of GFP. The data will also be used by Defense Contractors to understand historical timelines for completing inventories by commodity.
The DID contains the format, content, and intended use information for the data product resulting from the contract requirements and derived requirements.
This DID is for one-time use for N00019-21-RFPREQ-PMA-273-0368.
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
COMNAVAIRFORINST 4415.1 Series
NAVSUP P-485
DoDI 5000.64
2. Format. Contractor format is acceptable and must address all requirements listed in section 3 of this DID. The report will be in Microsoft Excel 2016 file format and must be completely accessible (including formulas) to the Government. The report will be free of proprietary markings.
3. Content. The report will contain the following:
• Contractor Name
• Contract Number
• Contract Data Requirements List (CDRL) Number
• Report Date
4. A separate report shall be submitted for each site that includes separate worksheet tabs that include the following commodity types:
• Special Test Equipment
• Individual Material Readiness List
• Government Furnished Property
• Tools
• Flight Gear
• Government Furnished Material Calibration Standards
5. The report shall include the following data in columns:
• Month
• Location
• Date Scheduled
• Date Completed
• Number of line items inventoried
• Number of inventory discrepancies
• Inventory Accuracy Rate
6. Appendices. Include appendices where applicable: tables, references, charts, or other descriptive
END OF OTD-21-00057
TITLE: CONTRACTOR OWNED PROPERTY REPORT
Number: OT-21-00058
DTIC Applicable: No GIDEP Applicable: No Preparing Activity: AS/PMA-273 Project Number: N/A
Use/relationship: The Contractor Owned Property (COP) Report provides inventory accountability for the contractor-owned property. The Government will use this information to assure that contractor’s property is segregated from other property.
The DID contains the format, content, and intended use information for the data product resulting from the contract requirements and derived requirements.
This DID is for one-time use for N00019-21-RFPREQ-PMA-273-0368.
1. Reference Documents. The applicable issue of the documents cited herein, including their specified in the contract. The Contractor shall ensure compliance with FAR and DFAR property clauses applicable to the contract.
2. Format. The report shall be in contractor’s format. MS EXCEL spreadsheet, columnar format, consecutive listing.
3. Content. Listed information shall include a listing of all COP, including but not limited to support equipment, special tooling, special test equipment, or plant equipment.
The report shall contain:
a. Contract name
b. Contract number
c. Contract location
d. Report Period
e. Serial Number
f. Identification Number
g. Vendor Part Number
h. Vendor name
i. National Stock Number (NSN)
j. Nomenclature
k. Warehouse/Current Location
l. Quantity Owned
m. Quantity Commingled with GFP
n. Quantity Difference from Previous Report
o. Reason for Difference in On Hand Quantity
p. Total Value of Each Item in Inventory
4. Intended use of Information: This data will be used by Government personnel to verify the loss, destruction, or theft of Government property or facilities and to document the Contractors investigation and corrective actions pertaining to the event
END OF OTD-21-00058
TITLE: PHASE-IN TRANSITION PLAN
Number: OT-21-00059
DTIC Applicable: No GIDEP Applicable: No Preparing Activity: AS/PMA-273 Project Number: N/A
Use/relationship: The Phase-In Transition Pan will be used to identify tasks, allocated resources, and schedule and risks associated with the transition into a fully operational facility ready to perform Modifications and Maintenance Repair and Overhaul (MR&O) of aircraft.
The DID contains the format, content, and intended use information for the data product resulting from the contract requirements and derived requirements.
This DID is for one-time use for N00019-21-RFPREQ-PMA-273-0368.
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions will be as specified in the contract.
2. Format. Contractor format is acceptable and must address all requirements listed in section three of this DID. The report will be in Microsoft Office 2016 file format (i.e, 2016 Microsoft Word, Excel, PowerPoint, and Project) and must be completely accessible (including formulas) to the Government.
Forms, letters, and signed documents will be in fully searchable Portable Document Format (.pdf) file.
The plan will be free of proprietary markings.
3. Content. The plan will contain the following:
3.1. Cover Page. The cover page will contain the following information:
• Title and identification of the system/component/program/project
• CDRL number and title
• Type of report
• Date of plan and period covered
• Contract number
• Preparing activity and location of the site where prepared.
• Security classification, when required
3.2. Project Management Schedule Elements. Project management schedule elements will include:
a. Schedule of tasks (including task owners) and any interdependencies.
b. Assigned resources at the lowest level necessary to manage risk and meet the timeline necessary for full performance of the contractual requirements.
c. A Gantt chart will be used to illustrate the schedule and will include:
• Task Mode
• Task Name
• Start Date
• Finish Date
• Duration
• Predecessor
• Task Owner
• Resource
• Comments
• Associated Risk Identifier
3.2. Risk Management will include the below information:
• Risks identified and prioritized, analysis conducted for each, and risk assigned owner(s)
• Issues identified and plan/status
• Constraints identified
• Opportunities identified
• Mitigation plans (as required)
• Identified work around plans and work around closure plans, and the constraints for each.
3.3. Report Preparer. Name of person(s) preparing report, email, and telephone number(s).
3.4. Appendices. Include appendices where applicable: tables, references, charts, or other descriptive
END OF OTD-21-00059
Title: FACILITY AND WORK CENTER WALK-THROUGH REPORT
Number: OT-21-00060 Approval Date: 20210914 ELH AMSC Number: Limitation: N00019-21-RFPREQ-PMA-273-0368 DTIC Applicable: GIDEP Applicable:
Preparing Activity: AS/PMA-273 Project Number:
Applicable Forms:
Use/relationship: This report provides the Government and Contractor the status of facilities and work centers spaces in use. This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract Performance Work Statement (PWS). This DID is for one-time use for N00019-21-RFPREQ-PMA-273-0368.
Requirements:
1. Reference documents: The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
1.1 NAVSUP P-485
1.2 NAVSUP P-700
1.3 CNAFINST 4790.2 series
2. Format: Contractor format acceptable. The Contractor shall submit the completed attached checklist to the Government on a monthly basis.
3. Content. The report shall contain the following:
3.1 The cover page of the report shall include:
3.1.1 Contractor Name
3.1.2 Contractor Address
3.1.3. Contract Number
3.1.4 Contractor Email Address
3.1.5 CDRL Number
3.1.6 Date prepared
3.1.7 Distribution Statement
4. The Site Manager at each site shall conduct a monthly walk through inspection of all spaces under their cognizance and submit separately for each site the attached “Facility and Work Center Space Walk-Thru Inspection Check Off List”. If there are any discrepancies found during the monthly inspection which require Public Works action, the trouble call number associated with the discrepancy with the date submitted to Public Works shall be included in the Check Off List.
5. The report shall include:
5.1.1 Site name
5.1.2 Date of Inspection
5.1.3 Inspection completed by:
5.1.4 Site Manager Name
WAREHOUSE/FACILITY CHECK OFF LIST
Name of Space Inspected (List each Space separately)
Building Number, Room Number, Shop Number, etc… (List each space inspected)
Have all Materiel condition discrepancies of stowage spaces, including all installed electrical fixtures, lighting fixtures, ventilation ducts, steam and water pipes, valves, bins, racks and cabinets, been documented and submitted to the appropriate command? (Yes/No) List each discrepancy.
Is there an authorized personnel access list posted, signed by the Site Manager? __Yes __No
Did Contractor document general cleanliness (neat and organized, free of dust, dirt, grime, loose gear, and trash on bins, shelves, and floor areas partially obscured by stores, bins and racks.)
__Yes __No
If discrepancies are noted, list them each discrepancy separately:
Is there a maximum utilization of available space? __Yes __No
Is Material stowed neatly in locations? __Yes __No
If no, list each discrepancy separately:
Are all storeroom/maintenance locations labeled clearly, and have barcode labels? __Yes __No
Do all shelving and cabinets have sufficient cushioning material? __Yes __No
Are all components labeled properly and have Ready For Issue/ FAA Form 8310-3/FAA Form 8130-9/Certificate of Conformance paperwork? __Yes __No
Are all repairable components in storerooms locations in RFI condition? __Yes __No
Are all repairable components properly bubbled wrapped or in approved containers? __Yes __No
Is an Electrostatic Discharge (ESD) station PMS card on file and current check completed?
__Yes __No
Is personal gear present in storeroom/spaces? __Yes __No
Comments:
Is there a designated area that is clearly labeled for each of the following Non Conformance items?
• Disposal Items
• Beyond Economical Repair (BER) items
• Supply Discrepancy items (SDR), etc.)
Is all operating and safety instructions posted appropriately? __Yes __No
Is all emergency lighting installed and in good operating order? __Yes __No
Are emergency exits clearly marked? __Yes __No
Is safety equipment (Fire extinguishers, Eyewash stations, Hazardous spill kits, etc.) clearly marked and have current inspection date? __Yes __No
Are there any unprocessed Non-RFI components (Backlog) in shop? __Yes __No
If so how many and list each asset separately, and note reason for backlog?
Is there any non-operational Equipment in the component repair shop? __Yes __No
If yes, list Broad Arrow Number, and Broad Arrow:
Inspection completed by: Site Manager/Name/ Date/
Signed _____________________________________________
End of OT-21-00060
Title: REPORTING OF INVENTORY RESULTS FOR GOVERNMENT FURNISHED
MATERIAL AND GOVERNMENT PROPERTY
Number: OT-21-00062 Approval Date: 20210914 ELH
AMSC Number:
DTIC Applicable:
Preparing Activity: AS/PMA-273 Applicable Forms:
Limitation: N00019-21-RFPREQ-PMA-273-0368 GIDEP Applicable:
Project Number:
Use/relationship: The report provides the Government with the data necessary for the effective accountability of Government Furnished Property.
This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract Performance Work Statement (PWS).
This DID is for one-time use for Solicitation N00019-21-RFPREQ-PMA-273-0368.
Requirements:
1. Reference documents:
1.1. FAR 52.245-1
1.2. DoDI 5000.64
1.3. SECNAVINST 4440.33A
1.4. NAVSUP P-485
1.5. COMNAVIRFORINST 4440.1 Series
2. Format. The Contractor's format is acceptable.
Content. The report shall contain the following:
3.1. For each report period:
3.1.1. Signed cover letter
3.1.1.1. Signed jointly by Contractor Logistics Manager and Chief of Naval
Air Training (CNATRA) Detachment Industrial Property Management Specialist (IPMS)
3.1.2. Cover page which shall include:
3.1.2.1. Contract Number
3.1.2.2. Name of Contract
3.1.2.3. CDRL Number
3.1.2.4. CDRL Title
3.1.2.5. Site Location
OT-21-00011
3.1.2.6.
3.1.2.7.
Delivery Date of Report Distribution Statement
3.1.3. A separate report shall be submitted for each site. The report shall include an individual worksheet tab for the following commodities:
3.1.3.1. Special Test Equipment
3.1.3.2. Individual Material Readiness List
3.1.3.3. Government Furnished Property
3.1.3.4. Tools
3.1.3.5. Flight Gear
3.1.3.6. Government Furnished Material
3.1.3.7. Calibration Standards
3.1.4. The report worksheets shall include the following data in columns:
3.1.4.1. Month
3.1.4.2. Annual Inventory Location
3.1.4.3. Date Started
3.1.4.4. Date Completed
3.1.4.5. Number of Line Items Inventoried
3.1.4.6. Number Of Inventory Discrepancies
3.1.4.7. Inventory Accuracy Rate
3.1.4.8. List of Inventory Discrepancies and research conducted to resolve inventory discrepancies
3.1.4.9. Remarks
3:1.4.10. Site
4. Intended Use Information: This data will be used by Government personnel to ensure annual inventories are conducted, evaluate the accuracy of physical inventory results compared to the records contained within the property record system and assess the Contractor's reconciliation/explanation of the discrepancies. The data will also be used by Defense contractors to understand historical inventory accuracy results.
5. A sample report is attached for information.
End of OT-21-00062
From:
To:
Subj:
Contractor Name and Address CNATRA Property Administrator
Reporting Of Inventory Results For Government Furnished Material And Government Property
Ref: CONTRACT NUMBER N00019-XX-D-XXXX, CDRL A0l0
1. As required by reference (a), CDRL A01P, Reporting Of Inventory Results For Government Furnished Material And Government Property NASCC, TX is enclosed for (month/ year).
(Signature) Contractor Logistics Manager Printed Name, Date
(Signature) CNATRA Det NASCC, TX
Printed Name Date
Calibration Standards
Month
Annual
Inventory Location (e.g., Warehouse)
Date Started
Dated Completed
Number of Line Items Inventoried
Number of
Discrepancies
List of Inventory and research conducted to resolve inventory discrepancies
Accuracy Rate
Remarks
Site
October
November
December
January
February
March
April
May
June
July
August
September
Government Furnished Material
Date Started
Dated Completed
Number of Line Items Inventoried
List of Inventory and research conducted
Accuracy Rate
November
December
January
February
March
April
May
June
July
Flight Gear
Inventory
Date Started
Completed
Items Inventoried
Accuracy Rate
List of Inventory Discrepancies and research conducted to resolve inventory discrepancies
November
December
January
February
March
April
M ay
June
Jul y
Tools
Inventory
Started
Completed
Items
Inventoried
Accuracy Rate
List of Inventory Discrepancies and research conducted
November
December
January
February
March
April
May
June
July
| OT-21-00054- Planning and Estimate Report.pdf |
| DATA ITEM DESCRIPTION |
| DTIC Applicable: GIDEP Applicable: Preparing Activity: AS/PMA273 Project Number: Applicable Forms: |
| OT-21-00056 Government Furnished Property Inventory Report.pdf |
| End of OT-21-00056 |
File details come from the government source that posted it. Updated .