Army Field Support Battalion (AFSBn-CHS) Facility Preventive Maintenance, Inspection & Repair Services
Solicitation number
FA441824Q0001
Issued by

About this file

This document outlines maintenance responsibilities for exterior water lines, sewage mains, and low voltage lines at Army facilities under the FA441824Q0001 solicitation. The contractor will be responsible for water supply lines from the building shutoff valve to five feet from the building, as well as sewage lines from the building cleanout to five feet from the building. Exterior lines beyond five feet from the building fall under the Base Civil Engineer's purview. For low voltage lines, the contractor must maintain components downstream of the main distribution breaker, while high voltage lines terminate at the breaker. This solicitation seeks preventive maintenance, inspection, and repair services for Army Field Support Battalion facilities.

View the file

Other files

File Type Posted
PWS AFSBn - CHS (Revision 11 Jan 2024).pdf PDF
Site Visit Attendees.pdf PDF
Q and A_FA441824Q0001.pdf PDF
AFSBn-CHS V2 Map.pdf PDF
Wage Determination_CBA-2023-746.pdf PDF
Appendix A - Equipment Inventory_Real Property_19 Dec 23.xlsx XLSX spreadsheet
Joint Base Charleston Base Access Worksheet - Form 111 (Aug 22).pdf PDF
COMBO_AFSBn_FA441824Q0001.pdf PDF
Appendix D- Service Call Historical Workload Data 2023 - Non-Real Property.xlsx XLSX spreadsheet
Appendix H - Wash Rack Service Matrix_2023.xlsx XLSX spreadsheet
Appendix A - Equipment Inventory_Real Property_26 Oct 2018.xlsx XLSX spreadsheet
Appendix M - Engineering Technical Advisory_Legionellos Mitigation Actions.pdf PDF
AFSBn Facility Maintenance and Repair Services Bid Schedule.xlsx XLSX spreadsheet
Appendix E - Building Inventory.xlsx XLSX spreadsheet
Provisions and Clauses.pdf PDF
Appendix F - Boilers (2022).xlsx XLSX spreadsheet
Appendix G - Wash Rack Parts List 2023.xlsx XLSX spreadsheet
Appendix L - LAMS Maintenance Requirements.pdf PDF
Appendix J - Contractor Base Security and Access.pdf PDF
PWS AFSBn-CHS (Revision 23 August 2023).pdf PDF
Appendix C- Service Call Historical Workload Data 2023 - Real Property.xlsx XLSX spreadsheet
Wage Determination 2015-4427 Rev 24 dated 10 July 2023.pdf PDF
Appendix B - Equipment Inventory NON Real Property (New) Oct 2023.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix I – Points of Demarcation 2023

FOR OFFICIAL USE ONLY

The Contractor shall be responsible for maintenance and repairs of exterior water lines as follows:

• Water supply lines from the shutoff valve to the building or five feet from the building if no valve exist, will be the responsibility of the Contractor.

• Water supply from the shut off valve or five feet from the building to the source main will be the responsibility of the Base Civil Engineer (BCE).

• If no shut off valve exist, the BCE will assist with isolation and the five foot rule will take effect.

Responsibility for maintenance and repairs of sewage mains are as follows:

• From the building clean-out to the building or five feet from the building if no clean-out exist, will be the responsibility of the contractor.

• From the clean-out to the sewer main or five feet from the building if no clean-out exist, will the responsibility of the BCE

Responsibility for maintenance and repairs of Low Voltage Lines are as follows:

• High Voltage Lines will end at the primary side of the main distribution breaker(s).

• The contractor shall be responsible for the main distribution breaker(s) and all components downstream.

File details come from the government source that posted it. Updated .