The file Att_10_Price_Schedule.xlsx appears to be a pricing template for the HAMP 326087 project to preserve historic structures at Hampton National Historic Site in Towson, Maryland. The solicitation (140P2025R0043) is specifically set aside for a Competitive 8(a) business concern, targeting a design-bid-build construction project for the Department of the Interior National Park Service. While the specific pricing details cannot be fully assessed without opening the Excel file, the document is likely intended to provide a structured format for contractors to submit their proposed pricing for the historic preservation work.
The project focuses on preserving historic structures at the Hampton National Historic Site, with the solicitation indicating a competitive procurement process restricted to 8(a) program-eligible businesses. The government anticipates a design-bid-build approach, suggesting contractors will need to provide comprehensive pricing that covers design, construction, and potentially restoration services specific to historic structure preservation. Potential offerors should carefully review Section L of the solicitation for additional details, particularly regarding the pre-proposal site visit, which will likely provide critical information for accurate pricing and project scoping.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price CLINs
| Contract Price Schedule | ||||
| National Park Service (NPS) - Denver Service Center (DSC) | ||||
| Solicitation Number: | 140P2025R0043 | |||
| PARK - PMIS: | HAMP 32607 | |||
| Developed Area: | Hampton National Historic Site, Towson, MD | |||
| Project Title: | Preserve Historic Structures | |||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Total Price |
| 0001 | Farm Side Rehabilitation - Base | 1 | Job | |
| 0002 | Garden Service Cluster Area Rehab- Base | 1 | Job | |
| 0003 | Hampton Mansion & Area Exterior Improvements - Base | 1 | Job | |
| 0004* | Ice House Rehabilitation - Option A | 1 | Job | |
| 0005* | Hampton Mansion Interior Improvements - Option B | 1 | Job | |
| 0006* | Caretaker's Cottage Rehabilitation (Except Fire Alarm & Intrusion Detection) - Option C | 1 | Job | |
| 0007* | Mule Barn Rehabilitation / Long House Granary Rehabilitation - Option D | 1 | Job | |
| 0008* | Road Maintenance (Except Repairs for Waterline and other utility-required repairs, no Garden Service Road - Option E | 1 | Job | |
| 0009* | Green Metal Building Rehab (No Fire Alarm & Intrusion Detection) - Option F | 1 | Job | |
| 0010* | Green House #1 Rehabilitation (No Site Work) - Option G | 1 | Job | |
| 0011* | Dairy Rehabilitation - Option H | 1 | Job | |
| 0012* | Pump House Rehabilitation - Option I | 1 | Job | |
| TOTAL Base Price - ALL CLINs (0001 through 0003) --------------------------------------------------------------------- | ||||
| TOTAL option Price - ALL CLINs (0004 through 0012) -------------------------------------------------------------------- | ||||
| TOTAL PROPOSED PRICE - ALL CLINs (0001 through 0012) ------------------------------------------------------ | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. | ||||
| *Otpion prices are valid 12 months from award date. |
Cost Breakdown
| Item No. | Description | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total | Direct Cost/Unit | Total Direct Costs |
| Equipment Cost | |||||||||
| 1 | Foundations | ||||||||
| 2 | Basement Construction | ||||||||
| 3 | Superstructure | ||||||||
| 4 | Exterior Enclosure | ||||||||
| 5 | Roofing | ||||||||
| 6 | Interior Construction | ||||||||
| 7 | Staircases | ||||||||
| 8 | Interior Finishes | ||||||||
| 9 | Conveying Systems | ||||||||
| 10 | Plumbing Systems | ||||||||
| 11 | HVAC | ||||||||
| 12 | Fire Protection | ||||||||
| 13 | Electrical | ||||||||
| 14 | Equipment | ||||||||
| 15 | Furnishings | ||||||||
| 16 | Special Construction | ||||||||
| 17 | Selective Building Demolition | ||||||||
| 18 | Site Preparation | ||||||||
| 19 | Site Improvements | ||||||||
| 20 | Site Mechanical Utilities | ||||||||
| 21 | Site Electrical Utilities | ||||||||
| 22 | Other Site Construction | ||||||||
| 23 | Standard General Conditions | ||||||||
| Subtotal Direct Construction Costs | |||||||||
| 24 | Design Contingency | ||||||||
| 25 | Total Subcontracting | ||||||||
| 26 | Overhead | ||||||||
| 27 | Profit | ||||||||
| 28 | Bonds | ||||||||
| 29 | Insurance | ||||||||
| 30 | Permits | ||||||||
| Total Construction Cost |
Labor Rates example
| Prime Labor Category | Rates | Hour | Total Labor Cost | |
| Project Executive | ||||
| Project Manager | ||||
| Superintendent | ||||
| Quality Control Manager | ||||
| Safety Manger | ||||
| Admin Support | ||||
| Subcontractor Labor Category | ||||
| Foremen | ||||
| Laborer | ||||
| L |
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Build (DB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Yosemite Valley | ||||
| Project Title: | Design and Build a New Structure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |