AM04_0004.pdf
PDF 168 KB Posted
- Attached to
- HAMP 326087: Preserve Historic Structures Hampto Federal contract opportunity
- Solicitation number
- 140P2025R0043
About this file
This document is an Amendment (Amendment 04) to Solicitation 140P2025R0043 for preserving historic structures at Hampton National Historic Site in Towson, Maryland. The amendment includes several key modifications: adding Option CLIN013 for a separate Construction Manager (CMR) office space in the construction trailer, providing photos of the Long House Granary, and clarifying technical specifications for fire suppression systems. Specifically, the amendment prohibits drilling historic floor joists for sprinkler piping and reinforces that only dry-pipe systems are acceptable in certain areas.
The solicitation remains a design-bid-build construction project set aside for a Competitive 8(a) business concern, with the proposal due date unchanged at 12 noon ET on May 28, 2025. The period of performance is from September 1, 2025, to March 1, 2027. The amendment updates the List of Attachments in Section J and provides technical clarifications about piping installation methods, emphasizing preservation of historic structural elements during the renovation project.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2025R0043 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 1 Denver Federal Center, Building 50 NPS, DSC Contracting Services Div
HAMP 32608705/12/20250004
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/26/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 04 is for the following:
1. Revise Attachment #10A Price Schedule to include Option CLIN013 Provide a separate CMR
Office Space. Due to limited office space at the Park's office, the Government requests contractor to provide a separate CMR office space in the construction trailer for CMR to work during the project construction activities.
2. Provide photos in answer #47 for the Long House Granary phots and keyplan via zip file in Attachment #18 (18 interior photos with keyplan).
3. Clarify a new RFI regarding the following, "With respect to the Overseer's house, Please confirm only the 2nd floor and attic will have a dry system. Can we run exposed pipe in the 2nd floor and attic or should we remove drywall and plaster to run pipes in joists? Is it ok for 2.5" and larger pipes to be SCH 40? Can CPVC piping be used in
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Marc Nguyen
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P2025R0043/0004 conditioned spaces where piping is running through the joists." The Answer is - See
Division 21 specs for fire suppression only include dry-pipe. It is NOT ACCEPTABLE to drill the historic floor joists to allow sprinkler piping to pass through them.
4. Update Section J - List of Attachments (See attached AM04).
5. The proposal due date remains unchanged at 12 noon ET on May 28, 2025.6.
6. All other terms and conditions remain the same.
Nothing follows
Period of Performance: 09/01/2025 to 03/01/2027
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation
Document No.
140P2025R0043
Document Title
HAMP 326087 Preserve Historic Structures, Hampton National Historic Site, Towson, MD
(b) The use in this solicitation or contract of any Department of Interior Acquisition Regulation (48 CFR Chapter 14) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of clause)
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
Attachment
Title Description Date # of pages
01A Specifications Volume 1R1 4/4/2025 826
02 Specifications Volume 2 3/20/2025 837
03 Drawings Volume 1 NA 288
04 Drawings Volume 2 NA 136
05 Permit Submittal List Form NA 7
06 Permit Approved SWM Plans 1/17/2024 32
07 Permit Final Approval SWM 5/30/2024 1
08 Product File NA 812
09A DBA MD20250108 3/14/2025 8
10A Revised Price Schedule NA 1
11 Project Experience Questionnaire (PEQ) NA 1
12 General References NA 2
13 Report on Limitation on Subcontracting NA 1
14 Past Performance Questionnaire NA 3
15 Proposed Equals NA 1
16 RFIs 5/8/2025 10 17 Site Visits Attendees List N/A 3
Long House Granary interior Photos -zipfile
NA 19
SECTION K – REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS
OF OFFERORS
Signature Extension
If the Offeror is a partnership or a joint venture, all partners or joint venture representatives are required to sign as Contractors. Signatures shall be provided below:
Name:_________________________ Name:________________________
Title:__________________________ Title:_________________________
PROVISIONS INCORPORATED BY REFERENCE
File details come from the government source that posted it. Updated .