Atch 5 Drawing Armstrong AFH 4100 J Condensate Pump 30GAL Duplex.pdf

PDF 262 KB Posted

Attached to
Z1DA--626-24-204 - Update / Upgrade Steam System Components Federal contract opportunity
Solicitation number
36C24924B0011
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This document is a Statement of Work (SOW) for a federal contract opportunity to upgrade the steam system components at the Tennessee Valley Healthcare System (TVHS) Nashville Campus. The key objectives include replacing failing condensate return skid pumps, piping, and associated components, as well as adding venting as specified in the attached drawings.

The scope of work includes replacing various steam traps, separating mixed pressure condensate return lines, installing new condensate return skid pumps, replacing flash tanks and pumping systems, and correcting piping issues throughout the facility. The contractor will be responsible for all work to provide an acceptable final product that meets the requirements outlined in the SOW and drawings. The period of performance is 120 calendar days from the notice to proceed, and the contract will result in a single award.

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--626-24-204 - Update / Upgrade Steam System Components, newest first.
File Type Posted
36C24924B0011 0009.docx DOCX document
Atch 17 VAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting CC.pdf PDF
Atch 14 VAAR Clause 852.219-75 VA Notice of Limitations on Subcontracting.docx DOCX document
36C24924B0011 0008.docx DOCX document
Atch 2 Specifications 626-24-204 Final R1.pdf PDF
36C24924B0011 0007.docx DOCX document
36C24924B0011 0006.docx DOCX document
36C24924B0011 0005.docx DOCX document
36C24924B0011 0004.docx DOCX document
Atch 6 Drawing Combined Steam-CAD Version.pdf PDF
36C24924B0011 0003.docx DOCX document
Atch 15 Construction Safety Guidebook.pdf PDF
Atch 16 VA Form 6112 Equipment Record.pdf PDF
36C24924B0011 0002.docx DOCX document
SPEC Section 01 45 00.pdf PDF
SPEC Section 01 32 16.15.pdf PDF
Atch 14 VA TVHS Confined Space Policy.docx DOCX document
Atch 1 WD Davidson County Building TN20240178 dated 07262024.pdf PDF
36C24924B0011 0001.docx DOCX document
Atch 7 Drawing Typical Flash Tank Connections.pdf PDF
Atch 6 Drawing Combined Steam.pdf PDF
Atch 3 Condensate Pump Selections Basis of Design.pdf PDF
Atch 1 WD Davidson County Building TN20240178 dated 06212024.pdf PDF
36C24924B0011_1.docx DOCX document
Atch 10 General Conditions Breakout.xlsx XLSX spreadsheet
Atch 8 Nashville VA Steam Components Name and Location Key.xlsx XLSX spreadsheet
Atch 4 Drawing Armstrong AFH 4100 J Condensate Pump 15GAL Duplex.pdf PDF
Atch 2 Specifications 626-24-204 Final.pdf PDF
Atch 13 Contractor EMR Certification Form.docx DOCX document
Atch 12 TAX ID UEI Document.docx DOCX document
Atch 11 Calculation of Contractor Self Performed Work.xlsx XLSX spreadsheet
Atch 9 Price Breakout Schedule Construction.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3.13

6.56 11.00

21.06 22.00

LIFTING EYES

(OPTIONAL)

THERMOMETER

(OPTIONAL)

1/2" NPT

DRAIN

11.00

9.00

18.00

2" NPT VENT

1-1/2" NPT

PUMP

DISCHARGE

PRESSURE GAUGE, CHECK VALVE

GATE VALVE AND BALL VALVE

(OPTIONAL)

4.50 9.00

.25

FOOT PAD

16.00

22.00 32.78

47.24

3.38

2" NPT

OVERFLOW

2-1/2" NPT

PROCESS RETURN

PRESSURE GAUGE, CHECK VALVE

GATE VALVE AND BALL VALVE

(OPTIONAL)

CONTROL PANEL OPTIONS ALSO AVAILABLE (NOT SHOWN):

• NEMA 4 OR NEMA 4X OR NEMA 3R CONSTRUCTION

• ELECTRIC ALTERNATOR

• POWER ON LIGHT

• PUMP TEST BUTTON

• PUMP RUN TIME METER

• EXTRA DRY CONTACTS

• UL/CUL LABELED PANEL

• HIGH LEVEL ALARM HORN & LIGHT W/SILENCE SWITCH

• LEAD-AUTO-LAG SELECTOR SWITCH

NOTES:

• TANK MATERIAL: STEEL

• ALL DIMENSIONS ARE ±0.25"

• DRAWING NOT FOR CONSTRUCTION

• CONSULT FACTORY AT TIME OF ORDER FOR CURRENT PRINT

• INLET BASKET STRAINER OR Y-STRAINER ALSO AVAILABLE

18.25

39.44

9.00

10.75

NEMA 12

CONTROL PANEL

(OPTIONAL)

ISOLATION VALVE

(OPTIONAL)

FLOAT SWITCH OR

ALTERNATOR

GAUGE GLASS

(OPTIONAL)

D

C

B

A A

B

C

D

12345678

8 7 6 5 4 3 2 1

THIRD ANGLE PROJECTION

SCALE: 1:12SHEET: 1 OF 1 A684.41030.00J

4/12/2018

NAME DATE

ENG APPR.

CHECKED

DRAWN

30 GALLON DUPLEX

PART NO:

GJM

Ref PartNo

TITLE

DWG NO. REV

4100 SERIES

"J" CONDENSATE PUMP

DRAWING MAY NOT BE PRINTED TO SCALE.

DATENAME

4/12/2018GJMA

REV DESCRIPTION ECN

Initial Design

WEIGHT

356.39

FABRICATION TOLERANCES

UNLESS OTHERWISE SPECIFIED:

DIMENSIONS ARE IN INCHES

TOLERANCES:

ANGULAR DIMENSIONS 1

FRACTIONS 1/32

TWO PLACE DECIMAL 0.06

THREE PLACE DECIMAL 0.030 PRODUCT CATEGORY

HTSP Boiler and Condensate

PRODUCT FAMILY

armstronginternational.com

Sheet1
Drawing View1
Drawing View2
Drawing View3
Drawing View4
Drawing View5

File details come from the government source that posted it. Updated .