Att_07_Permit_final_approal_SWM.pdf
PDF 272 KB Posted
- Attached to
- HAMP 326087: Preserve Historic Structures Hampto Federal contract opportunity
- Solicitation number
- 140P2025R0043
About this file
This document is a Stormwater Management and Sediment & Erosion Control Approval issued by the Maryland Department of Environment for the National Park Service's Hampton National Historic Site project in Baltimore County. The approval, designated MDE Number 24-SF-0094 and effective May 30, 2024, grants permission for site maintenance work with specific environmental compliance conditions. Key requirements include submitting a notice of intent (NOI) for the National Pollutant Discharge Elimination System (NPDES) General Permit, notifying the MDE/WSA Compliance Program before and after project work, and submitting certified as-built plans upon construction completion. The project involves minimal earth disturbance (0.02 acres) and has been granted a stormwater management waiver, with stormwater requirements to be satisfied through impervious area reduction and sheet flow to a conservation area.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STORMWATER MANAGEMENT AND SEDIMENT & EROSION CONTROL APPROVAL
STATE/FEDERAL PROJECTS
SEDIMENT & STORMWATER PLAN REVIEW DIVISION
MDE NUMBER: 24-SF-0094 APPROVED BY: ____________________________________
Program Manager, Sediment, Stormwater, and Dam Safety EFFECTIVE DATE: May 30, 2024 (Pursuant to Criteria Noted Below)
IN COMPLIANCE WITH: Environment Article, Sections 4-106 and 4-205 Annotated Code of Maryland
APPROVAL IS HEREBY GRANTED: National Park Service ADDRESS: 441 E. Main Street
Hancock, MD 21750 Attn: Mr. John Holtzinger
HEREINAFTER KNOWN AS OWNER,
FOR THE PLANS AND SPECIFICATIONS PRESENTED FOR: AI No.180696
Hampton National Historic Site - Baltimore County
PREPARED BY: Vanasse Hangen Brustlin, Inc.
This APPROVAL is granted subject to the following conditions:
1. This Approval shall become null and void if the construction authorized herein has not been completed within three (3) years from the granting of this Approval, except that these limits may be extended at the discretion of the Department when requested by the owner or authorized agent.
2. This Approval is subject to all laws and regulations now in effect and may be revoked if it is subsequently determined that this authorization violates other laws of the State. Construction shall comply with approved terms.
3. The location and dimensions of all sediment control structures and stormwater management facilities, as well as grading, excavation, and filling shall be in accordance with plans approved by the Department of the Environment/ Water and Science Administration (MDE/WSA). The owner or authorized agent shall obtain written approval from the MDE/WSA for any plan modifications or changes. A copy of the approved plan with any approved modifications and this Approval shall be available at the construction site for reference during the construction period.
4. Off-site borrow or waste sites require local county and Soil Conservation District approvals if they are located on private property or MDE/WSA approval if on State or federal property. Local approval numbers shall be furnished to the MDE/WSA Inspector.
5. The Owner or his authorized agent shall notify the MDE/WSA Compliance Program at (410) 537-3510, at least seven (7) days prior to initiation of the project and five (5) days after work ends.
6. This project has an earth disturbance of 1.0 acre or greater. Prior to any earth disturbance, notice of intent (NOI) application for the National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Associated with Construction Activity shall be submitted to and approved by MDE.
7. A stormwater management waiver has been granted for the maintenance work in accordance with Section 3.3.A of the Maryland Stormwater Management and Erosion & Sediment Control Guidelines for State and Federal Projects. Stormwater management requirements for the proposed development (IART=0.02 acre) are being satisfied by reducing impervious area, a non-rooftop disconnection, and sheet flow to conservation area.
8. Once construction is complete, as-built plans certified by a licensed professional engineer, land surveyor, or landscape architect shall be submitted to MDE/WSA for review and acceptance.
APM/LSW