Atch 05 - JB CHS GVS Install Design.pdf
PDF 4 MB Posted
- Solicitation number
- FA441826Q0046
About this file
This is an Installation Design Plan (IDP) and as-built documentation for a Giant Voice (GV) emergency warning system at Joint Base Charleston, South Carolina, dated March 28, 2025. The document comprises comprehensive technical drawings, equipment lists, and wiring diagrams for the system installation.
The project involves the installation of a multi-component emergency notification system including outdoor speaker towers with sirens, indoor speaker units (ISUs), horn speaker arrays, and associated control infrastructure. Key components include 16 outdoor speaker airbases positioned across the base, multiple speaker tower enclosures with Sircom sirens, communication control stations with CPU and RTU equipment, power systems (PSUs and UPS units), and interconnecting wiring for audio and signal distribution. The system utilizes 450 and 500 ampere amplifiers for speaker tower audio distribution, with both audio and signal pathway diagrams provided. Physical infrastructure includes pole-mounted installations with specific foundation designs (3.9-inch embedment depth, 50-foot siren post specifications) and coordinate locations referenced by GPS coordinates. Equipment lists identify components such as antennas, remote interface modules, circuit breakers, and various cable types (fiber optic, power, LAN). The design accommodates both primary control stations and alternate command and control units (CCU), with detailed interconnecting wiring schematics for 4, 8, and 12-speaker tower configurations. The as-built status indicates the system has been installed and documented to current specifications as of the March 2025 date.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AS
B
UI
LT
3/
/2
INSTALLATION DESIGN PLAN (IDP)
PRELIMINARY
FOR GIANT VOICE (GV) SYSTEM
JB CHARLESTON, SC
REVISIONS
ZONE LTR
DESCRIPTION
DATE
APPROVED
AS
B
UI
LT
3/
/2
DESCRIPTION
DATE
APPROVED
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
AS
B
UI
LT
3/
ISU INDOOR SPEAKER UNIT (ISU)
LAN LAN/NETWORK RACK
FIBER OPTIC CABLE
POWER CABLE
AS
B
UI
LT
3/
35 - -
DESCRIPTION
DATE
APPROVED
DANGER
HEARING
PROTECTION
REQUIRED
HORN
HORN
HORN 6
HORN 8
HORN 10
HORN
HORN
HORN 6
HORN 8
HORN 10
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN
HORNHORN
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN
HORNHORN
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN
HORNHORN
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN
HORNHORN
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORN
HORN
HORN 6
HORN 8
HORN
HORN
HORN 6
HORN 8
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
DANGER
HEARING
PROTECTION
REQUIRED
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
HORNHORN
HORNHORN
HORNHORN 65
HORNHORN 87
HORNHORN 109
HORNHORN 1211
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
ANTENNA CABLE
POWER CABLE
MONITOR
9 1
4 19
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
ANTENNA CABLE
POWER CABLE
MONITOR
9 1
4 19
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
-35
ANTENNA CABLE
POWER CABLE
MONITOR
9 1
4 19
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
AS
B
UI
LT
3/
DESCRIPTION
DATE
APPROVED
O5
PowerWakeSleep Up F12F11F10F9F8F7F6F5F4F3 F2F1Esc
- - - *- - - - - Num Lock
Home
8 9 PgUp
Enter
PgDn
1 2 End
Ins Del
+ Backspace
Enter]
{POIUYTREWQ
A S D
Z X
F
C V
G
B N
H J K
M
L
FnShift/
CtrlAltAltCtrl
Shift
Caps Lock
Tab
Screen Sys Rq
Scroll Lock
Pause Break
Page UpHomeInsert
Delete End Page Down
AS
B
UI
LT
3/
B
UI
LT
S
/2 8/
O5
B
UI
LT
S
/2 8/
B
UI
LT
S
/2
B
UI
LT
S
/2
B
UI
LT
S
/2
B
UI
LT
S
/2
B
UI
LT
S
/2
B
UI
LT
S
/2
B
UI
LT
S
/2
| Sheets and Views |
| JB_CHARLESTON GV AS BUILT_1-Model |
| JB_CHARLESTON GV AS BUILT_2-Model |
| JB_CHARLESTON GV AS BUILT_3-Model |
| JB_CHARLESTON GV AS BUILT_4-Model |
| JB_CHARLESTON GV AS BUILT_100-Model |
| JB_CHARLESTON GV AS BUILT_101-Model |
| JB_CHARLESTON GV AS BUILT_102-Model |
| JB_CHARLESTON GV AS BUILT_400-Model |
| JB_CHARLESTON GV AS BUILT_401-Model |
| JB_CHARLESTON GV AS BUILT_402-Model |
| JB_CHARLESTON GV AS BUILT_403-Model |
| JB_CHARLESTON GV AS BUILT_404-Model |
| JB_CHARLESTON GV AS BUILT_405-Model |
| JB_CHARLESTON GV AS BUILT_406-Model |
| JB_CHARLESTON GV AS BUILT_407-Model |
| JB_CHARLESTON GV AS BUILT_408-Model |
| JB_CHARLESTON GV AS BUILT_409-Model |
| JB_CHARLESTON GV AS BUILT_410-Model |
| JB_CHARLESTON GV AS BUILT_411-Model |
| JB_CHARLESTON GV AS BUILT_412-Model |
| JB_CHARLESTON GV AS BUILT_413-Model |
| JB_CHARLESTON GV AS BUILT_414-Model |
| JB_CHARLESTON GV AS BUILT_415-Model |
| JB_CHARLESTON GV AS BUILT_416-Model |
| JB_CHARLESTON GV AS BUILT_417-Model |
| JB_CHARLESTON GV AS BUILT_418-Model |
| JB_CHARLESTON GV AS BUILT_500-Model |
| JB_CHARLESTON GV AS BUILT_501-Model |
| JB_CHARLESTON GV AS BUILT_600-Model |
| JB_CHARLESTON GV AS BUILT_601-Model |
| JB_CHARLESTON GV AS BUILT_602-Model |
| JB_CHARLESTON GV AS BUILT_603-Model |
| JB_CHARLESTON GV AS BUILT_604-Model |
| JB_CHARLESTON GV AS BUILT_605-Model |
| JB_CHARLESTON GV AS BUILT_606-Model |
| JB_CHARLESTON GV AS BUILT_607-Model |
| JB_CHARLESTON GV AS BUILT_608-Model |
| JB_CHARLESTON GV AS BUILT_609-Model |
File details come from the government source that posted it. Updated .