Appendix J - Historical 3-yrs Record of Gap Service Calls - 20191204.xlsx

XLSX spreadsheet 163 KB Posted

Attached to
Solicitation Posting of the Global Sustainment of Anti-Terrorism Force Protection (AT/FP) Systems and Assets, Worldwide.
Solicitation number
N3943020R2245
Issued by

About this file

This is a solicitation for the Global Sustainment of Anti-Terrorism Force Protection (AT/FP) Systems and Assets, Worldwide. The Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC) is soliciting proposals for an indefinite delivery indefinite quantity contract to provide sustainment and modernization of AT/FP systems and assets located at naval and joint-service installations worldwide. The contract will have a base ordering period of 60 months with an option for an additional 36 months, and a potential extension of services period not to exceed six months. The maximum contract value is $600 million with a minimum guarantee of $50,000. The project award date is scheduled for March 1, 2021. NAVFAC EXWC intends to award sustainment work as the first task order to fulfill the minimum guarantee, with a base year and four option years plus potential extension. Separate task orders will be awarded for modernization and upgrades. One hundred questions were submitted in response to the solicitation.

View the file

Other files

File Type Posted
Remedy Incident Guide.pdf PDF
N3943020R22450001.pdf PDF
Remedy CDRL Submission Guide.pdf PDF
AIM User Guide.pdf PDF
N3943020R22450002.pdf PDF
N3943020R22450003.pdf PDF
Attachment 6 - Safety Factor 20200909.doc DOC document
Attachment 5 - Subcontracting Plan Template 20200910.doc DOC document
LENEL Dongles list June 2020.xlsx XLSX spreadsheet
Attachment 2 Pricing Schedule 20200921.xlsx XLSX spreadsheet
Remedy Incident Categorization Information.pptx PPTX presentation
Attachment 9 - Sustainment Task Order PWS 20200909.docx DOCX document
Appendix A - Acronym List.pdf PDF
Appendix D2 New Install 20200714 Final.pdf PDF
Appendix E CNIC Move Add Change Policy.pdf PDF
APP-C List of Systems to be Sustained - 20200709 Final.xlsx XLSX spreadsheet
Attachment 2 - ELIN Price Schedule 20200812.xlsx XLSX spreadsheet
Appendix D3 Tech Refresh 20200714 Final.pdf PDF
Appendix D1 Sustainment 20200714.pdf PDF
Attachment 9 Sustainment Task Order PWS 20200730.docx DOCX document
Appendix B Contractor User Guide for Remedy AIM 20200709 Final.docx DOCX document
Appendix N - Historical 3-yr Asset Failure Data - 20191204.xlsx XLSX spreadsheet
Appendix H ATFP Ashore GSC QASP 20200306.pdf PDF
Attachment 5 - Subcontracting Plan Template.doc DOC document
Appendix O - Historical 3-yr Record of Non-Gap Service Calls with tix count- 20191204.xlsx XLSX spreadsheet
Attachment 6 - Safety Factor.doc DOC document
Appendix L - DD Form 1423s for CDRL A002-A043.pdf PDF
Appendix P - Historical HAZMAT Costs.xlsx XLSX spreadsheet
Appendix R - Preventive Maintenance Checklist Samples.pdf PDF
Attachment 8 - RFI Form.doc DOC document
Appendix K - GSC DD254 Draft 20191206.pdf PDF
Attachment 3 - SB Subcontracting Record.docx DOCX document
Attachment 1 - PPQ.docx DOCX document
Appendix Q - Historical FRU Costs.xlsx XLSX spreadsheet
Attachment 4 - SB Participation and Commitment Strategy 20200812.docx DOCX document
APP-M Subcomponent Detail for Systems to be Sustained - 20200713 Final.xlsx XLSX spreadsheet
Appendix G CDRL Review Process BMT Approved 12Jan16.pdf PDF
Attachment 7 - Wage Determinations 20200819.pdf PDF
N3943020R2245.pdf PDF
Appendix F - CDRL A033 Asset Data Template v2.2.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 Year Gap Service Calls

Incident ID (NFAC)StatusDays OpenUnique Remedy IDPrincipal CategoryFamily of SystemsProject RegionBase (Site)Unique IdentifierProject NameSummaryDescriptionLast UpdateDate UpdatedWork Info TypeEstimated Start DateEstimated Resolution DateAssigned GroupContractor Assignment DateAssociated ContractImpactUrgencyPrioritySystem Down?Create DateSubmit DateWaiver OpenApproved Waiver Time (hrs)Operational Categorization Tier 1Operational Categorization Tier 2Operational Categorization Tier 3PM Task IDProduct Categorization Tier 1Product Categorization Tier 2Product Categorization Tier 3Last Resolved DateTotal Time to Repair (TTR) (Days)Resolution Categorization Tier 1Resolution Categorization Tier 2Resolution Categorization Tier 3Resolution Product Categorization Tier 1Resolution Product Categorization Tier 2Resolution Product Categorization Tier 3Repair Replace FormPass/FailPMI ReportPass/FailCustomer Sign Off SheetPass/Fail
NFAC00000109148Closed12048PSACACP-AVG-LCNRSENAS MeridianRabbit Road GatePSAC.ACP-AVG-L.CNRSE.NAS Meridian.Rabbit Road GateID card reader is inoperable, however cards can be scanned for access.ID card reader is inoperable, however cards can be scanned for access.CSO Attached12/8/16 11:40General Information12/6/16 23:0012/6/16 23:00Serco Gap12/6/16 12:01N39430-16-C-18113-Routine3-RoutineRoutineNo12/6/16 12:0112/6/16 12:01NoHardwareBiometrics & Access ControlBarrier12/7/16 9:150.88SoftwareTech AssistSystem RebootHardwareBiometrics & Access ControlBiometrics & Access ControlN/A733670;701311;NFAC 109148 12072016.pdfPass
reader is now reading cards and granting access resolving the issue.12/7/16 9:1121.1821.18
NFAC00000109272Closed612033PSACACP-AVG-LCNRSWNAVBASE Ventura CountyPt Hueneme Pleasant Valley GatePSAC.ACP-AVG-L.CNRSW.NAVBASE Ventura County.Pt Hueneme Pleasant Valley GateADA gate at Port Hueneme, Pleasant Valley AVG gateADA gate at Port Hueneme, Pleasant Valley AVG gate (Naval Base Ventura County) ATFP 0000195137, there needs to be a buzzer installed so when the button is pushed people know the gate is open.
DOES NOT IMPACT THE OPERATION OF THE GATECustomer Sign-Off form or PMI checklist summited.2/6/18 0:16General Information12/8/16 17:002/10/17 1:00Serco Gap12/8/16 10:39N39430-16-C-18113-Routine3-RoutineRoutineNo12/8/16 10:3912/8/16 10:39NoHardwareBiometrics & Access ControlButton2/7/17 10:5361.01HardwareTech AssistReplaceHardwareBiometrics & Access ControlBiometrics & Access ControlN/A690521;671203;NFAC00000109272 CSO FORM.pdfPassThe new electric latch and lockable hand set and buzzer was installed on the ABA gate. the original issue has been resolved. There is a plastic cover that goes on top of the frame that has been ordered and will be installed.12/8/16 13:513.23.2
NFAC00000109290Closed32068PSACACP-AVG-LCNRSENAS KingsvilleBack GatePSAC.ACP-AVG-L.CNRSE.NAS Kingsville.Back GateThe lower Cheater card reader is not allowing access into the back gate.The lower Cheater card reader is not allowing access into the back gate. Need serco tech to come and fix or replace.
SecureUSA ATFP00000168215CSO Attached12/13/16 11:12General Information12/8/16 1:0012/12/16 1:00Serco Gap12/8/16 15:07N39430-16-C-18112-High2-HighHighNo12/8/16 15:0712/8/16 15:07NoHardwareBiometrics & Access ControlGate12/11/16 23:203.34HardwareTech AssistReplaceHardwareBiometrics & Access ControlBiometrics & Access ControlN/A740971;703271;NFAC00000109290 Kingsville AVG lower reader not working.pdfPassTechs replaced reader and tested. Techs drove through gate approx 20 times with no failures. Resolving ticket.12/8/16 15:440.630.63
NFAC00000109440Closed12635PSACACP-AVG-LCNRMANS Great LakesGate 5, 5A and TurnstilesPSAC.ACP-AVG-L.CNRMA.NS Great Lakes.Gate 5, 5A and TurnstilesGate 5 - automatically popped up without activation - gate is currently secured.Gate 5 - automatically popped up without activation - gate is currently secured.Technicians arrived at NS Great Lakes Gate 5 to assess the situation. Technicians checked battery voltage and battery 1 is completely dead. This is due to operator error turning the main AC power off.12/11/16 12:55General InformationSerco Gap12/10/16 18:20N39430-16-C-18113-Routine3-RoutineRoutineNo12/10/16 18:2012/10/16 18:20NoHardwareBiometrics & Access ControlGate12/11/16 12:550.77HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A79806;75159;109440.pdfPass

Technicians checked voltage readings after replacement and readings are

nominal. Operations check x3 shows everything is functioning properly.12/10/16 21:493.483.48
NFAC00000109555Closed7187PSACACP-VGCNRSENS MayportPVG SE Gate 5 and 5APSAC.ACP-VG.CNRSE.NS Mayport.PVG SE Gate 5 and 5AGate 5ACustomer called and stated: GATE 5A - All pedestals need to be re-sealed.Customer Sign-Off form or PMI checklist summited.8/25/17 14:56General Information12/12/16 1:0012/16/16 1:00Serco Gap12/13/16 12:56N39430-16-C-18112-High2-HighHighNo12/12/16 6:4712/12/16 6:47No5.27HardwareBiometrics & Access ControlGate Arm12/19/16 11:515.74HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A695126;673271;ATFP CSO NFAC00000109555.pdfPassTech installed the synthetic washers and the panels are closing tightly now.
This is all that was requested at this time for this issue.12/12/16 11:505.065.06
NFAC00000109556Closed232046PSACACP-AVG-LCNRSENS MayportGate 5 and 5APSAC.ACP-AVG-L.CNRSE.NS Mayport.Gate 5 and 5AGATE 5ACustomer called and stated:

1. Reader pedestal camera cable 21 port 20 - not working

2. Ingress trap camera cable 33 port 21 - not workingCustomer Sign-Off form or PMI checklist summited.8/30/17 10:33General Information12/12/16 1:001/6/17 1:00Serco Gap12/13/16 12:55N39430-16-C-18112-High2-HighHighNo12/12/16 6:5012/12/16 6:50No523.85HardwareAV EquipmentCamera1/4/17 8:460HardwareTech AssistRepairHardwareAV EquipmentAV EquipmentN/A695339;673497;ATFP CSO NFAC00000109556.pdfPassThe tech found wires were disconnected to the CAT6 plug on the patch panel. Once the plug was re-terminated the cable tested good. Cable 21 now has connectivity12/12/16 11:474.954.95
NFAC00000109723Closed12335C4IDPC-LDCCNREURAFSWANSA Souda BayCAD UpgradeC4I.DPC-LDC.CNREURAFCENT.NSA Souda Bay.CAD Upgradee-911 SPOKE phone located at building
#93 room #137 at NSA Souda Bay in the Emergency Dispatch Cente-911 SPOKE phone located at building

#93 room #137 at NSA Souda Bay in the Emergency Dispatch Center workstation #2.

The dial pad in touch screen will not accept the Number "0" when dialing a number out. Please assign ticket to SERCO.

Note that user restarted the software for a quick fix with negative results.The dial pad in touch screen will not accept the Number "0" when dialing a number out. There was no issues found during the first day of visit. System was running as designed. Checked in with dispatcher in the morning, December 15, 2016. Dispatcher stated they can use the mouse to click on the keypad. Touch screen monitor has some spot on the screen that was not triggering the key pad. Dispatchers will monitor and test system for 24 hours to identify any problem. December 15, 2016, Technician re-calibrated the touch screen monitor via the control panel. After calibrating, tested the monitor by touching the screen. Test failed. Changed existing monitor with spare monitor left on site. After changing, test monitor touch screen and keypad works. Problem solved. Resolving ticket.12/15/16 5:41General Information12/15/16 6:00Serco Gap12/14/16 1:28N39430-16-C-18113-Routine3-RoutineRoutineNo12/14/16 1:2812/14/16 1:28NoHardwarePeripheralPhone12/15/16 5:411.18HardwareTech AssistReplaceHardwareMonitorMonitorN/A729581;699584;911 dispatch monitor.pdfPassThe dial pad in touch screen will not accept the Number "0" when dialing a number out. There was no issues found during the first day of visit. System was running as designed. Checked in with dispatcher in the morning, December 15, 2016. Dispatcher stated they can use the mouse to click on the keypad. Touch screen monitor has some spot on the screen that was not triggering the key pad. Dispatchers will monitor and test system for 24 hours to identify any problem. December 15, 2016, Technician re-calibrated the touch screen monitor via the control panel. After calibrating, tested the monitor by touching the screen. Test failed. Changed existing monitor with spare monitor left on site. After changing, test monitor touch screen and keypad works. Problem solved12/14/16 6:054.624.62
NFAC00000109863Closed42025PSACACP-AVG-LCNRNWNAS Whidbey IslandNortz St GatePSAC.ACP-AVG-L.CNRNW.NAS Whidbey Island.Nortz St GateREQUEST SERCO PRESENCE TO OPEN UP BOLLARD PANEL AT NORTZWe have a construction project at Nortz Gate, NAS Whidbey Island and contractor have requested access to the Final Denial Barrier Maintenance Panel for underground locates. Request presence of SERCO and for them to contact Lloyd Potter from NAVFAC to coordinate date and time.CSO Attached12/20/16 12:38General Information12/19/16 1:00Serco Gap12/15/16 18:58N39430-16-C-18113-Routine3-RoutineRoutineNo12/15/16 18:5812/15/16 18:58No83.74HardwarePower DistributionPower Panel12/19/16 11:400.21HardwareTech AssistTrainingHardwarePower DistributionPower DistributionN/A449548;367229;New Doc 1.pdfPassThe contractors met with the NAVFAC rep and have located needed lines.12/15/16 20:101.21.2
NFAC00000110048Closed01007PSACACP-VGCNRMANS Great LakesGate 1PSAC.ACP-VG.CNRMA.NS Great Lakes.Gate 1Not an AVG Barrier NS Great Lakes - Gate 1 (Main), inbound lane traffic arm is operating extremely sNot an AVG Barrier NS Great Lakes - Gate 1 (Main), inbound lane traffic arm is operating extremely slow. Reported taking 7 minutes to go up.Technicians arrived at NS Great Lakes Gate 1 to assess the situation. Technician inspected inbound lane 1 AG812 and found it operating properly. Slow operations may have been due to extreme temperatures (-5 to -10F) when the issue occurred.12/19/16 16:06General Information12/19/16 11:1912/20/16 1:00Serco Gap12/19/16 10:54N39430-16-C-18112-High2-HighHighNo12/19/16 10:5412/19/16 10:54NoHardwareBiometrics & Access ControlDrop Arm12/19/16 16:060.22HardwareTech AssistNo Fault FoundHardwareBiometrics & Access ControlBiometrics & Access ControlN/A80953;76312;110048.pdfPassTechnician verified AG812 internal heater was on. Technicians also readjusted

the arm levels as preventative measures. Operations check x3 shows no fault

found and everything is functioning properly.12/19/16 11:200.430.43
NFAC00000110051Closed32040PSACACP-AVG-LCNRSENAVSUBBASE Kings BayMadison GatePSAC.ACP-AVG-L.CNRSE.NAVSUBBASE Kings Bay.Madison GateKings Bay; Madison Gate, PTZ Camera not working. Cable 39, port 33Kings Bay; Madison Gate, PTZ Camera not working. Cable 39, port 33The Serco tech has established communication with the PTZ. The switch was not supplying enough POE power to power this camera. Once the CAT6 cable is plugged into a separate POE injector the camera powers up and the IP on the camera has been changed. This issue has been resolved.12/22/16 11:16General Information12/19/16 1:0012/22/16 1:00Serco Gap12/19/16 11:03N39430-16-C-18113-Routine3-RoutineRoutineNo12/19/16 11:0312/19/16 11:03No17.47HardwareAV EquipmentCamera12/22/16 11:162.28HardwareTech AssistRepairHardwareAV EquipmentAV EquipmentN/A1271790;1226173;NFAC00000110051.SIGNED.PDFPassThe Serco tech has established communication with the PTZ. The switch was not supplying enough POE power to power this camera. Once the CAT6 cable is plugged into a separate POE injector the camera powers up and the IP on the camera has been changed. This issue has been resolved.12/20/16 13:1026.1126.11
NFAC00000110204Closed12047PSACACP-AVG-LCNRSENAS Corpus ChristiNorth Back GatePSAC.ACP-AVG-L.CNRSE.NAS Corpus Christi.North Back GateThree Cheetah readers at N. Gate not reading inbound lane or ABA and APT.Three Cheetah readers at N. Gate not reading inbound lane or ABA and APT.Customer Sign-Off form or PMI checklist summited.5/26/17 14:02General Information12/22/16 1:0012/23/16 1:00Serco Gap12/21/16 15:44N39430-16-C-18113-Routine3-RoutineRoutineNo12/21/16 13:2512/21/16 13:25NoHardwareBiometrics & Access ControlReader12/22/16 12:240.86HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A723886;698096;NFAC00000110204 Cheetah Readers N Gate Corpus.pdfPassThe cheetah readers had to be power cycled at this gate.
There must have been a power surge at the gate that caused the readers to go offline. Power was removed for 5 minutes then reapplied and all the readers worked correctly. the gate was tested and it is working correctly12/21/16 15:432.290.29
NFAC00000110220Closed792161PSACACP-VGCNRSWNWS Seal BeachInnert ECP GatePSAC.ACP-VG.CNRSW.NWS Seal Beach.Innert ECP GateBollard wouldn't go down inbound lane at PCH Gate. This is a final denial barrier. Not anAVG barrierCustomer caller and reported the bollard wouldn't go down inbound lane at PCH GateAttached CSOS3/13/17 11:30General Information12/22/16 1:003/6/17 1:00Serco Gap12/21/16 17:46N39430-16-C-18112-High2-HighHighNo12/21/16 17:4612/21/16 17:46No17.73HardwareBiometrics & Access ControlBollard3/10/17 19:2078.33HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A438618;384666;110220.pdfPass2 hyrdaforce valves replaced. tested system multiple times works as designed turned back over to installation12/21/16 18:020.260.26
NFAC00000110613Closed02048PSACACP-AVG-LCNRSENAS MeridianRabbit Road GatePSAC.ACP-AVG-L.CNRSE.NAS Meridian.Rabbit Road GateRabbit Road Gate the touch screen control works inadvertenly, ATFP0000124304Customer called and stated on NAS Meridian the Rabbit Road Gate the touch screen control works inadvertenly, ATFP0000124304 console inside guard houseCSO Attached/ ARF Attached12/29/16 18:58General Information12/27/16 23:0012/27/16 23:00Serco Gap12/28/16 9:33N39430-16-C-18112-High2-HighHighNo12/28/16 9:3312/28/16 9:33NoHardwareAV EquipmentConsole12/28/16 16:010.27HardwareTech AssistReplaceHardwareAV EquipmentAV Equipment32799;27469;Asset Data NFAC 110613.xlsxPassN/A741143;702088;NFAC 110613.pdfPassUpon my arrival the RSSI final denial barrier remote interface touch screen was not responding to onscreen touch commands.Replaced the RSSI final denial barriers remote interface touch screen. Then I tested the inbound and outbound final denial barriers using the remote interface touch screen and tested it with satisfactory results resolving the issue.12/28/16 15:576.416.41
NFAC00000110845Closed01984PSACESS-NMCCNRSENAS KingsvillePSAC.ESS-NMC.CNRSE.NAS KingsvilleIntrusion Detection System not working at NAS Kingsville Bldg. 4788 (Weapons Bldg.), Room 10 (Arms RIntrusion Detection System not working at NAS Kingsville Bldg. 4788 (Weapons Bldg.), Room 10 (Arms Room)original issues on ticket have been fixed, and alarm keypad has been working since repair. closing ticket.1/10/17 20:50General InformationSerco Gap12/30/16 12:28N39430-16-C-18113-Routine3-RoutineRoutineNo12/30/16 9:4812/30/16 9:48NoHardwareNetworkAlarm12/30/16 12:280HardwareTech AssistRepairHardwareNetworkNetworkN/A725123;699426;NFAC00000110845 Alarm Keypad in the armory.pdfPassRequesting ticket reassignment. GSC tech's were onsite last night to assess per customer's request. This issue is with a alarm keypad on a weapons armory at a shooting range. Not CAT 1 or CAT 2.
techs found that the alarm keypad was improperly mounted, causing the anti tamper switch to trigger frequently ant the slightest touch, and had loose wiring. techs also found a short in the wiring, that was able to be fixed. the door sensor was also found to be not working due to faulty wiring and installation.12/30/16 12:272.650.65
NFAC00000111115Closed02248PSACACP-AVG-LCNRSENAS PensacolaCorry Station Gate 7PSAC.ACP-AVG-L.CNRSE.NAS Pensacola.Corry Station Gate 7Corry Station gate 7 The first inbound arm has led lights on it that are not functioningCorry Station gate 7

This morning the gate was put in the automatic mode.

The first inbound arm has led lights on it that are not functioning Corry Station gate 7 1/4/17 15:27 General Information 1/4/17 1:00 1/6/17 1:00 Serco Gap 1/4/17 9:40 N39430-16-C-1811 3-Routine 3-Routine Routine No 1/4/17 9:40 1/4/17 9:40 No Hardware Biometrics & Access Control Gate 1/4/17 15:27 0.24 Hardware Tech Assist Repair Hardware Biometrics & Access Control Biometrics & Access Control N/A 712868;693100;NFAC00000111115.pdf Pass Corry Station gate 7 This morning the gate was put in the automatic mode.

The first inbound arm has led lights on it that are not functioning. We found the Wire from the Magnetic Automation operator to the arm was pinched and broken. We pulled a new wire from the operator into the arm, and reconnected the lights. The Lights are working properly again. No further Issues. Resolving this ticket.1/4/17 11:562.272.27
NFAC00000111292Closed31953PSACACP-VGCNRSENCBC GulfportBroad Avenue GatePSAC.ACP-VG.CNRSE.NCBC Gulfport.Broad Avenue GateFDB will not deployFinal Denial Barriers will not deploy at Broad Avenue Gate at the Naval Construction Battalion Center.
Request emergency work order since there is no capability for containment. Both inbound and outbound are inoperable.Checked the Discount Ticket box to remove this ticket from calculations for Trend Reports7/13/18 11:48General Information1/12/17 1:001/9/17 1:00Serco Gap1/6/17 7:01N39430-16-C-18113-Routine3-RoutineRoutineNo1/6/17 7:011/6/17 7:01NoHardwareBiometrics & Access ControlBarrier1/9/17 7:523.04CancellationDuplicateIncidentHardwareBiometrics & Access ControlBiometrics & Access ControlN/A748979;667752;NFAC00000111292.pdfPassResolving the issue by canceling this ticket these are 2 separate issues opening different tickets. No further action required. Resolving this issue.1/6/17 7:250.390.39
NFAC00000111444Closed22620C4IDPC-RDCCNRSENAS JacksonvilleE-NERMSC4I.DPC-RDC.CNRSE.NAS Jacksonville.E-NERMSSE RDC ENERMS CAD workstations 1, 2, & 3 Adobe Acrobat has gone missingPlease create a ticket for ATFP Global Sustainment to resolve an issue currently affecting SE RDC ENERMS CAD workstations 1, 2, & 3 (so far) - Adobe Acrobat has gone missing after workstation updates were applied. Updates are stopped until resolved. (NAS Jacksonville RDC).Per tech: "Analyzed application/event logs to determine root cause of failure. I copied known good Adobe install package to the share to eliminate any possibilities with bad software package. Then NTFS and Windows share permissions were modified to allow the system and computer accounts to access the repository where the updated Adobe Reader package was stored. Created Test OU and group policy to facilitate testing above software with several machines. After several successful tests and conferring with team, updated enterprise group policy to match settings used in tests and removed test ou settings from system. RDC SW and RDC SE both tested successfully"1/11/17 14:58General InformationSerco Gap1/9/17 8:43N39430-16-C-18113-Routine3-RoutineRoutineNo1/9/17 8:431/9/17 8:43NoSoftwareApplicationThird Party1/11/17 14:582.26SoftwareTech AssistReconfigurationSoftwareApplicationApplicationN/A29804;25964;NFAC00000111444.pdfPassPer tech: "Analyzed application/event logs to determine root cause of failure. I copied known good Adobe install package to the share to eliminate any possibilities with bad software package. Then NTFS and Windows share permissions were modified to allow the system and computer accounts to access the repository where the updated Adobe Reader package was stored. Created Test OU and group policy to facilitate testing above software with several machines. After several successful tests and conferring with team, updated enterprise group policy to match settings used in tests and removed test ou settings from system. RDC SW and RDC SE both tested successfully"1/9/17 14:275.745.74
NFAC00000111590Closed13283PSACACP-AVG-LCNRMANWS YorktownFuel Farm GatePSAC.ACP-AVG-L.CNRMA.NWS Yorktown.Fuel Farm GateContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATEContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATECustomer Sign-Off form or PMI checklist summited.8/22/17 4:23General Information1/23/17 1:001/31/17 1:00Serco Gap1/18/17 12:21N39430-16-C-18113-Routine3-RoutineRoutineNo1/10/17 15:081/10/17 15:08NoHardwareSafety CheckGrounding RodHardwarePreventive MaintenancePreventive Maintenance1/23/17 10:024.9HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance706675;679172;ATFP CSO NFAC00000111590.pdfPassN/AThe grounding was checked at this gate and is with in specifications.1/23/17 10:02306.9117.9
NFAC00000111600Closed91844PSACACP-AVG-LCNRMAJEB Little Creek - Fort StoryGate 6PSAC.ACP-AVG-L.CNRMA.JEB Little Creek - Fort Story.Gate 6Contractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATEContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATECustomer Sign-Off form or PMI checklist summited.1/26/18 13:12General Information1/17/17 1:00Serco Gap1/18/17 10:50N39430-16-C-18113-Routine3-RoutineRoutineNo1/10/17 15:381/10/17 15:38NoHardwareSafety CheckGrounding RodHardwarePreventive MaintenancePreventive Maintenance1/19/17 11:521.04HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance711692;682910;ATFP CSO NFAC00000111600.pdfPassN/AThis AVG gate had the grounding tested at the VTG, VTB, IDF cabinet and the Drop arm. The results have been included in the grounding spread sheet. The only thing grounded at this site was the IDF cabinet.1/18/17 10:49187.180.18
NFAC00000111601Closed91359PSACACP-AVG-LCNRMANSA Hampton RoadsGate 10 (Charlie)PSAC.ACP-AVG-L.CNRMA.NSA Hampton Roads.Gate 10 (Charlie)Contractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATEContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATECustomer Sign-Off form or PMI checklist summited.8/31/17 10:59General Information1/17/17 1:00Serco Gap1/18/17 10:46N39430-16-C-18113-Routine3-RoutineRoutineNo1/10/17 15:401/10/17 15:40NoHardwareSafety CheckGrounding RodHardwarePreventive MaintenancePreventive Maintenance1/19/17 11:541.05HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance695422;673612;ATFP CSO NFAC00000111601.pdfPassN/AThis AVG gate had the grounding tested at the VTG, VTB, IDF cabinet and the Drop arm. The results have been included in the grounding spread sheet. Nothing unusual for this site.1/18/17 10:45187.090.09
NFAC00000111604Closed171908PSACACP-AVG-LCNRMANWS YorktownLackey GatePSAC.ACP-AVG-L.CNRMA.NWS Yorktown.Lackey GateContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATEContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATECustomer Sign-Off form or PMI checklist summited.1/26/18 13:28General Information1/23/17 1:001/31/17 1:00Serco Gap1/18/17 12:19N39430-16-C-18113-Routine3-RoutineRoutineNo1/10/17 15:431/10/17 15:43NoHardwareSafety CheckGrounding RodHardwarePreventive MaintenancePreventive Maintenance1/27/17 9:548.9HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance636160;609832;ATFP CSO NFAC00000111604.pdfPassN/AThis site was checked and all the equipment was with in the accepted grounding parameters. No further grounding needs to be done at this site.1/27/17 9:52402.15214.15
NFAC00000111609Closed172709PSACACP-AVG-LCNRMANSA Hampton RoadsNW Annex Main GatePSAC.ACP-AVG-L.CNRMA.NSA Hampton Roads.NW Annex Main GateContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATEContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATECustomer Sign-Off form or PMI checklist summited.1/26/18 13:29General Information1/17/17 1:001/18/17 11:00Serco Gap1/18/17 10:43N39430-16-C-18113-Routine3-RoutineRoutineNo1/10/17 15:511/10/17 15:51NoHardwareSafety CheckGrounding RodHardwarePreventive MaintenancePreventive Maintenance1/27/17 10:098.98HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance636241;609891;ATFP CSO NFAC00000111609.pdfPassN/AThis AVG gate had the grounding tested at the VTG, VTB, IDF cabinet and the Drop arm. The results have been included in the grounding spread sheet. Nothing unusual for this site.1/18/17 10:41186.830.83
NFAC00000111620Closed132068PSACACP-AVG-LCNRSENAS KingsvilleBack GatePSAC.ACP-AVG-L.CNRSE.NAS Kingsville.Back GateContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATEContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATECustomer Sign-Off form or PMI checklist summited.5/26/17 14:11General Information1/23/17 1:001/31/17 1:00Serco Gap1/18/17 12:18N39430-16-C-18113-Routine3-RoutineRoutineNo1/10/17 16:091/10/17 16:09NoHardwareSafety CheckGrounding RodHardwarePreventive MaintenancePreventive Maintenance1/23/17 9:594.9HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance723896;698097;NFAC00000111620 AVG Grounding Kingsville.pdfPassN/AThe grounding was checked at this gate and is with in specifications.1/23/17 9:59305.83117.83
NFAC00000111624Closed132253PSACACP-AVG-LCNRSENAS Corpus ChristiDelta GatePSAC.ACP-AVG-L.CNRSE.NAS Corpus Christi.Delta GateContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATEContractor is to ensure proper grounding of AVG system.
DOES NOT IMPACT THE OPERATION OF THE GATECustomer Sign-Off form or PMI checklist summited.5/26/17 14:11General Information1/23/17 1:00Serco Gap1/18/17 12:18N39430-16-C-18113-Routine3-RoutineRoutineNo1/10/17 16:181/10/17 16:18NoHardwareSafety CheckGrounding RodHardwarePreventive MaintenancePreventive Maintenance1/23/17 9:574.9HardwareTech AssistPMHardwarePreventive MaintenancePreventive Maintenance723740;697910;NFAC00000111624 AVG Grounding Corpus.pdfPassN/AThe grounding was checked at this gate and is with in specifications.1/23/17 9:56305.63118.63
NFAC00000111721Closed02659C4IMNS-GV/IVCNRSENSA Panama CityTech RefreshC4I.MNS-GV/IV.CNRSE.NSA Panama City.Tech RefreshGiant Voice is going off on different time. Needs help to set the alarms.Giant Voice is going off on different time. Needs help to set the alarms.
Base: NSA Panama cityGiant Voice is going off on different time. Needs help to set the alarms. We called the customer, she said she was trying to change some of the times in which automatic messages were sent out from the Federal Signal. I suggested that she call Federal Signal (the Manufacturer of her GV system) to ask specific programming questions. If she does not get the answers she is looking for, to call me back and I would help her further. She said she would call them. No further Actions Required. Resolving This issue.1/11/17 15:42General InformationSerco Gap1/11/17 8:40N39430-16-C-18111-Critical1-CriticalHighNo1/11/17 8:341/11/17 8:34NoHardwareAV EquipmentSpeaker1/11/17 15:420.29SoftwareTech AssistTrainingHardwareAV EquipmentAV EquipmentN/A723846;698977;NFAC00000111721.pdfPassGiant Voice is going off on different time. Needs help to set the alarms. We called the customer, she said she was trying to change some of the times in which automatic messages were sent out from the Federal Signal. I suggested that she call Federal Signal (the Manufacturer of her GV system) to ask specific programming questions. If she does not get the answers she is looking for, to call me back and I would help her further. She said she would call them. No further Actions Required. Resolving This issue.1/11/17 8:400.090.09
NFAC00000111741Closed12048PSACACP-AVG-LCNRSENAS MeridianRabbit Road GatePSAC.ACP-AVG-L.CNRSE.NAS Meridian.Rabbit Road GateCustomer called and stated that Rabbit road gate the AVG is in operational.Customer called and stated that Rabbit road gate the AVG is in operational.CSO Attached1/13/17 10:52General Information1/11/17 1:001/13/17 1:00Serco Gap1/11/17 11:36N39430-16-C-18112-High2-HighHighNo1/11/17 11:361/11/17 11:36NoHardwareBiometrics & Access ControlGate1/12/17 12:111.02HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A741412;702337;NFAC 111741.pdfPassThe batteries were checked for the VTB and VTG and they are working correctly.
The sentry interfaced was turned off. the tech turned it on and the SI connected and is working correctly.1/11/17 11:590.380.38
NFAC00000111863Closed12635PSACACP-AVG-LCNRMANS Great LakesGate 5, 5A and TurnstilesPSAC.ACP-AVG-L.CNRMA.NS Great Lakes.Gate 5, 5A and TurnstilesGate 5 AVG stuck openGate 5 AVG outbound lanes stuck openThe photo eye and the traffic light were controlled by the 24VDC circuit that was removed. The Photo eye and the traffic light were changed t the AC voltage so that they work. Since the photo eye was not powered it sent a signal that told the barrier to not close. This has been fixed and the gate is working correctly now.1/13/17 11:35General Information1/12/17 19:001/13/17 19:00Serco Gap1/12/17 18:48N39430-16-C-18113-Routine3-RoutineRoutineNo1/12/17 18:481/12/17 18:48NoHardwareBiometrics & Access ControlGate1/13/17 11:350.7HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A657096;634568;NFAC00000111863 - Signed.pdfPassThe photo eye and the traffic light were controlled by the 24VDC circuit that was removed. The Photo eye and the traffic light were changed t the AC voltage so that they work. Since the photo eye was not powered it sent a signal that told the barrier to not close. This has been fixed and the gate is working correctly now.1/12/17 19:100.370.37
NFAC00000111922Closed02068PSACACP-AVG-LCNRSENAS KingsvilleBack GatePSAC.ACP-AVG-L.CNRSE.NAS Kingsville.Back GateNAS Kingsville AVGRequest a service technician troubleshoot NAS Kingsville's AVG due to faults and anomalies to the system which are being problematic in clearing. GATE 3 BACK GATE.Techs were called about an avg fault that prevented the gates from opening. Fault was cleared before techs arrival, and gate was now functioning. Techs cycled the gate repeatedly and were unable to recreate the fault. techs observed gate traffic and no further issues were identified.1/13/17 15:45General InformationSerco Gap1/13/17 14:11N39430-16-C-18112-High2-HighHighNo1/13/17 14:111/13/17 14:11NoHardwareNetworkServer1/13/17 15:450.06HardwareTech AssistNo Fault FoundHardwareNetworkNetworkN/A742402;704717;NFAC00000111922 AVG Faults Kingsville.pdfPassTechs were called about an avg fault that prevented the gates from opening. Fault was cleared before techs arrival, and gate was now functioning. Techs cycled the gate repeatedly and were unable to recreate the fault. techs observed gate traffic and no further issues were identified.1/13/17 15:301.311.31
NFAC00000112089Closed52679C4IOPC-EOCCNREURAFCENTNSF Deveselu - RomaniaC4I.OPC-EOC.CNREURAFCENT.NSF Deveselu - RomaniaBriefing Display System (BDS) and Video Teleconferencing SystemOn the touch panel select Display and select an input computer to the two front monitors. The briefing is displayed. In approximately 1-2 minutes a VTC will try to start and the front screens either go blank or they will go white with" VTC unclassified" across the middle of screen. We then have to select the input to the output to redisplay the briefing.VDC System was reset and is now operational1/22/17 23:50General Information1/19/17 16:00Serco Gap1/17/17 9:26N39430-16-C-18113-Routine3-RoutineRoutineNo1/17/17 7:471/17/17 7:47NoHardwareAV EquipmentVideo Cube1/22/17 23:505.6SoftwareTech AssistSystem RebootSoftwareSoftware Application/SystemSoftware Application/SystemN/AFailVDC System was reset and is now operational. Operators were advised to not try to switch inputs too quickly while system is loading. Installer has verified that the programming is correct.1/17/17 9:251.630.63
NFAC00000112167Closed02253PSACACP-AVG-LCNRSENAS Corpus ChristiDelta GatePSAC.ACP-AVG-L.CNRSE.NAS Corpus Christi.Delta Gatereset/re-home D. St. AVGManual switch was used to open the gateCustomer Sign-Off form or PMI checklist summited.5/26/17 14:07General Information1/18/17 1:001/23/17 5:00Serco Gap1/18/17 7:35N39430-16-C-18113-Routine3-RoutineRoutineNo1/18/17 7:351/18/17 7:35NoHardwareMiscellaneousReference Guide1/18/17 10:020.1HardwareTech AssistTrainingHardwareMiscellaneousMiscellaneousN/A723719;697872;NFAC00000112167 D-Steet AVG Re-home Corpus.pdfPassThis was user training that was needed on how to re home the gate. The tech instructed the sentry on the proper procedure. The gate is working correctly now.1/18/17 10:002.422.42
NFAC00000112476Closed12048PSACACP-AVG-LCNRSENAS MeridianRabbit Road GatePSAC.ACP-AVG-L.CNRSE.NAS Meridian.Rabbit Road GateAVG-L Rabbit Road Gate is DownCustomer called and reported AVG-L at Rabbit Road Gate is Down due to severe storms.

Request tech be onboard 23 Jan in the A.M. Waiver Request WVR000000024138 pending 'Awaiting Platform Availability' has been Approved. - ROBERT.HEVERLEY.ctr 1/24/2017 7:24:32 AM 1/24/17 8:24 Status Update 1/23/17 1:00 1/24/17 1:00 Serco Gap 1/22/17 10:21 N39430-16-C-1811 2-High 2-High High No 1/22/17 10:21 1/22/17 10:21 No 21.9 Hardware Biometrics & Access Control Gate 1/23/17 13:05 0.2 Hardware Tech Assist Repair Hardware Biometrics & Access Control Biometrics & Access Control N/A 741493;702430;NFAC 112476.pdf Pass Arrived at gate at 1120 local 23 Jan 2017. Found gates in the open position and the AVG Sentry Interface was not connecting to the IDF. The three buttons on the bottom of the Sentry interface were not working. Was told by John Oxendine there was a power outage on the AVG due to a severe storm. Checked the connection on the inside of the cabinet and the terminal block for the buttons power wires were loose on the Lenel board. Shut off the Sentry interface and waiting 15 minutes and then turned the Sentry interface on and it connected to the IDF. Secured a proper connection to the terminal block for the buttons power wires and they worked. Then I tested the system in manual mode and PLC Auto mode for ten cycles and

system operated properly. Resolving ticket.1/22/17 10:590.640.64
NFAC00000112723Closed11390PSACESS-PerimeterCNRMANS NorfolkPSAC.ESS-Perimeter.CNRMA.NS NorfolkNS Norfolk - Gate 10 camera is not working. ATFP0000090659.NS Norfolk - Gate 10 camera is not working. Error says "Warning: Failed to open Event log file. C:\DVTR\Alarmlog\20170125\H1500 For writing. Possible drive error. Error! Video index save error. For main image partition- Error opening image control file. System operation may fail, image data y be lost. error number 6019. ATFP0000090659.Customer Sign-Off form or PMI checklist summited.1/11/18 8:43General InformationSerco Gap1/25/17 13:23N39430-16-C-18113-Routine3-RoutineRoutineNo1/25/17 13:231/25/17 13:23NoHardwareAV EquipmentCamera1/26/17 13:120.99SoftwareTech AssistSystem RebootSoftwareSoftware Application/SystemSoftware Application/SystemN/A655438;640680;NFAC00000112723CSO.pdfPassTechs arrived on sight and found camera was working but the DVR had stopped recording. Performed a hard reboot on the system and cleaned DVR Monitor and Camera. Camera and DVR system operates good with in Manufacturer standards.1/26/17 7:1117.817.8
NFAC00000112849Closed11071PSACACP-AVG-LCNRSWNAS LemooreFranklin GatePSAC.ACP-AVG-L.CNRSW.NAS Lemoore.Franklin GateAVG gate at Post #2/BLDG #991 Franklin Gate is currently inoperable.The AVG gate at Post #2/BLDG #991 Franklin Gate is currently inoperable. We are unable to find the dilemma that is causing the malfunction in the gate. We have tried resetting the gate completely and we have conducted a function check neither of which is fixing the malfunction.
Gate is currently inoperable both inbound and outbound.Customer Sign-Off form or PMI checklist summited.2/6/18 0:57General Information1/26/17 1:001/28/17 1:00Serco Gap1/26/17 15:52N39430-16-C-18112-High2-HighHighNo1/26/17 15:521/26/17 15:52NoHardwareBiometrics & Access ControlGate1/27/17 15:000.96HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A690442;671109;NFAC00000112849 CSO FORM.pdfPassTech onsite found sentry interface cut screen mouse in op. re-calibrated and is now working as normal. Also found outbound barrier stuck half way closed. Through troubleshooting found the actuator stuck. Manually re-calibrated the gate. System is now fully operational.1/26/17 18:402.82.8
NFAC00000112927Closed02637PSACACP-AVG-HCNRMANS Great Lakesgate 6 and TurnstilesPSAC.ACP-AVG-H.CNRMA.NS Great Lakes.gate 6 and TurnstilesGate 6 traffic arm with not level off, request tech assistance.Gate 6 traffic arm with not level off, request tech assistance.Technician arrived at NS Great Lakes Gate 6 to assess the situation. Technician found that the inbound lane 1 AG812 is really low in the down position. Technician found plastic part that engages the down limit switch has cracked and loosened due to cold temperatures.1/27/17 17:21General InformationSerco Gap1/27/17 14:50N39430-16-C-18112-High2-HighHighNo1/27/17 14:501/27/17 14:50NoHardwareBiometrics & Access ControlGate Arm1/27/17 17:210.1HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A77331;72637;112927.pdfPassTechnician replaced the plastic part. Operations check x3 shows that everything
is functioning properly.1/27/17 17:102.332.33
NFAC00000113062Closed22069PSACACP-AVG-LCNRSENAS KingsvilleOrange Grove GatePSAC.ACP-AVG-L.CNRSE.NAS Kingsville.Orange Grove GateAVG Lenel NGP 3320 and Lenel LNL 2220 Sentry Interface (SI) is not communicatingThe NAS Kingsville Orange Grove AVG Lenel NGP 3320 and Lenel LNL 2220 Sentry Interface (SI) is not communicating with the PT Loma Lenel Sever.Customer Sign-Off form or PMI checklist summited.5/26/17 14:18General Information2/1/17 1:00Serco Gap1/30/17 11:05N39430-16-C-18113-Routine3-RoutineRoutineNo1/30/17 11:051/30/17 11:05NoHardwareNetworkInterface2/1/17 6:481.82HardwareTech AssistRepairHardwareNetworkNetworkN/A723891;698086;NFAC00000113062 AVG Lenel No Comms Kingsville.pdfPassThere is still a fiber issue with the connection to the SI and from the IDF switch back to the PSNET connection.
There is already a ticket open for this issue. A bad UPS was found while investigating this issue, Another ticket will be opened for that problem.1/30/17 11:420.630.63
NFAC00000113126Closed21972PSACACP-VGCNREURAFCENTNSA Souda BayIndia Post GatePSAC.ACP-VG.CNREURAFCENT.NSA Souda Bay.India Post Gatethe gate is leaking from the shaft sealthe gate is leaking from the shaft sealAfter repairs and operations check of drop was completed and turn back over to Security, with drop in continuous operation for 24 hours after repair. Inspected seal that was replaced on gear for leaks, none were found. checked tightness of limit switch mounts and found those to be matching the marks we made on the mount, to indicate movement of the limit switch, found the limit switches tight, and marks were still lined up. Issue resolved.2/2/17 6:14General Information2/7/17 5:00Serco Gap1/31/17 1:21N39430-16-C-18113-Routine3-RoutineRoutineNo1/31/17 1:211/31/17 1:21NoHardwareBiometrics & Access ControlDrop Arm2/2/17 6:142.2HardwareTech AssistRepairHardwareBiometrics & Access ControlBiometrics & Access ControlN/A726754;701199;India Post seal replacement CSO 2Feb 2017 signed.pdfPassIndia post inbound lane was secured at 10:00 by PHYS SEC with concrete barriers. Power to India inbound drop arm was secured by way of LOTO. Confirmed no power present at motor with multi-meter, no power found. Removed power cable, and inverter cable from motor, unbolted motor and gear box from base. Removed actuator arm from gearbox shaft, and removed motor and gearbox, with motor and gearbox removed, the crack in the seal could be seen, The crack was located perpendicular to the gearbox shaft, indicating that the gear box leaked half of it's gear oil. Motor and gear box went the repair shop, as the seal need to be hot pressed in. With the seal removed the internal working of the gear box showed no damage or wear. New seal was hot pressed into position, and refilled with gear oil. No leaks were detected. With the motor and gear box removed, cleaned and removed the gear oil that had leaked out the cracked seal on the bottom of the housing, with oil cleaned up, turned over used pads to local HAZ MAT. Would guess about a quart of gear oil leaked out. With the housing clean, motor and gearbox returned from the repair shop. Reinstalled motor and gear box, tighten bolts, and reattached actuator arm to gear box shaft, tighten actuator arm, rewired motor and inverter. Proceeded to test drop arm for proper operation. Needed to make an minor adjust to the actuator arm, since it was loosened to removed it. With the alignment have been corrected previously, and the adjustment made to the actuator arm. Operationally tested drop arm, found the alignment to be correct, not hitting the receiver, or banging as the arm reached fully open. Before reopening the lane, PSO was on-site tested with him present. Left the drop in operation, to make sure no leaks occurred with normal operation. Checked for leaks after a 24 hour period, and found no leaks, and the arm to be operating as normal. Cycled the drop arm, observed no leaks or drips around the gearbox shaft. confirmed tightness of up limit switch as well as down limit switch. Customer sign off sheet has been completed and submitted and will be up loaded as soon as the signed copy has been returned.1/31/17 1:550.570.57
NFAC00000113261Closed82062PSACACP-AVG-LCNRSWNAVBASE Point LomaPost 10PSAC.ACP-AVG-L.CNRSW.NAVBASE Point Loma.Post 10Request Assistance - NBPL Post 10 Sentry Interface.Sentry Interface wiring - The Sentry Interface has not been bonded to the

electrical ground coming from the circuit breaker. Several 120VAC wires we also found to be unterminated.

The wires entering the SI were also found to be unprotected with no bushings or clamps securing the wires to the bottom of the SI.Customer Sign-Off form or PMI checklist summited.2/6/18 0:28General Information2/3/17 14:302/8/17 1:00Serco Gap2/3/17 10:36N39430-16-C-18113-Routine3-RoutineRoutineNo2/1/17 8:332/1/17 8:33NoHardwareMiscellaneousReference Guide2/9/17 10:476.01HardwareTech AssistRepairHardwareMiscellaneousMiscellaneousN/A690410;671174;NFAC00000113261 CSO FORM.pdfPassThe grounding and other work in the sentry interface has been completed. This issue has been resolved.2/3/17 10:3650.040.04
NFAC00000114116Closed452068PSACACP-AVG-LCNRSENAS KingsvilleBack GatePSAC.ACP-AVG-L.CNRSE.NAS Kingsville.Back GateInstall a new ground rod and a new Ground wire closer to the barrier. Remove existing ground wire.Request for a trouble ticket.

Base: NAS Kingsville System: AVG back gate Please initiate a GSC GAP ticket for grounding of the AVG VMAG barriers at NAS Kingsville Back gate.

Project:

PSAC.ACP-AVG-L.CNRSE.NAS Kingsville.Back Gate Tech Refresh Problem: The existing ground wire is in a conduit with and electrical line. Install a new ground rod and a new Ground wire closer to the barrier.

Remove the existing ground wire.

DOES NOT IMPACT GATE OPERATIONSThe new ground rods were installed and the ground wire run to them. The ground wire that was run in the conduit next to the power wire has been removed.3/27/17 12:50General Information2/13/17 1:003/28/17 0:00Serco Gap2/10/17 11:31N39430-16-C-18113-Routine3-RoutineRoutineNo2/10/17 10:262/10/17 10:26No767.54HardwareBiometrics & Access ControlBarrier3/27/17 12:5013.07HardwareTech AssistReplaceHardwareBiometrics & Access ControlBiometrics & Access ControlN/A723970;698106;NFAC00000114116 Grounding Ceaser Gate AVG Kingsville.pdfPassThe new ground rods were installed and the ground wire run to them. The ground wire that was run in the conduit next to the power wire has been removed.2/13/17 10:5572.4871.48
NFAC00000114259Closed41359PSACACP-AVG-LCNRMANSA Hampton RoadsGate 10 (Charlie)PSAC.ACP-AVG-L.CNRMA.NSA Hampton Roads.Gate 10 (Charlie)inbound CAC reader on vehicle pedestal denied all CAC/TASLON ID both proximity and swipeCustomer called and reported inbound CAC reader on vehicle pedestal denied all CAC/TASLON ID both proximity and swipeCustomer Sign-Off form or PMI checklist summited.1/26/18 14:21General Information2/13/17 1:002/17/17 5:00Serco Gap2/13/17 8:07N39430-16-C-18111-Critical1-CriticalCriticalYes2/13/17 8:072/13/17 8:07NoHardwareBiometrics & Access ControlCard Reader2/17/17 11:174.13HardwareTech AssistReplaceHardwareBiometrics & Access ControlBiometrics & Access ControlN/A636087;609760;ATFP CSO NFAC00000114259.pdfPassThe 3320 board was installed and the gate tested. The card readers are working correctly and the gate is working correctly at this time.2/13/17 9:171.171.17
NFAC00000114388Closed641678PSACACP-AVG-LCNRMANWS EarleWaterfront GatePSAC.ACP-AVG-L.CNRMA.NWS Earle.Waterfront GateADA Gate, when swipe card, the solonild is engaging.ADA Gate, when swipe card, the solonild is engaging.Customer Sign-Off form or PMI checklist summited.1/31/18 11:51General Information2/15/17 1:004/21/17 0:00Serco Gap3/30/17 12:38N39430-16-C-18112-High2-HighHighNo2/14/17 10:222/14/17 10:22No476.34HardwareBiometrics & Access ControlReader4/19/17 10:230.06HardwareTech AssistReplaceHardwareBiometrics & Access ControlBiometrics & Access ControlN/A714659;680728;NWS Earle Waterfront Gate - NFAC00000114388.pdfPassthe techs found that the none of the Lenel boards had a ground wire coming from the power supply to the boards. This was fixed and a new 1320 board installed. Wire was located that went to the turnstile circuit boards. These wires were placed on the 1320 board relay 1 with the help of Alan Sissel. The turnstile and AVG gate are working correctly. Now that this AVG is working correctly the base is using the AVG in Automode every day.2/14/17 11:351.221.22
NFAC00000114461Closed02040PSACACP-AVG-LCNRSENAVSUBBASE Kings BayMadison GatePSAC.ACP-AVG-L.CNRSE.NAVSUBBASE Kings Bay.Madison Gateoutbound lane VTB - two batteries require replacementCustomer called and reported outbound lane VTB - two batteries require replacement and open limit relay all on the same piece of equipment.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .