Appendix E-SC6.21 DBB A 2022.docx
DOCX document 76 KB Posted
- Solicitation number
- IFB1 GJTA 2027000021 2
- Issued by
- Pueblo County, Colorado
About this file
This is a Design/Bid/Build (D/B/B) Contractor's Agreement form (State Form SC-6.21) issued by the State of Colorado Office of the State Architect State Buildings Program for the EM2624 Yaeger Structural Stabilization and Repairs project. The agreement establishes the contractual relationship between the State of Colorado and a contractor selected to perform construction work. The contractor must perform all work required for complete and prompt execution as described in the Contract Documents to the highest industry standards and satisfaction of the State and its Architect/Engineer. The contractor is required to achieve Substantial Completion within a specified number of calendar days from the Notice to Proceed, with Final Acceptance occurring within an additional specified period. Timely completion is designated as an essential condition, with liquidated damages potentially assessed for failure to meet deadlines.
The contract sum is to be determined and inserted by the parties, with payment subject to authorized additions and deductions as outlined in the General Conditions. The agreement incorporates multiple exhibits including the Contractor's Bid, Performance Bond, Labor and Material Payment Bond, Insurance Certificates, and Building Code Compliance Policy. Depending on project characteristics, the contract may include provisions for Federal Davis-Bacon Act wage requirements (if federally funded), State prevailing wage requirements (for projects $500,000 or more not federally funded), and apprenticeship utilization certifications (for projects $1 million or more not federally funded). The contract is not valid until approved and signed by the State Controller or designee, and the contractor bears no obligation to perform work prior to the Effective Date. Labor burden calculations are required on all construction projects, and applicable prevailing wage determinations and apprenticeship contribution rates must be included as exhibits when relevant.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S AGREEMENT
DESIGN/BID/BUILD (D/B/B)
(STATE FORM SC-6.21)
| STATE AGENCY: |
| Insert Department's or IHE's Full Legal Name |
| DEPARTMENT ID: |
| XXXX |
| CONTRACT ID #: |
| Insert CMS Number & Encumbrance Number |
| PROJECT #: |
| Insert OSC Project Number |
| PROJECT NAME: |
| Insert Project Name as provided by the State Controller's Office |
| VENDOR NAME: |
| Insert Contractor's full Legal Name including "Inc.", "LLC" etc. |
SC-6.21
Rev. 07/2022
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
TABLE OF CONTENTS… Page Table of Contents for the entire Agreement is located in THE GENERAL CONDITIONS OF THE CONTRACTOR’S DESIGN/BID/BUILD (D/B/B) AGREEMENT (SC-6.23)
| SIGNATURE PAGE | 1 | |
| RECITALS: | 2 | |
| 1 | ARTICLE 1 PERFORMANCE OF THE WORK | 2 |
| 2 | ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS | 2 |
| 3 | ARTICLE 3 TIME OF COMPLETION | 3 |
| 4 | ARTICLE 4 ESSENTIAL CONDITION | 3 |
| 5 | ARTICLE 5 CONTRACT SUM | 3 |
| 6 | ARTICLE 6 CONTRACT DOCUMENTS | 3 |
| 7 | ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS | 3 |
| 7.1 | MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation. | 4 |
| 7.2 | MODIFICATION 1 OF ARTICLE 27: Labor and Wages | 4 |
| 7.3 | MODIFICATION 2 OF ARTICLE 27: Labor and Wages | 4 |
| 7.4 | MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations | 4 |
| 7.5 | MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion | 4 |
| 7.6 | MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages | 4 |
| 8 | ARTICLE 8 NOTICE IDENTIFICATION | 5 |
| EXHIBIT A: | CONTRACTORS BID | A |
| EXHIBIT B: | PERFORMANCE BOND | B |
| EXHIBIT C: | LABOR AND MATERIAL PAYMENT BOND | C |
| EXHIBIT D: | INSURANCE CERTIFICATE(S) | D |
| EXHIBIT E: | BUILDING CODE COMPLIANCE POLICY | E |
| EXHIBIT F: | STATE SALES AND USE TAX FORM | F |
| EXHIBIT G: | APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP CONTRIBUTION RATES | G |
| EXHIBIT H: | APPRENTICESHIP UTILIZATION CERTIFICATIONS | H |
SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS
Rev. 07/2022 TOC
SIGNATURE PAGE Comment by State Buildings Program: The SC5.1 template has been waived from a Risk Assessment and legal review so long as the document is not edited beyond the fillable fields.
THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT
Each person signing this Agreement represents and warrants that the signer is duly authorized to execute this Agreement and to bind the Party authorizing such signature.
*Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor’s behalf and acknowledge that the State is relying on their representations to that effect. Principal is not a recognized title and will not be accepted.
| Project Number/Name: |
| Insert OSC Project Number followed by Project Name |
| Contract ID No.: |
| Insert CMS Number & Encumbrance Number |
CONTRACTOR
INSERT-Legal Name of Contractor
By: Name & Title of Person Signing for Contractor
Date: _________________________
STATE OF COLORADO
Jared S. Polis, Governor INSERT-Name of Agency or IHE INSERT-Name & Title of Head of Agency or IHE
By: Name & Title of Person Signing for Agency or IHE
Date: _________________________
DEPARTMENT OF PERSONNEL & ADMINISTRATION
STATE BUILDINGS PROGRAM State Architect (or authorized delegate)
By: Name & Title of SBP Delegate
Date: _________________________
In accordance with §24-30-202, C.R.S., this Contract is not valid until signed and dated below by the State Controller (or an authorized delegate) or the Title of IHE CFO per the Fiscal Rules of the individual Institution of Higher Education Comment by State Buildings Program: Note to Drafters: If this contract is for a University that is outside State Fiscal Rule, insert the name of your organization here
STATE CONTROLLER Comment by State Buildings Program: Note to Drafters: If this contract is for a university that is outside of State Fiscal Rule, insert the title of the individual who is allowed to financially obligate the university.
Robert Jaros, CPA, MBA, JD
By:___________________________________________ Name of Agency or IHE Delegate-Please delete if contract will be routed to OSC for approval
Effective Date:_____________________
Rev. 07/2022 1
SC-6.21
Rev. 07/2022 5
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD (D/B/B) AGREEMENT
(STATE FORM SC-6.21)
| Department ID: |
| Insert Dept. Code |
| Contract ID #: |
| Insert Contract ID |
| Project #: |
| Insert Project # |
1. PARTIES. THIS AGREEMENT is entered into by and between the STATE OF COLORADO, acting by and through the Insert Department's or IHE's Full Legal Name hereinafter referred to as the Principal Representative, and Insert Contractor's full Legal Name including "Inc.", "LLC" etc. having its offices at Street address, City, State and Zip Codehereinafter referred to as the Architect/Engineer.
2. EFFECTIVE DATE AND NOTICE OF NONLIABILITY. This Agreement shall not be effective or enforceable until it is approved and signed by the State Controller or its designee (hereinafter called the “Effective Date”), but shall be effective and enforceable thereafter in accordance with its provisions. The State shall not be bound by any provision of this Contract before the Effective Date, and shall have no obligation to pay Architect/Engineer for any Work performed or expense incurred before the Effective Date.
RECITALS:
WHEREAS, the Principal Representative intends to procure Insert Project Name as provided by the State Controller's Office hereinafter called the Project; and
WHEREAS, authority exists in the Law and Funds have been budgeted, appropriated, and otherwise made available, and a sufficient unencumbered balance thereof remains available for payment.
WITNESSETH, that the State of Colorado and the Contractor agree as follows:
1. ARTICLE 1 PERFORMANCE OF THE WORK
The Contractor shall perform all of the Work required for the complete and prompt execution of everything described or shown in, or reasonably implied from the Contract Documents for the above referenced Project.
ARTICLE 2 PROVISIONS OF THE CONTRACT DOCUMENTS
The Contractor agrees to perform the Work to the highest industry standards and to the satisfaction of the State of Colorado and its Architect/Engineer in strict accordance with the provisions of the Contract Documents.
ARTICLE 3 TIME OF COMPLETION
The Contractor agrees to Substantially Complete the Project within calendar days from the date of the Notice to Proceed, in addition, the Contractor agrees to finally complete the Project from Substantial Completion to Final Acceptance within calendar days for a total time of completion of the entire Project of calendar days. The Contractor shall perform the Work with due diligence to completion.
ARTICLE 4 ESSENTIAL CONDITION
Timely completion of the Project is an essential condition of this Agreement. The Contractor shall be subject to any liquidated damages described in Article 7.6 for failure to satisfactorily complete the Work within the time periods in Article 3 above.
ARTICLE 5 CONTRACT SUM
The Contractor shall be paid for the performance of this Agreement, subject to any additions and deductions as provided for in Articles 32, 34 and 35 of The General Conditions of the Construction Contract SC-6.23, the sum of INSERT DOLLAR VALUE WRITTEN IN WORDS DOLLARS AND NO/100
ARTICLE 6 CONTRACT DOCUMENTS
The Contract Documents, as enumerated in Article 1.1 of The General Conditions of the Contractor’s Design/Bid/Build (D/B/B) Agreement SC-6.23, are all essential parts of this Agreement and are fully incorporated herein.
ARTICLE 7 OPTIONAL PROVISIONS AND ELECTIONS
The provisions of this Article 7 alter the Articles (The General Conditions of the Contractor’s Design/Bid/Build Agreement SC-6.23) or enlarge upon them as indicated:
The Principal Representative and or the State Buildings Program shall mark boxes and initial where applicable.
| MODIFICATION OF ARTICLE 2: Execution, Correlation, Intent of Documents, Communication and Cooperation. | Comment by : Note to Drafter: Apprenticeship utilization is required if Construction value is $1 million or more and not federally funded |
| If the box below is marked, certification of apprenticeship utilization is required for all mechanical, sheet metal, fire suppression, sprinkler fitting, electrical and plumbing work on the project. | Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” |
☐ ______ Principal Representative initial
| MODIFICATION 1 OF ARTICLE 27: Labor and Wages | Comment by : Note to Drafter: Federal Davis-Bacon Act might be applicable if federally funded. Confirm with the funding documentation. |
| If the box is marked, the Federal Davis-Bacon Act shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents. | Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” |
☐ ______ Principal Representative initial
| MODIFICATION 2 OF ARTICLE 27: Labor and Wages | Comment by : Note to drafter: State prevailing wage is required if the construction value is $500,000 or more and not federally funded. |
| If the box is marked, the State prevailing wage statute shall be applicable to the Project. The minimum wage rates to be paid on the Project shall be furnished by the Principal Representative and included in the Contract Documents. | Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” |
☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 39: Non-Binding Dispute Resolution – Facilitated Negotiations If the box is marked, and initialed by the State as noted, the requirement to participate in facilitated negotiations shall be deleted from this Contract. Article 39, Non-Binding Dispute Resolution – Facilitated Negotiations, shall be deleted in its entirety and all references to the right to the same where ever they appear in the contract shall be similarly deleted.
The box may be marked only for projects with an estimated value of less than $500,000. Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” ☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 45: Guarantee Inspections After Completion If the box below is marked the six month guarantee inspection is not required. Comment by : Note to Drafter: Double-click on the box to bring up Check Box Form Field window and select “Checked” ☐ ______ Principal Representative initial MODIFICATION OF ARTICLE 46: Time of Completion and Liquidated Damages If an amount is indicated immediately below, liquidated damages shall be applicable to this Project as, and to, the extent shown below. Where an amount is indicated below, liquidated damages shall be assessed in accordance with and pursuant to the terms of The General Conditions of the Design/Bid/Build Agreement Article 46, Time of Completion And Liquidated Damages, in the amounts and as here indicated. The election of liquidated damages shall limit and control the parties right to damages as the State’s sole and exclusive remedy for delay.
Inability To Use The Project For the inability to use the Project, for each day after the number of calendar days specified in the Contractor’s bid for the Project and the Agreement for achievement of Substantial Completion, until the day that the Project has achieved Substantial Completion and the Notice of Substantial Completion is issued, the Contractor agrees that an amount equal Insert dollar value written in words Dollars ($ ).).) shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due, but amounts remaining are insufficient to cover the entire assessment. Comment by State Buildings Program: Note to drafter: If liquidated damages are not applicable Note “Not Applicable” in this field.
Damages Related to Extended Closeout For damages related to or arising from additional administrative, technical, supervisory and professional expenses related to and arising from the extended closeout period, for each day in excess of the number of calendar days specified in the Contractor’s bid for the Project and the Agreement to finally complete the Project as defined by the issuance of the Notice of Final Acceptance (after the issuance of the final Notice of Substantial Completion), the Contractor agrees that an amount equal to Insert dollar value written in words Dollars ($ ). shall be assessed against Contractor from amounts due and payable to the Contractor under the Contract, or the Contractor and the Contractor’s Surety shall pay to the Principal Representative such sum for any deficiency, if amounts on account thereof are deducted from remaining amounts due but amounts remaining are insufficient to cover the entire assessment. Comment by : Note to drafter: If liquidated damages are not applicable Note “Not Applicable” in this field.
ARTICLE 8 NOTICE IDENTIFICATION
All Notices pertaining to General Conditions or otherwise required to be given shall be transmitted in writing, to the individuals at the addresses listed below, and shall be deemed duly given when received by the parties at their addresses below or any subsequent persons or addresses provided to the other party in writing.
NOTICE TO PRINCIPAL REPRESENTATIVE:
Insert Name of Individual acting on the PR behalf Insert Street Address City, State Zip Code Insert email address
With copies to State Buildings Program (or Delegate)
Insert Name of Individual acting on OSA/SBP behalf Insert Street Address City, State Zip Code Insert email address
NOTICE TO CONTRACTOR:
Insert Name of Individual acting on the contractor behalf Insert Street Address City, State Zip Code Insert email address
With copies to:
File
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT A: CONTRACTORS BID
CONTRACTOR’S BID (Form SBP-6.13) Comment by : Note to Drafter: Delete Alternates and Unit Pricing if not applicable Bid Alternates (Form SBP-6.131) Unit Pricing (Form SBP-6.133) Bid Bond (Form SBP-6.14) Comment by : Note to drafter: Labor burden is required on ALL construction projects Labor Burden Calculation (Form SBP-6.18)
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT B: PERFORMANCE BOND
PERFORMANCE BOND (Form SC-6.22)
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT C: LABOR AND MATERIAL PAYMENT BOND
LABOR AND MATERIAL PAYMENT BOND (Form SC-6.221)
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT D: INSURANCE CERTIFICATE(S)
INSURANCE CERTIFICATE(S) (attached)
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
EXHIBIT E: BUILDING CODE COMPLIANCE POLICY
BUILDING CODE COMPLIANCE POLICY: COORDINATION OF APPROVED BUILDING CODES, PLAN REVIEWS AND BUILDING INSPECTIONS (as applicable)
Refer to the Office of the State Architect State Buildings Building Codes Webpage Code Compliance Policy dated and Exhibit A of the Code Compliance Policy dated including the Amendment to Chapter 1 of the International Building Code
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
| EXHIBIT F: | STATE SALES AND USE TAX FORM |
| Comment by : Note to Drafter: The CDOR form should have the bottom half completed by the agency so the contractor may expedite their exemption certificate. |
STATE SALES AND USE TAX FORM
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
| Comment by : Note to Drafter: Delete this page if not applicable | |
| EXHIBIT G: | APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP CONTRIBUTION RATES |
APPLICABLE PREVAILING WAGE DETERMINATIONS AND APPRENTICESHIP CONTRIBUTION RATES
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
| Comment by : Note to drafter: Delete this page if not applicable | |
| EXHIBIT H: | APPRENTICESHIP UTILIZATION CERTIFICATIONS |
APPRENTICESHIP UTILIZATION CERTIFICATIONS
Rev. 07/2022
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAM
CONTRACTOR'S DESIGN/BID/BUILD AGREEMENT
(STATE FORM SC-6.21)
Comment by : Note to drafter: Delete this page if not applicable
SUPPLEMENTARY GENERAL CONDITIONS: FEDERAL PROVISIONS
Supplementary General Conditions Federal Provisions
SLFRF Federal Funds: Contractor Terms and Conditions Certification
SLFRF Federal Funds: Contractor Terms and Conditions
SC-6.21
Rev. 07/2022 image2.emf
Microsoft_Excel_Worksheet.xlsx Sheet1
Description of Work/Date Dollar Amount
Base Contract Amount
Alt. #01
Alt. #02 etc.
etc.
Total Contract Sum $ - 0 image1.jpeg