This document is an Amendment (Amendment 04) to Solicitation 140P2025R0043 for the Hampton National Historic Site preservation project in Towson, Maryland. The amendment includes several key modifications: 1) adding an Option CLIN013 for a separate Construction Manager (CMR) office space in the construction trailer, 2) providing photos for the Long House Granary, and 3) clarifying technical specifications for fire suppression systems in the Overseer's house. Specifically, the amendment prohibits drilling historic floor joists for sprinkler piping and references Division 21 specs for fire suppression requirements. The proposal due date remains unchanged at 12 noon ET on May 28, 2025, with a performance period from September 1, 2025, to March 1, 2027. The solicitation is set aside for a Competitive 8(a) business concern and is managed by the Department of the Interior National Park Service.

View the file

Other files for this federal contract opportunity

Other files attached to HAMP 326087: Preserve Historic Structures Hampto, newest first.
File Type Posted
AM04_0004.pdf PDF
LHG_Interior_Photos_and_Key_0004.zip ZIP file
Att_10A_Revised_Price_Schedule_0004.xlsx XLSX spreadsheet
Att_16_RFIs_0003.PDF PDF
Att_09A_Wage_Determination_MD20250108_0003.pdf PDF
Sol_140P2025R0043_Amd_0003.pdf PDF
Att_17_Site_Visits_Attendees_List_0003.PDF PDF
AM03_0003.pdf PDF
Sol_140P2025R0043_Amd_0002.pdf PDF
Att_01A_Specifications_Volume_1R1_0002.pdf PDF
Sol_140P2025R0043_Amd_0001.pdf PDF
Att_08B_Product_File_0001.pdf PDF
Att_03B_Drawings_Volume1_0001.pdf PDF
Att_08D_Product_File_0001.pdf PDF
Att_08A_Product_File_0001.pdf PDF
Att_03C_Drawings_Volume1_0001.pdf PDF
Att_08C_Product_File_0001.pdf PDF
Att_03A_Drawings_Volume1_0001.pdf PDF
Att_01_Specifications_Volume_1.pdf PDF
Att_02_Specifications_Volume_2.pdf PDF
Att_05_Permit_Submittal_List_Form.pdf PDF
Att_06_Permit_Approved_SWM_Plans.pdf PDF
Att_11_PEQ.docx DOCX document
Att_13_Report_on_Limitation_on_Subcontracting.xlsx XLSX spreadsheet
B08_Solicitation_140P2025R0043_HAMP_326087.pdf PDF
Att_09_Wage_Determination_MD20250046.pdf PDF
Att_12_General_References.pdf PDF
Att_14_Past_Performance_Questionnaire.docx DOCX document
Att_15_Proposed_Equals.docx DOCX document
Sol_140P2025R0043.pdf PDF
Att_04_Drawings_Volume_2.pdf PDF
Att_07_Permit_final_approal_SWM.pdf PDF
Att_10_Price_Schedule.xlsx XLSX spreadsheet
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2025R0043 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 1 Denver Federal Center, Building 50 NPS, DSC Contracting Services Div

HAMP 32608705/12/20250004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/26/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment 04 is for the following:

1. Revise Attachment #10A Price Schedule to include Option CLIN013 Provide a separate CMR

Office Space. Due to limited office space at the Park's office, the Government requests contractor to provide a separate CMR office space in the construction trailer for CMR to work during the project construction activities.

2. Provide photos in answer #47 for the Long House Granary phots and keyplan via zip file in Attachment #18 (18 interior photos with keyplan).

3. Clarify a new RFI regarding the following, "With respect to the Overseer's house, Please confirm only the 2nd floor and attic will have a dry system. Can we run exposed pipe in the 2nd floor and attic or should we remove drywall and plaster to run pipes in joists? Is it ok for 2.5" and larger pipes to be SCH 40? Can CPVC piping be used in

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Marc Nguyen

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2025R0043/0004 conditioned spaces where piping is running through the joists." The Answer is - See

Division 21 specs for fire suppression only include dry-pipe. It is NOT ACCEPTABLE to drill the historic floor joists to allow sprinkler piping to pass through them.

4. Update Section J - List of Attachments (See attached AM04).

5. The proposal due date remains unchanged at 12 noon ET on May 28, 2025.6.

6. All other terms and conditions remain the same.

Nothing follows

Period of Performance: 09/01/2025 to 03/01/2027