ARFQ DEP1800000004 MUDDY CREEK RESTORATION PLANS 29-73 06-30-17.pdf

PDF 14 MB Posted

Attached to
Addendum 1 Muddy Creek Project 4 Gravity UO-519, S-91-85
Solicitation number
ARFQ 0313 DEP1800000004 2
Issued by
Raleigh County, West Virginia

About this file

This file is a restoration plans document for the Muddy Creek project (ARFQ DEP1800000004) dated June 30, 2017, prepared for a state environmental or public works agency. The document contains comprehensive engineering plans and specifications for creek restoration work, including a composite plan sheet and thirteen detailed plan sheets covering the project scope. The deliverables include multiple technical profiles and cross-sections documenting Preston Energy Seep Collector, Force Main systems, Viking infrastructure, Fickey Run, ditch configurations, and pump station facilities. The plans span 73 pages total and appear to represent a complete design package for restoration activities along Muddy Creek with associated water management and infrastructure components.

The document serves as a design reference and planning tool for the proposed restoration work but does not specify contract pricing, bidding timelines, site visit requirements, or award dates within the provided content summary. No information regarding set-asides, funding sources, budget allocations, or renewal terms is evident from the file structure. The restoration plans appear to be foundational engineering documents intended to guide procurement processes, contractor bidding, or project implementation phases that would be detailed in separate solicitation documents or notices of intent.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 cover PDF (1)

2 composite plan sheet PDF 2 (1)
3 plan sheet 1 NEW 3 (1)
4 plan sheet 2 NEW PDF 8 (1)
5 plan sheet 3 NEW PDF 7 (1)
6 plan sheet 4 NEW PDF 6 (1)
7 plan sheet 5 NEW PDF 5 (1)
8 plan sheet 6 NEW PDF 4 (1)
9 plan shee 7 NEW PDF 3 (1)
10 plan sheet 8 NEW PDF 3 (1)
11 plan shee 9 NEW PDF 3 (1)
12 plan sheet 10 NEW PDF 3 (1)
13 plan sheet 11 NEW PDF 3 (1)
14 plan sheet 12 NEW PDF 3 (1)
15 plan sheet 13 NEW PDF 3 (1)
16
17
18
19
20
21
22
23
24
25
26
27
28
29-PRESTON ENERGY SEEP COLLOCTOR PROFILE 29 (1)
30-34 FORCE MAIN PROFILES 30 (1)
30-34 FORCE MAIN PROFILES 31 (1)
30-34 FORCE MAIN PROFILES 32 (1)
30-34 FORCE MAIN PROFILES 33 (1)
30-34 FORCE MAIN PROFILES 34 (1)
35 VIKING PROFILES 35 (1)
36-40 FICKEY RUN-PROFILES 36 (1)
36-40 FICKEY RUN-PROFILES 37 (1)
36-40 FICKEY RUN-PROFILES 38 (1)
36-40 FICKEY RUN-PROFILES 39 (1)
36-40 FICKEY RUN-PROFILES 40 (1)
41-42 DITCH PROFILES 41 (1)
41-42 DITCH PROFILES 42 (1)
43-46 cross sections 43 (1)
43-46 cross sections 44 (1)
43-46 cross sections 45 (1)
43-46 cross sections 46 (1)
47
48
49
50
51
52
53 pump station plan sheet 53 (1)
53A
53B
53C
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

File details come from the government source that posted it. Updated .