Atch 6 Drawing Combined Steam-CAD Version.pdf
PDF 12 MB Posted
- Attached to
- Z1DA--626-24-204 - Update / Upgrade Steam System Components Federal contract opportunity
- Solicitation number
- 36C24924B0011
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to upgrade the steam system components at the Department of Veterans Affairs Tennessee Valley Healthcare System (TVHS) Nashville Campus. The SOW includes replacing failing condensate return skid pumps and associated components, as well as adding venting, in Building 1 at the TVHS Nashville VA Medical Center. The work will involve replacing the electric condensate return system, separating and repairing two condensate return systems in the ACRE building, and making various other steam system upgrades throughout the facility. The period of performance is 120 calendar days from the notice to proceed. The contractor is required to follow all applicable federal, state, and local codes and regulations, provide licensed engineering drawings, and conduct system start-up and commissioning. Warranty requirements include a one-year warranty on workmanship in addition to any manufacturer warranties.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
LOCATION MAP
TENNESSEE VALLEY HEAL TH SYSTEM
NASHVILLE CAMPUS
NASHVILLE, TENNESSEE
Upgrade Steam System
VA PROJECT NO. 626-24-204
May 15, 2024
CBJBW. PAO,ECT AP14!1SJBAINE NQJES
1, THE INFORMATION SHOWN REGARDING EXISTING CONDmONS ON ALL DRAWINGS ANO AS
NOTED ELSEWHERE WERE BASED ON FIELD OBSERVATIONS ANO EXISTING DRAWINGS AS OF
MAY 2013. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO THOROUGHLY FIELD VERIFY
EXISTING CONDITIONS (EXPOSED ANO CONCEALED) OF ANY ANO ALL DIMENSIONS ANO
CONDITIONS PRIOR TO SUBMlmNG A 810. ROOM NUMBERS MAY BE OIFFERANT THAN
SHOWN. DRAWINGS ARE NOT TO BE SCALED FOR LOCATIONS OR NEW WORK ITEMS.
CONTRACTOR SHALL TAKE ACTUAL MEASUREMENTS IN THE FIELD FOR BIDDING PURPOSES,
MATERIAL TAKEOFFS, ac. SITE INVESTIGATIONS CAN BE SCHEDULED THROUGH THE
CONTRACTING OFFICER AND THE COTR.
2. CONTRACTOR MUST HAVE PRIOR APPROVAL OF COTR FOR ALL MATERIAL STORAGE,
EQUIPMENT SETUP, ANO STAGING FOR ALL DEMOLITION ANO OR NEW WORK.
3. NORMAL MEDICAL CENTER WORK HOURS ARE (7:00 AM TO 4:30 P.M. M-F) AND
WEEKENDS (FRIDAY 4:00 P.M. TO SUNDAY). CONTRACTORS WORK IS TO BE PERFORMED
DURING DUTY HOURS AS DIRECTED BY COTR.
4. CONTRACTOR SHALL MAKE EVERY EFFORT TO MINIMIZE DOWNTIME ASSOCIATED WITH
SCHEDULED SHUTDOWNS. ALL UTIUTY SHUT DOWNS MUST BE COORDINATED WITH THE
COTR PRIOR TO ANO IN ACCORDANCE WITH THE SPECIFICATIONS.
5. CONTRACTORS ARE TO KEEP ALL ROADWAYS ANO ENTRANCES TO THE MEDICAL CENTER
OPEN ANO OR ACCESSIBLE AT ALL TIMES, UNLESS APPROVED BY THE COTR.
6. CONTRACT DRAWINGS ANO SPECIFICATIONS REPRESENT A FINISHED STRUCTURE. THEY 00
NOT INDICATE METHODS OF CONSTRUCTION. THE CONTRACTORS SHALL PROVIDE ALL
MEASURES NECESSARY TO PROTECT THE STRUCTURE AND PERSONNEL DURING
CONSTRUCTION. CONTRACTORS ARE TO KEEP THE MEDICAL CENTER CLEAN AND FREE
FROM DEBRIS AT ALL TIMES.
7. THESE DRAWINGS ARE OIAGRAMMATICAL AND SHOW ONLY THE INTENT OF WORK TO BE
COMPLETED. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND OR
MATERIALS FOR A COMPLETE WORKING SYSTEM AS REQUIRED. AfN ERRORS OR
OMISSIONS SHOULD BE REPORTED TO THE COTR FOR CLARIFICATION PRIOR TO 810.
8. THE GOVERNMENT HAS SALVAGE RIGHTS TO ANY ANO OR ALL EQUIPMENT OR MATERIAL
BEING REMOVED UNDER THIS CONTRACT AS DIRECTED BY THE COTR.
X1-366 Cover Sheet X2-366 General Notes A1-366 Floor Pion - New Construction ond Phosing A2-366 Details A3-366 Finish Plan E1-366 Electrical Symbols/Legend E2-366 Floor Pion - Electrical Demolition E3-366 Floor Pion - Electrical E4-366 Electrical Detoils P1-366 Floor Pion - Plumbing P2-366 Plumbing Details
VA APPROVAL
ProJect Manager Date
Safety Manager Date
Maintenance and Operations Manager Dote
Chief Engineer Date
Executive Leadership Dote
Executive Leadership Date