Atch 9 Price Breakout Schedule Construction.xlsx

XLSX spreadsheet 72 KB Posted

Attached to
Z1DA--626-24-204 - Update / Upgrade Steam System Components Federal contract opportunity
Solicitation number
36C24924B0011
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document is a Price Breakout Schedule related to a federal contract opportunity for an upgrade and replacement of steam system components at the Tennessee Valley Healthcare System (TVHS) Nashville VA Medical Center.

The key details are:

The solicitation number is 36C24924B0011 and the project is to replace failing condensate return skid pumps, piping, and associated components, as well as add venting in Building 1 at the TVHS Nashville VA Medical Center. The project includes replacing condensate return systems in multiple areas of the facility, upgrading piping, steam traps, and other steam system components. The contractor is responsible for all work, including providing stamped drawings, commissioning, and a one-year warranty. The period of performance is 120 calendar days from notice to proceed. The document provides detailed requirements, guidelines, and standards for the project.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--626-24-204 - Update / Upgrade Steam System Components, newest first.
File Type Posted
36C24924B0011 0009.docx DOCX document
Atch 17 VAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting CC.pdf PDF
Atch 14 VAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting.docx DOCX document
36C24924B0011 0008.docx DOCX document
Atch 2 Specifications 626-24-204 Final R1.pdf PDF
36C24924B0011 0007.docx DOCX document
36C24924B0011 0006.docx DOCX document
36C24924B0011 0005.docx DOCX document
36C24924B0011 0004.docx DOCX document
Atch 6 Drawing Combined Steam-CAD Version.pdf PDF
36C24924B0011 0003.docx DOCX document
Atch 15 Construction Safety Guidebook.pdf PDF
Atch 16 VA Form 6112 Equipment Record.pdf PDF
36C24924B0011 0002.docx DOCX document
SPEC Section 01 32 16.15.pdf PDF
Atch 14 VA TVHS Confined Space Policy.docx DOCX document
SPEC Section 01 45 00.pdf PDF
Atch 1 WD Davidson County Building TN20240178 dated 07262024.pdf PDF
36C24924B0011 0001.docx DOCX document
Atch 7 Drawing Typical Flash Tank Connections.pdf PDF
Atch 6 Drawing Combined Steam.pdf PDF
Atch 3 Condensate Pump Selections Basis of Design.pdf PDF
Atch 1 WD Davidson County Building TN20240178 dated 06212024.pdf PDF
36C24924B0011_1.docx DOCX document
Atch 10 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 8 Nashville VA Steam Components Name and Location Key.xlsx XLSX spreadsheet
Atch 5 Drawing Armstrong AFH 4100 J Condensate Pump 30GAL Duplex.pdf PDF
Atch 13 Contractor EMR Certification Form.docx DOCX document
Atch 12 TAX ID UEI Document.docx DOCX document
Atch 11 Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
Atch 4 Drawing Armstrong AFH 4100 J Condensate Pump 15GAL Duplex.pdf PDF
Atch 2 Specifications 626-24-204 Final.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 Solicitation Number Project Number Project Title Proposal Date

SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS

DIVISION 1GENERAL REQUIREMENTS$0.00
Shop Drawings, Product Data, & Samples
Safety Requirements
Reference Standards
Quality Control
Testing Laboratory Services
Special Inspections
Temporary Environmental Controls
Construction Waste Management
General Commissioning Requirements
DIVISION 2Existing Conditions$0.00
Site Survey
Demolition
Traditional Asbestos Abatement
DIVISION 3CONCRETE$0.00
Cast in Place Concrete
Cast in Place Concrete (short form)
DIVISION 4MASONRY$0.00
Masonry Mortaring
DIVISION 5Metals$0.00
Structrural Steel Framing
Metal Fabrications
DIVISION 6Wood, plastics and Composites$0.00
Rough Carpentry
Finish Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
Thermal Insulation
Flashing and Sheet Metal
Roof Specialties
Roof Accessories
Firestopping
Joint Sealants
DIVISION 8Openings$0.00
Hollow Metal Doors & Frames
Interior Wood Doors
Intensive Care Unit Entrances
Door Hardware
Low Energy Power Assist Door Operators
Glazing
DIVISION 9FINISHES$0.00
Subsurface Prep for Floor Finishing
Schedule for Finishes
Non Struct Metal Framing
Gypsum Board
Ceramic/Porcelain Tiling
Acoustical Ceilings
Resilient Base and Accessories
Resilient Sheet Flooring
Resilient Tiling Flooring
Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2)
Carpeting
Painting
High-Build Glazed Coatings
DIVISION 10Specialties$0.00
Chalkboards and Markerboards
Signage
Cubicle Curtain Tracks
Wall & Door Protection
Toilet, Bath, & Laundry Accessories
Fire Extinguisher Cabinets

DIVISION 11 EQUIPMENT $0.00

DIVISION 12Furnishings$0.00
Window Shades
Manufactured Metal Casework
Manufactured Wood Casework
Countertops
DIVISION 13Special Construction$0.00
Seismic Restraint Requirements for Non- Structural Components
DIVISION 21Fire Suppression$0.00
Wet-Pipe Sprinkler Systems
DIVISION 22Plumbing$0.00
Common Work Results for Plumbing
Meters and Gages for Plumbing piping
General-Duty Valves for Plumbing Piping
General Motor Requirements for Plumbing Equipment
Plumbing Insulation
Facility Water Distribution
Facility Sanitary & Vent Piping
Facility Storm Drainage
Packaged Pedestal Drainage Pump Units
Plumbing Fixtures
Vacuum Systems for Laboratory & Healthcare Facilities
Gas Systems for Laboratory & Healthcare Facilities
DIVISION 23Heating, Ventilating and Air Conditioning HVAC$0.00
Common work results for Boiler and Steam Generation
Common Work Results for HVAC
Testing, Adjusting and Balancing for HVAC
General Motor Requriments for HVAC and Steam Generation Equipment
Noise and Vibration Control for HVAC Piping and Equipment
Testing, Adjusting and Balancing for HVAC
HVAC and Boiler Plant Insulation
Commissioning of HVAC Systems
Instrumentation and Control for Boiler Plant
Boiler Plant Piping System
Direct Digital Control System for HVAC
Hydronic Piping
Hydronic Pumps
Steam & Condensate Heating Piping
Steam Condensate Pumps
HVAC Water Treatment
HVAC Ducts and Casing
HVAC Fans
Air Terminal Units
Air Outlets & Inlets
HVAC Air Cleaning Devices
Indoor Central Station Air Handling units
DIVISION 26ELECTRICAL$0.00
Requirements for Electrical Installations
Low-Voltage Electrical Power Conductors and Cables
Grounding and Bonding for Electrical Systems
Raceway & Boxes for Electrical Systems
Overcurrent Protective Device Coordination Study
Low-voltage Bussed Junction Box
Commissioning of Electrical Systems
DVA/USACE Projects Commissioning of Electrical Systems
Motor Control Centers
Motor Controllers
Lighting Controls
Wiring Devices
Enclosed Switches & Circuit Breakers
Facility Lightening Protection
Interior Lighting
DIVISION 27COMMUNICATIONS$0.00
Requirements for Communications Installations
Raceways & Boxes for Communications Systems
Commissioning of Communications Systems
Control, Communication and Signal Wiring
Communications Equipment Room Fittings
Communications Structured Cabling
Nurse Call & Code Blue Systems
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
Common Work Results for Electronic Safety and Security
Conductors and Cables for Electronic Safety and Security
Conduits & Backboxes for Electronic Safety & Security
Physical Access Control System
Fire Detection & Alarm
DIVISION 31EARTHWORK$0.00
Earthwork
DIVISION 32EXTERIOR IMPROVEMENTS$0.00
Cement & Concrete for Exterior Improvements
DIVISION 33$0.00
Steam Energy Distribution
TOTALS
TOTAL LABOR$0.00

TOTAL MATERIALS $0.00

TAX FOR MATERIALS 6% $0.00

TOTAL EQUIPMENT $0.00

DIVISION GRAND TOTALS $0.00

DIVISION GRAND TOTALS$0INSTRUCTIONS
TAX FOR MATERIALS$0
1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD10%$0
PROFIT10%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;

SUBTOTAL $0

BOND/FEE
PERMITS/LICENSES3%$03. Divisions must still be listed even if not applicable to the construction requirement;

GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.

File details come from the government source that posted it. Updated .