Appendix C- Service Call Historical Workload Data 2023 - Real Property.xlsx

XLSX spreadsheet 967 KB Posted

Attached to
Army Field Support Battalion (AFSBn-CHS) Facility Preventive Maintenance, Inspection & Repair Services
Solicitation number
FA441824Q0001
Issued by

About this file

This document is a historical facilities work order log for the period of June 1, 2022 through June 28, 2022 from an Army facility. It includes over 100 individual work orders related to preventative maintenance, inspections, and repairs of building systems and components. The work orders cover a range of services including electrical, HVAC, plumbing and drainage, doors and windows, lighting and emergency lighting. The document provides details on the work requested, status, dates, locations, and notes from completion of each job. It serves as a record of facilities maintenance activities during this period.

View the file

Other files

File Type Posted
PWS AFSBn - CHS (Revision 11 Jan 2024).pdf PDF
Site Visit Attendees.pdf PDF
Q and A_FA441824Q0001.pdf PDF
AFSBn-CHS V2 Map.pdf PDF
Wage Determination_CBA-2023-746.pdf PDF
Appendix A - Equipment Inventory_Real Property_19 Dec 23.xlsx XLSX spreadsheet
Joint Base Charleston Base Access Worksheet - Form 111 (Aug 22).pdf PDF
COMBO_AFSBn_FA441824Q0001.pdf PDF
Appendix D- Service Call Historical Workload Data 2023 - Non-Real Property.xlsx XLSX spreadsheet
Appendix H - Wash Rack Service Matrix_2023.xlsx XLSX spreadsheet
Appendix A - Equipment Inventory_Real Property_26 Oct 2018.xlsx XLSX spreadsheet
Appendix M - Engineering Technical Advisory_Legionellos Mitigation Actions.pdf PDF
AFSBn Facility Maintenance and Repair Services Bid Schedule.xlsx XLSX spreadsheet
Appendix E - Building Inventory.xlsx XLSX spreadsheet
Provisions and Clauses.pdf PDF
Appendix F - Boilers (2022).xlsx XLSX spreadsheet
Appendix G - Wash Rack Parts List 2023.xlsx XLSX spreadsheet
Appendix I - Points of Demarcation.pdf PDF
Appendix L - LAMS Maintenance Requirements.pdf PDF
Appendix J - Contractor Base Security and Access.pdf PDF
PWS AFSBn-CHS (Revision 23 August 2023).pdf PDF
Wage Determination 2015-4427 Rev 24 dated 10 July 2023.pdf PDF
Appendix B - Equipment Inventory NON Real Property (New) Oct 2023.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RPIE

WO IDWO BarcodeDescriptionAsset IDAsset DescriptionCurrent Asset Service StatusWork TypeRequested ByCreated ByDate CreatedCost CenterExpense ClassStatusStateRequest DateActual
Start DateActual
Finish DateActual DurationRuntimeClosed DateNotesCommentsAsset ClassAsset TypeAttachment CountInstr. CountInstr. Step CountFrom Work Request?Start ResponseFinish ResponseNo Of WorkersEst Craft HoursEst. OT HoursActual Hours MaintenanceHours Variance
2022-1802*2022-1802*1660--Installation brackets on the outside of office 119 for defibrillator.1660-INTERIORFinishes_SheetRock_Ceiling_FloorsIn ServiceROUTINEKBR, KBRKBR-FacilitiesLead5/31/2022 10:56:04 AMInt-FinishesRPIECompletedClosed5/31/2022 6:52:00 AM6/1/2022 12:00 AM6/1/2022 12:00 AM0d 0h 0m0.006/1/2022 4:36:22 PM
704Jun 1 2022 4:36PM by SJONES: They did not have proper brackets to hang defibrillator.
EQINTERIOR000Yes0d 17h 8m0d 17h 8m000.000.500.5
2022-1803*2022-1803*458--men's bathroom in the main hall of building 458.Broken lock on bathroom stall door458-DOORSDoors, Closers and HardwareIn ServiceROUTINEKBR, KBRKBR-FacilitiesLead5/31/2022 11:04:43 AMDoors_HardwareRPIECompletedClosed5/31/2022 7:03:00 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/13/2022 6:56:55 AM
701Jun 13 2022 6:56AM by SJONES: Installed new stall door latch, complete.
EQDOORS000Yes8d 16h 57m8d 16h 57m000.002.002
2022-1804*2022-1804*318--Light flashing in the Joyce tucker meeting room.318-LIGHTING-INTERIORElectric LightingIn ServiceROUTINEOrtega, AbelORTEGAA5/31/2022 11:06:07 AMLIGHTINGRPIECompletedClosed5/31/2022 6:59:00 AM6/28/2022 12:00 AM6/28/2022 12:00 AM0d 0h 0m0.006/29/2022 6:57:12 AM
700Jun 29 2022 6:57AM by SJONES: Replaced broken battery / ballast with a new one.
EQLIGHTING000No27d 17h 1m27d 17h 1m000.002.002
2022-1805*2022-1805*455--main bay area, same location as previous exit replacement Exit sign inop455-LIGHTING-EXIT-AND-EMERGENCYEmergency and Exit LightingIn ServiceROUTINEKBR, KBRKBR-FacilitiesLead5/31/2022 11:12:08 AMLIGHTINGRPIECompletedClosed5/31/2022 7:08:00 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 7:45:53 AM
702Jun 8 2022 7:45AM by SJONES: Replaced old exit light with new exit sign, complete.
EQEM-LTS000Yes6d 16h 52m6d 16h 52m000.002.002
2022-1806*2022-1806*456--INOP AC IN BAY 3456-AHU-1Air Handling UnitIn ServiceROUTINEJONES, SONYASYELTON5/31/2022 12:25:49 PMHVACRPIECompletedClosed5/31/2022 8:25:00 AM6/22/2022 12:00 AM6/22/2022 12:00 AM0d 0h 0m0.006/27/2022 7:18:38 AM703Jun 27 2022 7:18AM by SJONES: AC was satisfied upon arrival, unit cycled several times on / off.
EQHVAC-AHU000No21d 15h 35m21d 15h 35m000.001.001
2022-1807*2022-1807*458--REPAIR INOP EXHAUST FAN IN HEAVY WHEEL458-EF-1Exhaust Fan, Power Roof VentilatorIn ServiceROUTINEJONES, SONYASYELTON5/31/2022 1:18:10 PMHVACRPIECompletedClosed5/31/2022 9:17:00 AM5/31/2022 12:00 AM5/31/2022 12:00 AM0d 0h 0m0.006/1/2022 2:01:56 PM
708Jun 1 2022 2:01PM by SJONES: Found motor to be tripped, reset breaker and took an amp draw on motor, amp draw checked good, made sure all connections tight, unit functioning properly.
EQEXH-FAN000No0d -9h -17m0d -9h -17m000.001.601.6
2022-1808*2022-1808*A/C is out in Bay 3 of Bldg 456456-AHU-1Air Handling UnitIn ServiceOrtega, AbelORTEGAA5/31/2022 2:14:22 PMHVACRPIECompletedClosed5/31/2022 10:11:00 AM6/28/2022 12:00 AM6/28/2022 12:00 AM0d 0h 0m0.006/28/2022 7:17:48 AMJun 28 2022 7:17AM by SJONES: Duplicate work order.
EQHVAC-AHU000No27d 13h 49m27d 13h 49m000.000.00
2022-1809*2022-1809*Bldg. 318 Keys given to MIS from Abel Ortega (Government) that need to be engraved POC Kevin McNeil318In ServiceKBR, KBRKBR-FacilitiesLead5/31/2022 8:40:44 PMRPIECompletedClosed5/31/2022 4:38:00 PM6/2/2022 12:00 AM6/2/2022 12:00 AM0d 0h 0m0.006/2/2022 3:59:20 PM730

Keys need to be label as follow:

0220105 Server 0220106 Server 0220107 Server 0220108 Server 0220109 Server 0220110 Server 0220111 Server 0220112 Server 0220113 Office 0220114 Office Jun 2 2022 3:59PM by SJONES: Stamped keys per sheet.

Jun 2 2022 3:59PM by SJONES: Stamped keys per sheet.

LO000Yes1d 7h 22m1d 7h 22m000.000.500.5
2022-1810*2022-1810*1681--AIR HANDLER IS CLOGGED IN MECH ROOM1681-ACU-3AIR CONDITIONING UNITIn ServiceROUTINEJONES, SONYASYELTON6/1/2022 11:32:05 AMHVACRPIECompletedClosed6/1/2022 7:30:00 AM6/1/2022 12:00 AM6/1/2022 12:00 AM0d 0h 0m0.006/13/2022 7:14:08 AM717Jun 13 2022 7:14AM by SJONES: Replaced piping on AHU drain line.
EQAIR-COND000No0d -7h -30m0d -7h -30m000.001.001
2022-1811*2022-1811*1660--Breakroom pedestrian door, door closer is hanging off. The door slings open and closed.1660-DOORSHinges, locks, Closer, weather stripping, paintingIn ServiceROUTINEKBR, KBRKBR-FacilitiesLead6/1/2022 12:33:19 PMDoors_HardwareRPIECompletedClosed6/1/2022 8:29:00 AM6/2/2022 12:00 AM6/2/2022 12:00 AM0d 0h 0m0.006/6/2022 10:58:48 AM
721Jun 6 2022 10:58AM by SJONES: Fixed door so that it closes properly, complete.
EQDOORS000Yes0d 15h 31m0d 15h 31m000.002.002
2022-1812*2022-1812*PM COOLING TOWER TREATMENT318-CT-1-TREATTower MaintanceIn ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 7:16 AM0d 7h 16m7.276/13/2022 7:17:13 AM
WeeklyJun 13 2022 7:15AM by SJONES: PM complete.
EQCT-1-TRE0110No4d 15h 10m4d 22h 26m100.001.501.5
2022-1813*2022-1813*PM COOLING TOWER TREATMENT348-CT-2-TREATTower Water TreatmentIn ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 7:16 AM0d 7h 16m7.276/13/2022 7:17:13 AM
WeeklyJun 13 2022 7:16AM by SJONES: Cooling tower is down for repairs.
EQH2OTREAT0110No4d 15h 10m4d 22h 26m100.000.250.25
2022-1814*2022-1814*DAILY MAINTENANCE1662-WASH-OPERATING-SYSTEMRoutine Operational Check of SystemIn ServicePM,system6/1/2022 12:49:03 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/9/2022 12:00 AM3d 0h 0m72.006/9/2022 1:13:10 PM
WeeklyJun 9 2022 1:13PM by SJONES: PM complete.
EQWASH-SYS016No4d 15h 10m7d 15h 10m110.004.004
2022-1815*2022-1815*Weekly Boiler Operational Check - Building 850,869 and 318318-BOILERBoiler Dual FuelIn ServicePM,system6/1/2022 12:49:03 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/13/2022 7:18:28 AM
WeeklyJun 13 2022 7:18AM by SJONES: Boiler is inop / offline.
EQBOILER011No4d 15h 10m4d 15h 10m000.000.100.1
2022-1816*2022-1816*Weekly Boiler Operational Check - Building 850,869 and 318850-B-2Boiler, Hot WaterIn ServicePM,system6/1/2022 12:49:03 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/13/2022 7:19:19 AM
WeeklyJun 13 2022 7:19AM by SJONES: Boiler is off for the summer.
EQBOILER011No4d 15h 10m4d 15h 10m000.000.100.1
2022-1817*2022-1817*Weekly Boiler Operational Check - Building 850,869 and 318869-B-1Boiler, Hot WaterIn ServicePM,system6/1/2022 12:49:03 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/13/2022 7:20:21 AM
WeeklyJun 13 2022 7:20AM by SJONES: Boiler is off for the summer.
EQBOILER011No4d 15h 10m4d 15h 10m000.000.100.1
2022-1818*2022-1818*Visual Inspection and Documentation on Active Fuel TanksFUEL-TANKS-IN_OUT-OF-USEFUEL TANKSIn ServiceASSET-PM,system6/1/2022 12:49:03 PMFuel-Oil-TankRPIECompletedClosed6/1/2022 8:49:03 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/9/2022 8:50:15 AM
USE FUEL TANK AND OBSERVATIONS AND CHECKS FORMJun 9 2022 8:50AM by SJONES: Checked all vents for free movement, checked fuel gauge, checked for water in fuel and in secondary containments.
EQFUEL-OIL011No5d 15h 10m5d 15h 10m100.001.001
2022-1819*2022-1819*HAZMAT STORAGE / INVENTORY / TRAINING458-HAZMAT-SAAIn ServiceASSET-PM,system6/1/2022 12:49:03 PMEnvironmentalRPIECompletedClosed6/1/2022 8:49:03 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 12:04:48 PM
Jun 8 2022 12:04PM by SJONES: Complete.
EQHAZWASTE011No5d 15h 10m5d 15h 10m100.002.002
2022-1820*2022-1820*VISUAL INSPECTION AND DOCUMENTATION ON AIR SYSTEMSAIR-COMPRESSORSALL SITE AIR COMPRESSORSIn ServicePM,system6/1/2022 12:49:03 PMRPIECompletedClosed6/1/2022 8:49:03 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 11:57:14 AM
WeeklyJun 8 2022 11:57AM by SJONES: Inspected all compressors, tanks and driers.
EQCOMPRESS0233No5d 15h 10m5d 15h 10m000.002.002
2022-1826*2022-1826*QUARTERLY SUMP PUMP INSPECTIONS324-P-7Sump PumpIn ServicePM,system6/1/2022 12:49:03 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/6/2022 11:01:32 AM
QuarterlyJun 6 2022 11:01AM by SJONES: Complete.
EQPUMP014No4d 15h 10m4d 15h 10m000.000.500.5
2022-1827*2022-1827*SEMI ANNUAL PM FOR GATES 1-4311--GATE-SEMI-ANNUALSEMI-ANNUAL GATE PMIn ServiceASSET-PM,system6/1/2022 12:49:03 PMRPIECompletedClosed6/1/2022 8:49:03 AM6/8/2022 12:00 AM6/8/2022 12:00 AM0d 0h 0m0.006/9/2022 8:53:01 AMSEMI ANNUAL
SEMI-ANNUALJun 9 2022 8:53AM by SJONES: Checked all four gate controllers, adjusted chains and stoppers, checked and lubricated roller guides.
EQEQUPMENT015No6d 15h 10m6d 15h 10m000.001.501.5
2022-1828*2022-1828*PM ELECTRIC WATER HEATER322-WH-2Water HeaterIn ServicePM,system6/1/2022 12:49:03 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/6/2022 11:03:58 AM
AnnualJun 6 2022 11:03AM by SJONES: Complete.
EQH2OHTR-E018No4d 15h 10m4d 15h 10m100.000.500.5
2022-1829*2022-1829*PM EXHAUST FANS (EXCLUDING PROPELLER)1659-EF-2Centrifugal Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:24:45 PM
AnnualJun 9 2022 1:24PM by SJONES: PM complete. Used aerial platform to complete task, replaced one belt.
EQEXH-FAN0117No7d 15h 10m7d 15h 10m100.001.001
2022-1830*2022-1830*PM EXHAUST FANS (EXCLUDING PROPELLER)1659-EF-3Centrifugal Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:37:30 PM
AnnualJun 9 2022 1:37PM by SJONES: PM complete.
EQEXH-FAN0117No7d 15h 10m7d 15h 10m100.000.600.6
2022-1831*2022-1831*PM EXHAUST FANS (EXCLUDING PROPELLER)1659-EF-1Centrifugal Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:23:40 PM
AnnualJun 9 2022 1:23PM by SJONES: PM complete. Used aerial platform to complete task, replaced one belt.
EQEXH-FAN0117No7d 15h 10m7d 15h 10m100.001.001
2022-1832*2022-1832*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-1Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 7:54:48 AM
AnnualJun 8 2022 7:54AM by SJONES: PM complete, fan not coming on, request repair wo.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1833*2022-1833*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-10Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 8:53:03 AM
AnnualJun 8 2022 8:53AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1834*2022-1834*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-11Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 8:53:50 AM
AnnualJun 8 2022 8:53AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1835*2022-1835*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-12Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 8:57:03 AM
AnnualJun 8 2022 8:57AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1836*2022-1836*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-13Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 8:59:58 AM
AnnualJun 8 2022 8:59AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1837*2022-1837*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-14Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 9:00:54 AM
AnnualJun 8 2022 9:00AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1838*2022-1838*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-15Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 9:22:16 AM
AnnualJun 8 2022 9:22AM by SJONES: PM complete. Replaced two belts.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.001.001
2022-1839*2022-1839*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-16Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 9:23:24 AM
AnnualJun 8 2022 9:23AM by SJONES: PM complete. Replaced one belt.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.001.001
2022-1840*2022-1840*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-17Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 9:24:41 AM
AnnualJun 8 2022 9:24AM by SJONES: PM complete. Replaced one belt.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.001.001
2022-1841*2022-1841*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-18Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:27:54 PM
AnnualJun 9 2022 1:27PM by SJONES: PM complete. Used aerial platform to complete task, replaced one belt.
EQEXH-FAN0117No7d 15h 10m7d 15h 10m100.001.001
2022-1842*2022-1842*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-19Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:35:41 PM
AnnualJun 9 2022 1:35PM by SJONES: PM complete. Used aerial platform to complete task.
EQEXH-FAN0117No7d 15h 10m7d 15h 10m100.000.800.8
2022-1843*2022-1843*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-2Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 7:55:46 AM
AnnualJun 8 2022 7:55AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1844*2022-1844*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-3Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 7:57:09 AM
AnnualJun 8 2022 7:57AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1845*2022-1845*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-4Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 7:58:02 AM
AnnualJun 8 2022 7:58AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1846*2022-1846*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-5Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 7:58:55 AM
AnnualJun 8 2022 7:58AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1847*2022-1847*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-6Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 7:59:58 AM
AnnualJun 8 2022 7:59AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1848*2022-1848*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-7Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 8:00:55 AM
AnnualJun 8 2022 8:00AM by SJONES: PM complete.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.000.800.8
2022-1849*2022-1849*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-8Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 8:03:33 AM
AnnualJun 8 2022 8:03AM by SJONES: PM complete. Replaced two belts.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.001.001
2022-1850*2022-1850*PM EXHAUST FANS (EXCLUDING PROPELLER)1660-EF-9Cent. Fan (Power Roof Ventilator)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 8:22:49 AM
AnnualJun 8 2022 8:22AM by SJONES: PM complete, replaced two belts.
EQEXH-FAN0117No4d 15h 10m4d 15h 10m100.001.001
2022-1851*2022-1851*PM EXHAUST FANS (EXCLUDING PROPELLER)322-EF-1Exhaust Fan, RestroomIn ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/8/2022 12:00 AM6/8/2022 12:00 AM0d 0h 0m0.006/9/2022 7:27:15 AM
AnnualJun 9 2022 7:27AM by SJONES: PM complete.
EQEXH-FAN0117No6d 15h 10m6d 15h 10m100.001.001
2022-1852*2022-1852*PM EXHAUST FANS (EXCLUDING PROPELLER)322-EF-3Exhaust Fan, Side wall PropellerIn ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/8/2022 12:00 AM6/8/2022 12:00 AM0d 0h 0m0.006/9/2022 7:28:13 AM
AnnualJun 9 2022 7:28AM by SJONES: PM complete.
EQEXH-FAN0117No6d 15h 10m6d 15h 10m100.001.001
2022-1853*2022-1853*PM GAS WATER HEATER1660-WH-1Water Heater- GasIn ServicePM,system6/1/2022 12:49:03 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/6/2022 11:03:17 AM
AnnualJun 6 2022 11:03AM by SJONES: Complete.
EQH2OHTR-G019No4d 15h 10m4d 15h 10m000.000.500.5
2022-1854*2022-1854*PM GAS WATER HEATER1660-WH-2Water Heater- GasIn ServicePM,system6/1/2022 12:49:03 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/6/2022 11:02:31 AM
AnnualJun 6 2022 11:02AM by SJONES: Complete.
EQH2OHTR-G019No4d 15h 10m4d 15h 10m000.000.500.5
2022-1855*2022-1855*PM UNIT HEATER1659-MAU-2Make-up Air UnitOut Of ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:38:08 PM
AnnualJun 9 2022 1:38PM by SJONES: PM complete.
EQM_UP-AIR0115No7d 15h 10m7d 15h 10m100.001.001
2022-1856*2022-1856*PM EXHAUST FANS (PROPELLER TYPE)1659-EF-5Centrifugal Fan (Vaneaxial)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:18:19 AMAnnualJun 8 2022 9:18AM by SJONES: PM complete.
EQEXH-FAN017No5d 15h 10m5d 15h 10m100.000.300.3
2022-1857*2022-1857*PM EXHAUST FANS (PROPELLER TYPE)1659-EF-6Centrifugal Fan (Vaneaxial)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:19:12 AMAnnualJun 8 2022 9:19AM by SJONES: PM complete.
EQEXH-FAN017No5d 15h 10m5d 15h 10m100.000.300.3
2022-1858*2022-1858*PM EXHAUST FANS (PROPELLER TYPE)1659-EF-7Centrifugal Fan (Vaneaxial)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:20:29 AMAnnualJun 8 2022 9:20AM by SJONES: PM complete.
EQEXH-FAN017No5d 15h 10m5d 15h 10m100.000.300.3
2022-1859*2022-1859*PM EXHAUST FANS (PROPELLER TYPE)1659-EF-4Centrifugal Fan (Vaneaxial)In ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:21:08 AMAnnualJun 8 2022 9:21AM by SJONES: PM complete.
EQEXH-FAN017No5d 15h 10m5d 15h 10m100.000.300.3
2022-1860*2022-1860*PM EXHAUST FANS (PROPELLER TYPE)1660-EF-20Propeller FanIn ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 9:09:09 AM
AnnualJun 8 2022 9:09AM by SJONES: PM complete.
EQEXH-FAN017No4d 15h 10m4d 15h 10m100.000.300.3
2022-1861*2022-1861*PM EXHAUST FANS (PROPELLER TYPE)1660-EF-21Propeller FanIn ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 9:08:15 AM
AnnualJun 8 2022 9:08AM by SJONES: PM complete.
EQEXH-FAN017No4d 15h 10m4d 15h 10m100.000.300.3
2022-1862*2022-1862*PM EXHAUST FANS (PROPELLER TYPE)1660-EF-22Propeller FanIn ServicePM,system6/1/2022 12:49:03 PMHVACRPIECompletedClosed6/1/2022 8:49:03 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 9:07:23 AM
AnnualJun 8 2022 9:07AM by SJONES: PM complete.
EQEXH-FAN017No4d 15h 10m4d 15h 10m100.000.300.3
2022-1863*2022-1863*PM EXHAUST FANS (PROPELLER TYPE)1660-EF-23Cent. Fan (In-Line)In ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 9:06:43 AM
AnnualJun 8 2022 9:06AM by SJONES: PM complete.
EQEXH-FAN017No4d 15h 10m4d 15h 10m100.000.400.4
2022-1864*2022-1864*PM ELECTRIC UNIT HEATER1659-UH-2Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:05:13 AMAnnualJun 8 2022 9:05AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1865*2022-1865*PM ELECTRIC UNIT HEATER1659-UH-3Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:04:34 AMAnnualJun 8 2022 9:04AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1866*2022-1866*PM ELECTRIC UNIT HEATER1659-UH-4Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:03:51 AMAnnualJun 8 2022 9:03AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1867*2022-1867*PM ELECTRIC UNIT HEATER1659-UH-5Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:03:13 AMAnnualJun 8 2022 9:03AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1868*2022-1868*PM ELECTRIC UNIT HEATER1659-UH-6Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:02:38 AMAnnualJun 8 2022 9:02AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1869*2022-1869*PM ELECTRIC UNIT HEATER1659-UH-7Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:02:00 AMAnnualJun 8 2022 9:02AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1870*2022-1870*PM ELECTRIC UNIT HEATER1659-UH-1Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:05:48 AMAnnualJun 8 2022 9:05AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1871*2022-1871*PM ELECTRIC UNIT HEATER1660-UH-33Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 7:48:54 AMAnnualJun 8 2022 7:48AM by SJONES: PM complete, disconnect for unit has come loose from wall, repair wo requested.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1872*2022-1872*PM ELECTRIC UNIT HEATER1660-UH-34Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:09:51 AMAnnualJun 8 2022 9:09AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1873*2022-1873*PM ELECTRIC UNIT HEATER1660-UH-35Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:10:32 AMAnnualJun 8 2022 9:10AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1874*2022-1874*PM ELECTRIC UNIT HEATER1660-UH-36Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:11:14 AMAnnualJun 8 2022 9:11AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1875*2022-1875*PM ELECTRIC UNIT HEATER1660-UH-37Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:11:56 AMAnnualJun 8 2022 9:11AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1876*2022-1876*PM ELECTRIC UNIT HEATER1660-UH-38Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:17:28 AMAnnualJun 8 2022 9:17AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1877*2022-1877*PM ELECTRIC UNIT HEATER1660-UH-39Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:12:37 AMAnnualJun 8 2022 9:12AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1878*2022-1878*PM ELECTRIC UNIT HEATER1660-UH-40Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:13:24 AM
AnnualJun 8 2022 9:13AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1879*2022-1879*PM ELECTRIC UNIT HEATER1660-UH-41Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:14:08 AM
AnnualJun 8 2022 9:14AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1880*2022-1880*PM ELECTRIC UNIT HEATER1660-UH-42Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:14:57 AM
AnnualJun 8 2022 9:14AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1881*2022-1881*PM ELECTRIC UNIT HEATER1660-UH-43Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:15:40 AM
AnnualJun 8 2022 9:15AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.300.3
2022-1882*2022-1882*PM ELECTRIC UNIT HEATER1660-UH-44Unit Heater - ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 9:16:47 AM
AnnualJun 8 2022 9:16AM by SJONES: PM complete.
EQUNIT-HTR016No5d 15h 10m5d 15h 10m100.000.400.4
2022-1883*2022-1883*PM WINDOW AIR CONDITIONING UNIT322-AC-2Thru-Wall Air Conditioning UnitIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:39:21 PMAnnualJun 9 2022 1:39PM by SJONES: PM complete.
EQWACU0111No7d 15h 10m7d 15h 10m000.001.001
2022-1884*2022-1884*Unit Heater (Electric)322-UH-2Unit Heater, ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:45 AM0d 8h 45m8.756/9/2022 8:45:18 AM
AnnualJun 9 2022 8:44AM by SJONES: PM complete.
EQUNIT-HTR016No6d 15h 10m6d 23h 55m100.000.800.8
2022-1885*2022-1885*Unit Heater (Electric)322-UH-3Unit Heater, ElectricIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:45 AM0d 8h 45m8.756/9/2022 8:45:18 AM
AnnualJun 9 2022 8:44AM by SJONES: PM complete.
EQUNIT-HTR016No6d 15h 10m6d 23h 55m100.000.800.8
2022-1886*2022-1886*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-12Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:48AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1887*2022-1887*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-15Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:39AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1888*2022-1888*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-16Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:38AM by SJONES: PM complete Adjusted therma-couple to better sit in flame.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1889*2022-1889*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-19Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:37AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1890*2022-1890*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-2Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 8:36AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1891*2022-1891*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-21Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:36AM by SJONES: PM complete. Adjusted therma-couple to sit in flame
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1892*2022-1892*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-23Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:35AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1893*2022-1893*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-26Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:34AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1894*2022-1894*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-28Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:32AM by SJONES: PM complete. Adjusted therma couple to better sit in flame.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1895*2022-1895*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-3Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 8:35AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1896*2022-1896*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-30Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:31AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1897*2022-1897*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-32Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 7:29AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1898*2022-1898*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-5Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 8:35AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1899*2022-1899*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-7Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 8:34AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1900*2022-1900*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-9Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 8:33AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1901*2022-1901*PREVENTIVE MAINTENANCE - GAS FIRED UNITS1660-UH-11Unit Heater- GasIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 8:37 AM0d 8h 37m8.626/9/2022 8:37:18 AM
AnnualJun 9 2022 8:32AM by SJONES: PM complete.
EQUNIT-HTR011No6d 15h 10m6d 23h 47m000.000.800.8
2022-1902*2022-1902*OUTSIDE AIR DAMPER ANNUAL PM322-OUTSIDE-AIR-DAMPER322--OUTSIDE AIR DAMPERIn ServicePM,system6/1/2022 12:49:04 PMRPIECompletedClosed6/1/2022 8:49:04 AM6/8/2022 12:00 AM6/8/2022 12:00 AM0d 0h 0m0.006/9/2022 8:42:53 AMLOCATED ON NORTH WALL BETWEEN GARAGE DOORS
ANNUALJun 9 2022 8:42AM by SJONES: PM complete. Unit not functioning properly.
EQ000No6d 15h 10m6d 15h 10m000.000.600.6
2022-1903*2022-1903*COMPRESSED AIR CONNECTION ANNUAL PM322-COMPRESSOR-C-1COMPRESSOR-C-1In ServicePM,system6/1/2022 12:49:04 PMComp.-Air-SysRPIECompletedClosed6/1/2022 8:49:04 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/8/2022 12:00:01 PMANNUALJun 8 2022 12:00PM by SJONES: Unit is electric, no oil or filter, belts are fine.
EQCOMPRESS000No4d 15h 10m4d 15h 10m000.000.500.5
2022-1904*2022-1904*MINI-SPLIT AIR CONDENSER UNIT HP322-MSACU-1322--MINI-SPLIT AIR CONDENSER UNIT HPIn ServicePM,system6/1/2022 12:49:04 PMRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:41:09 PMANNUALJun 9 2022 1:41PM by SJONES: PM complete.
EQHVAC000No7d 15h 10m7d 15h 10m000.001.001
2022-1905*2022-1905*MINI SPLIT AIR HANDLING UNIT322-MSAHU-1MINI SPLIT AIR HANDLING UNITIn ServicePM,system6/1/2022 12:49:04 PMRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 12:00 AM0d 0h 0m0.006/9/2022 1:40:12 PMANNUALJun 9 2022 1:40PM by SJONES: PM complete.
EQHVAC000No7d 15h 10m7d 15h 10m000.001.001
2022-1906*2022-1906*PREVENTATIVE MAINTENANCE- FILTERS864-AC-2-FAir Conditioning Unit FiltersIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:11 PM0d 13h 11m13.186/9/2022 1:11:39 PM
QuarterlyJun 9 2022 1:11PM by SJONES: PM complete.
EQFILTERS0210No7d 15h 10m8d 4h 21m100.000.300.3
2022-1907*2022-1907*PREVENTATIVE MAINTENANCE- FILTERS863-AC-I-FAir Conditioning Unit FiltersIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:04 PM0d 13h 4m13.076/9/2022 1:05:02 PMQuarterlyJun 9 2022 1:04PM by SJONES: PM complete.
EQFILTERS013No7d 15h 10m8d 4h 14m100.000.600.6
2022-1908*2022-1908*MONTHLY PM BOILERS318-BOILERBoiler Dual FuelIn ServicePM,system6/1/2022 12:49:04 PMPLUMBINGRPIECompletedClosed6/1/2022 8:49:04 AM6/6/2022 12:00 AM6/6/2022 12:00 AM0d 0h 0m0.006/13/2022 7:21:40 AM
MONTHLYJun 13 2022 7:21AM by SJONES: Boilers are off for replacement of boiler.
EQBOILER014No4d 15h 10m4d 15h 10m000.000.100.1
2022-1909*2022-1909*QUARTERLY CHILLER CHECKS850-ChillerAir Cooled ChillerIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/13/2022 12:00 AM6/13/2022 12:00 AM0d 0h 0m0.006/16/2022 3:07:41 PM
QuarterlyJun 16 2022 3:07PM by SJONES: PM complete.
EQCHILLER014No11d 15h 10m11d 15h 10m100.001.001
2022-1910*2022-1910*PREVENTATIVE MAINTENANCE- FILTERS344-AHU-1-FAir Handling Unit FiltersIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:09 PM0d 13h 9m13.156/9/2022 1:09:23 PMQuarterlyJun 9 2022 1:07PM by SJONES: PM complete.
EQFILTERS014No7d 15h 10m8d 4h 19m100.000.600.6
2022-1911*2022-1911*PREVENTATIVE MAINTENANCE- FILTERS344-AHU-2-FAir Handling Unit FiltersIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:09 PM0d 13h 9m13.156/9/2022 1:09:23 PMQuarterlyJun 9 2022 1:06PM by SJONES: PM complete.
EQFILTERS014No7d 15h 10m8d 4h 19m100.000.600.6
2022-1912*2022-1912*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-ACC-6-2MINI SPLIT FOR CGI SERVER ROOMIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 12:56PM by SJONES: PM complete.
EQDX-SPLIT0210No7d 15h 10m8d 4h 13m100.000.300.3
2022-1913*2022-1913*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-ACC5-2Back-up AC for EOC-Fan AND EvaporatorIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 12:54PM by SJONES: PM complete.
EQACCU0210No7d 15h 10m8d 4h 13m100.000.300.3
2022-1914*2022-1914*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-AHU-1-FAir FiltersIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 1:00PM by SJONES: PM complete.
EQFILTERS0210No7d 15h 10m8d 4h 13m100.000.600.6
2022-1915*2022-1915*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-AHU-2-FAir FiltersIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 12:59PM by SJONES: PM complete.
EQFILTERS0210No7d 15h 10m8d 4h 13m100.000.600.6
2022-1916*2022-1916*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-HP-1Package Heat PumpIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 12:58PM by SJONES: PM complete.
EQHEATPUMP0210No7d 15h 10m8d 4h 13m100.000.600.6
2022-1917*2022-1917*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-HP-2-1Split Heat Pump- Air HandlerIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 12:55PM by SJONES: PM complete.
EQHEATPUMP0210No7d 15h 10m8d 4h 13m100.000.300.3
2022-1918*2022-1918*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-HV-1-FHVU FiltersIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 12:57PM by SJONES: PM complete.
EQFILTERS0210No7d 15h 10m8d 4h 13m100.000.600.6
2022-1919*2022-1919*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-HV-2-FHVU FiltersIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 12:52PM by SJONES: PM complete.
EQFILTERS0210No7d 15h 10m8d 4h 13m100.000.600.6
2022-1920*2022-1920*PREVENTATIVE MAINTENANCE-CHANGE HVAC FILTERS318-ACC-4-2Mini-Split Heatpump for Telephone roomIn ServicePM,system6/1/2022 12:49:04 PMHVACRPIECompletedClosed6/1/2022 8:49:04 AM6/9/2022 12:00 AM6/9/2022 1:03 PM0d 13h 3m13.056/9/2022 1:03:40 PMQuarterlyJun 9 2022 12:51PM by SJONES: PM complete.
EQACCU0210No7d 15h 10m8d 4h 13m100.000.300.3
2022-1921*2022-1921*346--PAINT RISER ROOM DOORS346-DOORSDoors, Closers and HardwareIn ServiceROUTINEJONES, SONYASYELTON6/1/2022 2:47:31 PMDoors_HardwareRPIECompletedClosed6/1/2022 10:46:00 AM6/1/2022 12:00 AM6/1/2022 12:00 AM0d 0h 0m0.006/2/2022 6:47:28 AM
722Jun 2 2022 6:47AM by SJONES: Sanded and repainted doors, complete.
EQDOORS000No0d -10h -46m0d -10h -46m000.002.002
2022-1922*2022-1922*1659--REPAIR BLAST BOOTH DOOR1659-DOORSDoors, Closers and HardwareIn ServiceROUTINEJONES, SONYASYELTON6/1/2022 4:26:37 PMDoors_HardwareRPIECompletedClosed6/1/2022 12:25:00 PM6/1/2022 12:00 AM6/1/2022 12:00 AM0d 0h 0m0.006/2/2022 4:03:15 PM
723Jun 2 2022 4:03PM by SJONES: Removed frame from bldg, installed spacers and reinstalled, removed and relocated doorknob and latch.
EQDOORS000No0d -12h -25m0d -12h -25m000.004.004
2022-1923*2022-1923*1681--REPLACE CIRCULATING PUMP IN MECH ROOM1681-ELECTRIC-POWERElectric PowerIn ServiceROUTINEJONES, SONYASYELTON6/1/2022 7:59:52 PMELECTRICALRPIECompletedClosed6/1/2022 3:57:00 PM6/29/2022 12:00 AM6/29/2022 12:00 AM0d 0h 0m0.006/30/2022 7:40:04 AM
729Jun 30 2022 7:40AM by SJONES: Ordered new pump. removed faulty pump and installed new pump, pump working properly.
EQELEC-PWR000No27d 8h 3m27d 8h 3m000.005.005
2022-1924*2022-1924*318--request 4 keys for The office, Room 202. POC Kevin McField318In ServiceROUTINEKBR, KBRKBR-FacilitiesLead6/2/2022 2:57:00 PMRPIECompletedClosed6/2/2022 10:55:00 AM6/7/2022 12:00 AM6/7/2022 12:00 AM0d 0h 0m0.006/8/2022 12:01:32 PM755

4 keys for office should be label as follow.

0220115 0220116 0220117

0220118Jun 8 2022 12:01PM by SJONES: Picked up key for duplication, made four new keys and stamped per request, turned over to Abel.
LO000Yes4d 13h 5m4d 13h 5m000.001.001
2022-1925*2022-1925*317--Request Key box be moved from Room 114-A to room 120, old MIS office.317-ROOM-120In ServiceROUTINEKBR, KBRKBR-FacilitiesLead6/2/2022 2:59:06 PMRPIECompletedClosed6/2/2022 10:57:00 AM6/2/2022 12:00 AM6/2/2022 12:00 AM0d 0h 0m0.006/8/2022 9:34:16 AM
754Jun 8 2022 9:34AM by SJONES: Moved key box from room 114 to 120, complete.
LO000Yes0d -10h -57m0d -10h -57m000.001.001
2022-1926*2022-1926*458--Verify power of bandsaw in Allied trades. POC Donovan Grubbs458In ServiceROUTINEKBR, KBRKBR-FacilitiesLead6/6/2022 11:49:01 AMRPIECompletedClosed6/6/2022 7:48:00 AM6/22/2022 12:00 AM6/22/2022 12:00 AM0d 0h 0m0.006/27/2022 7:11:02 AM
756Jun 27 2022 7:11AM by SJONES: Located and labeled circuit at disconnect, verified power to the bandsaw was adequate.
LO000Yes15d 16h 12m15d 16h 12m000.001.001
2022-1927*2022-1927*317--Room 120 Security Office, Moldy smell coming from AC,317-ROOM-120In ServiceROUTINEKBR, KBRKBR-FacilitiesLead6/6/2022 4:59:52 PMRPIECompletedClosed6/6/2022 12:58:00 PM6/22/2022 12:00 AM6/22/2022 12:00 AM0d 0h 0m0.006/27/2022 7:16:55 AM

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .