This document outlines maintenance responsibilities for exterior water lines, sewage mains, and low voltage lines at Army facilities under the FA441824Q0001 solicitation. The contractor will be responsible for water supply lines from the building shutoff valve to five feet from the building, as well as sewage lines from the building cleanout to five feet from the building. Exterior lines beyond five feet from the building fall under the Base Civil Engineer's purview. For low voltage lines, the contractor must maintain components downstream of the main distribution breaker, while high voltage lines terminate at the breaker. This solicitation seeks preventive maintenance, inspection, and repair services for Army Field Support Battalion facilities.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix I – Points of Demarcation 2023
FOR OFFICIAL USE ONLY
The Contractor shall be responsible for maintenance and repairs of exterior water lines as follows:
• Water supply lines from the shutoff valve to the building or five feet from the building if no valve exist, will be the responsibility of the Contractor.
• Water supply from the shut off valve or five feet from the building to the source main will be the responsibility of the Base Civil Engineer (BCE).
• If no shut off valve exist, the BCE will assist with isolation and the five foot rule will take effect.
Responsibility for maintenance and repairs of sewage mains are as follows:
• From the building clean-out to the building or five feet from the building if no clean-out exist, will be the responsibility of the contractor.
• From the clean-out to the sewer main or five feet from the building if no clean-out exist, will the responsibility of the BCE
Responsibility for maintenance and repairs of Low Voltage Lines are as follows:
• High Voltage Lines will end at the primary side of the main distribution breaker(s).
• The contractor shall be responsible for the main distribution breaker(s) and all components downstream.