ADDENDUM #1 PROJECT #4.pdf

PDF 40 MB Posted

Attached to
Addendum 1 Muddy Creek Project 4 Gravity UO-519, S-91-85
Solicitation number
ARFQ 0313 DEP1800000004 2
Issued by
Raleigh County, West Virginia

About this file

This is an Addendum #1 to a solicitation document issued by the West Virginia Department of Environmental Protection (WVDEP) for the Muddy Creek Restoration Projects 1, 2, 3, and 4, involving three mining permits: Viking Coal (Permit UO-519), Preston Energy (Permit UO-235), and Rockville Mining (Permit S-91-85). The projects involve construction of acid mine drainage (AMD) treatment infrastructure, including lift stations, force mains, gravity lines, geotube pads, siphon tanks, and electrical systems. Projects 1 and 2 had an original bid closing date of July 20, 2017, while Projects 3 and 4 had a closing date of July 25, 2017. A pre-bid conference was conducted on-site on July 13, 2017. The work encompasses piping installation ranging from 4 to 24 inches in diameter, excavation of approximately 20,000 cubic yards on Project 4, geotube pad construction with seven 145-foot-long tubes, access roadway stone increased to 700 tons, manhole construction varying from 4 to 6 feet in depth, and comprehensive electrical installations including a 150 kW diesel generator, PLC-based control systems, and fiber optic communications. The specifications require compliance with the National Electrical Code, OSHA regulations, West Virginia Department of Transportation standards, and various industry standards including IEEE and NFPA guidelines.

No prevailing wages apply to this project in West Virginia. Significant specification clarifications and revisions addressed in the addendum include changes to equipment specifications to allow engineer-approved equals rather than proprietary equipment, modifications to piping materials and sizes, correction of dimensional discrepancies in construction plans, and revisions to bid schedule quantities including increases to access roadway stone from 80 to 700 tons and changes to manhole quantities. The addendum specifies that the WVDEP will provide lift station pumps, while contractors are responsible for all connections, controls, and startup coordination. Specifications emphasize the use of HDPE and PVC materials for piping, detectable underground utility marking tape for all lines, and stainless steel or epoxy-coated equipment components in corrosive AMD environments. All electrical work for Projects 1 and 3 must integrate with Mon Valley Integration (MVI) systems, though engineer-approved equal alternatives may be evaluated post-award. Contractors are required to provide comprehensive as-built documentation in both paper and electronic formats, including CAD files in AutoCAD 2017 format, equipment manuals, and fiber optic testing documentation.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum #1 - Questions During The Pre-Bid Conference For

Viking Coal, Permit UO-519; Preston Energy, Permit UO-235;

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4

The following questions were identified at the Pre-Bid Conference (PBC) conducted on-site on

July 13, 2017 and questions received from DEP Procurement. The answers and clarifications provided herein take precedence over verbal answers at the PBC and previously provided specifications and descriptions provided in the Solicitation should there be any conflicts between the two.

Q 1: Regarding the specifications section 11-00, page 1, this section calls for Mon Valley

Integration to provide controls and other materials for these jobs, and is to be bid as such.

With the provision of possible after award approved alternates, Engineer approved equals.

However no other firm or equal is listed. In addition to basically making the equipment to be provided by Mon Valley a proprietary spec. The specification go on and require/instruct that the equipment and all associated electrical work, conduit, wire and other associated materials and labor must be provided and performed by Mon Valley.

This is giving this company a mortal lock on the electrical work for this job, in addition to the equipment they are providing. Without any consideration of the price to be quoted.

The owner negotiating a up front price for equipment is one thing, but locking the contract up with no competitive bidding on the other related electrical work is giving them a monopoly for this job. I was going to quote the electrical work as a sub to the general contractors, but per the way these specs are written I cannot.

A 1: The Specification is written to allow Engineer approved equals to be installed. Engineered approved equals shall be evaluated according to Special Provisions Section 0-13

Alternatives (Engineer Approved Equal). The specification is written to provide compatible hardware for communication and control between existing and future equipment.

Technical Specification 11-00 Electrical Installation Requirements Section 1.5 heading has been revised to read “Other Items Furnished by Contractor”.

Q 2: Is all excavation for the geotube pad, incidental to the geotube pad line item?

A 2: Yes.

Q 3: Is there prevailing wages on this job?

A 3: No, none in the State.

Q 4: Is there any flexibility in the bid dates?

A 4: Yes, Projects 1 & 2 will have a bid closing date of July 20, 2017 and Projects 3 & 4 will have a bid closing date of July 25, 2017.

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4

Q 5: Does the existing manhole across the new T&T plant, have a pipe stubbed through to tie project 2 into?

A 5: Yes, there pipe is stubbed out approximately 2 feet. The conduit is stubbed up beside the manhole.

Q6: On Project 4, is there only one cable on the Ruth Belle side, to be installed to the control building?

A6: Yes, this is the flow transducer cable. The cable will be approximately 700 feet long to run in the conduit back to the control building at T&T. The contractor must provide approximately 320’ of 1” conduit from the flow meter manhole to the existing manhole.

The cable will be single pair 16 AWG instrument cable.

Q7: Are the project breaks spelled out?

A7: The breaks are clarified in the project clarifications at the end of this addendum.

Q8: How much excavation is there for the geotube pad and does the cut and fill balance out?

A8: The total cubic yards for the geotube pad is unavailable, but it did balance out.

Q9: Is the contractor allowed to bore under Rt. 26 at an angle?

A9: Yes, and the directional bore has been Permitted.

Q10: Would the DEP consider open cut in place of the bore and jack at the Dream Mountain entrance crossing?

A10: No.

Q11: Is there an existing access road north of the Dream Mountain sign, where the permanent access road is to be constructed? Does it stand out?

A11: Yes, about 300 yards North of the Dream Mountain sign.

Q12: What about supersilt fence?

A12: All supersilt fence has been changed to the Standard Silt Fence.

Q13: What size is the gas lines that must be crossed?

A13: See Special Provision 0-0 for the gas company contact information. The exact size of the gas lines are not known.

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4

Q14: Will the DEP approve HDPE wetwells and valve vaults on Project 1 Lift Station?

A14: Due to the very low pH AMD, HDPE wetwells and valve vaults will be approved. Also, cast in place will be approved. However, if the contractor decides to use cast in place, a resteel design and mix design inclusive of additives must be submitted to and be approved by the WVDEP.

Q15: How many cubic yards of cut are on project 4?

A15: Approximately 20,000 cubic yards.

Q16: What is the required compaction on project 4?

A16: At least 90% of Standard Proctor maximum dry density at a moisture content of not less than 2% below nor greater than 3% above optimum.

Q17: Will drilling and shooting be permitted on project 4? Or does it need to be hoe ramming?

A17: Due to the proximity of homes and US Route 26 to the work, the DEP will permit only hoe ramming.

Q18: If Southwestern pays for the lift station pumps, do they add funds to pay a tech to do the startup and make adjustments to the pumps?

A18: The WVDEP shall supply the lift station pumps. The Contractor shall be responsible for all connections both electrical and plumbing. The Contractor will be responsible for the pump controls and the WVDEP will arrange pump start-up with the pump manufacturer or supplier.

Q19: Is all the work on the Ruth Belle portion of the project in the field?

A19: Yes, that is correct. The mine seals are on the edge of the field and behind the cabin and the pipe work is in the open areas and down through a small section of woods just below the cabin.

Q20: Can a valve be used at MH-5 instead of a removable plug?

A20: No. The plug system shall be approved by WVDEP prior to installation.

Q21: Where the 18” line goes to the existing T&T manhole, can the conduit be placed in the same ditch?

A21: Yes, and the conduit would tie into the existing conduit at that manhole.

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4

Q22: Will there be access to the Ruth Belle project through the existing gate?

A22: Yes, there is a DEP lock on the gate and a key will be provided.

Q23: Please also verify the size of the geotextile tubes needed. The technical specifications mention only 7 ea 45’ circumference x 145’ long tubes, but the plans indicate otherwise.

I also noticed that the technical specifications alluded to a scour apron which would normally be used in marine/coastal protection projects but does not seem applicable here since you are dewatering on an impervious liner. Please clarify.

A23: The geotube specification is correct. The tubes are 145’ long with 45’circumference.

The plans show the direction of the geotubes laying in the direction of the length showing

144’, this is OK. The specification does call for a scour apron which is not needed in this application. The scour apron can be deleted from the project.

Q24: At the prebid it was mentioned that we would only be responsible to run pipes & valves to Geotube Pad #1. Plan sheet 52 shows pipes and valves to Geotube #2 also. Is what is shown on Sheet 52 future? Or are we responsible to furnish & Install the pipes & valves to Geotube 2 as is shown on SHt 52 as part of this contract.

A24: Sheet 49 and 52 of the Plans have been revised. Both Geotube Pads are to be constructed with the 6” HDPE sludge line to both pads and the underdrain systems in both pads.

Geotube Pad 1 will have the manifold, valves, layflat hoses and all associated fittings.

Geotube Pad 2 will be for future sludge disposal.

Q25: Who is the manufacturer / supplier for the Siphon Tank shown on SHT 72?

A25: HD Supply

Q26: 1) Is the Seep Collector profile line shown on Sht 16 from Siphon Tank to MH

3supposed to be 8" hdpe dr17 as shown on sht 16 ? Or 8" PVC as shown on sht 29?

2) Is the Seep Collector profile line shown on Sht 16 from MH 3 to Ex. T&T Phase 1 supposed to be 4" hdpe dr17 as shown on sht 16 ? Or 8" PVC as shown on sht 29?

3) MH 2 & 3 at sht 16 says "with Flange T for access. Please provide detail?

A26: 1) Sheet 16 has been revised. The Siphon Tank line is 8” HDPE from tank to MH3.

2) Sheet 16 has been revised. The line from MH 3 to existing flange is 4” HDPE.

3) Flange T should be a sanitary T for jetting purposes. The “T” will be welded to pipe inside of the manholes with a blind flange on the top of the “T”.

Q27: 1) Please provide correct dimensions for Geotube Pad 2. Plan sht 51 sect c-c calls for

144'. This dimension is clearly wrong as it scales approx. 267' on sht 16.

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4

2) Please provide correct dimensions for Geotube Pad 2. Plan sht 51 sect d-d calls for

146'. This dimension is clearly wrong as it scales approx. 154' on sht 16 & the fact that the pipe on the bottom on sht 50 calls for 150.5'.

A27: 1) Sheet 51 has been revised. The dimension is 267’.

2) Sheet 51 has been revised. The dimension is 156’.

Q28: What does Bid Item 8 Access Roadway Stone 80 TON pertain to?? Is it supposed to be for the Access Road that runs from RT 26 to the Siphon Tank?? If so, the quantity is way too light. Please advise.

A28: Bid Schedule 2 has been revised. The Access Roadway Stone has been increased to 700

TON, the original 80 TON was for the Access Road on the Ruth Belle side, east of the

T&T project. The additional 620 TON is for the road to the Siphon Tank.

Q29: In reference to the line from the siphon tank to the existing flange from TNT sheet 16 shows 4” HDPE from the flange to MH 3 and 8” HDPE from MH 3 to siphon tank the profile on sheet 29 shows all 8” PVC what is required and how is this 401.00 lf of line payed under.

A29: Sheet 16 and 29 have been revised to show all HDPE and is incidental to the siphon tank.

Q30: Can you provide detail drawing or additional information for the 18” flow meter manhole with ultra-sonic head required. The manhole is located between MH p-4 and MH p-5.

A30: Sheet 55 has been revised to show the detail for the 48” Fiberglass metering manhole with 18” flume and the location of the Drexel Brook ultra-sonic transducer.

Q31: There are 2 pipe penetrations "O" & "B" shown at the siphon tank. There is no piping shown on any of the Contract drawings showing where these 2 lines are going to be piped

to. So, I assume that these lines will just be capped/blind flanged off on the outside of this tank. Is this correct?

A31: This is not correct. “O” is an eight-inch overflow line that shall tie into line “C” the AMD siphon box discharge. This can immediately tie in outside of the siphon tank. Line “B” is an eight-inch bypass line. This line shall tie into line “C” at a point in which the elevation is lower than the invert elevation of the bypass line “B” leaving the siphon tank. All associated piping and bypass valve is incidental to the siphon tank.

The following Technical Specifications have been revised.

T1: Technical Specification 11-00 Electrical Installation Requirements

T2: Technical Specification 7-06 AMD Conveyance Lines and Channels

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4

T3: Technical Specification 8-0 Detectable Tape

The following Plan Sheets have been revised.

Sheets 16,19,22,26,27,29,32,35,36,38,39,42,47,49,50,51,52,53,53C,54,55,58,63,67,70

The following changes have been made in the Commodity Lines.

C1: Project 2 Commodity Line Items

a. Item # 8, Access Roadway Stone has been increased to pay for construction of the access roadway to the Siphon Tank. Any grading, excavation and installing separation fabric is incidental to the Access Roadway Stone pay item. Refer to the

Stabilized Construction detail for the road construction, Sheet 64.

Note: Fabric may be omitted from any portion of the access road that exceeds 10% in slope. The Preston Energy access road requires up to 80 tons of roadway stone for maintenance. The remaining 620 tons shall be used for the construction of the access road from the geotube pad to the siphon tank.

b. Item # 13, 6 Foot Manholes has been decreased from 7 EA to 3 EA.

c. Item # 26, 4 Foot Manholes has been added with a quantity of 7 EA.

C2: Project 3 Commodity Line Items

a. Item # 10, 24 inch Steel Casing Bore and Jack has been increased to 100 LF. The bore and jack for the Woolen Mills road crossing was inadvertently admitted and has been added to the bid schedule.

C3: Project 4 Commodity Lines Items

a. Item # 20, 24 inch Steel Casing Bore and Jack has been decreased to 150 LF.

b. Item # 31, 6 inch PVC Gravity has been added to the Bid Schedule.

The following notes/explanations are provided.

Note 1: All discharge piping and fittings from the siphon tank shall be paid incidental to

“Siphon Tank”.

Note 2: Windrowing of timber is permissible on this project. However, any trees over 8” need to be delimbed and stockpiled neatly.

Note 3: WVDEP will be providing the Lift Station pumps.

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4

Muddy Creek Restoration Project Clarifications

1. Project 1 Lift Station:

A. Include on the pig launcher flange, a four-inch isolation valve and quick connect coupler.

B. The ten-inch check valves and isolation valves associated with the force main and lift station shall be either Dezurik rubber-lined valves or stainless as specified in the original specifications.

C. The lift station project shall include a stabilized construction entrance that extends to the lift station access gate.

D. The contractor shall be responsible for all piping inside the lift station fenced area and the following:

From Wetwell to Manhole F-1 From Wetwell to Manhole V-1 The ten-inch force main shall extend a minimum of six-feet outside the lift station and terminate with a flanged connection.

E. The entire area of the lift station surface shall be covered with #4 clean aggregate, six-inches thickness, with separation fabric, and shall extend one-foot beyond the perimeter fencing.

F. The contractor immediately receiving bid award, shall work with the WVDEP on securing electrical service to the lift station.

G. All pump components located in the wetwell and all parts above the wetwell shall be 316 Stainless Steel. The only exception shall be the motor.

H. There shall be a twelve-inch in length spool piece required to be placed between the isolation valves and check valves in the lift station valve vault.

I. All force main piping shall be ten-inch HDPE-DR-11 with the exception of the check and isolation valves.

J. Straw Waddles and Super Silt Fence as shown on existing plans shall be replaced with silt fence.

K. A conduit shall be extended alongside the force main to the point of termination outside the fence for the fiber optic cable. The force main contractor shall be responsible for pulling the fiber optic cable through the conduit and making final connection(s).

2. Project 2 Preston Energy:

A. The contractor’s first task immediately after bid award, the contractor shall provide the WVDEP submittals on the Flow Meter Manhole, Manhole P-1, Manhole P-2, Manhole P-3, Manhole P-4, Manhole P-5, Manhole P-6, and Manhole P-7.

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4

B. Manhole P-7 shall have a twelve-inch overflow. A twelve-inch HDPE-DR-17 shall be used as the overflow pipe. The pipe shall extend into the manhole with the end inside the manhole having a flange. The overflow shall flow to the existing Preston Energy outlet ditch.

C. The contractor shall install AMD collection system as not to allow AMD to flow to the new AMD Treatment Plant.

D. A water tight plug shall be place in Manhole P-5 effluent pipe. The plug shall have the ability to be removed from the top of the manhole without displacing water from the system. The type of plug shall be approved by the WVDEP prior to installation.

E. Manhole P-5 shall have a water tight manhole lid.

F. The Contractor shall be required to pull control wire from the Flow Meter to the

Treatment Plant Control Building via conduit installed partially installed under this contract and the New AMD Treatment Plant contract.

G. The road adjacent to Geotube Pad leading to the siphon system is incidental to the Geotube Pad Construction.

H. Straw Waddles and Super Silt Fence as shown on existing plans shall be replaced with silt fence.

3. Project 3 Force Main:

A. The force main pipe has been changed from HDPE DR-9 to HDPE DR-11.

B. The force main start at T&T Manhole #13 and shall terminate approximately six feet outside of the lift station fencing. The contractor installing the force main shall be responsible for connecting the force main to the flange coupling installed by the lift station contractor.

C. Straw Waddles and Super Silt Fence as shown on existing plans shall be replaced with silt fence.

D. The contractor shall be responsible for the connections and terminations of the fiber optic cable. The contractor shall connect to the existing fiber optic cable at the electrical manhole located south of AMD Manhole #13. A fiber optic cable connection shall be made at the pH system located on Martin Creek. The contractor shall be responsible for the fiber optic connection at the lift station. A conduit shall be made available at the force main flange for the fiber optic cable.

4. Project 4 Gravity:

A. The contractor installing the gravity line shall be responsible for installing Manhole F-1 and Manhole V-1.

B. The contractor shall be responsible for constructing access road at the lift station gate and proceeding along the gravity AMD line. The contractor shall at the completion of the project and after the lift station has been completed, place

Rockville Mining, Permit S-91-85

Muddy Creek Restoration Projects 1, 2, 3 & 4 a final layer of stone over the stabilized construction entrance and compact to the Technical Specification’s Standard.

C. Straw Waddles and Super Silt Fence as shown on existing plans shall be replaced with silt fence.

D. All trees around dike area shall be wind rowed.

E. The contractor shall schedule culvert installation and AMD collection line crossing the Kingwood Mining entrance with WVDEP and Kingwood Mining representative.

7.06 - 1

7-06 AMD CONVEYANCE LINES AND CHANNELS

Project 2, Project 3, Project 4

1.0 DESCRIPTION

This work shall consist of furnishing all labor, equipment and materials necessary to construct and place the piping shown on the Plans.

2.0 MATERIALS

Materials needed for AMD Collection Lines and Channels include 6”, 12” and 18” diameter PVC SDR 35 grade solid and perforated piping.

A. Corrugated Polyethylene (PE) Pipe shall meet the requirements of AASHTO M 294 type “S” or type “D” only.

B. PVC SDR 35 pipe shall conform to the requirements of AASHTO M278, ASTM D3034, or ASTM F949.

3.0 METHOD OF CONSTRUCTION

A. The PVC SDR 35 grade pipe assemblies shall be located and constructed to the lines and grades shown on the Drawings. The pipes shall be installed in accordance with Section 604 of the WVDOH Standard Specifications for Roads and Bridges, Adopted 2010 and as detailed in these Specifications and the construction Plans. Trenches for pipes shall comply with dimensions depicted on the Plans.

1. AMD Seep Collector Line shall be constructed to collect all seep water for conveyance to the treatment site. The collection underdrain shall be 4 ft. X 4 ft. in cross-section. Stone for the underdrain shall be non-calcareous with a size of 3" to 6” in diameter. The drain shall be wrapped with filter fabric (Typar 3401 or equivalent). Filter fabric may be omitted from areas where the seepage enters the underdrain if approved by the DEP on site representative. An 8” perforated SDR- 35 PVC pipe shall extend the length of the underdrain and connect to solid pipe. The solid pipe shall daylight to the 24” ½ pipe ditch leading to the treatment site. The end of the 8” pipe seep collector shall extend to the surface as a clean-out and may be reduced to 6” diameter pipe with a cap.

2. “AMD Seep Collector” shall connect to the “8 inch AMD Conveyance Line”. An animal guard shall be installed on the exit of the pipe.

3. Pipe backfill operations shall comply with Section 604.8 of the WVDOH Standard Specifications for Roads and Bridges, Adopted 2010.

4. Backfill material shall be the best select, suitable random material

7.06 - 2 found on-site and free from particles larger than 3” and approved by the Engineer.

5. Bedding shall be placed under, around, or over pipes as shown on the Plans. The subgrade shall be prepared by proofrolling, and shall be satisfactory to the WVDEP prior to placement of the bedding or pipe.

6. Backfill material shall be placed in 6” loose lifts and compacted to at least 95% of Standard Proctor maximum dry density at a moisture content of not less than 3% below nor greater than 3% above optimum.

4.0 METHOD OF MEASUREMENT

A. The “Seep Collector”, “6 Inch PVC Gravity”, “12 Inch PVC Gravity”, “18 Inch PVC Gravity”, “10 Inch Force Main”, “Underdrain”, “Underdrain Conveyance Pipe”, “Gravity Stream Crossing”, “Permanent Stream Crossing”, and “Mine Seal Conveyance Pipe”, shall be measured by the linear foot in place. The Cleanouts shall be considered incidental and are to be included with the “Seep Collector”, “6 Inch PVC Gravity”, “12 Inch PVC Gravity”, “18 Inch PVC Gravity”, “10 Inch Force Main”, “Underdrain”, “Underdrain Conveyance Pipe”, “Gravity Stream Crossing”, “Permanent Stream Crossing”, and “Mine Seal Conveyance Pipe” shall include all wyes, tees, couplings, piping, incidentals, and appurtenances required for a complete-in-place and functional cleanout.

4.1 BASIS OF PAYMENT

A. The quantities “Seep Collector”, “6 Inch PVC Gravity”, “12 Inch PVC Gravity”, “18 Inch PVC Gravity”, “10 Inch Force Main”, “Underdrain”, “Underdrain Conveyance Pipe”, “Gravity Stream Crossing”, “Permanent Stream Crossing” and “Mine Seal Conveyance Pipe” will be paid for at the contract unit prices bid of the items listed, which prices and payments shall be full compensation for excavation and bedding, except otherwise provided, backfilling, jacking, when called for, furnishing all materials and doing all the work prescribed in a workmanlike and acceptable manner, including all labor, tools, equipment, supplies, and incidentals necessary to complete the work.

7.06 - 3

4.2 PAY ITEMS

“Seep Collector”, per linear foot.

“6 Inch PVC Gravity”, per linear foot.

“12 Inch PVC Gravity”, per linear foot.

“18 Inch PVC Gravity”, per linear foot.

“10 Inch Force Main”, per linear foot.

“Underdrain”, per linear foot.

“Underdrain Conveyance Pipe”, per linear foot.

“Mine Seal Conveyance Pipe”, per linear foot.

“Gravity Stream Crossing”, per each.

“Permanent Stream Crossing”, per each.

END OF SECTION

8.0-1

8-0 DETECTABLE UNDERGROUND UTILITY MARKING TAPE

Project 1, Project 2, Project 3, Project 4

1.0 DESCRIPTION

A. Tape consists of a minimum 5.0 mil overall thickness, with a 0.35 mil solid aluminum foil core. Construction is 0.8 mil clear film, reverse print with repeating warning message and laminated to an aluminum foil to 3.75 mil clear film backing, making the film permanently printed and pliable. The lettering on all tapes must have a minimum height of 1-inch unless otherwise specified. All detectable marking tape products must meet or exceed the industry standards including the American Public Works Association (APWA) color code. Maximum detectable burial range is twenty two (22) to thirty (30) inches.

2.0 APPLICABLE PUBLICATIONS

A. The following documents can be referenced to indicate specific manufacturing and material performance capabilities:

1. Thickness ASTM D 2103 5.0 mil

2. Tensile Strength ASTM D 882 35 lbs/inch (15,000 PSI)

3. Elongation ASTM D 882-75B 80%

4. Flexibility ASTM 671-76 Pliable hand

5. Printability ASTM D 2578 45 Dynes

6. Colors APWA Coded See list below

7. Bond Strength Boiling Water 5 hours without peel

8. Adhesives Manufacturers specs Morton 548 or equivalent

9. Bottom Layer Manufacturers specs Virgin PE

10. Top Layer Manufacturers specs Virgin PET

11. Foil Manufacturers specs 0.00035

12. Message Repeat Manufacturers specs Varies per legend

13. Inks Manufacturers specs AKL II

3.0 COLOR CODE

A. The following color codes shall be used:

1. RED – Electric, power lines/cables, lighting, fire, and associated lines

2. ORANGE – Telecommunications, telephone, fiber optic, alarm or signal lines

3. YELLOW – gas, oil, steam, petroleum, and associated lines

4. GREEN – Sanitary, storm drains, and associated lines

5. BLUE – Potable water and associated lines

8.0-2

6. BROWN – Force Mains and associated lines

7. PURPLE – Reclaimed water, non-potable water, irrigation, slurry lines

4.0 INSTALLATION

A. General

1. Detectable Underground Marking Tape shall be installed one foot +/- 3” above the utility (pipe, conduit, etc.) and shall be placed directly above and parallel with utility in a continuous run. Any splices in tape shall have a minimum of 2 foot overlap.

5.0 METHOD OF MEASUREMENT

The method of measurement for determining the quantity of Detectable Underground Utility Marking Tape as shown on plans is to be included in the unit bid prices for “Seep Collector”, “6 Inch PVC Gravity”, “12 Inch PVC Gravity”, “18 Inch PVC Gravity”, “10 Inch Force Main” and “Wire Test Station”, and the contract lump sum price bid for “Pump Station”, including furnishing all materials and doing all the work prescribed in a workmanlike and acceptable manner, including all labor, tools, equipment, supplies, and incidentals & appurtenances necessary to complete the work as shown on the Contract Drawings.

5.1 BASIS OF PAYMENT

The quantity of Detectable Underground Utility Marking Tape installed will be paid at the unit bid prices for “Seep Collector”, “6 Inch PVC Gravity”, “12 Inch PVC Gravity”, “18 Inch PVC Gravity”, “10 Inch Force Main” and “Wire Test Station”, and the contract lump sum price bid for “Pump Station”. No deduction will be made nor will any increase be made in the lump sum price for “Pump Station” item amounts regardless of decreases or increases in the final total contract amount or for any other cause.

5.2 PAY ITEM

“Seep Collector”, per linear foot.

“6 Inch PVC Gravity”, per linear foot.

“12 Inch PVC Gravity”, per linear foot.

“18 Inch PVC Gravity”, per linear foot.

“10 Inch Force Main”, per linear foot.

“Pump Station”, per lump sum.

8.0-3

“Wire Test Station”, per each.

11.0-1

11-00 ELECTRICAL INSTALLATION REQUIREMENTS

Applies to Project 1 and Project 3

1.0 GENERAL

1.1 SCOPE OF WORK

The following specifications describe the installation of the electrical power and control systems for the Viking Lift Station and the pH monitoring point located at the mouth of Martin Creek. These facilities are located near the WVDEP T & T Fuels, Inc. (EM-113) AMD Treatment Facility on Route 26, just outside of Albright WV. The Electrical System Integrator shall provide a turn-key installation, and provide materials as noted, labor and supervision to complete the project.

The Viking Lift Station facility shall utilize an integrated electrical system as designed, manufactured, and installed by Mon Valley Integration, LLC. (MVI), and should be bid as such. Alternatives may be evaluated after the award of the Bid, and must comply with Special Provisions Section 0-13 Alternatives (Engineer Approved Equals).

The pH monitoring point, located at the mouth of Martin Creek shall have an integrated electrical system as designed, manufactured, and installed by MVI, and should be bid as such. Alternatives may be evaluated after the award of the Bid, and must comply with Special Provisions Section 0-13 Alternatives (Engineer Approved Equals).

The Contractor is responsible for installing a complete and functional system. The drawings and specifications are to be considered conceptual in nature, and are not intended to limit the Contractor's responsibility to provide a complete and functional installation.

The Contractor shall provide apparatus, installation, commissioning and certification for the lift station facility in accordance with applicable standards and regulations.

The Viking Lift Station shall be monitored and controlled by a PLC-based control system. All field wiring to the PLC and the PLC programming will be done Mon Valley Integration, LLC. (MVI) or Engineer Approved Equal. Field wiring will include all power, control, instrumentation and communication wiring, whether copper or fiber-optic. See Contract drawings for conduit schedule and one line.

The Viking Lift Station shall be powered by 480 VAC, three phase commercial utility power. The Contractor shall make all the necessary arrangements with the utility to verify the location of the metering pole and utility connection point (Point of common coupling).

11.0-2

The Project calls for the installation of a permanent three-phase emergency generator that will be sized to operate this facility and allow for ten percent load growth. This generator shall be part of the MVI integrated electrical system and be supplied as such. The Contractor shall design and install a WVDEP-approved concrete pad with appropriately placed incoming, outgoing and control conduit stub-ups for this generator.

The Electrical System Integrator is responsible for installing a three-phase automatic transfer switch (ATS) to transfer load to the emergency generator in the event of a power failure. This ATS shall be part of the MVI integrated electrical system and be supplied as such.

The pH monitor at the mouth of Martin Creek shall operate on 120 VAC single phase power fed from the “Electric Man Hole” shown on the T & T AMD Plant – Phase One contract drawings. The Martin Creek site shall consist of a MVI pH monitoring system, pH sensor, and single mode fiber optic cable. The wire and cable between the Martin Creek site and the Viking Lift Station is the responsibility of the Contractor.

The Electrical System Integrator r will be responsible for supplying and installing all the facility lighting, whether indoor, outdoor, or area lighting. Refer to the Contract Drawings for lighting sizes and locations.

The Electrical System Integrator shall supply all conduits, cable, wire, fiber-optic cable, receptacles, boxes, switches, wire labels, terminals and other miscellaneous electrical equipment to do a complete installation in a workman-like manner.

The Contractor shall also supply all concrete, re-bar, strut, hangers and other necessary hardware to mount and secure all the equipment and components as shown in the Contract Drawings.

NFPA 820 will be used to identify the extent of any hazardous (classified) areas at the lift station. Wiring in these areas will comply with Chapter 5 (Special Occupancies) of the latest issue of the National Electrical Code (NEC). All electrical installations, regardless of location, shall be in strict compliance with the latest issue of the National Electrical Code (NEC). Any conflict shall be brought to attention of the Engineer for clarification.

Drawings, manuals, and documentation shall be provided for the entire system in both paper and electronic format. The Contractor will mark-up these drawings during the installation, and provide a set of as-built drawings in both paper and electronic format at the completion of the project.

The ensuing p ro j ec t shall be complete in every respect, and any material or work not specifically mentioned or shown on the Drawings, but necessary for the

11.0-3 completion of this project, shall be provided.

1.2 REMOVAL OF SUPPLANTED EQUIPMENT

Not applicable.

1.3 MAJOR ITEMS FURNISHED BY OTHERS

Motors and motor-driven equipment shall be provided and installed by others.

1.4 MAJOR ITEMS FURNISHED BY ELECTRICAL SYSTEM INTEGRATOR AND

CONTRACTOR (NOT AN ALL-INCLUSIVE LIST)

A. Qty. 1 - MVI Lift Station Pump Controller.

B. Qty. 1 - MVI 150 kW diesel-powered generator with a NEMA 3R enclosure.

C. Qty. 1 - MVI NEMA 4X stainless steel 200 Amp SE-rated transfer switch.

D. Qty. 1 - Flomotion Mag Meter.

E. Qty. 1 - MVI pH Monitoring Panels installation at the mouth of Martin Creek.

F. Fiber Optic and 120 VAC power from the “Electric Man Hole”, T & T AMD Plant phase one, to The Mouth of Martin Creek PH monitoring point. See T&T EM-113 contract drawings for details of “Electric Man Hole”.

1.5 OTHER ITEMS FURNISHED BY THE CONTRACTOR (LOCATION TO BE

DETERMINED BY ENGINEER) (NOT AN ALL-INCLUSIVE LIST)

A. Viking Lift Pump Station area lighting.

B. Viking Lift Pump Station area receptacles.

C. Wire, conduit, fittings, boxes, hangers, etc.

1.6 DELIVERABLE ENGINEERING DOCUMENTS

The Contractor shall be responsible for supplying electrical drawings and documents that describe the project electrical systems. The format of the deliverable documents is subject to the approval of the WVDEP. The drawing scope shall apply to all new, modified or altered areas. The drawings shall include, but not be limited to, the following descriptions:

11.0-4

A. Electrical Drawing Index – This consists of a list of the electrical drawings by drawing number. The drawing number shall reflect the project, the electrical section designator “E”, and the drawing sequence number.

B. Electrical Motor List – This is a tabular listing of all rotating apparatus and the associated electrical service apparatus. The motor information shall include the unit number, the unit description name, the motor type, frame, horsepower, voltage, full load amperage, service factor, full load RPM, KVA code letter, and motor supplier. The unit electrical starter information shall include the MCC number/location, the starter location within the MCC, the starter type, starter size, unit shunt capacitor size, unit current transformer size, unit overload size, unit I/O rack interface number, and unit control PLC number or name. The unit operator interface information shall include the unit control location(s) and type. The unit drawing cross reference information shall list the drawing numbers for the unit one line diagram, the I/O rack drawing, the unit schematic drawing, and the unit instrumentation interface drawing if applicable.

C. One Line Diagram - This is a graphical depiction of the project electrical distribution from the incoming service(s) through to the rotating or static apparatus. The drawing is based on a one line representation of three phase ac, single phase ac, and direct current systems. The one line diagram shall represent the electrical system capacities, voltages, amperage ratings, locations, starter sizes, conduit sizes, wire number and sizes, switchgear sizes, safety disconnect sizes, rotating apparatus sizes, and unit control device locations. The one line diagram shall cross-reference any other one line drawing for service connections. The one line diagram shall depict the available short circuit fault capacities at key points within the distribution system.

D. Unit Schematic Drawing - This is a graphical depiction of the unit from the motor control center to the prime mover for each unit. The drawing shall include the unit starter wiring, power wiring, and control wiring. The wire numbers shall reflect the unit number and a consistent unit function designation. The unit number, name, size in horsepower and full load amperage shall be shown near the rotating apparatus. The unit control interface shall provide I/O address numbers.

E. Instrumentation Drawings - This is a traditional PID drawing(s) done to

International Society of Automation (ISA) standards. The drawing shall depict instrument types, locations, functions, wiring, and power supply. The instrument drawing(s) shall include information on device configuration, calibration, and physical mountings.

F. Lighting Schematic and Layout - This is a drawing(s) that depicts the

11.0-5 lighting system wiring and physical layout as shown on the project mechanical drawings.

G. Communication System Schematic and Layout - This is a drawing(s) that shows the type, location, wiring, and layout of all project communication and signaling stations.

All electrical drawings shall be CAD based (AutoCad), unless otherwise approved by the Engineer. At the conclusion of the project, the Contractor shall deliver CAD files to the WVDEP in AutoCad 2017 format.

Three (3) Project CD’s shall be provided at the completion of the project. These CD’s shall contain all of the project drawings and schematics in both AutoCad 2017 and PDF format, and all project component information sheets and manuals in Adobe PDF format. An HTML type menu system shall be created to provide CD navigation. This menu shall be displayed, or “auto run”, anytime the CD is inserted into a CD drive.

1.7 PRE-CONSTRUCTION DOCUMENTS

The Contractor shall provide adequate documentation at the Pre- Construction Meeting that will allow the WVDEP to evaluate the Electrical Work and Equipment for the project.

The Documentation shall include, but not be limited to, the following:

Electrical System Inegrator.

A list of the proposed suppliers of said equipment or services

(i.e. Programming, Start-up, etc.).

A listing of any Sub-Contractor that may be utilized.

A list of requested deviations from the Specifications.

A list of any Specification requiring clarifications.

A list of any questionable or “Gray” areas of the Specifications.

If there are no deviations, clarifications, or gray areas, the WVDEP will expect the Specifications and Plans shall be followed as written and the project be completed as designed.

2.0 COMPLIANCE AND SAFETY

2.1 JURISDICTION

All work shall comply with the latest issue of the National Electrical Code, applicable local, State and Federal codes, and relevant standards issued by IEEE, NFPA and NEMA.

2.2 CONTACT REGISTER

11.0-6

A. The Contractor will be expected to comply with the work rules and regulations of OSHA and WVDEP.

B. Prior to starting work, the successful bidder shall submit to the WVDEP a Contractor Register Notebook listing all of Contractor's vital statistics that may be required by WVDEP in the event of accident, illness, or violation of WVDEP's work rules or OSHA regulations. The Register will include Contractor's ID numbers, insurance certificates, and workman's compensation certificate.

2.3 APPROVALS

This installation is subject to inspection and approval by OSHA and WVDEP. The Contractor will be called upon to be present during inspections by these agencies and stand ready to make corrections where mandated by law. Implicit in this requirement is that all work be performed in a workmanlike manner and in such a way that will comply with all applicable codes.

3.0 GENERAL PROVISIONS

3.1 REFERENCE

A. The General Conditions and other Contract Documents as set forth in the foregoing pages are hereby incorporated into and become a part of the Specifications for work under this title, insofar as these documents apply hereto.

B. The Contractor is directly responsible for complying with all the Electrical

Specifications including electrical work and/or materials supplied by sub-contractors.

3.2 CONTRACT DRAWINGS

A. The Drawings accompanying this Specification are complementary each to the other and what is called for by one shall be as if called for by both.

B. Consult all Contract Drawings which may affect the location of equipment, conduit and wiring and make minor adjustments in location to secure coordination.

C. Wiring layout is schematic, and exact c o m p o n e n t locations shall be determined by structural and other conditions. This shall not be construed to mean that the design of the system may be changed. This refers only to the exact locations of conduit and equipment required to fit into the building as-constructed, and with the coordination of conduit and other

11.0-7 equipment with piping and other equipment included under other Sections of the Technical Specifications.

D. Coordinate layout of work with other trades. Make minor adjustments in location required for coordination. Locations of structural systems, heating work and plumbing lines shall take preference over locations of conduit lines where conflict occurs.

E. Changes, other than minor adjustments shall be submitted to the Engineer for approval before proceeding with work.

F. The location of outlets and switches shown is approximate. The Engineer shall have the right to relocate any outlets or switches before installation without additional cost.

3.3 MANUFACTURER’S DRAWINGS

A. Provide submittal information in accordance with the Special Provisions Section 0-11 Submittals.

B. Provide Operation and Maintenance information in accordance with the

Special Provisions Section 0-11 Submittals and other Technical Specifications detailing Operation and Maintenance of components or equipment.

3.4 JOB SITE COPY OF DOCUMENTS

One copy of all Drawings, Specifications, Addenda, approved Shop Drawings, Change Orders and other modifications shall be maintained at the site, in good order. The Drawings shall be marked to record any changes made during construction, especially deviations necessary to incorporate equipment different from base equipment specified. These drawings shall be up-to-date and be available to the Engineer as needed.

The Drawings marked to record all changes made during construction shall be delivered to the Engineer upon completion of the work. An additional set of Drawings will be furnished by the Engineer for the Contractor for this purpose upon request by the Contractor.

4.0 ELECTRICAL WORK

4.1 GENERAL

Within the building or structure(s), provide a disconnect switch for incoming power, a distribution panel to sub-divide the service for the lighting, heating, 11.0-8 communication, and utility feeders. The distribution panel shall include molded case thermal magnetic circuit breakers housed within a metal-clad enclosure for each feeder circuit. The Contractor shall provide locking provisions for the feeder circuits for electrical isolation and lockout.

A. Lighting and Utility Power - The Contractor shall also furnish utility power of sufficient capacity for all initial loads plus 25% for future growth. A 480 VAC to 120/240 VAC single phase transformer(s) shall be used to supply all lighting, utility, heat, etc. loads. The transformer shall be a dry-type distribution unit, housed within a metal enclosure and suitable for indoor operation. The transformer windings shall be epoxy encapsulated. The transformer primary shall be protected by a properly sized thermal magnetic circuit breaker. The transformer shall be protected on the secondary side by surge arrestors. The transformer shall provide power to one or more single phase120/240 VAC distribution center(s).

B. Safety Switches – This project requires a visual disconnect function for equipment lockout and service. This visual disconnect switch shall be metal enclosed and have a viewing window so that the operator can verify that all three phases have been disconnected.

C. Electrical Safety Matting

Furnish and install electrical safety matting at all electrical switchgear and operator stations. Matting shall meet the appropriate Federal, State, and Local inspection jurisdiction requirements in place. These locations for these mats shall include, but not be limited to:

1. Operator Control Panels

2. Motor Control Centers

3. Switchgear

4. Power Centers

5. Distribution Panels

6. Safety Switches

7. Communication Stations

Matting shall carry an electrical rating commensurate with the hazard at that location. Matting brand shall be dictated by local site practices. The minimum matting size shall be 36" by 36".

E. General Lighting and Convenience Outlets

1. General Lighting

a. The Contractor shall furnish and install lighting in areas of enclosed building structures and where walkways are routed outdoors. The lighting design shall be based on the following

11.0-9 light intensities, using a coefficient of lamp utilization of 75% and a service factor of 75%. A maximum of 5/1 light intensity diversity shall be maintained for dark spots based on a light measurement of 5 readings within a 10 foot square filled pattern.

b. The Contractor shall provide:

50 foot-candles for the motor control center room(s), generator house, and drive panel areas;

20 foot-candles for all equipment floors and machinery areas; and 3 foot-candles for exterior walkways.

c. In general, fixtures shall be mounting at ceiling height. Light fixtures mounted more than 10 feet above the floor will require reflectors to bring light to floor areas, and fixtures mounted below 8 feet or where glare is noticeable will require refractors to diffuse the light.

2. Lighting for Non-Hazardous Facility Areas

Lighting fixtures for non-hazardous areas shall be enclosed, gasketed, v a p o r - tight, a n d p o w e r e d b y 120- v olt single phase power. Fixtures shall be mounted on centered pendants on spring cushion swivel hangers. Fixtures shall be suitable for locations where protection is required from wet, dirty, and corrosive atmospheres.

3. Floodlights

Area lighting fixtures shall be powered by 120-volt single phase power, trunnion mounted, gray, and have a photocell for dusk to dawn operation. Floodlights shall maintain a 5 foot-candle light intensity at ground level 20 feet from the structure. Floodlights shall be mounted on structures, buildings, and other site support elements.

4. Exterior Lights

All exterior lighting shall be controlled by photocells for dusk to dawn operation. Photocells shall be supplied for individual fixture control or for group control via a group lighting contactor. Photocells shall be mounted so as to not be falsely affected by plant lighting fixtures or vehicular traffic.

5. Exterior Doors

There shall be a suitable lighting fixture with photocell control mounted above all exterior entrances.

6. Exit Lighting No powered exit door or stairway lights are anticipated in this project.

The Contractor shall provide exit signage that "glow in the dark" for

11.0-10 up to 10 minutes after a power outage in lieu of exit lighting.

7. Lighting Panelboards

The C ontractor shall source lighting from the main 120/240 volt, single phase lighting transformer located in the motor control room(s). No 480 VAC lighting is anticipated. Panelboards shall include a main circuit breaker and adequate 20-amp branch circuit breakers. The lighting panelboards shall each contain 15% spare, 20 ampere, single pole circuit breakers. Panelboards shall source lighting circuits, solenoids, electric actuated valves, local infrared heating, and convenience outlets. Panelboards shall be clearly and uniquely identified on the exterior. A local branch circuit identifier listing shall be provided in a plastic sleeve. All branch circuit breakers shall be numbered or labeled. All 120 VAC distribution circuits from the panelboards shall be wired with separate current carrying neutral return wiring.

8. Convenience Receptacles

Convenience receptacles shall be installed throughout the site structure(s) to power electric hand tools, appliances, etc.

Receptacles shall be spaced to enable meeting all needs with a 50 foot extension cord. Convenience receptacles shall be Hubbell Catalog # 5362, 3 wire, 20 ampere, duplex, straight blade with weatherproof flip-cover utility plate, or Engineer approved equal.

Receptacles shall be mounted in a threaded, cast outlet box. Outlets shall be labeled for 120 volts AC. Outlets located outdoors shall be provided with GFCI protection.

4.2 INSTALLATION

A. Grounding

1. The grounding system shall be referenced to ground as developed in the 480 VAC power supply and extended to all circuits.

2. Any new site structure shall be grounded to a 3/4" x 10 foot long copperweld ground rod located at the base of every third major vertical column outside the concrete pier and connected to building steel columns by No. 4/0 AWG bare copper wire by exothermic or compression type connectors. All major column ground assemblies shall be interconnected to a No. 4/0 copper ground loop laid 18" below grade around the perimeter of the structure. Where the ground wire is embedded below concrete slabs, there will be at least 6" of soil cover between the wire and the bottom of the slab. Ground wires will not be encased within concrete fill or foundations. Concrete Slab

11.0-11 grounding may be required see NEC Article 250.52(A)(3)

3. All power and control conduits shall contain an internal insulated ground wire with green insulation or markings per NEC. The size of the ground wire shall be equal to that of the power conductors for No.

6 AWG circuits and smaller, and sized per NEC for power conductors larger than No. 6 AWG.

4. Where Sealtite flexible conduit or SO cord is used to connect utilization equipment to rigid conduit, an external bonding conductor shall be installed on power and control circuits. Equipment grounding connections shall be made by listed bolted connectors.

5. In general, all equipment shall be grounded by three methods; the insulated conductor within the conduit, the conduit shell as a continuous metallic path, and where practicable, an external bond from the equipment frame to the structural steel.

4.3 WIRING METHODS

The wiring methods used for this project shall meet all applicable requirements of the current revision of the NEC. The wiring methods are intended to be permanent and substantial in design and installation. The Contractor will take great care in the design, protection, and installation of the wiring system. The Contractor is responsible for the location of all conduit stub-ups.

A. All power, lighting, and control wiring shall be installed in galvanized, threaded, rigid steel conduit. Conduit shall be galvanized by the hot dipped method. Conduit shall be threaded prior to galvanizing. As an alternate, the Contractor may propose, and the WVDEP may approve, other heavy duty wiring means such as armored cable, wire trays, wire ways, TEC cable, intermediate conduit, plastic conduit, or others where appropriate to the application. Any wiring not installed in rigid conduit shall be approved individually by the WVDEP. No common circuit wire ways or common circuit pull boxes are anticipated without special permission.