This solicitation posting announces a request for proposals for the global sustainment of anti-terrorism force protection systems and assets worldwide. The Naval Facilities Engineering and Expeditionary Warfare Center will award an indefinite delivery indefinite quantity contract with a ceiling of $600 million and minimum guarantee of $50,000 for sustainment and modernization work. The base ordering period is 60 months with an option for an additional 36 months. The sustainment task order valued at the minimum guarantee will have a base year and four option years. Separate task orders will be awarded for modernization. The proposal due date is not specified but responses to 100 questions were due by September 11, 2020 and the closing date will be adjusted in the first amendment. The project award date is March 1, 2021. Offerors are invited to propose solutions for maintaining existing anti-terrorism force protection systems and assets globally.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 Anti-Terrorism and Force Protection Ashore, NAVFAC August 2019
CNIC & AT/FP Ashore
Move, Add, Change Policy
NAVFAC AT/FP Ashore
2 Anti-Terrorism and Force Protection Ashore, NAVFAC August 2019
Move/Add/Change (M/A/C) Policy/Process
CNIC has incorporated a Move/Add/Change Policy/Process for any action that changes the current capability or configuration of equipment under the AT/FP Ashore Sustainment Program (to include IA).
Move/Add/Change (M/A/C) Requests:
• Require CNIC HQ Program Director (HPD) approval.
• Include an EXSUM.
• Include a completed A033 Inventory.
• An AT/FP Ashore PDR may supplement/accompany the EXSUM submission.
• CNIC N6 authorization is required when network or IT related matters are involved.
• The change is within authorized CNICINST 3440.17 requirements for EM issues and/or OPNAVINST 5530.14E for
PS/AC issues (except for NMC Cat I/II systems).
• CNIC N6 is able to support the change (ex: moving PSNet drops or activation of NMCI), and
• The requesting Region/CNIC provides for all costs associated with the change.
Any request should be coordinated with the Region N6 (when applicable), and ROC Ops Board (when applicable) to determine feasibility, and forwarded to CNIC HPD for action.
Requests for additional sustainment efforts must include recurring funding via a budget based transfer or an approved POM submission across the FYDP.
• Request must utilize the CNIC / NAVFAC AT/FP Ashore Move, Add, Change Policy/Process.
• The effort must fit within the AT/FP Ashore Program policy and be approved by CNIC.
• A site survey must be conducted to inspect / verify the equipment’s operating condition.
If a Region moves, alters, or changes a sustained system without obtaining approval from the CNIC CCB, the
Sustainment services will be voided and stopped.
3 Anti-Terrorism and Force Protection Ashore, NAVFAC August 2019
MOVE/ADD/CHANGE (M/A/C) REQUEST PROCESS
Move/Add/Change Request Process
Re gi on In st al la tio n N
AV
FA
C
AT
FP
H
Q /F
EC
TL
CN
IC
R ev ie w
B oa rd
(N 3A
T, N
6, N
, N
CN
IC
N
START
Region submits M/A/C Request
Submit M/A/C Request to
Region
Route Request to CNIC Review
Board
Route Request to CNIC lead N code HPD
Complete actions per
M/A/C Request
NAVFAC ATFP HQ/Facilities Engineering Command Team Lead
(FECTL) receives, conducts engineering analysis review to determine if under NAVFAC ATFP baseline, and provides concur/ nonconcur recommendation
CNIC Review Board receives, reviews for requirements confirmation and coordination, and lead N code provides concur/ nonconcur recommendation
Lead N code HPD receives, reviews, and provides concur/nonconcur recommendation
Approved?
N3 receives, reviews, and provides final approval/disapproval
Route Request to CNIC N3
No
Disapproval notification sent to region and all involved in the review process with reason for denial
Yes
Approval notification sent to region and all involved in the review process
END