ARFQ DEP1800000004 MUDDY CREEK RESTORATION PLANS 1-28 06-30-17.pdf

PDF 15 MB Posted

Attached to
Addendum 1 Muddy Creek Project 4 Gravity UO-519, S-91-85
Solicitation number
ARFQ 0313 DEP1800000004 2
Issued by
Raleigh County, West Virginia

About this file

This document is a construction drawings index and plan sheet compilation prepared by the West Virginia Department of Environmental Protection, Office of Special Reclamation, for the Muddy Creek Restoration Project located in Preston County, West Virginia. The project encompasses comprehensive infrastructure improvements including the design and construction of a lift station, force main, gravity systems, Preston Energy seep collector, profiles for Viking and Fickey Run areas, ditch work, and a pump station. The plans were prepared by E.L. Robinson Engineering (5088 Washington Street, West Charleston, West Virginia 25313) and consist of 73 detailed sheets organized as a composite plan with individual plan sheets numbered 1 through 13, supplemented by specialized profile sheets for the force main (sheets 30-34), Fickey Run (sheets 36-40), ditch work (sheets 41-42), and cross-sections (sheets 43-46). The document includes state and county vicinity maps showing the project location within Preston County relative to surrounding counties and states including Ohio, Pennsylvania, Kentucky, and Virginia.

The file does not contain pricing information, contract terms, award dates, bidding procedures, or other commercial terms. This appears to be a technical construction document component of a larger Request for Quotes (ARFQ DEP1800000004) issued with a completion date of June 30, 2017, serving primarily as the engineering design reference material for contractors bidding on or executing the Muddy Creek Restoration Project. Funding sources and specific project budget information are not detailed in this index document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX TO SHEETS

WEST VIRGINIA DEPARTMENT OF ENVIRONMENTAL PROTECTION

JIM JUSTICE, GOVERNOR

AUSTIN CAPERTON, CABINET SECRETARY

OFFICE OF SPECIAL RECLAMATION

CONSTRUCTION DRAWINGS FOR

MUDDY CREEK PROJECT 1 LIFT STATION

MUDDY CREEK PROJECT 2 PRESTON ENERGY & GEOTUBE PAD

MUDDY CREEK PROJECT 3 FORCE MAIN

MUDDY CREEK PROJECT 4 GRAVITY

PRESTON COUNTY, WEST VIRGINIA

STATE VICINITY MAP

COUNTY VICINITY MAP

USGS VICINITY MAP

DESCRIPTIONNO.

PLANS PREPARED BY

5088 Washington Street, West

Charleston, West Virginia 25313

Phone: 304-776-7473

Fax: 304-776-6426 www.elrobinsonengineering.com

HANCOCK

BROOKE

OHIO

PENNSYLVANIA

M A

R Y

LA

N

D

JEFFERSON

BERKELEY

MORGAN

MINERAL

HAMPSHIRE

MARSHALL

WETZEL MONONGALIA

HARDY

GRANT

TAYLOR

MARION

HARRISON

DODDRIDGE

RITCHIE

TYLER

PLEASANTS

WOOD

LEWIS

BARBOUR

TUCKER

PENDLETON

RANDOLPH

UPSHUR

BRAXTON

WIRT

CALHOUN

ROANE

JACKSON

MASON

WEBSTER

POCAHONTAS

GREENBRIER

NICHOLAS

CLAY

PUTNAM

CABELL

WAYNE

LINCOLN

FAYETTE

KANAWHA

BOONE

MINGO

LOGAN

RALEIGH

SUMMERS

MERCER

MCDOWELL

K

E

N

T

U

C

K

Y

O

H

I

O

V

I

R

G

I

N

I

A

PETERSBURG

GILMER

MONROE

WYOMING

PRESTON

PLAN

SHEET 8

SHEET #

10,23

PLAN

SHEET 6

SHEET #

8,21

PLAN

SHEET 5

SHEET #

7,20

PLAN

SHEET 4

SHEET #

6,19

PLAN

SHEET 3

SHEET #

5,18

PLAN

SHEET 2

SHEET #

4,17

PLAN

SHEET 1

SHEET #

3,16

PLAN

SHEET 7

SHEET #

9,22

PLAN

SHEET 9

SHEET #

11,24

PLAN

SHEET 10

SHEET #

12,25

PLAN

SHEET 11

SHEET #

13,26

PLAN

SHEET 12

SHEET #

14,27

PLAN

SHEET 13

SHEET #

15,28

PLAN

SHEET 8

SHEET #

10,23

PLAN

SHEET 6

SHEET #

8,21

PLAN

SHEET 5

SHEET #

7,20

PLAN

SHEET 4

SHEET #

6,19

PLAN

SHEET 3

SHEET #

5,18

PLAN

SHEET 2

SHEET #

4,17

PLAN

SHEET 1

SHEET #

3,16

PLAN

SHEET 7

SHEET #

9,22

PLAN

SHEET 9

SHEET #

11,24

PLAN

SHEET 10

SHEET #

12,25

PLAN

SHEET 11

SHEET #

13,26

PLAN

SHEET 12

SHEET #

14,27

PLAN

SHEET 13

SHEET #

15,28

01 cover PDF (1)
2 composite plan sheet PDF 2 (1)
3 plan sheet 1 NEW 3 (1)
4 plan sheet 2 NEW PDF 8 (1)
5 plan sheet 3 NEW PDF 7 (1)
6 plan sheet 4 NEW PDF 6 (1)
7 plan sheet 5 NEW PDF 5 (1)
8 plan sheet 6 NEW PDF 4 (1)
9 plan shee 7 NEW PDF 3 (1)
10 plan sheet 8 NEW PDF 3 (1)
11 plan shee 9 NEW PDF 3 (1)
12 plan sheet 10 NEW PDF 3 (1)
13 plan sheet 11 NEW PDF 3 (1)
14 plan sheet 12 NEW PDF 3 (1)
15 plan sheet 13 NEW PDF 3 (1)
16
17
18
19
20
21
22
23
24
25
26
27
28
29-PRESTON ENERGY SEEP COLLOCTOR PROFILE 29 (1)
30-34 FORCE MAIN PROFILES 30 (1)
30-34 FORCE MAIN PROFILES 31 (1)
30-34 FORCE MAIN PROFILES 32 (1)
30-34 FORCE MAIN PROFILES 33 (1)
30-34 FORCE MAIN PROFILES 34 (1)
35 VIKING PROFILES 35 (1)
36-40 FICKEY RUN-PROFILES 36 (1)
36-40 FICKEY RUN-PROFILES 37 (1)
36-40 FICKEY RUN-PROFILES 38 (1)
36-40 FICKEY RUN-PROFILES 39 (1)
36-40 FICKEY RUN-PROFILES 40 (1)
41-42 DITCH PROFILES 41 (1)
41-42 DITCH PROFILES 42 (1)
43-46 cross sections 43 (1)
43-46 cross sections 44 (1)
43-46 cross sections 45 (1)
43-46 cross sections 46 (1)
47
48
49
50
51
52
53 pump station plan sheet 53 (1)
53A
53B
53C
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

File details come from the government source that posted it. Updated .