Att.3 CDRLS.pdf
PDF 2 MB Posted
- Attached to
- FAA Academy Transportation Services
- Solicitation number
- 6973GH-24-R-00154
About this file
This is a Contract Data Requirements List (CDRL) document containing 13 CDRLs that specify various data deliverables required for an FAA Academy Transportation Services contract. The CDRLs detail requirements for transportation schedules, vendor staff lists, fleet inventory, certificates of insurance, invoicing, ridership reporting, and other contract documentation.
Key deliverables include: MMAC transportation schedule with pickup times and routes (CDRL 001), vendors' transportation stop schedule (CDRL 002), certificate of insurance to be submitted 10 days after award and annually (CDRL 003), fleet inventory with vehicle details submitted semi-annually (CDRL 005), drivers list with MVR and vehicle assignments (CDRL 006), monthly invoices with trip details (CDRL 008), monthly ridership reports by route (CDRL 009), and documentation for on-demand/overflow transport services (CDRLs 010-013). All deliverables are to be submitted electronically to the AMA-20 COR, with specific formatting and content requirements detailed for each CDRL. The document includes preparation instructions and frequency codes for all submissions.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (6/98)
CONTRACT DATA REQUIREMENTS LIST (CDRL) Page 1 of
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
TDP TM Other X D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle CDRL 001 MMAC Transportation Schedule Transportation STOP pick-up time(s)
4. Authority 5. Contact Reference 6. Requiring Office PWS Paragraph AMA-20
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A
12. Date of First
Submission
13. Date of Subsequent
Submission 15. Distribution
a. b. Draft c. Final Copies
Addressee Copies Reg. Repro
14. REMARKS:
Prior to contract award review routes, STOPs, location pickup, and drop-off times. Review and approve for safety (consider the area at night such as lighting, shelter, vagrants, and oncoming traffic when approving STOPs) and arrival points of destination for on-time class arrival. Create or recreate a pick-up time schedule to provide for the betterment of transportation services Monday - Friday in accordance with the MMAC Transportation Schedule.
Transportation services are required to/from several specific lodging properties and the Mike Monroney Aeronautical Center (MMAC) for numerous students attending training at the Center Monday - Friday.
Class times during the day are 0700 to 1530 and during the evening are 1530 to 2400. Routes and Lodging Providers are subject to change based on location and need.
Prior to the start of each day route and midnight route it is the vendor's responsibility to call the MMAC status line to stay aware of the center's closure or early departures. MMAC Status Line (405) 954-0040. Events can happen to change the center's ability to remain open and students must be dismissed for early departure immediately.
Thus a return to Status Open can happen the same day requiring the next shift to report to class. After Hours Duty Officer (405) 954-3583 And the status line numbers will keep the drivers up to date as the COR, CO and Academy management may not be fully informed and not a good source of information.
AMA-20 COR 1 ea
16. Total
H. Date I. Approved By J. DateG. Prepared By:
17. Price Group 18. Estimated Total Price
MISTY D MCGLUGRITCH Digitally signed by MISTY D MCGLUGRITCH Date: 2024.07.08 10:03:47 -05'00'
08 JUL 2024 12 SEP 2024
OMB Control No. 2120-0595 (DD Form 1423-1) FAA Template No. 59 (reverse) (6/98)
INSTRUCTIONS FOR COMPLETING FAA Template No. 59 (6/98) (Mark Not Applicable sections as N/A)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes Code Definition Code Definition
ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
16. Total. Total number of draft and final (regular/reproducible) copies required.
17. Price Group. Not used. 18. Estimated Total Price. Not used.
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
TDP TM Other X D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle
CDRL 002 Vendors' Transportation STOP schedule Transportation STOP pick-up time(s)
4. Authority 5. Contact Reference 6. Requiring Office
PWS Paragraph AMA-20
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A
12. Date of First Submission
13. Date of Subsequent Submission 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies Addressee Copies Reg. Repro
Provide transportation services in accordance with the MMAC Transportation Schedule
Vendors CBA Transportation STOP pick-up time(s) Prior to contract Award and updated within two days of route changes.
See the Example for reference note; vendors design is negotiable
AMA-20 COR 1 ea
16. Total
H. Date I. Approved By J. DateG. Prepared By:
17. Price Group 18. Estimated Total Price
07/08/2024 09/12/2024
(Mark Not Applicable sections as N/A)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes Code Definition Code Definition
ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
A. Contract line-Item No. B. Exhibit C. Category (Check appropriate one)
TDP TM Other X
D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle
CDRL 003 Certificate of Insurance
4. Authority 5. Contact Reference 6. Requiring Office
FAR 52.228-5 AMA-20
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A Annually
12. Date of First Submission
10 days after the Award
13. Date of Subsequent Submission Annually 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies Addressee Copies Reg. Repro
Submit electronically to the AMA-20 COR.
10th day after the Award, and then annually upon the beginning date of each Option Year.
AMA-20 COR 1 ea
16. Total
H. Date I. Approved By J. DateG. Prepared By:
(Mark Not Applicable sections as N/A)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes Code Definition Code Definition
ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
TDP TM Other X
D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle
CDRL 004 Certificates Title(s)
4. Authority 5. Contact Reference 6. Requiring Office
AMA-20
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A Semi-Annually
12. Date of First Submission
10 days after the Award
13. Date of Subsequent Submission
Semi-Annual
15. Distribution
14. REMARKS: a. b. Draft c. Final Copies Addressee Copies Reg. Repro
Submit electronically to the AMA-20 COR.
10th day after the Award, and purchase of each transportation vehicle used in the performance of services in the contract:
AMA-20 COR 1 ea
16. Total
H. Date I. Approved By J. DateG. Prepared By:
(Mark Not Applicable sections as N/A)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes Code Definition Code Definition
ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
TDP TM Other X
D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle
CDRL 005 Fleet Inventory Fleet Descriptions
4. Authority 5. Contact Reference 6. Requiring Office
Factor 1 AMA-20
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A Semi-Annually
12. Date of First Submission
10 days after the Award
13. Date of Subsequent Submission
Semi-Annual
15. Distribution
14. REMARKS: a. b. Draft c. Final Copies Addressee Copies Reg. Repro
Submit electronically to the AMA-20 COR.
10th day after the Award, and then semi-annually.
Of each transportation vehicle used in the performance of services in the contract:
Provide the Vehicle ID# (bus number), Seating Capacity.
Make.
Model.
Model Year Date.
VIN Number.
If it is a Primary or a Backup vehicle.
If it has a Wheelchair lift.
AMA-20 COR 1 ea
16. Total
H. Date I. Approved By J. DateG. Prepared By:
(Mark Not Applicable sections as N/A)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes Code Definition Code Definition
ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
TDP TM Other X D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle
CDRL 006 Drivers List
4. Authority 5. Contact Reference 6. Requiring Office
SOW Paragraph AMA-20
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A w/ each new driver
12. Date of First Submission Award
13. Date of Subsequent Submission Annually 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies Addressee Copies Reg. Repro
Submit upon Contract Award, and annually a complete updated list of all drivers. Transmit via electronically to the AMA-20 COR and copy the CO.
Driver list MVR Full Name/ Driver Class/ Assigned Vehicle No.
Annually no less than one week prior to the start of the Option Year.
Updated with personnel changes.
AMA-20 COR 1 ea
16. Total
H. Date I. Approved By J. DateG. Prepared By:
07/11/2024 09/12/2024
(Mark Not Applicable sections as N/A)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes Code Definition Code Definition
ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
TDP TM Other X D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle
CDRL 007 Vendors Staff List Staff Contact List
4. Authority 5. Contact Reference 6. Requiring Office
SOW Paragraph AMA-20
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A w/ each new driver
12. Date of First Submission Award
13. Date of Subsequent Submission Annually 15. Distribution
14. REMARKS: a. b. Draft c. Final Copies Addressee Copies Reg. Repro
Submit upon Contract Award, and annually a complete updated list of all Staff members. Transmit via electronically to the AMA-20 COR and copy the CO.
Managerial, Dispatch, Accounting, Drivers Vendor Staff Contact List
Full Name/Office Phone/Cell Phone/email.
Updated with each personnel change.
Annually no less than one week prior to the start of each Option Year. Update with personnel changes.
AMA-20 COR 1 ea
16. Total
H. Date I. Approved By J. DateG. Prepared By:
(Mark Not Applicable sections as N/A)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the technical adequacy of the data.
7. DD 250 Required.
8. APP Code. Identification, by entry of an “A,” of a requirement for advance written approval prior to final distribution of an item of data. An “A” in this item indicates that one or more draft submittals are required. Item 14 will show length of turn-around time for the contractor to resubmit the data after Government approval/disapproval has been issued.
9. Distribution Statement Required.
10. Frequency. The frequency of data submittal. Entries in this item are explained in Table 1. If the data is of a recurring type, it is to be submitted at the end of the reporting period established in this item unless otherwise indicated in item 14.
Table 1. Data Submittal Frequency Codes
CODE FREQUENCY CODE FREQUENCY
ANNLY Annually ASGEN As generated ASREQ As required BI-MO Every two months
BI-WE Every two weeks CP/RQ Change pages as required DAILY Daily DFDEL Deferred delivery
MTHLY Monthly ONE/R One time with revisions OTIME One time (does not include draft submissions QRTLY Quarterly R/ASR Revisions as required SEMIA Every six months
WEKLY Weekly “N”TIME Multiple separate submittals (2time, 3time, etc.)
See Item #14 Requirement is described in item #14. Used in lieu of other codes where such are inadequate to define requirement, or used in addition to other codes requiring amplification in item #14.
11. As of Date. Date for cutting off collection of the data. If the data is to be submitted multiple times, a numeral will be entered to indicate the number of calendar days prior to the end of the reporting period, established in item 10, that data collection will be cut off. For example, “15” would place the “as of date” for the data at 15 days before the end of the month, quarter, or year, depending upon the frequency established in item 10; a “0 or blank” would place the “as of” date at the end of each month, quarter, etc.
12. Date of First Submission. Due date for initial data submission. This is normally the postage date or date the data is delivered to the Contracting Officer or keyed to a specific event or milestone, using a code from Table 2.
Table 2. Data Submission Codes Code Definition Code Definition
ASGEN As generated ASREQ As required DFDEL Deferred delivery “N”DAC Days after contract award
“N”DACM Days after contract modification “N”DARP Days after reporting period “N”DARC Days after receipt of comments “N”DTC Days after test completion
NLT No later than EOC End of contract EOM End of month EOQ End of quarter
See item #14 Use to indicate requirement is described in item 14. Used in lieu of other codes where such are inadequate to define requirement or used in addition to other codes when amplification is included in item 14.
The “N” is assigned a value indicating the number of days, e.g., 30 DAC
13. Date of Subsequent Submission. Due date(s) for subsequent data submission(s), if data is to be submitted more than once. If submittal is constrained by a specific event or milestone, the constraint will be given using a code from Table 2.
14. Remarks. Contains all pertinent information not specified elsewhere and any amplification of other items on this format (e.g., DID tailoring, approva criteria and authority, inspection and acceptance clarification, distributions statements, specific submission instructions, explanation of reproducible copy and delivery requirements, alternative medium for delivery of the data item, etc.)
15. Distribution. Addressees and the number of draft and final copies (regular or reproducible) to be provided to each. FAA facility designator and/or office symbols/codes may be used; however, an explanation of these will be provided in the Addressee Listing. When reproducible copies (e.g., magnetic diskettes/tape, vellum, negative, etc.) are required, an explanation will be provided in item 14. If deferred delivery is required, amplification will be given in item 14.
A. Contract line Item No. B. Exhibit C. Category (Check appropriate one)
TDP TM Other X
D. System/Item E. Contract/PR No. F. Contractor
1. Data Item No. 2. Title of Data Item 3. Subtitle
CDRL 008 Invoice Invoice Monthly Data Report
4. Authority 5. Contact Reference 6. Requiring Office
PWS Paragraph AMA-20
7. DD 250 Req’d 8. APP Code 9. Distribution Statement Required 10. Frequency 11. As of Date (AOD)
N/A Monthly
12. Date of First Submission
13. Date of Subsequent Submission 15. Distribution
a. b. Draft c. Final Copies Addressee Copies Reg. Repro
14. REMARKS:
Submit electronically by 10th day of next month
Contains: Contract Line Item Numbers (CLIN) descriptions, dates of service, and monthly totals for each CLIN:
Include for each:
Vehicle Transport Trips:
Total number of one-way trips a day 7 (7 trips a day is 3 combined routes) X number of days each month X dollar charge per transport vehicle. The combined total for the month.
Example using full month of April 2024 #140 trips all month X $10.00 Per trip = $1400.00 (total vehicle charge)
140 x $10.00 per trip = $1400.00
On Demand Transport
ON CALL Transport Trips #__ X $ _____ = $_______
Out Processing Transport Trips #__ X $ _____ = $_______
AMA-20 COR 1 ea
16. Total
H. Date I. Approved By J. DateG. Prepared By:
(Mark Not Applicable sections as N/A)
A. Contract Line Item No.. Contract Line Item Number (CLIN) associated with this Contract Data Requirements List (CDRL).
B. Exhibit. Exhibit identifier for this CDRL item.
C. Category. TDP, TM, or Other.
D. System/Item. System, item, project designator or name, or title of services being acquired that the data will support.
E. Contract/PR No. Procurement Instrument Identification Number (PIIN) (i.e., the contract number, the Purchase Request (PR) number, the screening Information Request (SIR) number, or other appropriate designator.
F. Contractor. Contractor’s name.
G. Prepared by. Preparer’s organization responsible for preparing the CDRL.
H. Date. Date the form was prepared.
I. Approved by. Office responsible for approving the CDRL. The approving official’s signature appears on the last page of exhibit.
J. Date. The date the CDRL was approved.
1. Data Item No. The 4-character Exhibit Line Item Number (ELIN). The first position consists of the exhibit identifier and the remaining positions are assigned sequentially.
2. Title of Data Item. The title of the Data Item Description (DID) cited in item 4.
3. Subtitle. Further identification of the data item to supplement the title, if required.
4. Authority (Data Acquisition Document No.) DID identification number where detailed preparation instructions are provided.
5. Contract Reference. The specific paragraph number of the applicable contractual document that contains the tasking that generates a requirement for the data item. Normally, this will be a Statement of Work (SOW) paragraph.
6. Requiring Office. The technical office having responsibility for ensuring the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .